Skip to main content

Checklist for the Piper PA-39 Twin Comanche C/R

Piper PA-39 Twin Comanche C/R · Checklist

Free account — keep the POHs & checklists you reference in one place.

Overview

This document serves as a checklist for the Piper PA-39 Twin Comanche C/R, providing pilots with a structured guide to ensure all necessary pre-flight, in-flight, and post-flight procedures are followed. It is designed to enhance safety and efficiency during operations of the aircraft. The checklist includes critical steps that pilots must complete to verify the aircraft's readiness for flight, as well as procedures to follow during various phases of operation. This document is essential for both experienced pilots and those new to the Piper PA-39, ensuring compliance with operational standards and safety protocols.

  • Perform a thorough Preflight Inspection to ensure aircraft readiness.
  • Follow the correct Engine Start Procedures to prevent damage.
  • Complete all Before Takeoff checks, including flight plan verification.
  • Monitor engine performance and fuel consumption during flight.
  • Conduct Post-Flight Procedures to secure the aircraft and log flight details.

Document

Source

Originally published by www.piperflyer.com. Sprinkle hosts a reference copy with an added summary, specifications and searchable full text.

Report a problem or request removal

Document details

Type
Checklist
Pages
8
File size
954 KB
Publisher
www.piperflyer.com
How rare is it?
5Piper PA-39 Twin Comanche C/R registered worldwide · 0 active

Common. Rarer than 10% of the aircraft models we track.

Documentation completeness
5/7

Most owners only have the POH. Here's the essential set for the Piper PA-39 Twin Comanche C/R.

More Piper PA-39 Twin Comanche C/Rmanuals & documents

See all 21

In this document

Preflight Inspection

The Preflight Inspection section outlines the necessary checks to be performed before flight. This includes verifying fuel levels, oil levels, and checking the condition of the aircraft's exterior and control surfaces. Pilots are advised to ensure that all required documents are on board and that the aircraft is free of any hazards.

Engine Start Procedures

This section details the steps for safely starting the engines of the Piper PA-39. It includes checks for fuel selectors, mixture settings, and electrical systems. The checklist emphasizes the importance of following the correct sequence to prevent engine damage and ensure a smooth start.

Before Takeoff

The Before Takeoff section provides a comprehensive list of actions to be taken prior to departing. This includes verifying the flight plan, conducting a final check of instruments, and ensuring that all safety equipment is in place. Pilots are reminded to perform a thorough briefing with the crew.

In-Flight Procedures

In-Flight Procedures cover essential actions during flight, including monitoring engine performance, fuel consumption, and navigation systems. This section also includes emergency procedures that pilots should be familiar with in case of an unexpected situation.

Post-Flight Procedures

The Post-Flight Procedures section outlines the steps to be taken after landing. This includes securing the aircraft, completing flight logs, and conducting a post-flight inspection to identify any issues that may need addressing before the next flight.

Safety notes

  • Always verify fuel and oil levels before flight.
  • Ensure all safety equipment is functional and accessible.
  • Follow emergency procedures as outlined in the In-Flight Procedures section.

Full document text

PIPER 4-77 Piper Aircraft Corporation SERVICE axy gears 6/5 No. 782A Ise replaced Bungees. LETTER Lock Haven, Pennsylvania, U.S.A. March 21, 1977 S/M 1 (Supersedes and voids Service Letter No. 782 dated October 13, 1976.) Subject: Reason for Revision: Landing Gear Manual Extension System Inspection and Nose Gear Down Lock Spring Installation. 1. Inclusion of PA-24-400 Comanche; 2. Ref. NOTE, Compliance Time II. INSTALLATION below. Serial Numbers Affected: Models Affected: PA-24, PA-24-250 and PA-24-260 Comanche PA-24-400 Comanche PA-30 Twin Comanche 24-1 to 24-5047 Inclusive 26-2 to 26-148 Inclusive 30-1 to 30-2000 Inclusive PA-39 Twin Comanche "C/R" 39-1 to 39-155 Inclusive Compliance Time: I. INSPECTION: Recommended as follows; at the next regularly A. Aircraft with 1000 hours or more total time in operation scheduled inspection interval (100 Hour or Annual), and at each subsequent 500 hours of operation. B. Aircraft with less than 1000 hours total time in operation operation and at each subsequent 500 hours of operation. - at 1000 hours of II. INSTALLATION: (affected aircraft - reference Material Required II, below); Recommended during one of the above referenced inspection intervals or sooner, at owner/operator's discretion. NOTE: Aircraft (denoted in Material Required II, below) that have previously installed Piper Kit No. 760 627, Landing Gear Emergency Extension Security Installation as announced on Piper Service Spares Letter No. SP 325 dated February 12, 1973, do not require installation of Kit No. 761 082 described herein. over Service Letter No. 782A Page 2 Purpose: Reports have been received from the field describing failure of the landing gear to remain in the "down locked" position during landing roll-out. This condition occurred following: (1) normal (electrical) landing gear extension failure, and (2) landing gear extension by manual (emergency) system. Investigation revealed that the down lock mechanism did not remain engaged due to system wear, apparently as a result of inadequate system maintenance and inspection. In some cases, chronic landing gear circuit breaker tripping preceded actual failure (collapse), which should have indicated to the operator that system maintenance was needed. In order to properly maintain the landing gear system on the above referenced aircraft and to provide a "back-up" down lock mechanism, this Service Release: 1. Provides instructions to conduct a detailed landing gear manual extension system inspection, including system component wear limits, and 2. Announces the availability of a field installation kit containing material and instructions to install an additional nose gear down lock spring on earlier model aircraft (see Material Required No. II, below). Instructions: I. Inspection: attached. II. Installation: contained in Piper Kit Number 761 082, Nose Gear Down Lock Spring Installation Kit (reference Material Required II, below). Material Required: I. Refer to attached main and nose gear wear limit tables; replace components exceeding specified wear limits. II. Applies to: PA-24, PA-24-250 and PA-24-260 serial numbers 24-1 to 24-4782 Inclusive, 24-4784 to 24-4803 Inclusive; PA-24-400 Comanche, serial numbers 26-2 to 26-148 Inclusive; and PA-30 Twin Comanche, serial numbers 30-1 to 30-1716 Inclusive, 30-1718 to 30-1744 Inclusive: One (1) each per aircraft Piper Kit No. 761 082 Nose Gear Down Lock Spring Installation @ suggested unit list price $20.00A. Availability of Parts: Your Piper Field Service Facility. Effectivity Date: This Service Release is effective upon receipt. Summary: Please contact your Piper Field Service Facility to make arrangements for the inspection and product refinement installation described herein, as recommended in Compliance Time, above. Kit installation time is approximately 14 man-hours per aircraft. To minimize aircraft down time/labor expense, suggest coordination during routine aircraft inspection/maintenance interval. Service Letter No. 782 A Page 3 of 8 INSPECTION OF THE LANDING GEAR MANUAL EXTENSION SYSTEM REFERENCE CURRENT SERVICE MANUAL PARAGRAPH/FIGURE PA-24 Series PA-30/39 Series 1. Place aircraft on jacks... 2-10 2-12 2. 3. 4. 5. Disconnect each gear from the actuator; also disconnect the past center locking springs. Inspect all components for condition and wear. (Refer to attached tables I and II for wear limits.... Inspect rod ends for wear by clinching the bearing between a bolt and nut arrangement as shown on attached figure 1; using a dial indicator, measure the total free play between the ball and race. Maximum service limit is .005 inch.... Check the thru center travel of both the left and right drag links on the nose gear.. 6-46, 6-47 7-37, 7-38 6-48 7-39 N/A N/A 6-13, Fig. 6-3 7-10, Fig. 7-2 NOTE: Insure both nose gear drag links contact thru stops simultaneously..... 6-15, Step "H" 7-12, Step "H" 6. Check thru center travel of each main gear side brace link.... 6-32, Fig. 6-8a 7-23, Fig. 7-8a. 7. Install the downlock springs on the nose gear. NOTE: 8. 9. 10. If only one spring is used, obtain Piper Kit Number 761 082 for additional spring installation.... Disconnect and inspect main gear push pull cables... Hook up both main gears and check manual retraction only (transmission not connected)..... Hook up the nose gear and rig to operate with the main gear (transmission not connected ); synchronize the over-center locks 6-14 6-48 7-11 7-39 6-50, 6-55 7-41, 7-46 NOTE: At this point the landing gear is in a down locked serviceable condition, without benefit of the transmission.... 11. 12. 13. 14. Perform landing gear retraction load test. Reengage transmission; perform a retraction/ extension cycle of the landing gear electrically. Make necessary limit switch adjustments.. Insure landing gear is down and locked; remove aircraft from jacks. Make appropriate log book entries. 6-50, 6-55 6-58 7-41, 7-46 7-49 6-51 through 6-67 7-42 through 7-54

Show full text

Above data reflects June 1976 PA-24 and PA -30/39 Service Manual information. CLINCH THE ROD END BEARING BETWEEN THE BOLT AND NUT DIAL INDICATOR ROD END VICE FIGURE 1: INSPECTION OF ROD END BEARINGS REF. Service Letter # 782 A Page 4 of 8 eccccccccccccccccccccccc 11 -10 2. 12 3 MAIN GEAR WEAR LIMITS (See Table I) FWD 4A REF. Service Letter #782 A Page 5 of 8 Index Part Mfg. Limits Service Limits No. No. Item I.D. O.D. Min. Max. 1 AN26-25 Bolt .373/.371 .370 .373 2 14843-16 Bushing .375/.373 .373 .376 3 14843-30 Bushing .374/.376 .435/.433 .374 .377 .432 .435 44 20829 Stud .4365/.4385 .4365 .4395 22512 Stud .4365/.4385 .4365 .4395 4a 20829 Stud .497/.495 .494 .497 4a 22512 Stud .560/.558 .557 .560 55 20737-6 Bushing .498/.500 20737-14 Bushing .561/.563 .498 .501 .561 .564 99 20737-5 20737-13 Bushing .498/.500 .498 .501 Bushing .561/.563 .561 .564 7 AN4-23A Bolt .249 +.000 -.003 .245 .249 8 20737-8 Bushing .251/.249 .249 .252 9 AN26-21 Bolt .373/.371 .370 .373 10 14843-60 Bushing .373/.375 .435/.433 .373 .432 .435 .376 24911 Link .4365/.4385 .4365 .4395 25046 Link .4365/.4385 .4365 4395 20768 Link .4365/.4385 .4365 .4395 22577 Link .4365/.4385 .4365 4395 12 23412 12 22943 Bearing- Rod End (See Figure 1) .005 TABLE I: MAIN GEAR WEAR LIMITS REF. Service Letter # 782 A Page 6 of 8 11 -12 6 5 NOSE GEAR WEAR LIMITS (See Table II) 10 REF. Service Letter # 782 A Page 7 of 8 Index Part Mfg. Limits Service Limits No. No. Item I.D. O.D. Min. Max. AN6-34 Bolt .374 +.000 -.003 .370 .374 2 14843-18 Bushing .3745/.3755 .3745 .3765 3 14843-18 Bushing .3745/.3755 .3745 .3765 4 20737-4 Bushing .374/.376 .374 .377 5 22066 Bolt .3742/.3737 .3727 .3742 6 14843-18 Bushing .3745/.3755 .3745 .3765 7 AN6-23 Bolt .374 +.000 .370 .374 -.003 7 AN6-26 Bolt .374 +.000 .370 .374 -.003 88 14843-18 Bushing .3745/.3755 14843-19 Bushing .3745/.3755 .3745 .3765 .3745 .3765 9 20803 Bushing .374/.376 .374 .376 10 AN178-40 Bolt .4991/.4986 .4976 4991 11 20777 Bushing .5015/.5000 .5000 .5025 11 31766 Bushing .5015/.5000 .5000 .5025 12 12 22 17164-0 Bushing .4995/.5005 .4995 .5015 17164-4 Bushing .4995/.5005 .4995 .5015 TABLE II: NOSE GEAR WEAR LIMITS REF. Service Letter #782 A Page 8 of 8