Skip to main content

Parker Hannifin Corp FAA PMA parts

8,608 FAA-approved PMA parts

How to read FAA PMA parts records

Parts Manufacturer Approval records identify replacement parts approved by the FAA for use on type-certificated aircraft. Use the part number, part name, OEM make, PMA holder and status together; a table match is a starting point, not an installation approval.

Part NumberPart NameOEM MakeStatusDate
010-002-013Tank UnitBoeingCurrent2012-06-25
010-002-014Tank UnitBoeingCurrent2012-04-25
010-002-015Tank UnitBoeingCurrent2012-04-25
010-002-016Tank UnitBoeingCurrent2012-04-25
010-002-017Tank UnitBoeingCurrent2012-04-25
010-002-018Tank UnitBoeingCurrent2012-04-25
010-002-019Tank UnitBoeingCurrent2012-04-25
010-002-020Tank UnitBoeingCurrent2012-04-25
010-002-021Tank UnitBoeingCurrent2012-04-25
010-002-022Tank UnitBoeingCurrent2012-04-25
010-005-( )Tank UnitBoeingCurrent2012-04-25
010-05101Master CylinderEurocopter DeutschlandHistorical2002-12-11
010-906-001Wing GageDassaultCurrent2013-11-26
010-906-002Wing GageDassaultCurrent2013-11-26
010-907-001Wing Center GageDassaultCurrent2013-11-26
011-001-( )Tank UnitBoeingCurrent2012-04-25
013-901-001Feeder Tank GageDassaultCurrent2013-11-26
015-001-003TransmitterBoeingCurrent2009-10-14
015-001-004TransmitterBoeingCurrent2009-10-14
015-00100Shimmy Dampener, Nose GearPiperHistorical1996-02-04
019-002-003TransmitterBoeingCurrent2009-10-14
019-002-004Repeater IndicatorBoeingCurrent2009-10-14
019-012-001Hydraulic TransmitterBoeingCurrent2009-10-14
019-012-002Hydraulic TransmitterBoeingCurrent2009-10-14
019-012-003TransmitterBoeingCurrent2009-10-14
019-028-001Transmitter, Quantity ReservoirBoeingCurrent2013-04-15
020-016-( )Tank UnitBoeingCurrent2012-04-25
Page 2 of 173
PMA parts FAQ
What is an FAA PMA part?

A PMA part is a replacement or modification part approved under the FAA Parts Manufacturer Approval process for eligible type-certificated aircraft.

Does a PMA catalogue match prove a part can be installed?

No. Verify the part number, aircraft applicability, current approval status and required release paperwork with maintenance records or a qualified maintenance provider.