Skip to main content

Goodrich Landing Gear FAA PMA parts

9,961 FAA-approved PMA parts

How to read FAA PMA parts records

Parts Manufacturer Approval records identify replacement parts approved by the FAA for use on type-certificated aircraft. Use the part number, part name, OEM make, PMA holder and status together; a table match is a starting point, not an installation approval.

Part NumberPart NameOEM MakeStatusDate
161N2301-22REACTION LINK ASSEMBBoeingHistorical2009-07-28
161N2301-23REACTION LINK ASSEMBBoeingHistorical2009-07-28
161N2301-24REACTION LINK ASSEMBBoeingHistorical2009-07-28
161N2301-25REACTION LINK ASSEMBBoeingHistorical2009-07-28
161N2301-26REACTION LINK ASSEMBBoeingHistorical2009-07-28
161N2301-7REACTION LINK ASSEMBBoeingHistorical2009-07-28
161N2301-8REACTION LINK ASSEMBBoeingHistorical2009-07-28
161N2301-9REACTION LINK - MAINBoeingHistorical2009-07-28
161N2501-5SWIVEL ASSYBoeingCurrent2009-04-08
161N2501-6SWIVELBoeingCurrent2009-04-08
161N2503-3SWIVEL ASSYBoeingCurrent2009-04-08
161N2503-4SWIVEL-LOWERBoeingCurrent2009-04-08
161N2510-10PIN-UPPERBoeingCurrent2009-04-08
161N2510-11PIN-LOWERBoeingCurrent2009-04-08
161N2510-12PIN-APEXBoeingCurrent2009-04-08
161N3001-23DOWN LOCK ASSYBoeingCurrent2009-04-08
161N3001-24DOWN LOCK ASSYBoeingCurrent2009-04-08
161N3002-3DOWNLOCK LINK ASSYBoeingCurrent2009-04-08
161N3002-4DOWNLOCK LINK-UPPERBoeingCurrent2009-04-08
161N3004-3DOWNLOCK LINK ASSY - LOWER, MAIN LANDING GEARBoeingCurrent2009-04-08
161N3004-4DOWNLOCK LINK - LOWER, MAIN LANDING GEARBoeingCurrent2009-04-08
161N3008-1SPRING RETAINERBoeingCurrent2009-04-08
161N3008-2SPRING RETAINERBoeingCurrent2009-04-08
161N3009-1SPRING RETAINERBoeingCurrent2009-04-08
161N3010-2FUSE PINBoeingCurrent2009-04-08
Page 25 of 200
PMA parts FAQ
What is an FAA PMA part?

A PMA part is a replacement or modification part approved under the FAA Parts Manufacturer Approval process for eligible type-certificated aircraft.

Does a PMA catalogue match prove a part can be installed?

No. Verify the part number, aircraft applicability, current approval status and required release paperwork with maintenance records or a qualified maintenance provider.