Skip to main content

Panasonic Avionics Corporation FAA PMA parts

101,417 FAA-approved PMA parts

How to read FAA PMA parts records

Parts Manufacturer Approval records identify replacement parts approved by the FAA for use on type-certificated aircraft. Use the part number, part name, OEM make, PMA holder and status together; a table match is a starting point, not an installation approval.

Part NumberPart NameOEM MakeStatusDate
IS60354-01Seat EquipmentBoeingCurrent2007-07-03
IS60354-02Seat EquipmentBoeingCurrent2015-04-18
IS60366-01Seat Configuration KitBoeingCurrent2015-04-18
IS60366-02Seat Configuration KitBoeingCurrent2015-04-18
IS60366-03Seat Configuration KitBoeingCurrent2015-04-18
IS60366-05Seat Configuration KitBoeingCurrent2015-04-18
IS60368-01eX2 Seat EquipmentBoeingCurrent2015-04-18
IS60368-02eX2 Seat EquipmentBoeingCurrent2015-04-18
IS60368-03eX2 Seat EquipmentBoeingCurrent2015-04-18
IS60368-05eX2 Seat Equipment ConfigurationBoeingCurrent2015-04-18
IS60368-06Seat EquipmentBoeingCurrent2015-04-18
IS60396-01eFX Seat EquipmentBoeingCurrent2015-04-18
IS60396-02eFX Seat EquipmentBoeingCurrent2015-04-18
IS60396-04eFX Seat EquipmentBoeingCurrent2015-04-18
IS60396-05eFX Seat EquipmentBoeingCurrent2015-04-18
IS60396-06eFX Seat EquipmentBoeingCurrent2015-04-18
IS60396-07eFX Seat EquipmentBoeingCurrent2015-04-18
IS60408-01Seat KitBoeingCurrent2015-04-18
IS60408-02Seat KitBoeingCurrent2015-04-18
IS60408-03Seat KitBoeingCurrent2015-04-18
IS60408-04Seat KitBoeingCurrent2015-04-18
IS60408-05Seat KitBoeingCurrent2015-04-18
IS60408-06Seat KitBoeingCurrent2015-04-18
IS60408-07Seat Configuration KitBoeingCurrent2015-04-18
IS60408-08Seat KitBoeingCurrent2015-04-18
IS60411-01Seat Equipment ConfigurationBoeingCurrent2015-04-18
Page 74 of 2,029
PMA parts FAQ
What is an FAA PMA part?

A PMA part is a replacement or modification part approved under the FAA Parts Manufacturer Approval process for eligible type-certificated aircraft.

Does a PMA catalogue match prove a part can be installed?

No. Verify the part number, aircraft applicability, current approval status and required release paperwork with maintenance records or a qualified maintenance provider.