Skip to main content

Airbus PMA parts

195,449 FAA-approved PMA parts

How to read FAA PMA parts records

Parts Manufacturer Approval records identify replacement parts approved by the FAA for use on type-certificated aircraft. Use the part number, part name, OEM make, PMA holder and status together; a table match is a starting point, not an installation approval.

Part NumberPart NamePMA HolderStatusDate
636D0050-559FILTER MODULERohr Inc/dba Goodrich AerostructuresCurrent2019-08-11
636D0050-577FILTER MODULERohr Inc/dba Goodrich AerostructuresCurrent2024-10-16
636D0051-507HOSE TUBERohr Inc/dba Goodrich AerostructuresCurrent2017-08-26
636D0051-509HOSE TUBERohr Inc/dba Goodrich AerostructuresCurrent2017-08-26
636D0051-511HOSE TUBERohr Inc/dba Goodrich AerostructuresCurrent2017-08-26
636D0052-501DOS ACTUATORRohr Inc/dba Goodrich AerostructuresCurrent2017-08-26
636K9001-1POWER PLANT QEC KITRohr Inc/dba Goodrich AerostructuresCurrent2017-08-26
636K9001-11POWER PLANT QEC KITRohr Inc/dba Goodrich AerostructuresCurrent2019-11-13
636K9001-13POWER PLANT QEC KITRohr Inc/dba Goodrich AerostructuresCurrent2020-04-14
636K9001-15POWER PLANT QEC KITRohr Inc/dba Goodrich AerostructuresCurrent2020-11-24
636K9001-17POWER PLANT QEC KITRohr Inc/dba Goodrich AerostructuresCurrent2024-10-16
636K9001-19POWER PLANT QEC KITRohr Inc/dba Goodrich AerostructuresCurrent2024-10-16
636K9001-21POWER PLANT QEC KITRohr Inc/dba Goodrich AerostructuresCurrent2024-10-16
636K9001-23POWER PLANT QEC KITRohr Inc/dba Goodrich AerostructuresCurrent2024-10-16
636K9001-25POWER PLANT QEC KITRohr Inc/dba Goodrich AerostructuresCurrent2024-10-16
636K9001-3POWER PLANT QEC KITRohr Inc/dba Goodrich AerostructuresCurrent2017-08-26
Page 912 of 3,909
PMA parts FAQ
What is an FAA PMA part?

A PMA part is a replacement or modification part approved under the FAA Parts Manufacturer Approval process for eligible type-certificated aircraft.

Does a PMA catalogue match prove a part can be installed?

No. Verify the part number, aircraft applicability, current approval status and required release paperwork with maintenance records or a qualified maintenance provider.