NCAMP Process Specification

Cessna Citation XLS+ · Specifications

Free account — keep the POHs & checklists you reference in one place.

Overview

This document is a process specification for the fabrication of test panels using NMS 128 material, specifically for Hexcel 8552 and 8552S prepregs. It outlines the methods for prepreg cutting, layup, vacuum bagging, and curing processes in an autoclave. The specification is intended for use in material qualification, equivalency, and acceptance testing, and serves as a baseline for users to develop their own process specifications for aerospace composite parts. It includes health and safety considerations, applicable documents, materials required, and detailed procedures for test laminate fabrication. This document is relevant for engineers and technicians involved in the fabrication of composite structures for the Cessna Citation XLS+ and other aerospace applications.

  • The document outlines the fabrication process for test panels using NMS 128 material for Hexcel prepregs.
  • Key materials include vacuum bags, breather materials, and release films, all with specified temperature tolerances.
  • The baseline cure cycle requires heating to 355±10°F and holding for 120 minutes, with specific pressure requirements.
  • Quality assurance includes in-process monitoring of temperatures and pressures, with ultrasonic inspection performed by NCAMP.
  • Shipping guidelines require completion of monitoring data and FAA conformity records.

Document

Source

Originally published by www.wichita.edu. Sprinkle hosts a reference copy with an added summary, specifications and searchable full text.

Report a problem or request removal

Document details

Type
Specifications
Year
2022
Pages
14
File size
487 KB
Publisher
www.wichita.edu
How rare is it?
120Cessna Citation XLS+ registered worldwide · 0 active

Common. Rarer than 1% of the aircraft models we track.

Documentation completeness
3/7

Most owners only have the POH. Here's the essential set for the Cessna Citation XLS+.

More Cessna Citation XLS+manuals & documents

Similar aircraft

If you fly the Cessna Citation XLS+, you may also be researching these.

In this document

Scope

The scope of this specification includes the methods for fabricating test panels using NMS 128 material. It covers the processes of prepreg cutting, layup, vacuum bagging, and curing in an autoclave. It does not provide all necessary information for composite structure fabrication, such as personnel qualifications.

Materials

This section lists the materials required for the fabrication process, including vacuum bags, breather materials, release films, and sealant tapes. Each material is specified with its minimum use temperature and potential sources for procurement.

Test Laminate Fabrication

This section details the procedures for cutting and laying up prepreg materials, including the importance of maintaining fiber orientation and the creation of reference edges. It also describes the bagging techniques and the use of thermocouples for temperature monitoring during the curing process.

Cure Cycles

The specification outlines baseline and alternative cure cycles for the test panels, detailing the temperature and pressure requirements at each stage of the curing process. It emphasizes the importance of monitoring vacuum integrity and temperature during curing.

Quality Assurance

This section describes the quality assurance measures to be taken during the fabrication process, including in-process monitoring and inspection requirements. It specifies that ultrasonic non-destructive inspection is to be performed by NCAMP.

Shipping

Guidelines for shipping the fabricated panels are provided, including the need for completion of monitoring data and FAA conformity records. The shipping address and contact information for NCAMP are also included.

Safety notes

  • Users must ensure familiarity with hazardous materials involved in the processes described.
  • Proper safety measures must be taken when handling materials and during the fabrication process.

Full document text

NPS 81228 Rev C Date: March 16, 2022 National Center for Advanced Materials Performance Wichita State University – NIAR 1845 Fairmount Ave., Wichita, KS 67260-0093, USA Page 1 of 14 Document No.: NPS 81228, Revision C, March 16th, 2022 NCAMP Process Specification This specification is generated and maintained in accordance with NCAMP Standard Operating Procedures, NSP 100 Fabrication of NMS 128 Qualification, Equivalency, and Acceptance Test Panels (for Hexcel 8552 and 8552S prepregs) Prepared by: Yeow Ng, John Tomblin Edited by: Michelle Man Reviewed by: David Boll (Hexcel), Rick Cole (Bristol Aerospace Limited), Allison Crockett (NIAR), Susan Daggett (ATK), Jim Diepenbrock, Steve Ellery (Hexcel), Ed Hooper, Larry Ilcewicz (FAA), Erkan Kececi (Cessna), David Ostrodka (FAA), Anoush Poursartip (University of British Columbia), Engin Sabuncu (Cessna) This specification is intended for general distribution to the public, either freely or at a price that does not exceed the cost of reproduction (e.g. printing) and distribution (e.g. postage). March 16, 2022 NPS 81228 Rev C Page 2 of 14 REVISIONS Revision Date Description - 2/5/2007 Initial Release A 6/7/2007 Added clarification to section 1. Added the following to section 4.2: “During the layup process, each ply must be laid up within +/- 1 degree of the reference edge.” Added the following to section 4.5: “The reference edge created in section 4.2 should be clearly marked on each panel.” Sections 4.3 procedure (h), added “Remove from autoclave when autoclave temperature is less than 120°F” B 4/14/2011 Changes were made to the cover sheet only: removed “for test only” note from the cover sheet and reformatted the cover sheet. No change was made to the content of this document. C 3/06/2022 -Temperature tolerance in section 4.4.1 and 4.4.2 corrected to ±10°F (from ±5°F) -Revision block moved up from last section in document -Header on cover page updated to current NIAR header, and general editorial changes. March 16, 2022 NPS 81228 Rev C Page 3 of 14 Table of Contents 1. SCOPE ..................................................................................................................................4 1.1 Purpose .................................................................................................................................4 1.2 Health and Safety ..................................................................................................................4 2. APPLICABLE DOCUMENTS.................................................................................................4 2.1 NCAMP Publications .............................................................................................................4 2.2 ISO Publications: ...................................................................................................................5 2.3 US Government Publications:................................................................................................5 2.4 SAE Publications ...................................................................................................................5 3. MATERIALS: .........................................................................................................................5 3.1 Vacuum bag ..........................................................................................................................5 3.2 Breather .................................................................................................................................5 3.3 Breather string (optional) .......................................................................................................6 3.4 Non-porous FEP, separator/release film ...............................................................................6 3.5 Silicone rubber dam ...............................................................................................................6 3.6 Caul plates.............................................................................................................................6 3.7 Tape ......................................................................................................................................6 3.8 Sealant tape ..........................................................................................................................6 3.9 Mold .......................................................................................................................................6 3.10 Release Agents .....................................................................................................................6 3.11 Release Fabric ......................................................................................................................7 4. TEST LAMINATE FABRICATION .........................................................................................7 4.1 Prepreg cutting ......................................................................................................................7 4.2 Prepreg layup and bagging ...................................................................................................7 4.3 Baseline/Medium Cure Cycle (M) ..........................................................................................9 4.4 Alternative Cure Cycles .......................................................................................................11 4.4.1 Alternate 1 Cure cycle (unverified) (AH) ........................................................................11 4.4.2 Alternate 2 Cure cycle (unverified) (AL) .........................................................................12 4.5 Cured Panels .......................................................................................................................13 5. QUALITY ASSURANCE ......................................................................................................13

Show full text

5.1 Process Control ...................................................................................................................13 5.2 Ultrasonic Non-Destructive Inspection .................................................................................13 5.3 Visual Inspection .................................................................................................................14 6. SHIPPING ...........................................................................................................................14 March 16, 2022 NPS 81228 Rev C Page 4 of 14 1. SCOPE This process specification describes the methods of fabricating test panels using NMS 128 material. Specifically, this specification covers prepreg cutting, layup, vacuum bagging, and curing process by an autoclave. This specification does not contain all the necessary information typically required in a composite process specification for the fabrication of composite structures, such as personnel qualification and layup room requirements. Users should refer to their existing company process specification for such information. DOT/FAA/AR-02/110 provides guidance for the development of composite process specifications. 1.1 Purpose The purpose of this process specification is to provide processing information for the fabrication of test panels for use in material qualification, equivalency, and acceptance testing. This process specification may also be used as a baseline by material users to develop a process specification for the fabrication of aerospace composite parts. 1.2 Health and Safety While the materials, methods, applications, and processes described or referenced in this specification may involve the use of hazardous materials, this specification does not address the hazards which may be involved in such use. It is the sole responsibility of the user to ensure familiarity with the safe and proper use of any hazardous materials and to take necessary precautionary measures to ensure the health and safety of all personnel involved. 2. APPLICABLE DOCUMENTS The following publications form a part of this specification to the extent specified herein. The latest issue of the NCAMP and SAE publications shall apply. The applicable issue of other publications shall be the issue in effect on the date of the purchase order unless otherwise specified. When a referenced document has been canceled and no superseding document has been specified, the last published issue of that document shall apply. 2.1 NCAMP Publications NMS 128 350ºF Autoclave Cure, Low Flow Toughened Epoxy Prepregs NTP 1628Q1 Material Property Data Acquisition and Qualification Test Plan For Hexcel 8552 AS4 Plain Weave Fabric Prepreg at 193 gsm 38% RC March 16, 2022 NPS 81228 Rev C Page 5 of 14 NTP 1628EX [Panel Fabricator Name] Process Equivalency Test Plan For Hexcel 8552 AS4 Plain Weave Fabric Prepreg at 193 gsm 38% RC NTP 1828Q1 Material Property Data Acquisition and Qualification Test Plan For Hexcel 8552 IM7 Unidirectional Prepreg at 190 gsm & 35% RC NTP 1828EX [Fabricator Name] Process Equivalence Test Plan For Hexcel 8552 IM7 Unidirectional Prepreg at 190 gsm & 35% RC NTP 1128Q1 Material Property Data Acquisition and Qualification Test Plan For Hexcel 8552 AS4 Unidirectional Prepreg at 190 gsm & 35% RC NTP 1128EX [Fabricator Name] Process Equivalence Test Plan For Hexcel 8552 AS4 Unidirectional Prepreg at 190 gsm & 35% RC 2.2 ISO Publications: ISO 9000 Quality Management Systems 2.3 US Government Publications: DOT/FAA/AR-02/110 Guidelines for the Development of Process Specifications, Instructions, and Controls for the Fabrication of Fiber- Reinforced Polymer Composites 2.4 SAE Publications (available from SAE, 400 Commonwealth Drive, Warrendale, PA 15096, http://www.sae.org): AS9100 Quality Systems – Aerospace – Model for Quality Assurance in Design, Development, Production, Installation and Servicing 3. MATERIALS: 3.1 Vacuum bag, nylon film, 3 mils maximum, 375ºF minimum use temperature Sources: - Airtech International, Inc., 5700 Skylab Road, Huntington Beach, CA 92647 - Richmond Aircraft Products, Inc., 13503 Pumice St., Norwalk, CA 90650 - De-Comp Composites, Inc., RR 4 Box 4460, Cleveland, OK 74020 - Or equivalent 3.2 Breather, polyester mat (non-woven), 4 to 10 oz/sq.yd., 375ºF minimum use temperature Sources: - Airtech International, Inc., 5700 Skylab Road, Huntington Beach, CA 92647 March 16, 2022 NPS 81228 Rev C Page 6 of 14 - Richmond Aircraft Products, Inc., 13503 Pumice St., Norwalk, CA 90650 - De-Comp Composites, Inc., RR 4 Box 4460, Cleveland, OK 74020 - Or equivalent 3.3 Breather string (optional), glass or Kevlar roving strings/threads. For example, glass threads extracted from 7781 or 1581 style glass fabric in the fill direction. Open source. 3.4 Non-porous FEP, separator/release film, 1 to 2 mils, 375ºF minimum use temperature Sources: - Airtech International, Inc., 5700 Skylab Road, Huntington Beach, CA 92647 - Richmond Aircraft Products, Inc., 13503 Pumice St., Norwalk, CA 90650 - De-Comp Composites, Inc., RR 4 Box 4460, Cleveland, OK 74020 - Or equivalent 3.5 Silicone rubber dam, 375ºF minimum use temperature Sources: - Airtech International, Inc., 5700 Skylab Road, Huntington Beach, CA 92647 - Richmond Aircraft Products, Inc., 13503 Pumice St., Norwalk, CA 90650 - De-Comp Composites, Inc., RR 4 Box 4460, Cleveland, OK 74020 - Or equivalent 3.6 Caul plates, 0.125 to 0.375 inch thick, aluminum, flat and smooth, or equivalent 3.7 Tape, pressure sensitive, 375ºF minimum use temperature Sources: - Airtech International, Inc., 5700 Skylab Road, Huntington Beach, CA 92647 - Richmond Aircraft Products, Inc., 13503 Pumice St., Norwalk, CA 90650 - De-Comp Composites, Inc., RR 4 Box 4460, Cleveland, OK 74020 - Or equivalent 3.8 Sealant tape, compatible with nylon vacuum bag, 375ºF minimum use temperature Sources: - Airtech International, Inc., 5700 Skylab Road, Huntington Beach, CA 92647 - Richmond Aircraft Products, Inc., 13503 Pumice St., Norwalk, CA 90650 - De-Comp Composites, Inc., RR 4 Box 4460, Cleveland, OK 74020 - Or equivalent 3.9 Mold (bottom tool), 0.250 to 0.500 inch thick, aluminum, flat and smooth, or equivalent 3.10 Release Agents - Frekote 44-NC, Loctite Corporation, 1001 Trout Brook Crossing, Rocky Hill, CT 06067-3910 - ZYVAX WaterSheild, P.O. Box 825, Boca Raton, FL 33429 - Or equivalent March 16, 2022 NPS 81228 Rev C Page 7 of 14 3.11 Release Fabric (release coated peel-ply), to be used on 0-degree unidirectional tension panels (LT) only - Bleeder Lease A, Airtech International, Inc., 5700 Skylab Road, Huntington Beach, CA 92647 - Release Ease 234 TFP, Airtech International, Inc., 5700 Skylab Road, Huntington Beach, CA 92647 - Or equivalent 4. TEST LAMINATE FABRICATION 4.1 Prepreg cutting Wear non-contaminating gloves such as disposable powder-free nitrile gloves when handling the prepreg. The prepreg may be cut using conventional method (i.e. on a polyurethane table top with utility knife) or automated method. The method of cutting must not contaminate the prepreg. Fiber orientation (e.g. warp versus fill directions) must be maintained during the cutting process. 4.2 Prepreg layup and bagging Wear non-contaminating gloves such as disposable powder-free nitrile gloves when handling the prepreg. The panel layups (stacking sequences) for qualification and equivalency purposes should be in accordance with appropriate test plans. For material acceptance purpose, the panel layups should be in accordance with NMS 128. In the case of materials which are not mid-plane symmetric, such as satin weave fabrics, plies must be orientated such as to give a mid-plane symmetric laminate as best as possible, as shown in Figure 1. March 16, 2022 NPS 81228 Rev C Page 8 of 14 Figure 1 Example Satin Weave Showing Warp and Fill Faces Used for Ply Collation In order to maintain the fiber orientation, a reference edge should be created on each panel. During the layup process, each ply must be laid up within +/- 1 degree of the reference edge. The edge dams around the layup/prepreg will form a straight edge on the cured panel (see Figure 2). In the layup of unidirectional prepreg, plies may be butt spliced in the 90º direction; ply splicing is not allowed in the 0º direction. Ply splicing is not allowed in the layup of woven fabric prepreg in any direction. In material qualification and equivalency programs, for panel identification purpose, place a label within ½-inch from the prepreg edge with the following information: “0º direction →, Test Plan Document Number -Prepregger ID - Material Code - Fabricator ID - Test Type - Batch ID - Cure Cycle ID -Test Panel ID.” Make sure that the “0º direction →” actually points in the 0º direction or warp direction. Appendix 2 of the test plan contains the panel identification information. Use a laser printer to print the labels on standard printer paper. Figure 2 shows the bagging arrangement which will be used for the manufacture of mechanical test panels. Thermocouple wires should be used to monitor and record the temperature of representative test panels. One method is to place the thermocouple March 16, 2022 NPS 81228 Rev C Page 9 of 14 junctions at the laminate mid-plane and near the edge of the laminate where they will be trimmed off after the panels have been cured. An alternative method is to place the thermocouple junctions in between the part and the caul plate (on the part but about 0.5 inch away from the edge). The latter method allows the thermocouples wires to be reused if the thermocouple junctions are wrapped with Teflon or flash-breaker tape so that they can be removed from the part after cure. Thermocouples may be placed outside the bag only if it has been previously demonstrated that there is negligible temperature difference between the inside and outside of the bag. Release agents may be used on tool surface instead of non-porous FEP. Metal edge dams may be used instead of silicone dams. Vacuum Vacuum Bag Caul plate Tape seal Non-porous FEP Breather string (see Note 2) Release Fabric (see Note 1) Silicone dam Sealant Tape Release Fabric (see Note 1) Bottom Tool Note 1: Release fabric is to be used on 0-degree unidirectional tension (longitudinal tension, LT) panels only. Strings Dam Recommended Bagging Sequence (General) Part Note 2: The breather string must be in the edge of the part, not layed on the top of the panel and must extend out past the seal to touch the breather pad material as shown below Non-porous FEP Breather Figure 2 Bagging Technique 4.3 Baseline/Medium Cure Cycle (M) The baseline/medium cure cycle shall be in accordance with the following process and Figure 3. For the purpose of specimen naming, this cure cycle is designated as “M.” The March 16, 2022 NPS 81228 Rev C Page 10 of 14 material qualification panels are processed in accordance with the baseline cure cycle. Check vacuum bag integrity prior to starting cure cycle; leak rate shall not exceed 5 in.Hg in 5 minutes. All temperatures are part temperatures. Steps a through f are based on leading thermocouple, except step e is based on lagging thermocouple. a. Pull vacuum (min 22 in Hg) b. Heat at 1 to 8°F/min (4.5 °F/min nominal) to 355±10ºF and ramp autoclave pressure to 85-100 psig. c. Before temperature reaches 140°F and when autoclave pressure is 20±10 psig, vent vacuum bag to atmosphere d. From 325°F to 355±10ºF a minimum heat-up rate of 0.3 °F/min is acceptable. e. Hold 355±10ºF for 120+60/-0 min f. Cool down rates from cure temperature to 150°F shall be no more than 10ºF/minute. g. Release autoclave pressure when lagging thermocouple is below 150°F or minimum 1 hour into cool down, whichever occurs sooner. h. Remove from autoclave when autoclave temperature is less than 120°F Cure Cycle 75 125 175 225 275 325 375 0 50 100 150 200 250 300 Time Temp 0 10 20 30 40 50 60 70 80 90 100 psi or in Hg Temp Pressure Vacuum Figure 3 Baseline/Model Cure Cycle for Test Panel Fabrication March 16, 2022 NPS 81228 Rev C Page 11 of 14 4.4 Alternative Cure Cycles Based on limited historical data, a resin cure kinetics model, and a viscosity model, the lamina and laminate material properties are believed to be robust to some minor changes in the cure cycle, although deviations from the nominal qualification cure cycle may increase the risk of equivalency failure. The cure process as shown in Figure 4 and 5 have been used for this material system although full equivalency demonstration to the baseline cure cycle has never been attempted. The cure cycle tolerance (i.e. upper and lower cure cycle envelope) has also not been thoroughly investigated. Since not all properties are investigated in a typical equivalency program, users should not assume that successful equivalency demonstration also means that all other properties are equivalent; a more extensive test matrix that includes more test methods and test conditions may be necessary to thoroughly evaluate the true equivalency of the alternate cure cycle(s). Based on the popularity of the alternate cure cycle(s), NCAMP may perform more extensive testing to investigate the equivalency of the alternate cure cycle(s). Users who wish to use the alternate or any other cure cycles may contact NCAMP to have the cure cycles evaluated against the cure kinetics model and the viscosity model. This evaluation will provide a reasonable level of confidence about the similarities of the two cure cycles and may improve the chance of successful equivalency demonstration. 4.4.1 Alternate 1 Cure cycle (unverified) (AH) The cure process should be in accordance with the following process and Figure 4. For the purpose of specimen naming, this alternate high pressure cure cycle is designated as “AH.” Check vacuum bag integrity prior to starting cure cycle; leak rate shall not exceed 5 in.Hg in 5 minutes. All temperatures (except step h) are part temperatures. Steps a through e are based on leading thermocouple, step f based on lagging thermocouple. a. Pull vacuum (min 22 in Hg) and apply 15±5 psig autoclave pressure b. Heat at 1 to 5°F/min to 225°±10ºF c. Hold 225°±10ºF for 60±10 min d. At the end of the 225°±10ºF hold, bring autoclave to 100±10 psig - vent vacuum when pressure is 30 ± 5 psig e. Heat at 1 to 5°F/min to 350°±10ºF f. Hold 350°±10ºF for 120+20/-0 min g. Cool at 5 to 7°F/min to 150°F and vent pressure when temperature reaches 150°F h. Remove from autoclave when autoclave temperature is less than 120°F March 16, 2022 NPS 81228 Rev C Page 12 of 14 Cure Cycle 75 125 175 225 275 325 375 0 50 100 150 200 250 300 350 Time Temp 0 20 40 60 80 100 120 psi or in Hg Temp Pressure Vacuum Figure 4 Alternate 1 Cure Cycle for Test Panel Fabrication 4.4.2 Alternate 2 Cure cycle (unverified) (AL) The cure process should be in accordance with the following process and Figure 5. For the purpose of specimen naming, this alternate low pressure cure cycle is designated as “AL.” Check vacuum bag integrity prior to starting cure cycle; leak rate shall not exceed 5 in.Hg in 5 minutes. All temperatures (except step h) are part temperatures. Steps a through e are based on leading thermocouple, step f based on lagging thermocouple. a. Pull vacuum (min 22 in Hg) and apply 15 ± 5 psig autoclave pressure b. Heat at 1 to 5°F/min to 225°±10ºF c. Hold 225°±10ºF for 60±10 min d. At the end of the 225°±10ºF hold, bring autoclave to 45±10 psig - vent vacuum when pressure is 25 ± 5 psig e. Heat at 1 to 5°F/min to 350°±10ºF f. Hold 350°±10ºF for 120+20/-0 min g. Cool at 5 to 7°F/min to 150°F and vent pressure when temperature reaches 150°F h. Remove from autoclave when autoclave temperature is less than 120°F March 16, 2022 NPS 81228 Rev C Page 13 of 14 Cure Cycle 75 125 175 225 275 325 375 0 50 100 150 200 250 300 350 Time Temp 0 5 10 15 20 25 30 35 40 45 50 psi or in Hg Temp Pressure Vacuum Figure 5 Alternate 2 Cure Cycle for Test Panel Fabrication 4.5 Cured Panels The reference edge created in section 4.2 should be clearly marked on each panel. This reference edge will be used as datum for subsequent machining process. Sharp edges should be removed from cured panels so that they can be handled and packaged safely. No more than 0.5-inch shall be removed inside of the original edge of the prepreg. 5. QUALITY ASSURANCE 5.1 Process Control In-process monitoring data such as part temperature, autoclave temperature, autoclave pressure, autoclave vacuum, and part vacuum readings through the cycle, if available, must be provided to NCAMP together with the fabricated panels. Process control testing is not required. 5.2 Ultrasonic Non-Destructive Inspection Panel fabricator need not perform ultrasonic non-destructive inspection. The panels will be ultrasonically inspected by NCAMP. March 16, 2022 NPS 81228 Rev C Page 14 of 14 5.3 Visual Inspection Verify that each panel has a panel identification label. Verify that there is no obvious defect such as warpage and dry spots. 6. SHIPPING (FOR NCAMP SPONSORED QUALIFICATION AND EQUIVALENCY PROGRAMS ONLY) Prior to shipping the panels, verify the following: - The appropriate sections in the “Panel Data” sheet of PMC_Data_Collection_Template.xls file has been completed. - In-process monitoring data such as part temperature, autoclave temperature, autoclave pressure, autoclave vacuum, and part vacuum readings, preferably in electronic format, is included - FAA conformity record (if needed), is included. - The panel names match the names listed in Appendix 2 of the test plan Send the panels along with the in-process monitoring data and FAA conformity records to: Wichita State University NIAR NCAMP, Attn: Royal Lovingfoss 1845 Fairmount Ave. Wichita, KS 67260-0093 USA Tel: 316-978-5317