Skip to main content

AmSafe Bridport FAA PMA parts

11,411 FAA-approved PMA parts

How to read FAA PMA parts records

Parts Manufacturer Approval records identify replacement parts approved by the FAA for use on type-certificated aircraft. Use the part number, part name, OEM make, PMA holder and status together; a table match is a starting point, not an installation approval.

Part NumberPart NameOEM MakeStatusDate
453U1557-25ACCESS PANEL ASSYBOEINGCurrent2011-02-03
453U1557-26ACCESS PANEL ASSYBOEINGCurrent2011-02-03
453U1557-28ACCESS PANEL ASSYBOEINGHistorical2011-02-03
453U1557-29ACCESS PANEL ASSYBOEINGCurrent2011-02-03
453U1557-30ACCESS PANEL ASSYBOEINGCurrent2011-02-03
453U1565-12ACCESS DOOR ASSYBOEINGCurrent2011-02-03
453U1565-4HINGE ASSYBOEINGCurrent2011-02-03
453U1574-1PANEL ASSYBOEINGHistorical2011-02-03
453U2004-1SEAL ASSY - WASTE TABOEINGCurrent2011-02-03
453U2004-2SEAL ASSY - WASTE TABOEINGCurrent2011-02-03
453U2004-3SEAL ASSY - WASTE TABOEINGHistorical2011-02-03
453U2004-4SEAL ASSY - WASTE TABOEINGHistorical2011-02-03
453U2004-5SEAL ASSY - WASTE TABOEINGCurrent2011-02-03
453U2004-6SEAL ASSY - WASTE TABOEINGCurrent2011-02-03
453U7128-1FABRIC LINER ASSYBOEINGCurrent2011-02-03
453U7128-10FABRIC LINER ASSYBOEINGCurrent2011-02-03
453U7128-14FABRIC LINER ASSYBOEINGCurrent2011-02-03
453U7128-15FABRIC LINER ASSYBOEINGCurrent2011-02-03
453U7128-16FABRIC LINER ASSYBOEINGCurrent2011-02-03
453U7128-17FABRIC LINER ASSYBOEINGCurrent2011-02-03
453U7128-18FABRIC LINER ASSYBOEINGCurrent2011-02-03
453U7128-19FABRIC LINER ASSYBOEINGCurrent2011-02-03
453U7128-2FABRIC LINER ASSYBOEINGCurrent2011-02-03
453U7128-20FABRIC LINER ASSYBOEINGCurrent2011-02-03
453U7128-22FABRIC LINER ASSYBOEINGCurrent2011-02-03
Page 49 of 229
PMA parts FAQ
What is an FAA PMA part?

A PMA part is a replacement or modification part approved under the FAA Parts Manufacturer Approval process for eligible type-certificated aircraft.

Does a PMA catalogue match prove a part can be installed?

No. Verify the part number, aircraft applicability, current approval status and required release paperwork with maintenance records or a qualified maintenance provider.