Skip to main content

Airborne Maintenance & Engineering Services FAA PMA parts

7,241 FAA-approved PMA parts

How to read FAA PMA parts records

Parts Manufacturer Approval records identify replacement parts approved by the FAA for use on type-certificated aircraft. Use the part number, part name, OEM make, PMA holder and status together; a table match is a starting point, not an installation approval.

Part NumberPart NameOEM MakeStatusDate
007-09505-602TeeBoeingCurrent2022-05-11
007-09505-603ClipBoeingCurrent2018-05-20
007-09505-604ClipBoeingCurrent2018-05-20
007-09505-607Radius BlockBoeingCurrent2018-05-20
007-09505-609Channel SupportBoeingCurrent2018-05-20
007-09505-611TeeBoeingCurrent2018-05-20
007-09505-613TeeBoeingCurrent2018-05-20
007-09505-615TeeBoeingCurrent2018-05-20
007-09505-617TeeBoeingCurrent2018-05-20
007-09505-621Radius BlockBoeingCurrent2018-05-20
007-09505-623Radius BlockBoeingCurrent2018-05-20
007-09505-625FillerBoeingCurrent2022-05-11
007-09505-627FillerBoeingCurrent2022-05-11
007-09505-631AngleBoeingCurrent2022-05-11
007-09505-633AngleBoeingCurrent2022-05-11
007-09505-635Radius BlockBoeingCurrent2018-05-20
007-09505-637TeeBoeingCurrent2022-05-11
007-09505-638TeeBoeingCurrent2022-05-11
007-09505-639AngleBoeingCurrent2018-05-20
007-09505-641TeeBoeingCurrent2018-05-20
007-09505-642TeeBoeingCurrent2018-05-20
007-09505-643Radius BlockBoeingCurrent2022-05-11
007-09505-645TeeBoeingCurrent2018-05-20
007-09505-647TeeBoeingCurrent2018-05-20
007-09505-655DoublerBoeingCurrent2022-05-11
007-09505-657ChannelBoeingCurrent2022-05-11
007-09505-661TeeBoeingCurrent2018-05-20
007-09505-662TeeBoeingCurrent2018-05-20
007-09505-663DoublerBoeingCurrent2018-05-20
007-09505-664DoublerBoeingCurrent2018-05-20
Page 76 of 145
PMA parts FAQ
What is an FAA PMA part?

A PMA part is a replacement or modification part approved under the FAA Parts Manufacturer Approval process for eligible type-certificated aircraft.

Does a PMA catalogue match prove a part can be installed?

No. Verify the part number, aircraft applicability, current approval status and required release paperwork with maintenance records or a qualified maintenance provider.