Skip to main content

Saab Aircraft AB PMA parts

1,646 FAA-approved PMA parts

How to read FAA PMA parts records

Parts Manufacturer Approval records identify replacement parts approved by the FAA for use on type-certificated aircraft. Use the part number, part name, OEM make, PMA holder and status together; a table match is a starting point, not an installation approval.

Part NumberPart NamePMA HolderStatusDate
WA142CZFloor PanelTeklamHistorical2007-06-16
WA151AZFloor PanelTeklamHistorical2007-06-16
WA151BZFloor PanelTeklamHistorical2007-06-16
WA152AZFloor PanelTeklamHistorical2007-06-16
WA152BZFloor PanelTeklamHistorical2007-06-16
WA161AZFloor PanelTeklamHistorical2007-06-16
WA161BZFloor PanelTeklamCurrent2007-06-16
WA162ACZFloor PanelTeklamHistorical2007-06-16
WA162AZFloor PanelTeklamHistorical2007-06-16
WA162BDZFloor PanelTeklamHistorical2007-06-16
WA162BZFloor PanelTeklamHistorical2007-06-16
WA162CZFloor PanelTeklamHistorical2007-06-16
WA162DZFloor PanelTeklamHistorical2007-06-16
WA171AZFloor PanelTeklamHistorical2007-06-16
WA171BZFloor PanelTeklamHistorical2007-06-16
WA171DZ-AFloor PanelTeklamHistorical2007-06-16
WA172AZFloor PanelTeklamHistorical2007-06-16
WA172BZFloor PanelTeklamHistorical2007-06-16
WA172CBZ-AFloor PanelTeklamHistorical2007-06-16
WA172CZ-AFloor PanelTeklamHistorical2007-06-16
WA181AZFloor PanelTeklamHistorical2007-06-16
WA181BZFloor PanelTeklamHistorical2007-06-16
WA182ACZFloor PanelTeklamHistorical2007-06-16
WA182AZFloor PanelTeklamHistorical2007-06-16
WA182AZ-AFloor PanelTeklamCurrent2007-06-16
WA182BZ-AFloor PanelTeklamHistorical2007-06-16
WA182CZFloor PanelTeklamHistorical2007-06-16
WA183BZFloor PanelTeklamHistorical2007-06-16
WA183CZFloor PanelTeklamHistorical2007-06-16
Page 32 of 33
PMA parts FAQ
What is an FAA PMA part?

A PMA part is a replacement or modification part approved under the FAA Parts Manufacturer Approval process for eligible type-certificated aircraft.

Does a PMA catalogue match prove a part can be installed?

No. Verify the part number, aircraft applicability, current approval status and required release paperwork with maintenance records or a qualified maintenance provider.