Skip to main content

Wencor LLC FAA PMA parts

5,826 FAA-approved PMA parts

How to read FAA PMA parts records

Parts Manufacturer Approval records identify replacement parts approved by the FAA for use on type-certificated aircraft. Use the part number, part name, OEM make, PMA holder and status together; a table match is a starting point, not an installation approval.

Part NumberPart NameOEM MakeStatusDate
739504WECylinder Block and Piston AssemblyBombardier IncCurrent2020-10-14
739585WESeal Face # 4 1/2 BearingPratt & WhitneyCurrent2015-09-28
739585WESeal Face # 4 ½ BearingPratt & WhitneyCurrent2020-10-14
73974WEGear Assembly, Driver and DrivenGeneral Electric CompanyCurrent2015-09-28
739951WETerminal Block AssemblyBombardier, IncCurrent2018-02-01
740-0530-501WESpacerAirbusCurrent2017-04-02
740-2001-505WERetainerINTERNATIONAL AERO ENGINESCurrent2013-10-02
740-2022-505WEPinAirbusCurrent2013-08-10
740259WERivet-TubularPratt & WhitneyCurrent2015-09-28
740367-1WEPlug, ThrustBoeingCurrent2015-09-28
740369-21WERing - PistonBoeing /The Boeing CompanyBombardier / De Havilland Aircraft of Canada LimitedCurrent2021-03-18
740369-21WERing, PistonBoeingCurrent2015-09-28
740369-25WERing - PistonBoeing / The Boeing CompanyCurrent2021-03-18
740369-25WERing, PistonBoeingCurrent2015-09-28
740369-8WERing, PistonBoeingCurrent2015-09-28
740501AWEShaft-InputAirbusCurrent2015-09-28
741313WARivet-TubularPratt & WhitneyCurrent2015-09-28
742158WEVane-PumpAirbusCurrent2015-09-28
742687-2WEWasher, MachinedBoeingCurrent2015-09-28
742687AVS-1WasherBoeingCurrent2012-03-25
742687AVS-2WasherBoeingCurrent2012-03-25
742896WERing, Seal MatingBOEINGCurrent2015-02-01
743500WELiner-PumpAirbusCurrent2015-09-28
743502WELiner, PumpAirbusCurrent2015-09-28
Page 70 of 117
PMA parts FAQ
What is an FAA PMA part?

A PMA part is a replacement or modification part approved under the FAA Parts Manufacturer Approval process for eligible type-certificated aircraft.

Does a PMA catalogue match prove a part can be installed?

No. Verify the part number, aircraft applicability, current approval status and required release paperwork with maintenance records or a qualified maintenance provider.