Skip to main content

Aviation Materials Management Inc FAA PMA parts

11,340 FAA-approved PMA parts

How to read FAA PMA parts records

Parts Manufacturer Approval records identify replacement parts approved by the FAA for use on type-certificated aircraft. Use the part number, part name, OEM make, PMA holder and status together; a table match is a starting point, not an installation approval.

Part NumberPart NameOEM MakeStatusDate
287N6103-226Support AssyBoeingCurrent2010-10-04
287N6103-228CoverBoeingCurrent2013-02-26
287N6103-252Fwd J-Box AssyBoeingCurrent2013-02-26
287N6103-39BRACKET ASSYBoeingCurrent2013-03-25
287N6103-92GasketBoeingCurrent2013-02-26
287N6103-97BracketBoeingCurrent2013-02-26
287N6104-3Clamp GuideBoeingCurrent2013-03-25
287N6104-4Guide AssyBoeingCurrent2013-02-26
287N6115-1Support ClipBoeingCurrent2013-02-26
287N6115-2Support ClipBoeingCurrent2013-02-26
287N6115-3GuideBoeingCurrent2013-02-26
287N6115-4GuideBoeingCurrent2013-02-26
287N6116-1Conduit AssyBoeingCurrent2013-02-26
287N6116-11CONDUIT ASSYBoeingCurrent2013-03-25
287N6116-13CONDUIT ASSYBoeingCurrent2013-03-25
287N6116-15CONDUIT ASSYBoeingCurrent2013-03-25
287N6116-2Conduit AssyBoeingCurrent2013-02-26
287N6116-3Conduit AssyBoeingCurrent2013-02-26
287N6116-36CONDUIT ASSYBoeingCurrent2013-03-25
287N6116-4Conduit AssyBoeingCurrent2013-02-26
287N6116-5Conduit AssyBoeingCurrent2013-02-26
287N6117-7BracketBoeingCurrent2013-02-26
287N6117-8BracketBoeingCurrent2013-02-26
287N6202-11FLEX CONDUIT ASSYBoeingCurrent2013-03-25
287N6202-13Flex Conduit AssyBoeingCurrent2013-02-26
287N6202-17Flex Conduit AssyBoeingCurrent2013-02-26
287N6202-18FLEX CONDUIT ASSYBoeingCurrent2013-03-25
287N6202-19Flex Conduit AssyBoeingCurrent2013-02-26
Page 142 of 227
PMA parts FAQ
What is an FAA PMA part?

A PMA part is a replacement or modification part approved under the FAA Parts Manufacturer Approval process for eligible type-certificated aircraft.

Does a PMA catalogue match prove a part can be installed?

No. Verify the part number, aircraft applicability, current approval status and required release paperwork with maintenance records or a qualified maintenance provider.