Skip to main content

Airborne Maintenance & Engineering Services FAA PMA parts

7,241 FAA-approved PMA parts

How to read FAA PMA parts records

Parts Manufacturer Approval records identify replacement parts approved by the FAA for use on type-certificated aircraft. Use the part number, part name, OEM make, PMA holder and status together; a table match is a starting point, not an installation approval.

Part NumberPart NameOEM MakeStatusDate
B37-53-022-210Opp -209BoeingCurrent2014-03-25
B37-53-022-211Attach Fitting - UpperBoeingCurrent2014-03-25
B37-53-022-215Intercostal - AFTBoeingCurrent2014-03-25
B37-53-022-216Opp -215BoeingCurrent2014-03-25
B37-53-022-217Tee - IntercostalBoeingCurrent2014-03-25
B37-53-022-218Opp -217BoeingCurrent2014-03-25
B37-53-022-219Tee - IntercostalBoeingCurrent2014-03-25
B37-53-022-220Opp -219BoeingCurrent2014-03-25
B37-53-022-221AngleBoeingCurrent2014-03-25
B37-53-022-222AngleBoeingCurrent2014-03-25
B37-53-022-223Cross ChannelBoeingCurrent2014-03-25
B37-53-022-224Cross ChannelBoeingCurrent2014-03-25
B37-53-022-225Cross Beam -AFTBoeingCurrent2014-03-25
B37-53-022-231AngleBoeingCurrent2014-03-25
B37-53-022-232AngleBoeingCurrent2014-03-25
B37-53-022-233FillerBoeingCurrent2014-03-25
B37-53-022-237AngleBoeingCurrent2014-03-25
B37-53-022-241Attach Fitting AFTBoeingCurrent2014-03-25
B37-53-022-243Cross ChannelBoeingCurrent2014-03-25
B37-53-022-247TeeBoeingCurrent2014-03-25
B37-53-022-248TeeBoeingCurrent2014-03-25
B37-53-022-249Radius FillerBoeingCurrent2014-03-25
B37-53-022-251Radius BlockBoeingCurrent2014-03-25
B37-53-023-201Chord - FailsafeBoeingCurrent2014-03-25
B37-53-023-203Chord - FailsafeBoeingCurrent2014-03-25
B37-53-023-205Chord - FailsafeBoeingHistorical2014-02-23
Page 136 of 145
PMA parts FAQ
What is an FAA PMA part?

A PMA part is a replacement or modification part approved under the FAA Parts Manufacturer Approval process for eligible type-certificated aircraft.

Does a PMA catalogue match prove a part can be installed?

No. Verify the part number, aircraft applicability, current approval status and required release paperwork with maintenance records or a qualified maintenance provider.