CESSNA P-210 Pressurized Centurion II manuals
Pilot's operating handbook, checklist, flight manual and related references for the CESSNA P-210 Pressurized Centurion II.
Cessna CESSNA P-210 Pressurized Centurion II manuals & documents
6 documents on Sprinkle — POH, checklist, flight manual and related references. PDFs served from cdn.sprinkle.com.
This Service Bulletin, dated April 17, 1992, addresses the mandatory replacement of certain hydraulic landing gear hoses in specific Cessna aircraft models, including the P-210. The bulletin outlines the affected models, compliance timelines, and detailed instructions for replacing hoses that may be kinked or damaged, which could prevent proper landing gear operation. It emphasizes the importance of adhering to the specified procedures to ensure safety and compliance with FAA regulations. The document is intended for aircraft owners and maintenance personnel responsible for the upkeep of the affected aircraft models.
- Affected models include Cessna 210 and P210 with specific serial numbers.
- Mandatory compliance within 50 hours of operation or at the next annual inspection.
- Replace hoses with part number S2178-4 series if they are kinked or improperly installed.
- Replacement hoses are part number S2888-4 series, with prices ranging from $81.80 to $99.60.
- A prorated credit for replacement hoses is available for those purchased after April 17, 1987.
Performance Data
Pilot's Operating Handbook
Documents are sourced from publicly available references. Sprinkle does not host OEM-restricted materials; if you are a rights-holder and want a document removed, email privacy@sprinkle.com.