Skip to main content

Sonic Industries Inc FAA PMA parts

5,391 FAA-approved PMA parts

How to read FAA PMA parts records

Parts Manufacturer Approval records identify replacement parts approved by the FAA for use on type-certificated aircraft. Use the part number, part name, OEM make, PMA holder and status together; a table match is a starting point, not an installation approval.

Part NumberPart NameOEM MakeStatusDate
69B80006-1VALVE VENTBOEINGHistorical2004-06-02
69B80017-1RETAINERBOEINGHistorical2004-06-02
69B80023-2PISTON RODBOEINGHistorical2004-06-02
69B80028-1SLEEVEBOEINGHistorical2004-06-02
69B80047-1SLEEVEBOEINGHistorical2004-06-02
69B80166-2BOLTBoeingCurrent2003-03-16
69B80168-12WASHERBoeingCurrent2006-05-14
69B80205-1BOLTBoeingCurrent2003-03-16
69B80340-1BOLTBoeingCurrent2003-03-16
69B80341-1BOLTBoeingCurrent2003-03-16
69B80341-2BOLTBoeingCurrent2003-03-16
69B80345-2BOLTBoeingCurrent2003-03-16
69B80345-3BOLTBoeingCurrent2003-03-16
69B80345-4BOLTBoeingCurrent2003-03-16
69B80816-1PIN RETAINRBOEINGHistorical2004-06-02
69B80871-1SLEEVEBOEINGHistorical2004-06-02
69B80875-1BOLTBoeingCurrent2006-05-14
69B80875-2BOLTBoeingCurrent2006-05-14
69B81033-3BOLT AssemblyBoeingCurrent2003-03-16
69B81033-4BOLT AssemblyBoeingCurrent2003-03-16
69B81040-2PINBOEINGCurrent2010-01-20
69B81040-2SHEAR PINBoeingCurrent2003-03-16
69B81348-1BOLT AssemblyBoeingCurrent2003-03-16
69B81349-4OUTER PINBOEINGHistorical2004-06-02
69B81622-4PIN AssemblyBoeingCurrent2003-03-16
69B81622-6PIN AssemblyBoeingCurrent2003-03-16
69B81622-7PIN AssemblyBoeingCurrent2003-03-16
69B81754-6BOLTBoeingCurrent2006-05-14
69B81990-1BOLT AssemblyBoeingCurrent2003-03-16
69B81990-10BOLT AssemblyBoeingCurrent2003-03-16
69B81990-11BOLT AssemblyBoeingCurrent2003-03-16
Page 101 of 108
PMA parts FAQ
What is an FAA PMA part?

A PMA part is a replacement or modification part approved under the FAA Parts Manufacturer Approval process for eligible type-certificated aircraft.

Does a PMA catalogue match prove a part can be installed?

No. Verify the part number, aircraft applicability, current approval status and required release paperwork with maintenance records or a qualified maintenance provider.