Skip to main content

Aviation Materials Management Inc FAA PMA parts

11,340 FAA-approved PMA parts

How to read FAA PMA parts records

Parts Manufacturer Approval records identify replacement parts approved by the FAA for use on type-certificated aircraft. Use the part number, part name, OEM make, PMA holder and status together; a table match is a starting point, not an installation approval.

Part NumberPart NameOEM MakeStatusDate
161N3001-401Down Lock AssyBoeingCurrent2010-10-17
161N3001-402Down Lock AssyBoeingCurrent2013-03-24
161N3001-7Down Lock AssyBoeingCurrent2013-03-24
161N3001-8Down Lock AssyBoeingCurrent2013-03-24
161N3002-3Down Lock Link AssyBoeingCurrent2013-03-24
161N3002-4Down Lock Link AssyBoeingCurrent2013-03-24
161N3004-3Down Lock Link Assy-Lower, Main Landing GearBoeingCurrent2013-03-24
161N3004-4Down Lock Link Assy-Lower, Main Landing GearBoeingCurrent2013-03-24
161N4001-1PinBoeingCurrent2013-03-24
161N4001-2PinBoeingCurrent2013-03-24
161N4002-1SpacerBoeingCurrent2013-03-24
161N5001-5Actuator AssyBoeingCurrent2013-03-24
161N5001-5ActuatorBoeingCurrent2013-02-26
161N5001-7Actuator AssyBoeingCurrent2013-03-24
161N5001-7ActuatorBoeingCurrent2013-02-26
161N5001-900ShimBoeingCurrent2013-03-24
161N5002-4Uplock AssemblyBoeingCurrent2013-03-24
161N5002-5Uplock AssyBoeingCurrent2013-03-24
161N5002-6Uplock AssemblyBoeingCurrent2013-03-24
161N5002-7Uplock AssyBoeingCurrent2013-03-24
161N5012-1Fitting AssyBoeingCurrent2013-03-24
161N5023-1Shoulder BoltBoeingCurrent2013-03-24
161N5023-3Shoulder BoltBoeingCurrent2013-03-24
161N5029-1Fitting AssyBoeingCurrent2013-03-24
161T0000-101Buildup AssyBoeingCurrent2010-10-17
161T0000-102Buildup AssyBoeingCurrent2010-10-17
161T0000-103Buildup AssyBoeingCurrent2010-10-17
Page 47 of 227
PMA parts FAQ
What is an FAA PMA part?

A PMA part is a replacement or modification part approved under the FAA Parts Manufacturer Approval process for eligible type-certificated aircraft.

Does a PMA catalogue match prove a part can be installed?

No. Verify the part number, aircraft applicability, current approval status and required release paperwork with maintenance records or a qualified maintenance provider.