Skip to main content

Aviation Materials Management Inc FAA PMA parts

11,340 FAA-approved PMA parts

How to read FAA PMA parts records

Parts Manufacturer Approval records identify replacement parts approved by the FAA for use on type-certificated aircraft. Use the part number, part name, OEM make, PMA holder and status together; a table match is a starting point, not an installation approval.

Part NumberPart NameOEM MakeStatusDate
273T0050-1StrapBoeingCurrent2010-10-04
273T0050-12StrapBoeingCurrent2013-02-26
273T0050-5StrapBoeingCurrent2013-02-26
273T0050-6StrapBoeingCurrent2013-02-26
273T0050-7StrapBoeingCurrent2013-02-26
273T0073-1Actuator Assy-Door Main Landing GearBoeingCurrent2013-03-24
273T1100-5Actuator AssyBoeingCurrent2013-03-24
273T1100-6Actuator AssyBoeingCurrent2013-03-24
273T1146-1WasherBoeingCurrent2013-02-26
273T1147-1WasherBoeingCurrent2013-02-26
273T1300-2Transfer Cyl AssyBoeingCurrent2013-03-24
273T1300-7Transfer Cyl AssyBoeingCurrent2013-03-24
273T1400-10Valve Assy-Sequence, MLG OperatedBoeingCurrent2013-03-24
273T1400-3Valve AssyBoeingCurrent2013-03-24
273T1400-4Valve AssyBoeingCurrent2013-03-24
273T1400-7Valve AssyBoeingCurrent2013-03-24
273T1400-8Valve AssyBoeingCurrent2013-03-24
273T1400-9Valve Assy-Sequence, MLG OperatedBoeingCurrent2013-03-24
273T4110-4Actuator AssyBoeingCurrent2013-03-24
273T4110-6Actuator AssyBoeingCurrent2013-03-24
273T4110-8Actuator Assy-Retract Actuator Instl-Nose GearBoeingCurrent2013-03-24
273T4120-2Actuator AssyBoeingCurrent2013-03-24
273T4121-1Actuator Assy-Lock, Nose GearBoeingCurrent2013-03-24
273T4130-2Transfer Cylinder Assy-Nose GearBoeingCurrent2013-03-24
273T4520-9Actuator AssyBoeingCurrent2013-03-24
273T4538-1Arm Assy-UpperBoeingCurrent2013-03-24
Page 128 of 227
PMA parts FAQ
What is an FAA PMA part?

A PMA part is a replacement or modification part approved under the FAA Parts Manufacturer Approval process for eligible type-certificated aircraft.

Does a PMA catalogue match prove a part can be installed?

No. Verify the part number, aircraft applicability, current approval status and required release paperwork with maintenance records or a qualified maintenance provider.