Skip to main content

Airborne Maintenance & Engineering Services FAA PMA parts

7,241 FAA-approved PMA parts

How to read FAA PMA parts records

Parts Manufacturer Approval records identify replacement parts approved by the FAA for use on type-certificated aircraft. Use the part number, part name, OEM make, PMA holder and status together; a table match is a starting point, not an installation approval.

Part NumberPart NameOEM MakeStatusDate
007-02201-317SpacerBoeingCurrent2018-05-20
007-02201-321AngleBoeingCurrent2018-05-20
007-02201-427AngleBoeingCurrent2018-05-20
007-02201-433AngleBoeingCurrent2018-05-20
007-02201-441AngleBoeingCurrent2018-05-20
007-02201-442AngleBoeingCurrent2018-05-20
007-02201-444AngleBoeingCurrent2018-05-20
007-02201-457AngleBoeingCurrent2018-05-20
007-02201-463AngleBoeingCurrent2018-05-20
007-02201-464AngleBoeingCurrent2018-05-20
007-02201-475ShimBoeingCurrent2018-05-20
007-02201-483AngleBoeingCurrent2022-05-11
007-02201-485AngleBoeingCurrent2022-05-11
007-02201-486AngleBoeingCurrent2022-05-11
007-02201-491AngleBoeingCurrent2018-05-20
007-02201-492AngleBoeingCurrent2018-05-20
007-02201-493AngleBoeingCurrent2022-05-11
007-02201-495AngleBoeingCurrent2018-05-20
007-02201-496AngleBoeingCurrent2018-05-20
007-02201-497AngleBoeingCurrent2022-05-11
007-02201-501AngleBoeingCurrent2018-05-20
007-02201-503AngleBoeingCurrent2022-05-11
007-02201-505AngleBoeingCurrent2018-05-20
007-02201-513FillerBoeingCurrent2018-05-20
007-02201-515AngleBoeingCurrent2018-05-20
007-02201-517AngleBoeingCurrent2018-05-20
007-02201-521PlateBoeingCurrent2018-05-20
007-02201-521Top PlateBoeingCurrent2022-05-11
007-02201-623AngleBoeingCurrent2018-05-20
007-02201-623BracketBoeingCurrent2022-05-11
Page 44 of 145
PMA parts FAQ
What is an FAA PMA part?

A PMA part is a replacement or modification part approved under the FAA Parts Manufacturer Approval process for eligible type-certificated aircraft.

Does a PMA catalogue match prove a part can be installed?

No. Verify the part number, aircraft applicability, current approval status and required release paperwork with maintenance records or a qualified maintenance provider.