Boeing PMA parts
813,025 FAA-approved PMA parts
How to read FAA PMA parts records
Parts Manufacturer Approval records identify replacement parts approved by the FAA for use on type-certificated aircraft. Use the part number, part name, OEM make, PMA holder and status together; a table match is a starting point, not an installation approval.
| Part Number | Part Name | PMA Holder | Status | Date |
|---|---|---|---|---|
| 161A1213-1 | BUSHING | Gemini Engineering | Current | 2009-06-02 |
| 161A1213-1 | Bushing | Aviation Materials Management Inc | Current | 2013-02-26 |
| 161A1213-1 | Bushing | Aviation Materials Management, Inc | Current | 2015-02-12 |
| 161A1213-2 | Bushing | Aerotech Engineering Inc (Surrendered) | Historical | 2008-04-01 |
| 161A1213-2 | BUSHING | Aviation Materials Management Inc (CANCELLED 05/17/2010) | Historical | 2006-08-23 |
| 161A1213-2 | BUSHING | Gemini Engineering | Current | 2009-06-02 |
| 161A1213-2 | Bushing | Aviation Materials Management Inc | Current | 2013-02-26 |
| 161A1213-2 | Bushing | Aviation Materials Management, Inc | Current | 2015-02-12 |
| 161A1214-1 | Pin | Aerotech Engineering Inc (Surrendered) | Historical | 2007-03-28 |
| 161A1214-2 | Pin | Aerotech Engineering Inc (Surrendered) | Historical | 2007-03-28 |
| 161A1214-3 | Pin- Damper | Aerotech Engineering Inc (Surrendered) | Historical | 2007-03-28 |
| 161A1214-3 | PIN | Aviation Materials Management Inc (CANCELLED 05/17/2010) | Historical | 2006-08-23 |
| 161A1214-3 | PIN- DAMPER | Goodrich Landing Gear | Current | 2008-11-24 |
| 161A1214-3 | Pin | Aviation Materials Management Inc | Current | 2013-02-26 |
| 161A1214-3 | Pin | Aviation Materials Management, Inc | Current | 2015-02-12 |
| 161A1214-4 | PIN- DAMPER | Goodrich Landing Gear | Current | 2008-11-24 |
| 161A1215-1 | Nut-Damper, Torsion Link Apex, MLG | Aerotech Engineering Inc (Surrendered) | Historical | 2007-03-28 |
| 161A1215-1 | NUT | Aviation Materials Management Inc (CANCELLED 05/17/2010) | Historical | 2006-08-23 |
| 161A1215-1 | NUT-DAMPER | Goodrich Landing Gear | Current | 2008-11-24 |
| 161A1215-1 | Nut | Aviation Materials Management Inc | Current | 2013-02-26 |
| 161A1215-1 | Nut | Aviation Materials Management, Inc | Current | 2015-02-12 |
| 161A1215-2 | NUT-DAMPER | Goodrich Landing Gear | Current | 2008-11-24 |
| 161A1216-1 | WASHER | Aviation Materials Management Inc (CANCELLED 05/17/2010) | Historical | 2006-08-23 |
| 161A1216-1 | WASHER SPLINED | Gemini Engineering Inc | Current | 2009-11-15 |
| 161A1216-1 | WASHER- SPLINED | Goodrich Landing Gear | Current | 2008-11-24 |
| 161A1216-1 | Washer | Aviation Materials Management Inc | Current | 2013-02-26 |
| 161A1216-1 | Washer | Aviation Materials Management, Inc | Current | 2015-02-12 |
| 161A1216-2 | WASHER- SPLINED | Goodrich Landing Gear | Current | 2008-11-24 |
| 161A1217-1 | Washer Assy | Aerotech Engineering Inc (Surrendered) | Historical | 2007-03-28 |
| 161A1217-1 | WASHER | Aviation Materials Management Inc (CANCELLED 05/17/2010) | Historical | 2006-08-23 |
| 161A1217-1 | WASHER ASSY | Spirit AeroSystems Inc | Current | 2010-09-12 |
| 161A1217-1 | WASHER ASSY | Goodrich Landing Gear | Current | 2008-11-24 |
| 161A1217-1 | Washer | Aviation Materials Management Inc | Current | 2013-02-26 |
| 161A1217-1 | Washer | Aviation Materials Management, Inc | Current | 2015-02-12 |
| 161A1217-3 | WASHER ASSY | Goodrich Landing Gear | Current | 2008-11-24 |
| 161A1218-1 | Spacer | Aerotech Engineering Inc (Surrendered) | Historical | 2007-03-28 |
PMA parts FAQ
What is an FAA PMA part?
A PMA part is a replacement or modification part approved under the FAA Parts Manufacturer Approval process for eligible type-certificated aircraft.
Does a PMA catalogue match prove a part can be installed?
No. Verify the part number, aircraft applicability, current approval status and required release paperwork with maintenance records or a qualified maintenance provider.