Skip to main content

Timken Alcor Aerospace Technologies Inc FAA PMA parts

3,691 FAA-approved PMA parts

How to read FAA PMA parts records

Parts Manufacturer Approval records identify replacement parts approved by the FAA for use on type-certificated aircraft. Use the part number, part name, OEM make, PMA holder and status together; a table match is a starting point, not an installation approval.

Part NumberPart NameOEM MakeStatusDate
E6893606Seal, Labyrinth, Fourth Stage Nozzle AssemblyAllisonHistorical2010-01-14
E6893607Seal, Labyrinth, Fourth Stage Nozzle AssemblyRolls-RoyceHistorical2008-10-29
E6893614Nut, SpannerRolls-RoyceHistorical2008-10-29
E6893672Gear, Helical Powertrain PinionRolls-RoyceHistorical2008-10-29
E6893673Gearshaft Assembly, Helical TorquemeterRolls-RoyceHistorical2008-10-29
E6893676Deflector, Shield, Turbine Nozzle First StageRolls-RoyceHistorical2008-10-29
E6894196PinRolls-RoyceHistorical2008-10-29
E6895005Plate, Retaining - Gas Producer Thrust BrgRolls-RoyceHistorical2008-10-29
E6896098Seal, Labyrinth GP Turbine, ForwardRolls-RoyceHistorical2008-10-29
E6896408Nut, Spline LockRolls-RoyceHistorical2008-10-29
E6896437Gearshaft, Spur-Fuel Control & Oil PumpRolls-RoyceHistorical2008-10-29
E6898558Support, Torque Bearing and ShaftRolls-RoyceHistorical2008-10-29
E6898561Coupling, Adapter CompressorRolls-RoyceHistorical2008-10-29
E6898642Gearshaft, Centrifugal Breather C30Rolls-RoyceHistorical2008-10-29
E6898657Seal, Ring, Compressor Discharge TubeRolls-RoyceHistorical2008-10-29
E6898764Seal Assembly, Oil BellowsRolls-RoyceHistorical2008-10-29
E6898784Adapter, Splined, Second Stage TurbineRolls-RoyceHistorical2008-10-29
E6898785Gearshaft, Assembly Helical Power Take-OffRolls-RoyceHistorical2008-10-29
Page 64 of 74
PMA parts FAQ
What is an FAA PMA part?

A PMA part is a replacement or modification part approved under the FAA Parts Manufacturer Approval process for eligible type-certificated aircraft.

Does a PMA catalogue match prove a part can be installed?

No. Verify the part number, aircraft applicability, current approval status and required release paperwork with maintenance records or a qualified maintenance provider.