Skip to main content

Turbine Kinetics Inc, Subsidiary of HEICO Corp FAA PMA parts

4,070 FAA-approved PMA parts

How to read FAA PMA parts records

Parts Manufacturer Approval records identify replacement parts approved by the FAA for use on type-certificated aircraft. Use the part number, part name, OEM make, PMA holder and status together; a table match is a starting point, not an installation approval.

Part NumberPart NameOEM MakeStatusDate
J854P013AQQBolt, Shear-Hex HeadGeneral ElectricCurrent2004-07-20
J855P014AQQBolt, Shear-Hex HeadGeneral ElectricCurrent2011-06-20
J855P024AQQBolt, Shear-Hex HeadCFM InternationalCurrent2011-06-20
J856P014AQQBolt, Shear- Hex HeadCFM InternationalCurrent2011-03-01
J856P014AQQBolt, Shear-Hex HeadCFM InternationalCurrent2004-08-30
J903P03AQQBolt, Machine- Hex HeadCFM InternationalCurrent2011-03-01
J903P03AQQBolt, Machine-Hex HeadCFM International General ElectricCurrent2004-08-30
J904P04BQQBolt, Machine- Hex HeadCFM InternationalCurrent2011-03-01
J904P04BQQBolt, Machine-Hex HeadCFM InternationalCurrent2004-08-30
J904P05BQQBolt, Machine- Hex HeadCFM InternationalCurrent2011-03-01
J904P05BQQBolt, Machine-Hex HeadCFM InternationalCurrent2004-08-30
J904P07AQQBolt, Machine- Hex HeadGeneral ElectricCurrent2010-09-07
J904P07AQQBolt, Machine-Hex HeadCFM International General ElectricCurrent2002-12-11
J905P05AQQBolt, Machine- Hex HeadGeneral ElectricCurrent2010-09-07
J905P05AQQBolt, Machine-Hex HeadCFM International General ElectricCurrent2002-12-11
J979P03QQNut Self LockingGeneral ElectricCurrent2010-09-07
J979P04QQNut Self LockingGeneral ElectricCurrent2010-09-07
J979P05QQNut Self LockingGeneral ElectricCurrent2010-09-07
J979P06QQNut Self LockingGeneral ElectricCurrent2010-09-07
Page 36 of 82
PMA parts FAQ
What is an FAA PMA part?

A PMA part is a replacement or modification part approved under the FAA Parts Manufacturer Approval process for eligible type-certificated aircraft.

Does a PMA catalogue match prove a part can be installed?

No. Verify the part number, aircraft applicability, current approval status and required release paperwork with maintenance records or a qualified maintenance provider.