Boeing PMA parts
813,025 FAA-approved PMA parts
How to read FAA PMA parts records
Parts Manufacturer Approval records identify replacement parts approved by the FAA for use on type-certificated aircraft. Use the part number, part name, OEM make, PMA holder and status together; a table match is a starting point, not an installation approval.
| Part Number | Part Name | PMA Holder | Status | Date |
|---|---|---|---|---|
| 113T2252-13 | COLLAR FITTING ASSY | Spirit AeroSystems Inc | Current | 2007-11-14 |
| 113T2252-14 | Collar Fitting Assy | Aerotech Engineering Inc (Surrendered) | Historical | 2006-12-28 |
| 113T2252-14 | COLLAR FITTING ASSY | Spirit AeroSystems Inc | Current | 2009-11-30 |
| 113T2253-1 | Splined Bushing | Aerotech Engineering Inc (Surrendered) | Historical | 2006-12-28 |
| 113T2253-2 | Splined Bushing | Aerotech Engineering Inc (Surrendered) | Historical | 2006-12-28 |
| 113T2253-3 | Splined Bushing | Aerotech Engineering Inc (Surrendered) | Historical | 2006-12-28 |
| 113T2253-7 | Splined Bushing Assy | Aerotech Engineering Inc (Surrendered) | Historical | 2006-12-28 |
| 113T2253-7 | BUSHING ASSY | Spirit AeroSystems Inc | Current | 2007-08-01 |
| 113T2271Y43 | HINGE FTG ASSY | AWS (USA) Inc | Historical | 2009-07-25 |
| 113T2271Y43 | HINGE FTG ASSY | Spirit AeroSystems Inc | Current | 2007-08-01 |
| 113T2271Y44 | HINGE FTG ASSY | Spirit AeroSystems Inc | Current | 2009-11-30 |
| 113T2276-5 | TRACK ASSY | AWS (USA) Inc | Historical | 2009-07-25 |
| 113T2302-1 | FABRIC COVERED AEROD | Spirit AeroSystems Inc | Current | 2010-09-28 |
| 113T2302-5 | FABRIC COVERED AEROD | Gemini Engineering Inc | Current | 2009-11-15 |
| 113T2311Y46 | NOSE SKIN | AWS (USA) Inc | Current | 2009-07-25 |
| 113T2401-5 | ROD ASSY | Sonic Industries Inc | Historical | 2004-06-02 |
| 113T3100-50 | END PLUG | Spirit AeroSystems Inc | Current | 2010-07-21 |
| 113T3100-51 | END PLUG | Gemini Engineering Inc | Current | 2009-11-15 |
| 113T3100-52 | SEAL | Spirit AeroSystems Inc | Current | 2010-09-28 |
| 113T3100-57 | SEAL | Spirit AeroSystems Inc | Current | 2010-07-21 |
| 113T5002-1 | Spacer Clamp-Up | Aerotech Engineering Inc (Surrendered) | Historical | 2008-02-06 |
| 113T5102-5 | RUB STRIP | Spirit AeroSystems Inc | Current | 2010-07-21 |
| 113T6105-2 | SEAL | Gemini Engineering | Current | 2009-06-02 |
| 113T6105-3 | SEAL | Gemini Engineering | Historical | 2005-12-15 |
| 113T6105Y2 | SEAL | Gemini Engineering Inc | Current | 2009-11-15 |
| 113T6105Y3 | SEAL | Aerotech Engineering Inc (Surrendered) | Historical | 2011-04-13 |
| 113T6105Y3 | SEAL | Gemini Engineering Inc | Current | 2009-11-15 |
| 113T6105Y3 | SEAL | Spirit AeroSystems Inc | Current | 2010-07-21 |
| 113T7100-23 | DISCHARGER BASE | Gemini Engineering | Current | 2009-06-02 |
| 113T7100-24 | DISCHARGER BASE | Gemini Engineering | Current | 2009-06-02 |
| 113T7104-1 | ADJUSTABLE WEIGHT | Gemini Engineering | Current | 2009-06-02 |
| 113T8004-1 | WASHER | Spirit AeroSystems Inc | Current | 2010-07-21 |
| 113T8006-1 | WASHER | Spirit AeroSystems Inc | Current | 2010-09-28 |
| 113T8006-2 | NUT | Spirit AeroSystems Inc | Current | 2010-09-28 |
| 113T8204-7 | BLADE SEAL | Aviation Materials Management Inc (CANCELLED 05/17/2010) | Historical | 2008-12-15 |
| 113T8204-7 | BLADE SEAL | Gemini Engineering Inc | Current | 2009-11-15 |
| 113T8204-7 | BLADE SEAL | Aviation Materials Management Inc | Historical | 2013-03-25 |
| 113T8204-7 | BLADE SEAL | Aviation Materials Management, Inc | Historical | 2015-02-12 |
| 113T8301-11 | SEAL | Gemini Engineering | Current | 2009-06-02 |
| 113T8301-11 | SEAL | Spirit AeroSystems Inc | Current | 2010-07-21 |
| 113T8313-6 | FITTING ASSY | Aviation Materials Management Inc (CANCELLED 05/17/2010) | Historical | 2008-12-15 |
PMA parts FAQ
What is an FAA PMA part?
A PMA part is a replacement or modification part approved under the FAA Parts Manufacturer Approval process for eligible type-certificated aircraft.
Does a PMA catalogue match prove a part can be installed?
No. Verify the part number, aircraft applicability, current approval status and required release paperwork with maintenance records or a qualified maintenance provider.