Skip to main content

Airworthiness Directive Schedule Aeroplanes Mooney M20 Series

Mooney M20R Ovation · Service Bulletins

Free account — keep the POHs & checklists you reference in one place.

Overview

This document is an Airworthiness Directive (AD) schedule for the Mooney M20 series aircraft, including the M20R model. Issued on February 23, 2023, it outlines mandatory inspections, modifications, and replacements required to maintain airworthiness. The document is intended for owners and operators of Mooney M20 aircraft, providing detailed compliance requirements to ensure safety and reliability. Each directive includes specific applicability, compliance timelines, and references to relevant service bulletins. The ADs cover various components, including fuel systems, landing gear, and control systems, emphasizing the importance of regular maintenance and adherence to safety standards.

  • The document is an Airworthiness Directive schedule for Mooney M20 series aircraft, including the M20R model.
  • Mandatory inspections and modifications are outlined for various components to ensure airworthiness.
  • Specific compliance timelines are provided, often requiring actions within 25 to 100 hours TIS.
  • References to relevant service bulletins are included for detailed instructions on compliance.
  • The document emphasizes the importance of regular maintenance and adherence to safety standards.

Document

Source

Originally published by www.aviation.govt.nz. Sprinkle hosts a reference copy with an added summary, specifications and searchable full text.

Report a problem or request removal

Document details

Type
Service Bulletins
Year
2023
Pages
13
File size
200 KB
Publisher
www.aviation.govt.nz
How rare is it?
2Mooney M20R Ovation registered worldwide · 0 active

Common. Rarer than 17% of the aircraft models we track.

Documentation completeness
4/7

Most owners only have the POH. Here's the essential set for the Mooney M20R Ovation.

More Mooney M20R Ovationmanuals & documents

See all 24
Similar aircraft

If you fly the Mooney M20R Ovation, you may also be researching these.

In this document

Static Pressure Button - Inspection and Replacement

Applicable to M20, M20A, M20B, M20C, M20D, and M20E models with specific serial numbers. Requires inspection and replacement every 100 hours TIS until replaced according to Mooney SB M20-118.

Dukes Astronautics Fuel Pumps Replacement

Applicable to M20C, M20D, and M20E models with specified serial numbers. Replacement must be completed as detailed in Mooney SB M20-121B.

Hartzell Propellers and Mooney Decal Inspection

Applicable to M20E models with serial numbers 101 through 722. Inspection and modification required within the next 25 hours TIS as per Mooney SB M20-127.

Fuel Line Modification

Applicable to M20C, M20D, and M20E models. Modification of the fuel line from the electric boost pump to the fuel fitting box is required within the next 100 hours TIS according to Mooney SB M20-125.

Main Gear Retract Truss Bracket Replacement

Applicable to M20C and M20E models with specified serial numbers. Replacement of attachment bolts is required within the next 100 hours TIS as per Mooney SB M20-143.

Throttle, Mixture and Propeller-Governor Controls Modification

Applicable to M20C, M20D, M20E, M20F, and M20G models. Modification is required within the next 100 hours TIS according to Mooney SB M20-174.

Engine Mount Members Inspection

Applicable to M20C, M20D, M20E, M20F, and M20G models. Inspection required within the next 50 hours TIS or before 450 hours TIS, whichever occurs later, as per Mooney SB M20-192.

Oil Cooler Inspection and Replacement

Applicable to M20E and M20F models with specific serial numbers. Inspection and potential replacement of the oil cooler is required within the next 5 hours TIS.

Safety notes

  • Failure to comply with these directives may result in unsafe operating conditions.
  • Regular inspections are critical to prevent potential failures in aircraft systems.

Full document text

Issued 23 February 2023 Page 1 of 13 CAA of NZ Airworthiness Directive Schedule Aeroplanes Mooney M20 Series 23 February 2023 Notes 1. This AD schedule is applicable to Mooney Aircraft Corp. M20C, M20E, M20F, M20G M20J, M20M, and M20R aircraft manufactured under FAA Type Certificate Number 2A3. 2. The Federal Aviation Administration (FAA) is the National Airworthiness Authority (NAA) responsible for the issue of State of Design Airworthiness Directives (ADs) for these aircraft. State of Design ADs can be obtained directly from the FAA website at: Dynamic Regulatory System (faa.gov) 3. The date above indicates the amendment date of this schedule. 4. New or amended ADs are shown with an asterisk * Contents DCA/MY/1 Static Pressure Button - Inspection and Replacement ...................................................... 3 DCA/MY/2 Dukes Astronautics Fuel Pumps Part Numbers 4140-00-19, 4140-00-19A, 4140-00- 21 and 4140-00-21A - Replacement ................................................................................. 3 DCA/MY/3 Hartzell Propellers and Mooney Decal - Inspection and Modification ............................... 3 DCA/MY/4 Cancelled: Once only inspection, purpose fulfilled ............................................................ 3 DCA/MY/5 Fuel Line from Electric Boost Pump to Fuel Fitting Box - Modification .............................. 3 DCA/MY/6 Master Power Relay Cover - Modification ......................................................................... 4 DCA/MY/7 Cancelled: Purpose fulfilled............................................................................................... 4 DCA/MY/8 Main Gear Retract Truss Bracket - Attachment Bolts - Replacement ............................... 4 DCA/MY/9 Installation of Alternate Static Air Source Placard - Modification ....................................... 4 DCA/MY/10 Fuel Line Routing - Modification ........................................................................................ 4 DCA/MY/11 Steering Horn Bolt on Nose Gear Truss - Modification ..................................................... 4 DCA/MY/12 Retraction Handle and Down Lock Block - Inspection ...................................................... 5 DCA/MY/13 Throttle, Mixture and Propeller-Governor Controls - Modification ..................................... 5 DCA/MY/14A Flight Control and Landing Gear Systems - Lubrication and Inspection ........................... 5 DCA/MY/15 Flight Control and Landing Gear Systems - Modification .................................................. 5 DCA/MY/16 Landing Gear Actuator - Modification ................................................................................ 6 DCA/MY/17 Dukes Electric Gear Actuators (P/N 4196-00-1C) and Ball Joint - Inspection and Lubrication ........................................................................................................................ 6 DCA/MY/18 Engine Mount Members - Inspection................................................................................. 6 DCA/MY/19A Oil Cooler - Inspection and Replacement.......................................................................... 6 DCA/MY/20B Propeller RPM Restriction - Tachometer Marking and Placard ......................................... 7 DCA/MY/21A Control Wheel Shaft - Inspection ...................................................................................... 7 DCA/MY/22 Main Landing Gear - Modification ..................................................................................... 8 DCA/MY/23 Rear Spar - Inspection ...................................................................................................... 8 DCA/MY/24 Fuel System - Modification ................................................................................................ 8 DCA/MY/25 Fuel Tanks and Filter Caps - Inspection............................................................................ 8 DCA/MY/26 Fuel Filler Cap Retaining Lanyard - Removal ................................................................... 9 DCA/MY/27 Aileron Control Links - Inspection ..................................................................................... 9 DCA/MY/28 Turbocharger Exhaust – Modifications ............................................................................ 10 DCA/MY/29 O & N Bladder Fuel Cell – Inspection and Replacement................................................. 10 DCA/MY/30 Engine Mount Attachment – Torque and Replacement................................................... 11 DCA/MY/31 Cancelled – DCA/MY/32 refers ....................................................................................... 11 DCA/MY/32 Tail Pitch Trim – Inspection and Rework ......................................................................... 11 Issued 23 February 2023 Page 2 of 13 CAA of NZ The State of Design ADs listed below are available directly from the National Airworthiness Authority (NAA) websites. Links to NAA websites are available on the CAA website at https://www.aviation.govt.nz/aircraft/airworthiness/airworthiness-directives/links-to-state-of-design- airworthiness-directives/ If additional NZ ADs need to be issued when an unsafe condition is found to exist in an aircraft or aeronautical product in NZ, they will be added to the list below. .............................................. 13 2014-15-18 Empennage Attach Fittings – Inspection ......................................................................... 13 * 2023-02-04 Elevator Balance Weight – Inspection ............................................................................ 13 Aeroplanes Mooney M20 Series Issued 23 February 2023 Page 3 of 13 CAA of NZ DCA/MY/1 Static Pressure Button - Inspection and Replacement Applicability: Models M20, M20A, M20B, M20C, M20D and M20E with S/N listed in SB 20-118 Requirement: Mooney SB M20-118

Show full text

Compliance: Every 100 hours TIS until button is replaced in accordance with SB 20-118 Effective Date: 28 February 1969 Note: Document previously referred to as Service Letter (SL). Title changed by Mooney Service Bulletin Index dated 7 January 1968 DCA/MY/2 Dukes Astronautics Fuel Pumps Part Numbers 4140-00-19, 4140-00-19A, 4140-00- 21 and 4140-00-21A - Replacement Applicability: Models M20C, M20D and M20E S/N as listed in SB M20-121B Requirement: Mooney SB M20-121B Compliance: As detailed Effective Date: 28 February 1969 DCA/MY/3 Hartzell Propellers and Mooney Decal - Inspection and Modification Applicability: Model M20E S/N 101 through 722 Requirement: Mooney SB M20-127 Compliance: Within the next 25 hours TIS Effective Date: 28 February 1969 Note: Document previously referred to as Service Letter (SL). Title changed by Mooney Service Bulletin Index dated 7 January 1968 DCA/MY/4 Cancelled: Once only inspection, purpose fulfilled DCA/MY/5 Fuel Line from Electric Boost Pump to Fuel Fitting Box - Modification Applicability: Models M20C, M20D and M20E S/N as listed in SB M20-125 Requirement: Mooney SB M20-125 Compliance: Within the next 100 hours TIS Effective Date: 28 February 1969 Note: Document previously referred to as Service Letter (SL). Title changed by Mooney Service Bulletin Index dated 7 January 1968 Mooney M20 Series Issued 23 February 2023 Page 4 of 13 CAA of NZ DCA/MY/6 Master Power Relay Cover - Modification Applicability: Models M20C and M20D S/N as listed in SB M20-126 Requirement: Mooney SB M20-126 Compliance: Within the next 100 hours TIS Effective Date: 28 February 1969 Note: Document previously referred to as Service Letter (SL). Title changed by Mooney Service Bulletin Index dated 7 January 1968 DCA/MY/7 Cancelled: Purpose fulfilled DCA/MY/8 Main Gear Retract Truss Bracket - Attachment Bolts - Replacement Applicability: Model M20C S/N 2807 through 3466 and M20E S/N 470 through 1270 Requirement: Mooney SB M20-143 Compliance: Within the next 100 hours TIS Effective Date: 28 February 1969 DCA/MY/9 Installation of Alternate Static Air Source Placard - Modification Applicability: Models M20C, M20E and M20F S/N as listed in SB M20-158 Requirement: Mooney SB M20-158 Compliance: Within the next 50 hours TIS Effective Date: 28 February 1969 DCA/MY/10 Fuel Line Routing - Modification Applicability: Models M20E and M20F S/N as listed in SB M20-166 Requirement: Mooney SB M20-166 Compliance: Within the next 50 hours TIS Effective Date: 28 February 1969 DCA/MY/11 Steering Horn Bolt on Nose Gear Truss - Modification Applicability: Models M20, M20A, M20B, M20C, M20D, M20E, M20F and M20G S/N as listed in SB M20-169 Requirement: Mooney SB M20-169 Compliance: Within the next 100 hours TIS Effective Date: 28 February 1969 Mooney M20 Series Issued 23 February 2023 Page 5 of 13 CAA of NZ DCA/MY/12 Retraction Handle and Down Lock Block - Inspection Applicability: All model M20C Requirement: An accident during landing occurred due to the retraction handle not engaging fully in the down lock block P/N 560006. Inspect as follows: 1. With the aircraft jacked up check the retraction operation and ensure that the retraction handle engages fully in the down lock block P/N 560006 and that the pre- load of the over-centre locking mechanism is within the limits prescribed in the Mooney Service and Maintenance Manual. 2. Inspect the rear face of the bore below the latch for grooving and/or ovality and renew the down lock block if found excessive, i.e. to such extent that the retraction handle could be restricted from entering fully the down lock position. Compliance: Before further flight and thereafter at intervals not exceeding 50 hours TIS Effective Date: 31 May 1969 DCA/MY/13 Throttle, Mixture and Propeller-Governor Controls - Modification Applicability: Models M20C, M20D, M20E, M20F and M20G S/N as listed in SB M20-174 Requirement: Mooney SB M20-174 Compliance: Within the next 100 hours TIS Effective Date: 30 April 1971 DCA/MY/14A Flight Control and Landing Gear Systems - Lubrication and Inspection Applicability: All model M20, M20A, M20B, M20C, M20D, M20E, M20F and M20G Requirement: To prevent corrosion and possible binding of the subject systems lubricate and inspect as follows: 1. Lubricate all flight control system and landing gear system rod end bearings with a silicone spray lubricant. 2. Perform a landing gear retraction test and check the landing gear rigging. Compliance: Within the next 25 hours TIS and thereafter at intervals not to exceed 12 calendar months from the last inspection or 100 hours TIS from the last inspection whichever comes first Effective Date: 30 November 1973 DCA/MY/15 Flight Control and Landing Gear Systems - Modification Applicability: Models M20, M20A, M20B, M20C, M20D, M20E, M20F and M20G as detailed in FAA AD 72-12-2 Requirement: FAA AD 72-12-2 amendment 39-1482 Compliance: By 1 March 1973 Note: A copy of the reference document may be obtained from the Director Mooney M20 Series Issued 23 February 2023 Page 6 of 13 CAA of NZ DCA/MY/16 Landing Gear Actuator - Modification Applicability: Models M20C, M20E and M20F with S/N listed in SB M20-191 Requirement: Mooney SB M20-191 (FAA AD 75-04-09 also refers) Compliance: Before further flight Effective Date: 28 February 1975 Note: Requirement notified to registered owners on effective date DCA/MY/17 Dukes Electric Gear Actuators (P/N 4196-00-1C) and Ball Joint - Inspection and Lubrication Applicability: All model M20 series with Dukes Electric Gear Actuator P/N 4196-00-1C Requirement: Mooney SB M20-190 Compliance: 1. Part I of SB within the next 25 hours TIS and thereafter at intervals not exceeding 200 hours TIS. 2. Part II of SB within the next 100 hours TIS and thereafter at intervals not exceeding 100 hours TIS. 3. Part III of SB in conjunction with Part I within the next 25 hours TIS. Effective Date: 19 May 1975 DCA/MY/18 Engine Mount Members - Inspection Applicability: Models M20C, M20D, M20E, M20F and M20G with S/N listed in SB M20-192 Requirement: Mooney SB M20-192 (FAA AD 75-09-08 also refers) Compliance: Within the next 50 hours TIS or before the accumulation of 450 hours TIS whichever occurs later, thereafter at intervals not exceeding 100 hours TIS. The repetitive inspection may be discontinued after rework in accordance with Mooney SB M20-192 or after installation of a new revised mount Effective Date: 19 May 1975 DCA/MY/19A Oil Cooler - Inspection and Replacement Applicability: Model M20E, S/N 101 through 466 and M20F, S/N 22-0001 through 22-1437 fitted with Stewart Warner oil cooler 8432H, S/N 001 through 499 or 8432F S/N 1610 through 1717 Requirement: 1. Remove cowl assembly as necessary to gain access to oil cooler. 2. Check oil cooler model and serial number, found on fluid fitting side. 3. If oil cooler is model 8432H S/N 001 through 499 or, model 8432F S/N 1610 through 1717, replace with an approved oil cooler outside the applicability range of this Airworthiness Directive. 4. Affected coolers may remain fitted for a further 5 hours TIS, subject to a satisfactory inspection for leaks prior to each flight. If any leaks are detected replace cooler before further flight. Mooney M20 Series Issued 23 February 2023 Page 7 of 13 CAA of NZ (FAA AD 77-08-06 amendment 39-2903 also refers) Compliance: 1. Inspection - before further flight and if cooler is in affected S/N range, prior to each flight until replaced. 2. Replacement - within the next 5 hours TIS Effective Date: DCA/MY/19 - 28 April 1977 DCA/MY/19A - 20 July 1977 Note: Requirement notified to registered owners on effective date DCA/MY/20B Propeller RPM Restriction - Tachometer Marking and Placard Applicability: All model M20E and M20F with Hartzell HC-C2YK-1 ( ) propeller Requirement: Unless already accomplished, 1. re-mark engine tachometer face or bezel with red arcs covering the ranges 2000 to 2350 RPM and 2600 to 2700 RPM, 2. remove propeller vibration placard covering range 2100 to 2350 RPM if installed, and on instrument panel adjacent to tachometer affix placard which reads: "AVOID CONTINUOUS OPERATION BETWEEN 2000 AND 2350 RPM" In addition, aircraft fitted with a propeller not inspected per Hartzell SB 118A or later revision shall have, unless already accomplished, on instrument panel adjacent to tachometer a placard which reads: "AVOID CONTINUOUS OPERATION ABOVE 2600 RPM IN FULL THROTTLE LEVEL FLIGHT" (FAA AD 77-12-06 refers) Compliance: By 17 April 1978 Effective Date: DCA/MY/20A - 31 August 1977 DCA/MY/20B - 17 March 1978 DCA/MY/21A Control Wheel Shaft - Inspection Applicability: All model M20 series Requirement: 1. Inspect per Mooney SB M20-205B. 2. Replace or modify cracked shafts with new original type or with strengthened type per SB M20-205B before further flight. (FAA AD 77-17-04 amendment 39-3258 refers) Compliance: At 1000 hours TTIS and thereafter at intervals not exceeding 500 hours TIS. Aircraft which have exceeded 1000 hours TIS shall be initially inspected within next 30 days unless already accomplished within last 250 hours TIS. When new original type parts fitted, new initial inspection time is 1000 hours TIS. When strengthened type parts fitted, requirement for 500 hours inspections is removed. Effective Date: DCA/MY/21 - 14 June 1978 DCA/MY/21A - 1 September 1978 Mooney M20 Series Issued 23 February 2023 Page 8 of 13 CAA of NZ DCA/MY/22 Main Landing Gear - Modification Applicability: All model M20F. Model M20J S/N 24-0001 through 24-0609 Requirement: Replace side brace bolts per Mooney SB M20-212 (FAA AD 78-15-02 refers) Compliance: By 30 November 1978 Effective Date: 1 September 1978 DCA/MY/23 Rear Spar - Inspection Applicability: Model M20B, M20C, M20D, M20E, M20F and M20G with S/N listed in Mooney SB M20-217 and manual, or hydraulically actuated, flaps Requirement: Inspect rear spar centre splice per Mooney SB M20-217 and repair as necessary Compliance: At intervals not exceeding 500 hours TIS until repaired or modified. Aircraft which have exceeded 500 hours TIS shall be inspected within next 100 hours TIS or 90 days whichever is the sooner Effective Date: 1 June 1979 DCA/MY/24 Fuel System - Modification Applicability: All model M20E with Dukes model 4140-00-19A fuel pump Requirement: Install fuel filter per Mooney SB M20-222 or replace fuel pump with Dukes model 1499-00-19 (FAA AD 80-13-03 refers) Compliance: Within the next 25 hours TIS Effective Date: 1 August 1980 DCA/MY/25 Fuel Tanks and Filter Caps - Inspection Applicability: All model M20B, M20C, M20D, M20E and M20F Requirement: To preclude water entrapment and fuel contamination accomplish the following: 1. Inspect fuel tank bays and rib stations per Mooney SB M20-230 2. Inspect filler caps per Mooney SB M20-229. Rectify defective installation before further flight (FAA AD 85-24-03 refers) Compliance: (1) and (2) - within next 50 hours TIS or by 31 May 1986, whichever is the sooner, and thereafter repeat (2) at intervals not exceeding 12 months Effective Date: 28 February 1986 Mooney M20 Series Issued 23 February 2023 Page 9 of 13 CAA of NZ DCA/MY/26 Fuel Filler Cap Retaining Lanyard - Removal Applicability: Model M20F all S/N, M20J S/N 24-0001 through 24-3381 and M20L S/N 26-0001 through 26-0041. Requirement: To prevent false fuel gauge indication during flight, accomplish the following:- Remove the lanyard (nylon type material) from the left-hand and right-hand fuel filler cap assembly per the INSTRUCTIONS section of Mooney Aircraft Corporation SB M20-259. (FAA AD 97-26-08 refers) Compliance: Within next 50 hours TIS. Effective Date: 13 February 1998 DCA/MY/27 Aileron Control Links - Inspection Applicability: Models Serial Numbers M20B all serial numbers M20C all serial numbers M20D all serial numbers M20E all serial numbers M20F all serial numbers M20G all serial numbers M20L all serial numbers M20J 24-0001 through 24-3359 M20K 25-0001 through 25-1999 M20M 27-0001 through 27-0197 M20R 29-0001 through 29-0042 Requirement: To detect and correct cracked aileron control links, which could result in loss of aileron control, accomplish the following:- 1. Visually inspect the aileron control links (left-hand and right-hand) at the second 90-degree angle joint from the Heim bearing for the installation of a reinforcement gusset per Mooney SB M20-264. If a reinforcement gusset is installed, this AD requires no further action. 2. If a reinforcement gusset is not installed, inspect, using magnetic particle methods, the aileron control links for cracks per Mooney SB M20-264. If cracks are found, prior to further flight, replace the cracked aileron control link with an aileron control link of improved design per SB M20-264. Note 1: Replacing both aileron control links with aileron control links of improved design may be accomplished at any time as terminating action for the repetitive inspection requirement of this AD, but must be accomplished prior to further flight on any aileron control link found cracked. Note 2: If one aileron control link is replaced when a crack is found, the other aileron control link must still be repetitively inspected every 100 hours TIS until replacement with an improved design part. (FAA AD 98-24-11 refers) Compliance: 1. Within the next 100 hours TIS. 2. Within the next 100 hours TIS, and thereafter at intervals not to exceed 100 hours TIS. Effective Date: 18 December 1998 Mooney M20 Series Issued 23 February 2023 Page 10 of 13 CAA of NZ DCA/MY/28 Turbocharger Exhaust – Modifications Applicability: Model M20M aircraft S/N 27-0001 through 27-0321 Requirement: To prevent engine bay and possible cockpit in-flight fire, replace the radiant heat shield P/N 600182-501 and the V band clamp P/N 55677-340M or 40D21162-30M, and modify the hydraulic brake line, in accordance with Mooney Airplane Company SB M20-283A. (FAA AD 2004-23-17 refers) Compliance: Within 10 Hours TIS. Effective Date: 31 March 2005 DCA/MY/29 O & N Bladder Fuel Cell – Inspection and Replacement Applicability: Models M20B, M20C, M20D, M20E, M20F, M20G, and M20J aircraft, all serial numbers equipped with an O & N Bladder Fuel Cell installed per STC SA2277CE or STC SA2350CE. Requirement: To prevent rainwater from entering the fuel bladders, which could result in rough engine operation or complete loss of engine power, accomplish the following: 1. On both the left and right wing, inspect the drain valve to assure that it was inserted fully into the drain nipple. Modify any drain valve found not to be inserted fully into the drain nipple before further flight. 2. On both the left and right wing do the following: a) Install a foam wedge to reduce the amount of trapped fluids in the center fuel cell. b) Install an anti-ice mast forward of the vent tubes to prevent icing of the fuel tank vents. c) Drill a vent hole to prevent icing of the engine’s crankcase breathers; and d) Replace the flush style fuel caps and adapters with raised style caps and adapters. Follow the instructions in paragraph 3. of this AD as an alternative method of compliance for replacing the flush style fuel caps. 3. Instead of replacing the flush style fuel caps as required in paragraph 2. d) of this AD, you may do a preflight fuel system check prior to each flight. To do this, you must insert the following "Pilot Operating Procedures-Preflight Fuel System Check" into the Limitation Section of the FAA-approved Airplane Flight Manual (AFM): a) Place a suitable container under the fuel strainer drain outlet prior to operating the strainer drain control for at least 4 seconds. Check strainer to ensure drain is closed. b) Inspect the fluid drained from the fuel strainer and each wing tank quick drain for evidence of fuel contamination in the form of water, rust, sludge, ice, or any other substance not compatible with fuel. Also check for proper fuel grade before the first flight of each day and after each refueling. If any contamination is detected, comply with paragraph (f)(4) of this AD. c) Repeat steps a. & b. on each wing tank quick drain. Mooney M20 Series Issued 23 February 2023 Page 11 of 13 CAA of NZ d) If the airplane has been exposed to rain, sleet, or snow, or if the wing fuel tanks or fuel strainer drains produce water or other contamination, you must purge the airplane fuel system to the extent necessary to ensure that there is no water, ice, or other fuel contamination. (FAA AD 2004-25-04 refers) Compliance: 1. Before 28 January 2006 2. Before 28 January 2006 3. Before 28 January 2006 Effective Date: 31 March 2005 DCA/MY/30 Engine Mount Attachment – Torque and Replacement Applicability: Model M20M aircraft, S/N 27-0317 through to 27-0355 Model M20R aircraft, S/N 29-0290 through to 29-0448 Requirement: To prevent the upper right and upper left engine mounting hardware from losing torque, which could result in a reduction in engine mount load carrying capability and could lead to engine mount failure, accomplish the following: 1. Torque the upper left and upper right engine mount attachment hardware, per Mooney Airplane Company, Inc. Service Bulletin M20-292A, dated 22 December 2006. 2. Replace the engine mount attachment hardware per SB M20-292A. (FAA AD 2007-05-04 refers) Note: Accomplishment of Requirement 2 is a terminating action to this AD. Compliance: 1. Within the next 25 hours TIS, unless Requirement 2 of this AD has been accomplished. 2. Within the next 100 hours TIS, unless already accomplished. Effective Date: 26 April 2007 DCA/MY/31 Cancelled – DCA/MY/32 refers Effective Date: 27 March 2012 DCA/MY/32 Tail Pitch Trim – Inspection and Rework Applicability: Models M20B, M20C, M20D, M20E, M20F, M20G, M20J, M20K, M20L, M20M, M20R, M20S and M20TN aircraft, all S/N. Note 1: This AD supersedes DCA/MY/31 to expand the AD applicability and remove the requirement to report inspection results to the manufacturer. Requirement: To prevent failure of the tail pitch trim assembly which could result in loss of aircraft control accomplish the following: Inspect the tail pitch trim assembly for correct configuration and attachment and inspect the huck bolt fasteners for security per the instructions in Mooney Aviation Company SB No. M20-313A dated 29 February 2012. If the tail pitch trim assembly is found incorrectly positioned, or the tail pitch trim fitting, hinge and filler plate are found incorrectly attached, and/or the huck bolt fasteners are found loose or incorrectly installed, accomplish the instructions in Mooney SB No. M20-314A dated 29 February 2012 before further flight. Mooney M20 Series Issued 23 February 2023 Page 12 of 13 CAA of NZ Note 2: Inspections accomplished before 27 March 2012 per the instructions in Mooney Aviation Company, Inc. SB No. M20-313, dated 7 February 2012 and corrective actions accomplished before 27 March 2012 per the instructions in Mooney Aviation Company, Inc. SB No. M20-314, dated 10 February 2012 satisfies the requirements of this AD. (FAA AD 2012-05-09 refers) Compliance: Within the next 10 hours TIS unless previously accomplished. Effective Date: 27 March 2012 Mooney M20 Series Issued 23 February 2023 Page 13 of 13 CAA of NZ The State of Design ADs listed below are available directly from the National Airworthiness Authority (NAA) websites. Links to NAA websites are available on the CAA website at https://www.aviation.govt.nz/aircraft/airworthiness/airworthiness-directives/links-to-state-of- design-airworthiness-directives/ If additional NZ ADs need to be issued when an unsafe condition is found to exist in an aircraft or aeronautical product in NZ, they will be added to the list below. 2014-15-18 Empennage Attach Fittings – Inspection Applicability: M20C aircraft, S/N 2313; M20E aircraft, S/N 761; M20M aircraft, S/N 27-0057; M20R, S/N 29-0141 and 29-0513 through to 29-0519; and M20TN aircraft, S/N 31-0101 through to 31-0127. Effective Date: 20 August 2014 * 2023-02-04 Elevator Balance Weight – Inspection Applicability: M20C, M20D, M20E, M20F and M20G aircraft, all S/N up to 680170 inclusive. Effective Date: 13 February 2023