Skip to main content

Mooney M20B Mark 21 — Service Bulletins

1 service bulletins reference for the Mooney M20B Mark 21.

Overview
SCHEDULE OF AIRWORTHINESS DIRECTIVES · 1999

This document is a Schedule of Airworthiness Directives issued by the Civil Aviation Safety Authority of Australia, specifically addressing the Mooney M20 Series aeroplanes. It outlines the requirements for inspecting and maintaining the aileron control links across various models within the M20 series. The directive is crucial for ensuring the safety and airworthiness of these aircraft, particularly in light of reported failures in the aileron control system. Compliance with the directive is mandatory for all applicable models, and it specifies inspection procedures, timelines, and actions to take if defects are found. The document serves as a critical reference for maintenance personnel and pilots operating these aircraft.

  • Applicable to Mooney M20B, M20C, M20D, M20E, M20F, M20G, M20L, M20J, M20K, M20M, M20R.
  • Inspect aileron control links for reinforcement gussets and cracks as per SB M20-264.
  • If cracks are found, replace the cracked link before further flight.
  • Compliance required within 100 hours after February 25, 1999, and at intervals not exceeding 100 hours thereafter.
  • Failure of aileron control links can lead to loss of control of the aircraft.
1 document
Mooney M20B Mark 21 — Service Bulletins FAQ
How many Service Bulletins documents does Sprinkle have for the Mooney M20B Mark 21?

Sprinkle has 1 Service Bulletins document on file for the Mooney M20B Mark 21.

What year is the Mooney M20B Mark 21 Service Bulletins?

The Mooney M20B Mark 21 Service Bulletins on file is dated 1999.

How many pages is the Mooney M20B Mark 21 Service Bulletins?

The Mooney M20B Mark 21 Service Bulletins runs 2 pages.

Where does Sprinkle's Mooney M20B Mark 21 Service Bulletins come from?

This Mooney M20B Mark 21 Service Bulletins was originally published by services.casa.gov.au and is hosted on Sprinkle with full text and specs.