Skip to main content

Goodrich Landing Gear FAA PMA parts

9,961 FAA-approved PMA parts

How to read FAA PMA parts records

Parts Manufacturer Approval records identify replacement parts approved by the FAA for use on type-certificated aircraft. Use the part number, part name, OEM make, PMA holder and status together; a table match is a starting point, not an installation approval.

Part NumberPart NameOEM MakeStatusDate
272W6160-9BRACKETBoeingCurrent2009-10-29
272W6160-90BRACKET ASSY - HYDRABoeingCurrent2009-10-29
272W6161-1LOWER LINK ASSYBoeingHistorical2009-07-28
272W6161-10LOWER LINK, SHELF SUBoeingHistorical2009-07-28
272W6161-11LOWER LINK, GUIDE SUBoeingHistorical2009-07-28
272W6161-12LOWER LINK ASSY - MABoeingHistorical2009-07-28
272W6161-2MACHINED CASTINGBoeingHistorical2009-07-28
272W6161-3CASTINGBoeingHistorical2009-07-28
272W6161-4LOWER LINK ASSYBoeingHistorical2009-07-28
272W6161-5MACHINED CASTINGBoeingHistorical2009-07-28
272W6161-6LOWER LINK ASSY - MABoeingHistorical2009-07-28
272W6161-7LOWER LINK, FRAME -BoeingHistorical2009-07-28
272W6161-8LOWER LINK, SHELF -BoeingHistorical2009-07-28
272W6161-9LOWER LINK, SHELF SUBoeingHistorical2009-07-28
272W6162-1HOSE GUIDEBoeingCurrent2008-11-24
272W6162-12HOSE GUIDEBoeingCurrent2008-11-24
272W6162-14HOSE GUIDEBoeingCurrent2008-11-24
272W6162-15HOSE GUIDEBoeingCurrent2008-11-24
272W6162-2HOSE GUIDEBoeingCurrent2008-11-24
272W6162-3HOSE GUIDEBoeingCurrent2008-11-24
272W6162-4HOSE GUIDEBoeingCurrent2008-11-24
272W6162-5HOSE GUIDEBoeingCurrent2008-11-24
272W6162-6HOSE GUIDEBoeingCurrent2008-11-24
272W6163-2BUSHINGBoeingCurrent2008-11-24
272W6164-1STOP PLATEBoeingCurrent2008-11-24
272W6165-1PAD - PHENOLICBoeingCurrent2009-10-29
Page 104 of 200
PMA parts FAQ
What is an FAA PMA part?

A PMA part is a replacement or modification part approved under the FAA Parts Manufacturer Approval process for eligible type-certificated aircraft.

Does a PMA catalogue match prove a part can be installed?

No. Verify the part number, aircraft applicability, current approval status and required release paperwork with maintenance records or a qualified maintenance provider.