MANDATORY service bulletin
CESSNA T-210 · Service Bulletins
Overview
This service bulletin, issued by Teledyne Continental Motors on December 21, 1987, addresses critical maintenance procedures for the TSIO520CE engine used in Cessna P210 and T210 aircraft. The bulletin mandates the replacement of piston pins and a torque check of the crankcase thru bolts due to a confirmed engine failure caused by a broken piston pin. Compliance is required within the next 25 hours of operation. The document outlines detailed inspection and maintenance procedures to ensure engine safety and reliability, emphasizing the importance of following the specified torque values and inspection steps. It serves as a crucial reference for maintenance personnel and aircraft operators to maintain airworthiness and comply with FAA directives.
- Compliance required within 25 hours of operation.
- Normal propeller rotation effort is 10 to 20 pounds.
- Thru bolt nuts must be torqued to 700 inch pounds final torque.
- Piston pins must be replaced if inspection indicates issues.
- Warranty claims must document compliance with recorded propeller rotation effort.
Document
Source
Originally published by continental.aero. Sprinkle hosts a reference copy with an added summary, specifications and searchable full text.
Document details
- Type
- Service Bulletins
- Year
- 1987
- Pages
- 6
- File size
- 330 KB
- Publisher
- continental.aero
Most owners only have the POH. Here's the essential set for the CESSNA T-210.
- Pilot's Operating Handbook / AFM
- Checklist
- Maintenance Manual
- Parts Catalog (IPC)
- Systems & Wiring
- Service Bulletins
- Type Certificate (TCDS)
More CESSNA T-210manuals & documents
- WINGS - MODEL 210 CARRY-THRU SPAR ONE-TIME CORROSION INSPECTIONService Manual
- WINGS - MODEL 210 CARRY-THRU SPAR ONE-TIME CORROSION INSPECTIONMaintenance Manual
- T210 Aircraft CheckoutPilot's Operating Handbook
- Runway excursion involving Cessna T210, VH-DQIOther Documents
- Cessna T206/T207/T210 Modified STCSystems Description
- AIRWORTHINESS DIRECTIVEAirworthiness Directives
- SCHEDULE OF AIRWORTHINESS DIRECTIVESAirworthiness Directives
- Slick Service Bulletin No. SB 1-84Service Bulletins
- SCHEDULE OF AIRWORTHINESS DIRECTIVESAirworthiness Directives
- SEB88-3 - Cessna Flyer AssociationService Bulletins
- Type Certificate Data SheetType Certificate
- Supplemental Type Certificate for CESSNA T-210Supplemental Type Certificate
In this document
Compliance Requirements
Operators must comply with the service bulletin within the next 25 hours of operation. Until compliance is achieved, the engine must be operated according to the related FAA Airworthiness Directive.
Inspection Procedures
The bulletin outlines specific inspection procedures, including checking the effort required to rotate the propeller and ensuring proper crankshaft end play. If the recorded values are outside the normal range of 10 to 20 pounds, further action is required.
Torque Specifications
Thru bolt nuts must be torqued to a preliminary torque of 350 inch pounds, followed by a final torque of 700 inch pounds. The document provides detailed torque sequences for the installation of cylinders and nuts.
Piston Pin Replacement
The bulletin details the steps for gaining access to the piston pins by removing the cylinders without detaching the pistons. It includes instructions for inspecting crankcase main bearings and replacing piston pins as necessary.
Warranty Information
The actions taken to comply with this service bulletin are covered by the TCM Gold Medallion Warranty. Warranty claims must include the recorded effort required to rotate the propeller as specified in the bulletin.
Safety notes
- Use extreme caution in the area of the propeller during checks.
- Ensure proper grounding of magnetos before performing inspections.
Full document text
TELEDYNE CONTINENTAL AIRCRAFT ENGINE TELEDYNE INDUSTRIES, INC. 1987 TELEDYNE CONTINENTAL MOTORS Aircraft Products Division PO Box 90 Mobile Alabama 36601 Member of GAMA General Aviation Manufacturer’s Association MANDATORY service bulletin 21 December 1987 SUBJECT: PISTON PIN REPLACEMENT AND THRU BOLT TORQUE CHECK MODELS AFFECTED: TSIO520CE - This engine is used on the Cessna P210 and T210 Aircraft S/N 530001 through 530140 COMPLIANCE: Within the next 25 hours of operation. NOTE...The engine must be operated in accordance with the related FAA Airworthiness Directive until this Service Bulletin (M87-26) is complied with. A broken piston pin, P/N 643846, has been confirmed to have been the cause of a recent engine failure. The following action is therefore required on the above referenced engines. I. A. Insure that the magnetos are properly grounded. Remove one spark plug (the most accessible) from each cylinder. Attach a spring scale to the propeller blade at the 30 inch station. Rotate the propeller in normal direction of rotation via the attached scale and record the pounds required to rotate the propeller. Normal range is approximately 10 to 20 pounds. While holding opposite propeller blades as close to the hub as possible, move the crankshaft fore and aft to assure the crankshaft has end play. NOTE...If the recorded pounds are not within the normal range or there is no crankshaft end play, contact your local Teledyne Continental Motors representative (See Page 4) for disposition. WARNING...Use extreme caution in the area of the propeller while performing this check. B. Gain access to the eight (8) crankcase thru bolt nuts. With a cylinder base wrench, loosen the eight (8) thru bolt nuts and back them off approximately 1/2 inch. Liberally lubricate the exposed thru bolt threads and the nuts with clean 50 weight engine oil. Torque the nuts to a preliminary torque of 350 inch pounds, then repeat final torque to 700 inch pounds each. It may be necessary to retain the opposite nuts to prevent thru bolt rotation. (Continued) M87-26 Technical Portions Are FAA Approved 21 December 1987 M87-26 Page 2 C. Repeat paragraph IA above and record the pounds required to rotate the propeller. If after torquing the thru bolts per paragraph IB, the effort (pounds) to rotate the propeller has increased above that previously recorded or there is no crankshaft end play, contact your local Teledyne Continental Motors representative (See Page 4) for disposition. If no special disposition is required, proceed to Section II. II. A. Gain access to the piston pins by removal of all cylinders. NOTE...DO NOT REMOVE THE PISTON FROM THE CYLINDER. REMOVE ONLY TO A POINT TO GAIN ACCESS TO THE PISTON PIN. REMOVE THE PISTON PIN, THEN THE PISTON AND CYLINDER AS ONE UNIT. B. With cylinders and pistons removed, visually inspect the number 1, 2, 3, and 4 crankcase main bearings for any signs of bearing rotation within the case; bearing movement fore or aft within the case or crankcase material distress. Particular attention should be given to number 2 and 3. The crankshaft should be moved fore and aft while performing this inspection. The crankshaft will also require rotation to allow for unobstructed view of the bearings. NOTE...The crankcase main bearings are numbered from number 1 in the rear of the engine and progressing forward. (Toward the propeller flange). Figure A depicts how bearing should generally appear. Figure B depicts a bearing that has shifted. NOTE...Contact your local Teledyne Continental Motors representative (See Page 4) for disposition of any bearing appearing as in Figure B or with any signs of crankcase material distress. C. If no problems are detected during the inspection outlined in paragraph IIB, proceed with the installation of new piston pins P/N 630046 and the reassembly of the engine. D. The cylinders should be installed in sequence and torqued in sequence per the instructions in Figure C. New cylinder gasket sets should be used, 6 each P/N 646563A1. NOTE...Liberally apply clean 50 weight engine oil on the rod bushing, piston pin and valve mechanism during engine reassembly. (Continued) 21 December 1987 M87-26 Page 3 III. A. Finalize reassembly of the cylinders to the point of rocker cover installation. At this point repeat paragraph IA above and record the pounds required to rotate the propeller. If the effort (pounds) to rotate the propeller has increased above that previously recorded in paragraph IC or there is no crankshaft end play, contact your local Teledyne Continental Motors representative (See page 4) for disposition. If no discrepancies are noted, finalize reassembly of the engine. B. Perform appropriate testing, make appropriate log book entry stating compliance to this service bulletin and return the engine to service. WARRANTY: The action to comply with this service bulletin is covered by the TCM Gold Medallion Warranty subject to its terms and conditions. Warranty claims may be filed through any TCM distributor. When submitting the warranty claim for compliance with this service bulletin, you must enter the pounds required to rotate the propeller as recorded in paragraph IA, IC, IIIA. It should be recorded in the CONDITIONS REPORTED SECTION of the warranty claim. EXAMPLE: Compliance with Service Bulletin M87-26 Paragraph IA - 12 pounds Paragraph IC - 12 pounds Paragraph IIIA - 14 pounds TCM will allow 32 hours labor at current posted shop rates to comply with this service bulletin and the following parts: 6 each P/N 630046 piston pin 6 each P/N 646563A1 gasket set 21 December 1987 M87-26 Page 4 ADDRESS: Teledyne Continental Motors Attn: J. Black/C. McClellan P.O. Box 90 Mobile, AL 36601 (205) 438-3411 J. A. Buskirk 10014 Venetian Way Dallas, TX 75229 (214) 351-3149 R. W. Lambrix 3661 Duffer Court Zellwood, FL 32798 (305) 880-1221 Tom Thys/Tony Evanson Room 4, 19 The Square Sand Bach, CW11 OAT
Show full textShow less
Chesire, ENGLAND 44 270 76-7339 David Blanchard P.O. Box 427 Scarborough, ME 04074 (207) 883-3150 R. A. Deets 14611 Chalet Lane Huntingdon Beach, CA 92647 (714) 895-5597 R. M. Robbins 11477 Wolftooth Pass Littleton, CO 80127 (303) 979-7923 Edgardo Martedi R Charles S Chaplin 85 Apartment #23 05642 Sao Paulo BRAZIL 55 11 299-2666 21 December 1987 M87-26 Page 5 Figure B (Continued) 21 December 1987 M87-26 Page 6 CYL# 6 CYL# 4 CYL# 2 1 5 7 3 4 2 8 6 9 13 15 11 12 10 16 14 17 21 23 19 20 18 24 22 28 31 25 26 27 CYL# 1 CYL# 3 CYL# 5 1 5 7 3 4 2 8 6 9 13 15 11 12 10 16 14 28 32 34 30 31 29 35 33 17 20 38 37 36 CAUTION...Before proceeding note that the six nuts utilized with the seventh stud (positions 25, 26, 27, 36, 37, 38) have a conical seat and can only be used in these positions. NOTE...Nuts on both ends of thru bolts must be torqued and all studs and thru bolt threads are to be lubricated with clean 50 weight engine oil before installing nuts. ASSEMBLY AND PRELIMINARY TORQUE 1) Install cylinders 4 & 5. Tighten stud nuts (2, 3, 5, 6, 7, 8) and thru bolts (1 & 4) to 300-400 inch lbs. in sequence shown above. 2) Install cylinders 2 & 3. Tighten stud nuts (10, 11, 13, 14, 15, 16) and thru bolts (9 & 12) to 300-400 inch lbs. in sequence shown above. 3) Install cylinder #6. Tighten stud nuts (18, 19, 21, 22, 23, 24) and thru bolts (17 & 20) to 300- 400 inch lbs. in sequence shown above. 4) Install cylinder #1. Tighten stud nuts (29, 30, 32, 33, 34, 35) and thru bolts (28 & 31) to 300- 400 inch lbs. in sequence shown above. 5) Install 7th stud brackets & nuts (25, 26, 27, 36, 37, 38) and tighten to 300-400 inch lbs. (See Caution above). 6) Finish torquing thru bolts and stud nuts to their final torque values in sequence shown above. FINAL TORQUE VALUES INCH LBS. Thru Bolts 1, 4, 9, 12, 17, 20, 28, 31 690-710 Stud Nuts 2, 3, 5, 6, 7, 8, 10, 11, 13 Thru 16, 18, 19, 21 Thru 27, 29, 30, 32, Thru 38 490-510 NOTE...Repeat torquing sequence with final torque values to insure that all thru bolts and stud nuts have been torqued. FIGURE C