Skip to main content

Sonic Industries Inc FAA PMA parts

5,391 FAA-approved PMA parts

How to read FAA PMA parts records

Parts Manufacturer Approval records identify replacement parts approved by the FAA for use on type-certificated aircraft. Use the part number, part name, OEM make, PMA holder and status together; a table match is a starting point, not an installation approval.

Part NumberPart NameOEM MakeStatusDate
114T2130-51BOLT assemblyBoeingCurrent2004-01-13
114T2130-55BOLT assemblyBoeingCurrent2003-03-16
114T2130-59BOLT assemblyBoeingCurrent2003-03-16
114T2130-6BOLT assemblyBoeingCurrent2003-03-16
114T3007-1BOLT assemblyBoeingCurrent2003-03-16
114T3007-3BOLT assemblyBoeingCurrent2003-03-16
114T3007-5BOLT assemblyBoeingCurrent2003-03-16
114T3051-1BOLT ASSYBOEINGCurrent2003-02-27
114T4000-65BOLTBOEINGCurrent2010-01-20
114T4000-66BOLTBOEINGCurrent2010-01-20
114T4145-1BOLT ASSYBOEINGCurrent2003-02-27
114T4145-2BOLTBOEINGCurrent2010-01-20
114T4145-5BOLT assemblyBoeingCurrent2003-03-16
114T4145-7BOLT ASSYBoeingCurrent2006-05-14
114T4145-7BOLTBoeingHistorical2004-04-25
114T4145-8BOLTBoeingCurrent2003-03-16
114T4145-9BOLTBoeingCurrent2006-05-14
114W4002-1BOLTBoeingCurrent2003-03-16
114W4002-3BOLTBoeingCurrent2003-03-16
114W4002-5BOLTBoeingCurrent2003-03-16
114W4002-7BOLTBoeingCurrent2003-03-16
114W4012-1BUSHINGBoeingCurrent2006-05-14
114W4012-3BUSHINGBoeingCurrent2006-05-14
114W4013-1SPACERBoeingCurrent2006-05-14
114W4014-1LOCKING KEYBoeingCurrent2006-05-14
114W4014-3LOCKING KEYBoeingCurrent2006-05-14
115A1310-1FUSE PINBoeingCurrent2003-03-16
115A1310-2FUSE PINBoeingCurrent2003-03-16
115A1310-3FUSE PINBoeingCurrent2003-03-16
115A1320-1FUSE PINBoeingCurrent2003-03-16
115A2930-7SEAL BULKHEAD ASSYBoeingCurrent2006-05-14
Page 19 of 108
PMA parts FAQ
What is an FAA PMA part?

A PMA part is a replacement or modification part approved under the FAA Parts Manufacturer Approval process for eligible type-certificated aircraft.

Does a PMA catalogue match prove a part can be installed?

No. Verify the part number, aircraft applicability, current approval status and required release paperwork with maintenance records or a qualified maintenance provider.