Wiring Diagram for the Piper PA-23 Aztec
Piper PA-23 Aztec · Wiring Diagram
Overview
This document serves as a wiring diagram for the Piper PA-23 Aztec, providing essential information for maintenance and troubleshooting electrical systems. It is intended for use by certified mechanics and technicians who are responsible for the upkeep and repair of the aircraft's electrical components. The wiring diagram illustrates the layout and connections of various electrical systems, ensuring that technicians can accurately diagnose and rectify issues that may arise. The document includes detailed schematics that highlight the wiring paths, component locations, and connection points, which are crucial for effective maintenance and repair procedures.
- The wiring diagram is specific to the Piper PA-23 Aztec.
- It includes detailed schematics for the aircraft's electrical systems.
- Connections are clearly labeled for easy identification during maintenance.
Document
Source
Originally published by janitrol.aero. Sprinkle hosts a reference copy with an added summary, specifications and searchable full text.
Document details
- Type
- Wiring Diagram
- Pages
- 8
- File size
- 1.2 MB
- Publisher
- janitrol.aero
Common. Rarer than 17% of the aircraft models we track.
Most owners only have the POH. Here's the essential set for the Piper PA-23 Aztec.
- Pilot's Operating Handbook / AFM
- Checklist
- Maintenance Manual
- Parts Catalog (IPC)
- Systems & Wiring
- Service Bulletins
- Type Certificate (TCDS)
Free — save the PA-23 Aztec 250 to your watchlist and track it in one place.
More Piper PA-23 Aztecmanuals & documents
See all 20 →- AAIB Bulletin: G-BKJW AAIB-29361Other Documents
- Airworthiness Directive Schedule Aeroplanes Piper PA-23 Series (Apache and Aztec)Airworthiness Directives
- SERVICE BULLETIN NO. 540BService Bulletins
- PIPER PA-23-250 C-F Aztec with Lycoming IO-540 EngineSystems Description
- AZTEC PARTS CATALOGParts Catalog
- AIRWORTHINESS DIRECTIVE AD/PA-23/46Airworthiness Directives
- SCHEDULE OF AIRWORTHINESS DIRECTIVESAirworthiness Directives
- HEATER INSTALLATION INSTRUCTIONS FOR MODEL CD25K KIT, P/N CD940-25K12 AND CD940-25K24, MODEL CD35K KIT, P/N CD940-35K12 AND CD940-35K24, MODEL CD45K KIT, P/N CD940-45K12 AND CD940-45K24Wiring Diagram
- AZTEC F INFORMATION MANUALTraining Manual
- INAZTEC OWNER'S HANDBOOKEmergency Procedures
- Piper Apache Owner’s ManualPilot's Operating Handbook
- Piper AztecSystems Description
If you fly the Piper PA-23 Aztec, you may also be researching these.
In this document
Electrical System Overview
The electrical system of the Piper PA-23 Aztec is designed to provide power to essential components such as lighting, avionics, and engine systems. The diagram outlines the main power sources, including the battery and alternator, and their connections to various circuits.
Wiring Connections
This section details the specific wiring connections between components, including switches, circuit breakers, and instruments. Each connection is labeled for easy identification, ensuring that technicians can follow the wiring paths without confusion.
Troubleshooting Guidelines
The document provides troubleshooting guidelines for common electrical issues. It includes flowcharts and diagnostic steps to help technicians identify problems in the electrical system quickly.
Safety notes
- Ensure all electrical work is performed with the power off to prevent shock hazards.
- Follow proper grounding procedures to avoid damage to sensitive components.
Full document text
United States of America Department of Transportation -- Federal Aviation Administration Supplemental Type Certificate This certificate issued to Number SA01566CH Hartzell Engine Technologies LLC 2900 Selma Highway Montgomery, Alabama 36108 certifies that the change in the type design for the following product with the limitations and conditions therefor us specified hereen meets the airworthiness requirements of Part 3 of the Civil Air Regulations. See Aircraft Specification No. 1A10 for complete certification basis. Original Product Type Certificate Number: ΤΑΤΟ Make: Model: Piper PA-23, PA-23-160, PA-23-235, PA-23-250, PA-E23-250 Description of Type Design Change: 1. 2. 3. 4. Installation of C&D Associates Combustion Heater Kit | P/N CD11005KI, on PA-23, PA-23-160, PA-23-235 in accordance with C&D Associates heater Installation Instructions IN11005K1, Rev. -, dated March 15, 2001 or later FAA approved revision. Installation of C&D Associates Combustion Heater Kit 2A(c) P/N CD11005K2 (C) for carbureted engine, on PA-23-250, PA-E23-250 in accordance with C&D Associates heater Installation Instructions IN11005K2, Rev. -, dated March 15, 2001 or later FAA approved revision. Installation of C&D Associates Combustion Heater Kit 2A(f) P/N CD11005K2 (F) for fuel injected engine, on PA-23-250, PA-E23-250 in accordance with C&D Associates heater Installation Instructions IN11005K2, Rev. -, dated March 15, 2001 or later FAA approved revision. Installation of C&D Associates Combustion Heater Kit 2B P/N CD11006K2, on PA-23-250, PA-E23-250 in accordance with C&D Associates heater Installation Instructions IN11006K2, Rev. -, dated March 15, 2001 or later FAA approved revision. Limitations and Conditions: 1. Compatibility of this design change with previously approved modifications must be determined by the installer. 2. Check aircraft Weight and Balance. 3. 4. 5. FAA approved flight manual supplement Rev. no change, dated 8/30/2004, is required. Full compliance with the C&D Combustion Heater Airworthiness Limitations, revision B, dated January 1, 2000, or later FAA approved revision, is required. If the holder agrees to permit another person to use this certificate to alter the product, the holder shall give the other person written evidence of that permission. This certificate and the supporting data which is the basis for approval shall remain in effect until surrendered, suspended, revoked or a termination date is otherwise established by the Administrator of the Federal Aviation Administration. Date reissued: March 4, 2004; November 1, 2004 February 11, 2016 Date of application March 15, 2001 Date of issuance November 5, 2001 Pate amended September 7, 2004 By direction of the Mult FEDERAL AVIATION Signature) Timothy Smyth TOMINISTRATION Manager, Chicago Aircraft Certification Office (Title) Any alteration of this certificate is punishable by a fine of not exceeding $1,000, or imprisonment not exceeding 3 years, or both. FAA FOPM 8110-2 (10-68) This certificate may be transferred in accordance with FAR 21.47. PAGE 1 of 2 PAGES & C&D ASSOCIATES, INC. HEATER INSTALLATION INSTRUCTIONS FOR MODEL CD35K KIT 2A, P/N CD11005K2 For Piper Aircraft PA-23-250, PA-E23-250 (12VDC) Aztec S/N 27-1 thru 27-258, 27-365 thru 27-401, 27-403 thru 27-2297, 27-2299 thru 27-2330, 27-2332 thru 27-3049, 27-3051 thru 27-3153. READ COMPLETE INSTRUCTIONS BEFORE BEGINNING INSTALLATION IN11005K2 Page 1 of 3 3-15-01 Rev B Dated 7/29/04 NOTE: Fuel injected aircraft require fuel regulator P/N 20800. Carbureted aircraft require fuel pump P/N 21197. 1. Follow the Aircraft Service Manual or other FAA approved source for removal of the existing combustion heater. 2. Install the C&D Associates, Inc., TSO-C20 Approved combustion heater utilizing the existing Aircraft Service Manual or other FAA approved source where applicable. A. Remove the old safety valve and fuel filter assembly from the firewall and return with old heater for core value. Install the new fuel pump P/N 21197 (carbureted aircraft only) or the remote fuel regulator shutoff (fuel injected only). Replace the fuel lines with those included with the kit. B. Replace the old exhaust pipe, shroud and retainer with the new ones included with the heater kit. Secure the exhaust pipe and shroud assembly P/N 25118 with the clamp assembly. The new shroud retainer P/N 20632 is to replace the old one in the A/C skin. If needed trim the exhaust shroud to allow a 1/4" extension beyond the aircraft skin. The 1/2" exhaust pipe should extend 2" beyond the skin of the aircraft, maintaining the same exhaust scarf aft creating vacuum in flight. C. Combustion Air Blower: If room permits locate the combustion air blower on the heater using the mounting bracket P/N 21191B and two six inch clamps. (Figure 1) If room does not permit, discard the bracket and two clamps and install the combustion air blower above the heater on the existing shelf. Connect the combustion air hose (red) as shown. (Figure 2) FIGURE 1 FIGURE 2 ODED ASSOCIATED CCAD ASSOCIA FAA APPROVED M SEP 07 2004 CHICAGO AIRCRAFT CERTIFICATION OFFICE CENTRAL REGION Optional combustion air blower installation locations. D. The adjustable duct switch P/N CD21253 is to be installed aft of the heater in the plenum. Make two 1/16" holes 2-5/8" apart in a convenient location. Half way between the 1/16" holes, drill a 1/2" hole for the thermister and mount the switch using two sheet metal screws. 302 POST ROAD, BUCHANAN, MI, 49107 USA PH: 269-695-7469 FX: 269-695-6004 WEB: www.aircraftheater.com EMAIL: sales@aircraftheater.com C&D ASSOCIATES, INC. IN11005K2 Page 2 of 3 3-15-01 Rev B Dated 7/29/04 3. Electrical: This heater installation comes with a new heater control switch P/N CD20654. This switch replaces the old heater wiring, old heater control switch and high-low switch if equipped. A. Remote shutoff (Fuel injected only) or fuel pump: There is only one wire you may want to reuse. Locate this wire,
Show full textShow less
marked H2B, running from the old heater terminal 2 to the safety valve on the firewall. In the new installation this wire will connect from the fuel pump or shutoff valve over to the new heater terminal strip number 2. B. Heater Electrical Connection (Figure 3): Remove the old heater control switch. Locate and identify the wire running from the heater circuit breaker to the old heater switch. The new heater requires a 20 amp fuse. Marking on this old wire will be H3A. This wire is to be connected to the red wire on the new switch. Route the remaining wires (blue, white, and two yellow) to the new heater. Secure in route in accordance with AC 43.13-1A Chapter 12 for Electrical applications. The blue wire from the new switch is for the vent fan and will be connected to the heater terminal strip number 6. The white wire is connected to the heater terminal strip number 1. C. Thermostat (see step 2D): Connect thermostat red wire to the heater terminal 2 and blue wire to terminal 3. The two yellow wires are to join the switches yellow wires, in any order. D. Combustion Air Blower: Black wire to airframe ground, red wire to heater terminal strip #1. E. Old Wiring: CAUTION: The old wire marked H3A or H3B is hot any time the master switch is on. Remove or secure the ends of the old wiring. Optional hour meter is connected to terminal #2. Optional overheat light may be connected to terminal #4 on the heater strip. TO AIRFRAME GROUND OPTIONAL HEAT CONTROL HEAT JUMPER CA 20/15 AMP OFF BLUE CR 12/24 VDC 20/15 AMP WHITE WHITE FAN BLUE YELLOWOR FOLLOW OR ORANGE DRANGE BLACK OPTIONAL OVERHEAT WARNING LAMP TWITCH, ROTARY P/N C320654 3 POLE/12 POSITION OPTIONALY HOUR METER BLUE ADTABLE! PCB SWITCH 4 VENTILATING AIR BLOVER OPTIONAL CAPACITOR FLACK RED 24V GREEN 12VT CYCLING SWITCH RED BLUE MITZLE SOLENGED TYPICAL AIRCRAFT CONTROLS COMBUSTION AIR BLOWER K FUEL CELL RED 24 VT GREEN 12 VT FUEL PUMP AND/OR SHUT OFF VALVE COMBUSTION HEATER TERMINAL STRI AIR PRESSURE SWITCH OVER HEAT SWITCH FIGURE 3 IGNITION IGNITION UNIT LEAD SPARK PLUG BLACK ASSEMBLED ON HEATER FAA APPROVED су SEP 07 2004 CHICAGO AIRCRAFT CERTIFICATION OFFICE CENTRAL REGION 4. Follow the 'Combustion Heater PREFLIGHT/OPERATIONAL CHECK AND SHUTDOWN PROCEDURE' outlined within the Combustion Heater "Air-worthiness Limitations", First Edition, Revision B, dated 01-01-00, or later revision, included with these instructions. This FAA-approved Airworthiness Limitations must become a permanent part of the Aircraft Operations and Procedures manual. 5. NOTE: Full compliance with the enclosed 'Combustion Heater Airworthiness Limitations' is required. 6. NOTE: Removal of the combustion heater and the installation of the C&D Assoc. Products TSO-C20 approved heater will have no affect on electrical load. 7. NOTE: Weight and balance change: Remove South Wind heater weighing 23 pounds and install C&D heater weighing 28 pounds. 302 POST ROAD, BUCHANAN, MI, 49107 USA PH: 269-695-7469 FX: 269-695-6004 WEB: www.aircraftheater.com EMAIL: sales@aircraftheater.com C&D ASSOCIATES, INC. DOCUMENTATION AND PARTS REQUIREMENT TABLE DOCUMENTATION 1. FAA/PMA Supplement # 27 2. Installation Instructions IN11005K2 3. Label for flight manual 4. MM10000 Maintenance Manual 5. Quality Assurance Certificate of Compliance #527 6. Flight Manual Supplement FM11005K2 PARTS IN11005K2 Page 3 of 3 3-15-01 Rev B Dated 7/29/04 Quantity S/N 1. Heater CD11005 2. (1) Adj. Solid State Duct Sw. 21253 3. (1) Exhaust Extension Assembly 25118 4. (1) Blower Assembly 21414 5. (4) Worm Drive Clamps 1½" 6. (2) Bracket, Mount 21191B 7. (6) Bolt 8. (6) Nuts 9. (6) Washer 10. (2) Clamp, Worm 11. (2) Clamps (7 3/4") AN4-4A MS-20365-428 AN960-416 3" SAE #16 12. (18") Drain Hose w/Clamps 21279 13. (1) Switch, Rotary 20654 14. (1) Retainer Assembly 20632 15. (13") Fuel Line #3 w/ hardware 21081 16. (40") Fuel Line #3 w/ hardware 21081 17. (12") 12" x 12" Sceet-6 Sceet-6 18. (24") 12" x 24" Scat-6 19. (1) Regulator, 7.5 Scat-6 20800 20. (1) Elbow, 1/8" NPT Male-Female 60024 21. (2) Adapter 22. (1) Fuel Pump AN816-3D 21197 FAA APPROVED су 23 (1) Elbow AN822-3D Initials: Date: -SEP 07 7004 CHICAGO AIRCRAFT CERTIFICATION OFFICE CENTRAL REGION 302 POST ROAD, BUCHANAN, MI, 49107 USA PH: 269-695-7469 FX: 269-695-6004 WEB: www.aircraftheater.com EMAIL: sales@aircraftheater.com C&D ASSOCIATES, INC. HEATER INSTALLATION INSTRUCTIONS FOR MODEL CD25K KIT, P/N CD11005K1 For Piper Aircraft PA-23, PA-23-160, PA-23-235 (12VDC) Apache S/N 23-1 and up, S/N 27-505 thru 27-622. READ COMPLETE INSTRUCTIONS BEFORE BEGINNING INSTALLATION IN11005K1 Page 1 of 2 3-15-01 Rev- 1. Follow the Aircraft Service Manual or other FAA approved source for removal of the existing combustion heater. 2. Install the C&D Associates, Inc., TSO-C20 Approved combustion heater utilizing the existing Aircraft Service Manual or other FAA approved source where applicable. A. Remove the old safety valve and fuel filter assembly from the firewall. For carborated aircraft install the new fuel pump (CD21197) with the safety wired end cap down, using the legs of the pump as a template for the new bolt pattern. Replace the fuel lines with those included with the kit. B. Replace the old exhaust pipe and shroud and shroud retainer with the new ones included with the heater kit. Secure the exhaust pipe and shroud with two stainless steel 10/32 bolts supplied with exhaust pipe. The shroud retainer will replace the old one in the A/C skin. C. Combustion Air Blower: If room permits locate the combustion air blower on the heater using the mounting bracket P/N 21191B and two six inch clamps. (Figure 1) If room does not permit, discard the bracket and two clamps and install the combustion air blower above the heater on the existing shelf. Connect the combustion air hose (red) as shown. (Figure 2) FIGURE 1 FIGURE 2 C&D ASSOCIATES Optional combustion air blower installation locations. FAA APPROVED NOV 05 2001 CHICAGO AIRCRAFT CERTIFICATION OFFICE CENTRAL REGION D. The adjustable duct switch P/N CD21253 is to be installed aft of the heater in the plenum. Make two 1/16" holes 2-5/8" apart in a convenient location. Half way between the 1/16" holes, drill a 1/2" hole for the thermister and mount the switch using two sheet metal screws. 302 POST ROAD, BUCHANAN, MI, USA PHONE: 616-695-7469 FAX: 616-695-6004 C&D ASSOCIATES, INC. IN11005K1 Page 2 of 2 3-15-01 Rev- 3. Electrical: This heater installation comes with a new heater control switch P/N CD20654. This switch replaces the old heater wiring, old heater control switch and high-low switch if equipped. A. Remote shutoff (Fuel injected only) or fuel pump: There is only one wire you may want to reuse. Locate this wire, marked H2B, running from the old heater terminal 2 to the safety valve on the firewall. In the new installation this wire will connect from the fuel pump or shutoff valve over to the new heater terminal strip number 2. B. Heater Electrical Connection (Figure 3): Remove the old heater control switch. Locate and identify the wire running from the heater circuit breaker to the old heater switch. Marking on this old wire will be H3A. This wire is to be connected to the red wire on the new switch. Route the remaining wires (blue, white, and two yellow) to the new heater. Secure in route in accordance with AC 43.13-1A Chapter 12 for Electrical applications. The blue wire from the new switch is for the vent fan and will be connected to the heater terminal strip number 6. The white wire is connected to the heater terminal strip number 1. C. Thermostat (see step 2D): Connect thermostat red wire to the heater terminal 2 and blue wire to terminal 3. The two yellow wires are to join the switches yellow wires, in any order. D. Combustion Air Blower: Black wire to airframe ground, red wire to heater terminal strip #1. E. Old Wiring: CAUTION: The old wire marked H3A or H3B is hot any time the master switch is on. Remove or secure the ends of the old wiring. Optional hour meter is connected to terminal #2. Optional overheat light may be connected to terminal #4 on the heater strip. CB WHITE VENTILATING AIR BLOWER 12/24 VDC 20/15 AMP BLUE 6 YELLOW YELLOW SWITCH, ROTARY 3 POLE/12 POSITION (OPTIONAL) OVERHEAT WARNING LAMP 5 TYPICAL AIRCRAFT CONTROLS ADJUSTABLE DUCT SWITCH 2 (OPTIONAL) HOUR METER COMBUSTION AIR BLOWER COMBUSTION AIR PRESSURE SWITCH CYCLING SWITCH IGNITION UNIT IGNITION LEAD FUEL NOZZLE FUEL SOLENOID SPARK PLUG FAA FUEL CELL FUEL PUMP AND/OR SHUT OFF VALVE FIGURE 3 OVER HEAT SWITCH ASSEMBLED ON HEATER APPROVED NOV 05 2001 CHICAGO AIRCRAFT CERTIFICATION OFFICE CENTRAL REGION 4. Follow the 'Combustion Heater PREFLIGHT/OPERATIONAL CHECK AND SHUTDOWN PROCEDURE outlined within the Combustion Heater "Air-worthiness Limitations", First Edition, Revision B, dated 01-01-00, or later revision, included with these instructions. This FAA-approved Airworthiness Limitations must become a permanent part of the Aircraft Operations and Procedures manual. 5. NOTE: Full compliance with the enclosed 'Combustion Heater Airworthiness Limitations' is required. 6. NOTE: Removal of the combustion heater and the installation of the C&D Assoc. Products TSO-C20 approved heater will have no affect on electrical load. 7. NOTE: Weight and balance change: Remove South Wind heater weighing 23 pounds and install C&D heater weighing 28 pounds. 302 POST ROAD, BUCHANAN, MI, USA PHONE: 616-695-7469 FAX: 616-695-6004 C&D ASSOCIATES, INC. HEATER INSTALLATION INSTRUCTIONS FOR MODEL CD25K KIT, P/N CD11006K2 For Piper Aircraft PA-E23-250, PA-23-250 (24VDC) Aztec S/N 27-259 thru 27-364, 27-402, 27-2298, 27-2331. READ COMPLETE INSTRUCTIONS BEFORE BEGINNING INSTALLATION IN11006K2 Page 1 of 2 3-15-01 Rev- 1. Follow the Aircraft Service Manual or other FAA approved source for removal of the existing combustion heater. 2. Install the C&D Associates, Inc., TSO-C20 Approved combustion heater utilizing the existing Aircraft Service Manual or other FAA approved source where applicable. A. Remove the old safety valve and fuel filter assembly from the firewall. For carborated aircraft install the new fuel pump (CD21199) with the safety wired end cap down, using the legs of the pump as a template for the new bolt pattern. Replace the fuel lines with those included with the kit. B. Replace the old exhaust pipe and shroud and shroud retainer with the new ones included with the heater kit. Secure the exhaust pipe and shroud with two stainless steel 10/32 bolts supplied with exhaust pipe. The shroud retainer will replace the old one in the A/C skin. C. Combustion Air Blower: If room permits locate the combustion air blower on the heater using the mounting bracket P/N 21191B and two six inch clamps. (Figure 1) If room does not permit, discard the bracket and two clamps and install the combustion air blower above the heater on the existing shelf. Connect the combustion air hose (red) as shown. (Figure 2) FIGURE 1 FIGURE 2 CC ASSOCIATES Optional combustion air blower installation locations. FAA APPROVED NOV 05 2001 CHICAGO AIRCRAFT CERTIFICATION OFFICE CENTRAL REGION D. The adjustable duct switch P/N CD21253 is to be installed aft of the heater in the plenum. Make two 1/16" holes 2-5/8" apart in a convenient location. Half way between the 1/16" holes, drill a 1/2" hole for the thermister and mount the switch using two sheet metal screws. 302 POST ROAD, BUCHANAN, MI, USA PHONE: 616-695-7469 FAX: 616-695-6004 C&D ASSOCIATES, INC. IN11006K2 Page 2 of 2 3-15-01 Rev- 3. Electrical: This heater installation comes with a new heater control switch P/N CD20654. This switch replaces the old heater wiring, old heater control switch and high-low switch if equipped. A. Remote shutoff (Fuel injected only) or fuel pump: There is only one wire you may want to reuse. Locate this wire, marked H2B, running from the old heater terminal 2 to the safety valve on the firewall. In the new installation this wire will connect from the fuel pump or shutoff valve over to the new heater terminal strip number 2. B. Heater Electrical Connection (Figure 3): Remove the old heater control switch. Locate and identify the wire running from the heater circuit breaker to the old heater switch. Marking on this old wire will be H3A. This wire is to be connected to the red wire on the new switch. Route the remaining wires (blue, white, and two yellow) to the new heater. Secure in route in accordance with AC 43.13-1A Chapter 12 for Electrical applications. The blue wire from the new switch is for the vent fan and will be connected to the heater terminal strip number 6. The white wire is connected to the heater terminal strip number 1. C. Thermostat (see step 2D): Connect thermostat red wire to the heater terminal 2 and blue wire to terminal 3. The two yellow wires are to join the switches yellow wires, in any order. D. Combustion Air Blower: Black wire to airframe ground, red wire to heater terminal strip #1. E. Old Wiring: CAUTION: The old wire marked H3A or H3B is hot any time the master switch is on. Remove or secure the ends of the old wiring. Optional hour meter is connected to terminal #2. Optional overheat light may be connected to terminal #4 on the heater strip. св WHITE VENTILATING AIR BLOWER 12/24 VDC 20/15 AMP BLUE 6 YELLOW YELLOW (OPTIONAL) OVERHEAT WARNING LAMP 5 SWITCH, ROTARY 3 POLE/12 POSITION 4 FUEL NOZZLE CYCLING SWITCH T TYPICAL AIRCRAFT CONTROLS (OPTIONAL) HOUR METER ADJUSTABLE DUCT SWITCH COMBUSTION AIR BLOWER IGNITION UNIT IGNITION LEAD COMBUSTION AIR PRESSURE SWITCH OVER HEAT FUEL PUMP SWITCH FUEL CELL AND/OR SHUT OFF VALVE FIGURE 3 ASSEMBLED ON HEATER SPARK PLUG FUEL SOLENDID Hi FAA APPROVED NOV 05 2001 CHICAGO AIRCRAFT CERTIFICATION OFFICE CENTRAL REGION 4. Follow the 'Combustion Heater PREFLIGHT/OPERATIONAL CHECK AND SHUTDOWN PROCEDURE' outlined within the Combustion Heater "Air-worthiness Limitations", First Edition, Revision B, dated 01-01-00, or later revision, included with these instructions. This FAA-approved Airworthiness Limitations must become a permanent part of the Aircraft Operations and Procedures manual. 5. NOTE: Full compliance with the enclosed 'Combustion Heater Airworthiness Limitations' is required. 6. NOTE: Removal of the combustion heater and the installation of the C&D Assoc. Products TSO-C20 approved heater will have no affect on electrical load. 7. NOTE: Weight and balance change: Remove South Wind heater weighing 23 pounds and install C&D heater weighing 28 pounds. 302 POST ROAD, BUCHANAN, MI, USA PHONE: 616-695-7469 FAX: 616-695-6004




