Skip to main content

Goodrich Landing Gear FAA PMA parts

9,961 FAA-approved PMA parts

How to read FAA PMA parts records

Parts Manufacturer Approval records identify replacement parts approved by the FAA for use on type-certificated aircraft. Use the part number, part name, OEM make, PMA holder and status together; a table match is a starting point, not an installation approval.

Part NumberPart NameOEM MakeStatusDate
272T6146-27BRACKET, SUPPORTBoeingCurrent2009-04-08
272T6146-28BRACKET, SUPPORTBoeingCurrent2009-04-08
272T6146-29BRACKET ASSYBoeingCurrent2009-04-08
272T6146-30BRACKET, SUPPORTBoeingCurrent2009-04-08
272T6146-31BRACKET, SUPPORTBoeingCurrent2009-04-08
272T6146-33BRACKET, SUPPORTBoeingCurrent2009-04-08
272T6146-34BRACKET, SUPPORTBoeingCurrent2009-04-08
272T6146-35BRACKET, SUPPORTBoeingCurrent2009-04-08
272T6146-36BRACKET, SUPPORTBoeingCurrent2009-04-08
272T6146-41BRACKET ASSYBoeingCurrent2009-04-08
272T6146-42BRACKET ASSYBoeingCurrent2009-04-08
272T6146-43BRACKETBoeingCurrent2009-04-08
272T6146-44BRACKETBoeingCurrent2009-04-08
272T6146-65BRACKET, SUPPORT, HYDRAULIC, SECTION 61BoeingCurrent2009-04-08
272T6146-66BRACKET, SUPPORTBoeingCurrent2009-04-08
272T6146-67BRACKET ASSY, SUPPORT, HYDRAULIC, SECTION 61BoeingCurrent2009-04-08
272T6146-68BRACKET ASSY, SUPPORT, HYDRAULIC, SECTION 61BoeingCurrent2009-04-08
272T6214-1BRACKET-BoeingHistorical2009-07-28
272U6100-10TUBE ASSY-BoeingCurrent2009-10-29
272U6100-101TUBE ASSY-BoeingCurrent2009-10-29
272U6100-102TUBE ASSY-BoeingCurrent2009-10-29
272U6100-13TUBE ASSYBoeingCurrent2009-10-29
272U6100-14TUBE ASSYBoeingCurrent2009-10-29
272U6100-5TUBE ASSY-BoeingCurrent2009-10-29
272U6100-6TUBE ASSY-BoeingCurrent2009-10-29
272U6100-9TUBE ASSY-BoeingCurrent2009-10-29
Page 97 of 200
PMA parts FAQ
What is an FAA PMA part?

A PMA part is a replacement or modification part approved under the FAA Parts Manufacturer Approval process for eligible type-certificated aircraft.

Does a PMA catalogue match prove a part can be installed?

No. Verify the part number, aircraft applicability, current approval status and required release paperwork with maintenance records or a qualified maintenance provider.