Skip to main content

Interagency Aviation Accident Prevention Bulletin 26-02: Pilatus PC-12 Nose Landing Gear

· DOI Office of Aviation Services · 2025

Public domain · DOI Office of Aviation ServicesAviation Safety Documents

Overview

The Interagency Aviation Accident Prevention Bulletin 26-02: Pilatus PC-12 Nose Landing Gear () is a public-domain DOI Office of Aviation Services aviation safety document, republished here as a free chaptered HTML edition with a linked table of contents and the official PDF.

Publisher
DOI Office of Aviation Services
Document
Year
2025
Pages
2

Key points

  • The bulletin addresses the risk of fatigue cracking in the nose landing gear drag link of Pilatus PC-12 aircraft.
  • A recent incident involved a fracture of the right hand drag link during flight, leading to a nose gear collapse upon landing.
  • Pilatus has identified the RH upper drag link as a fatigue critical component, requiring adherence to inspection intervals and component life limits.
  • Operators are advised to verify installed part numbers to ensure compliance with inspection tracking and replacement planning.
  • Upgrading to the redesigned drag link component improves fatigue resistance and eliminates the need for repetitive inspections.
Frequently asked questions
What is the main concern highlighted in the bulletin?

The main concern is the risk of fatigue cracking in the nose landing gear drag link of Pilatus PC-12 aircraft, which can lead to structural failures.

What should operators do regarding part numbers?

Operators are strongly encouraged to verify installed part numbers across their fleets to ensure correct inspection tracking and replacement planning.

What are the two part numbers mentioned in the bulletin?

The two part numbers are P/N 532.20.12.289, the original component requiring inspections, and P/N 532.20.12.296, the redesigned component with improved fatigue resistance.

What actions are recommended for maintenance?

Recommended actions include verifying component part numbers, referencing Service Letter 228 for guidance, considering upgrades to improved components, and continuing periodic oversight of inspection compliance.

What is the significance of Service Letter 228?

Service Letter 228 warns of potential confusion between similar drag link assemblies and emphasizes the importance of correctly identifying parts to prevent lapses in inspections.

Document

OAS-43A (12/12)

Interagency Aviation

Accident Prevention Bulletin

No. IA APB 26-02 November 7, 2025 Page 1 of 2 Subject: Pilatus Nose Landing Gear Drag Link Fatigue Cracking Risk Area of Concern: Flight Safety Distribution: All Aviation Operations Discussion: The purpose of this bulletin is to increase awareness of nose landing gear (NLG) drag link fatigue cracking on Pilatus PC-12 aircraft and to reinforce the importance of compliance with manufacturer inspection intervals and component life limits. This information is provided due to a recent mishap involving a PC-12/45, where the right hand (RH) drag link fractured in flight, resulting in a nose gear collapse upon landing. The pilot landed the aircraft safely and no injuries occurred, but the event highlights a growing concern with fatigue related failures on aging NLG assemblies.

The RH upper drag link of the PC-12, PC-12/45, PC-12/47, and PC-12/47E have been identified by Pilatus as a fatigue critical component. Over time, cyclic loading from takeoffs, landings, and turbulence contributes to microscopic cracking that can lead to failure. While fatigue cracking develops gradually, external stresses such as higher operating weights, and frequent turbulence can accelerate it.

Pilatus has addressed this issue through component life limits and mandatory inspection intervals defined in the Airworthiness Limitations Section (ALS 12-A-04-00-00-00A-000A-A) and associated Master Maintenance Plan (MMP) tasks. These controls are designed to detect early crack formation before structural integrity is compromised.

No. IA APB 26-02 November 7, 2025 Page 2 of 2 In addition, Service Letter (SL) 228 (issued in 2022) warns operators of potential part number confusion between similar drag link assemblies: • P/N 532.20.12.289: Original component, subject to recurring inspection requirements.

• P/N 532.20.12.296: Redesigned component with improved fatigue resistance, not requiring repetitive inspections.

The following excerpt from SL-228 highlights the critical maintenance concern: “There are no obvious visual differences to the two drag links and it is possible that a maintenance facility may believe the improved RH drag link is installed when it may be the old RH drag link. This could lead to the inspections not being carried out, the life limit not being adhered to and could lead to failures of an old RH drag link.” SL-228 applies to Pilatus PC-12, PC-12/45, PC-12/47, and PC-12/47E aircraft, covering Manufacturer Serial Numbers (MSN) 101 through 1450.

Operators are strongly encouraged to verify installed part numbers across their fleets to ensure correct inspection tracking and replacement planning. Use of the older P/N 532.20.12.289 requires continued adherence to the specified repetitive inspection cycle, while upgrading to the improved PN 532.20.12.296 provides long term mitigation of fatigue related risk.

Fatigue cracking is a known and manageable engineering condition, not an isolated event. However, lapses in inspection tracking, data verification, or component identification increase the likelihood of failure.

Ensuring that inspection intervals are met, parts are correctly identified, and fatigue critical components are replaced within their defined service lives is key to preventing landing gear collapse events.

Recommended actions: 1. Verify Component Part Numbers: Confirm that all fleet aircraft have verified RH drag link part numbers and are tracked according to their applicable inspection and replacement schedules.

2. Reference SL-228: Review and incorporate SL-228 guidance, which includes measurement details for the RH drag link to eliminate risk of part number misidentification.

3. Consider Upgrading Components: Where feasible, replace legacy PN 532.20.12.289 assemblies with the improved PN 532.20.12.296. Recommend continuing with previously stated interval inspections.

4. Continue Periodic Oversight: Supervisors and maintenance leads should periodically review inspection compliance for fatigue critical structures as part of safety assurance activities.

/s/ Keith C. Raley /s/ Lori Clark Keith C. Raley Lori Clark Chief, Aviation Safety, Training, Program Branch Chief - Aviation Safety Management Evaluation, and Quality Management Systems DOI, Office of Aviation Services USDA, Forest Service

Source & rights

Source: doi.gov. Public-domain U.S. Government work (17 USC §105) — freely reproducible.

Permanent URL — we don’t break links.

Report a problem or request removal

Document details

Doc number
Publisher
DOI Office of Aviation Services
Year
2025
Pages
2
File size
339 KB