Skip to main content

Change 3

· FAA

Public domain · FAAAir Traffic Publications

Overview

The Change 3 () is a public-domain FAA publication, republished here as a free chaptered HTML edition with a linked table of contents and the official PDF.

Publisher
FAA
Document
Pages
192
Chapters
31

Key points

  • Change 3 to FAA Order JO 7210.3EE is effective from July 9, 2026.
  • This change includes updates to organization titles and editorial corrections.
  • The term 'Interregional' has been clarified to 'Facility' in the updated policy.
  • New requirements for Standard Operating Procedures regarding emergency airport information have been added.
  • The change incorporates and cancels previous notices related to air traffic operations.
Frequently asked questions
What is the effective date of Change 3?

Change 3 is effective from July 9, 2026.

Where can I find the revised pages for this change?

The revised pages are available on the FAA’s Air Traffic Plans and Publications website and the Orders & Notices website.

What major terminology change is included in this update?

The term 'Interregional' has been changed to 'Facility' for clarity.

What new requirement has been added regarding emergency airport information?

Facilities with emergency airport information via ERAM or STARS must include a description of its functionality in their Standard Operating Procedures.

What does this change say about previous notices?

This change incorporates and cancels previous notices related to air traffic operations, ensuring updated guidance.

Part 1. BASIC

7/9/26 JO 7210.3EE CHG 3

Table of Contents

Part 1. BASIC

Chapter 1. General

Section 1. Introduction Paragraph Page 1 − 1 − 1. PURPOSE OF THIS ORDER . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1 − 1 − 1 1 − 1 − 2. AUDIENCE . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1 − 1 − 1 1 − 1 − 3. WHERE TO FIND THIS ORDER . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1 − 1 − 1 1 − 1 − 4. WHAT THIS ORDER CANCELS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1 − 1 − 1 1 − 1 − 5. EXPLANATION OF CHANGES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1 − 1 − 1 1 − 1 − 6. EFFECTIVE DATES AND SUBMISSIONS FOR CHANGES . . . . . . . . . . . . . . . . . . 1 − 1 − 1 1 − 1 − 7. DELIVERY DATES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1 − 1 − 2 1 − 1 − 8. RECOMMENDATIONS FOR PROCEDURAL CHANGES . . . . . . . . . . . . . . . . . . . . 1 − 1 − 2 1 − 1 − 9. REQUESTS FOR INTERPRETATIONS OR CLARIFICATIONS TO THIS ORDER 1 − 1 − 2 1 − 1 − 10. PROCEDURAL LETTERS OF AGREEMENT (LOAs) . . . . . . . . . . . . . . . . . . . . . . 1 − 1 − 3 1 − 1 − 11. WAIVERS TO THIS ORDER . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1 − 1 − 3 1 − 1 − 12. SAFETY MANAGEMENT SYSTEM (SMS) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1 − 1 − 3 1 − 1 − 13. REFERENCES TO FAA NON-AIR TRAFFIC ORGANIZATION . . . . . . . . . . . . . . 1 − 1 − 4 1 − 1 − 14. DISTRIBUTION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1 − 1 − 4 Section 2. Order Use 1 − 2 − 1. POLICY . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1 − 2 − 1 1 − 2 − 2. ANNOTATIONS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1 − 2 − 1 1 − 2 − 3. WORD MEANINGS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1 − 2 − 1 1 − 2 − 4. ABBREVIATIONS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1 − 2 − 1

Chapter 2. Administration of Facilities

Section 1. General 2 − 1 − 1. FACILITY REQUIREMENTS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2 − 1 − 1 2 − 1 − 2. FACILITY STANDARD OPERATING PROCEDURES (SOP) . . . . . . . . . . . . . . . . . 2 − 1 − 1 2 − 1 − 3. POSITION/SECTOR BINDERS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2 − 1 − 1 2 − 1 − 4. REFERENCE FILES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2 − 1 − 2 2 − 1 − 5. RELEASE OF INFORMATION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2 − 1 − 2 2 − 1 − 6. CHECKING ACCURACY OF PUBLISHED DATA . . . . . . . . . . . . . . . . . . . . . . . . . . 2 − 1 − 3 2 − 1 − 7. AIR TRAFFIC SERVICE DURING PLANNED AND UNPLANNED OUTAGES . . 2 − 1 − 4 2 − 1 − 8. OPERATIONS DURING A STAFFING CONSTRAINT . . . . . . . . . . . . . . . . . . . . . . . 2 − 1 − 7 2 − 1 − 9. HANDLING BOMB THREAT INCIDENTS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2 − 1 − 7 2 − 1 − 10. HANDLING MANPADS INCIDENTS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2 − 1 − 8 2 − 1 − 11. AIRPORT EMERGENCY PLANS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2 − 1 − 9 2 − 1 − 12. EXPLOSIVES DETECTION K − 9 TEAMS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2 − 1 − 10 2 − 1 − 13. INTERSECTION TAKEOFFS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2 − 1 − 10 2 − 1 − 14. AIRCRAFT IDENTIFICATION PROBLEMS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2 − 1 − 11 2 − 1 − 15. APPROACH CONTROL AIRSPACE . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2 − 1 − 11 2 − 1 − 16. AUTHORIZATION FOR SEPARATION SERVICES BY TOWERS . . . . . . . . . . . . 2 − 1 − 11 Table of Contents i JO 7210.3EE CHG 3 7/9/26 Paragraph Page 2 − 1 − 17. BIRD HAZARDS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2 − 1 − 12 2 − 1 − 18. PROHIBITED/RESTRICTED AREAS AND STATIONARY ALTRVS . . . . . . . . . . 2 − 1 − 12 2 − 1 − 19. SPECIAL ACTIVITY AIRSPACE (SAA) SCHEDULING, COORDINATION, AND DISSEMINATION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2 − 1 − 13 2 − 1 − 20. SPECIAL AIR TRAFFIC RULES (SATR) AND SPECIAL FLIGHT RULES AREA (SFRA) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2 − 1 − 13 2 − 1 − 21. ATC SECURITY SERVICES FOR THE WASHINGTON, DC, SPECIAL FLIGHT RULES AREA (DC SFRA) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2 − 1 − 14 2 − 1 − 22. AIRPORT TRAFFIC PATTERNS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2 − 1 − 15 2 − 1 − 23. OBSTACLE IDENTIFICATION SURFACES, OBSTACLE FREE ZONES, RUNWAY SAFETY AREAS, APPROACH/ DEPARTURE HOLD AREAS, AND CLEARWAYS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2 − 1 − 15 2 − 1 − 24. FACILITY IDENTIFICATION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2 − 1 − 15 2 − 1 − 25. DISPOSITION OF OBSOLETE CHARTS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2 − 1 − 16 2 − 1 − 26. OUTDOOR LASER DEMONSTRATIONS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2 − 1 − 16 2 − 1 − 27. COMBINE/RECOMBINE AN ATCT/TRACON . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2 − 1 − 16 2 − 1 − 28. SUBMISSION OF AIR TRAFFIC CONTROL ASSIGNED AIRSPACE (ATCAA) DATA . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2 − 1 − 16 2 − 1 − 29. SUBMISSION OF SUA AND PAJA FREQUENCY INFORMATION . . . . . . . . . . . 2 − 1 − 17 2 − 1 − 30. REPORTING UNAUTHORIZED LASER ILLUMINATION OF AIRCRAFT . . . . 2 − 1 − 17 2 − 1 − 31. REPORTING SUSPICIOUS AIRCRAFT/PILOT ACTIVITIES . . . . . . . . . . . . . . . . 2 − 1 − 17 2 − 1 − 32. REPORTING DIVERTED AIRCRAFT ARRIVING FROM INTERNATIONAL LOCATIONS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2 − 1 − 18 2 − 1 − 33. REPORTING INOPERATIVE OR MALFUNCTIONING ADS − B TRANSMITTERS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2 − 1 − 18 2 − 1 − 34. REPORTING SUSPICIOUS UAS ACTIVITIES . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2 − 1 − 19 2 − 1 − 35. USE OF UAS DETECTION SYSTEMS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2 − 1 − 20 2 − 1 − 36. USE OF COUNTER UNMANNED AIRCRAFT SYSTEMS (C − UAS) . . . . . . . . . . 2 − 1 − 20 2 − 1 − 37. REPORTING DEATH, ILLNESS, OR OTHER PUBLIC HEALTH RISK ON BOARD AIRCRAFT . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2 − 1 − 21 2 − 1 − 38. OPPOSITE DIRECTION OPERATIONS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2 − 1 − 22 2 − 1 − 39. SPECIAL INTEREST SITES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2 − 1 − 24 2 − 1 − 40. TRANSPORTATION SECURITY ADMINISTRATION AND FAA JOINT OPERATING PROCEDURES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2 − 1 − 24 2 − 1 − 41. DISPLAYING SPACE LAUNCH AND REENTRY AREAS ON THE SITUATION DISPLAY . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2 − 1 − 24 2 − 1 − 42. DISPLAYING DEBRIS RESPONSE AREAS ON THE SITUATION DISPLAY . . . 2 − 1 − 24 2 − 1 − 43. ACCESS TO FALCON REPLAY SYSTEM . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2 − 1 − 25 2 − 1 − 44. OBTAINING PILOT CONTACT INFORMATION . . . . . . . . . . . . . . . . . . . . . . . . . . 2 − 1 − 25 Section 2. Responsibilities 2 − 2 − 1. LEGAL LIABILITIES OF PERSONNEL . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2 − 2 − 1 2 − 2 − 2. JOB REQUIREMENTS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2 − 2 − 1 2 − 2 − 3. POSITION RESPONSIBILITY . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2 − 2 − 1 2 − 2 − 4. DUTY FAMILIARIZATION AND THE TRANSFER OF POSITION RESPONSIBILITY . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2 − 2 − 1 2 − 2 − 5. OPERATING INITIALS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2 − 2 − 3 2 − 2 − 6. SIGN IN/OUT AND ON/OFF PROCEDURES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2 − 2 − 4 2 − 2 − 7. CIRNOT HANDLING . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2 − 2 − 5 2 − 2 − 8. GENOT HANDLING . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2 − 2 − 5 2 − 2 − 9. PERSONNEL BRIEFINGS REGARDING AIR TRAFFIC PROCEDURES BULLETIN ITEMS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2 − 2 − 5 2 − 2 − 10. LAW ENFORCEMENT INFORMATION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2 − 2 − 6 Table of Contents ii 7/9/26 JO 7210.3EE CHG 3 Paragraph Page 2 − 2 − 11. PERSONNEL BRIEFINGS REGARDING ORDERS, PUBLISHED AERONAUTICAL DATA, AND FLIGHT PROCEDURES . . . . . . . . . . . . . . . . . . . 2 − 2 − 6 2 − 2 − 12. SYSTEMS MANAGEMENT OF VSCS EQUIPMENT . . . . . . . . . . . . . . . . . . . . . . 2 − 2 − 7 2 − 2 − 13. REPORTING EQUIPMENT TROUBLE . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2 − 2 − 7 2 − 2 − 14. FACILITY DIRECTIVES REPOSITORY (FDR) . . . . . . . . . . . . . . . . . . . . . . . . . . . 2 − 2 − 7 Section 3. Air Traffic Familiarization/Currency Requirements for En Route/Terminal/System Operations Facilities 2 − 3 − 1. GENERAL . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2 − 3 − 1 2 − 3 − 2. APPLICATION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2 − 3 − 1 2 − 3 − 3. REQUIREMENTS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2 − 3 − 1 2 − 3 − 4. DIFFERENTIAL . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2 − 3 − 3 2 − 3 − 5. TRACKING . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2 − 3 − 3 Section 4. Hours of Duty 2 − 4 − 1. SERVICE HOURS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2 − 4 − 1 2 − 4 − 2. TIME STANDARDS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2 − 4 − 1 2 − 4 − 3. TIME CHECKS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2 − 4 − 1 2 − 4 − 4. STATUS OF SERVICE . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2 − 4 − 1 Section 5. Watch Coverage − Flight Service Stations 2 − 5 − 1. BASIC WATCH SCHEDULES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2 − 5 − 1 2 − 5 − 2. DESIGNATING WATCH SUPERVISION COVERAGE . . . . . . . . . . . . . . . . . . . . . . . 2 − 5 − 1 2 − 5 − 3. AREA SUPERVISION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2 − 5 − 1 2 − 5 − 4. RELIEF PERIODS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2 − 5 − 2 2 − 5 − 5. OVERTIME DUTY . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2 − 5 − 2 2 − 5 − 6. HOLIDAY STAFFING . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2 − 5 − 2 2 − 5 − 7. CONSOLIDATING POSITIONS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2 − 5 − 2 2 − 5 − 8. SUPERVISORS HOURS OF DUTY (ALASKA ONLY) . . . . . . . . . . . . . . . . . . . . . . . 2 − 5 − 2 2 − 5 − 9. FACILITY COMPLEMENTS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2 − 5 − 2 2 − 5 − 10. CONTROLLER − IN − CHARGE (CIC)/DESIGNATED LEAD SPECIALIST (DLS) TRAINING . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2 − 5 − 3 Section 6. Watch Supervision − Terminal/En Route 2 − 6 − 1. WATCH SUPERVISION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2 − 6 − 1 2 − 6 − 2. WATCH SUPERVISION ASSIGNMENTS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2 − 6 − 2 2 − 6 − 3. CIC DESIGNATION AT FAA-OPERATED FACILITIES . . . . . . . . . . . . . . . . . . . . . . 2 − 6 − 3 2 − 6 − 4. CONTROLLER-IN-CHARGE (CIC) SELECTION PROCESS . . . . . . . . . . . . . . . . . 2 − 6 − 3 2 − 6 − 5. CONSOLIDATING POSITIONS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2 − 6 − 4 2 − 6 − 6. RELIEF PERIODS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2 − 6 − 4 2 − 6 − 7. BASIC WATCH SCHEDULE . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2 − 6 − 4 2 − 6 − 8. OVERTIME DUTY . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2 − 6 − 5 2 − 6 − 9. HOLIDAY STAFFING . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2 − 6 − 5 2 − 6 − 10. ADMINISTRATIVE HOURS OF DUTY . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2 − 6 − 5 2 − 6 − 11. FACILITY COMPLEMENTS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2 − 6 − 5 2 − 6 − 12. CONSOLIDATING TOWER/TRACON FUNCTIONS . . . . . . . . . . . . . . . . . . . . . . . 2 − 6 − 6 2 − 6 − 13. SINGLE PERSON MIDNIGHT OPERATIONS . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2 − 6 − 6 Section 7. Appearance and Security 2 − 7 − 1. PERSONNEL APPEARANCE . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2 − 7 − 1 Table of Contents iii JO 7210.3EE CHG 3 7/9/26 Paragraph Page 2 − 7 − 2. QUARTERS APPEARANCE . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2 − 7 − 1 2 − 7 − 3. BULLETIN BOARDS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2 − 7 − 1 2 − 7 − 4. FOOD AND BEVERAGES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2 − 7 − 1 2 − 7 − 5. FACILITY SECURITY . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2 − 7 − 1 2 − 7 − 6. SUSPICIOUS ACTIVITIES AROUND AIRPORTS OR FAA FACILITIES . . . . . . . 2 − 7 − 1 2 − 7 − 7. COOPERATION WITH LAW ENFORCEMENT AGENCIES . . . . . . . . . . . . . . . . . . 2 − 7 − 1 2 − 7 − 8. FACILITY VISITORS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2 − 7 − 2 2 − 7 − 9. SECURITY OF JOINT − USE RADAR DATA . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2 − 7 − 2 Section 8. Medical 2 − 8 − 1. GENERAL . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2 − 8 − 1 2 − 8 − 2. MEDICAL CLEARANCE REQUIREMENTS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2 − 8 − 1 2 − 8 − 3. SPECIAL MEDICAL EVALUATIONS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2 − 8 − 1 2 − 8 − 4. SPECIAL CONSIDERATION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2 − 8 − 1 2 − 8 − 5. USE OF DRUGS AND SEDATIVES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2 − 8 − 1 2 − 8 − 6. RESTRICTED DRUGS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2 − 8 − 2 2 − 8 − 7. BLOOD DONORS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2 − 8 − 2 2 − 8 − 8. USE OF ALCOHOL AND OTHER DRUGS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2 − 8 − 2 2 − 8 − 9. MEDICAL STATUS DETERMINATIONS ON FG − 2154s . . . . . . . . . . . . . . . . . . . . . 2 − 8 − 2 Section 9. Weather/Visibility 2 − 9 − 1. BACKUP/AUGMENTATION OF WEATHER OBSERVATIONS . . . . . . . . . . . . . . . 2 − 9 − 1 2 − 9 − 2. RECEIPT AND DISSEMINATION OF WEATHER OBSERVATIONS . . . . . . . . . . . 2 − 9 − 1 2 − 9 − 3. LIMITED AVIATION WEATHER REPORTING STATION (LAWRS) HOURS OF OPERATION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2 − 9 − 1 2 − 9 − 4. NONAVIATION WEATHER SERVICE . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2 − 9 − 2 2 − 9 − 5. NATIONAL WEATHER RECORDS CENTER . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2 − 9 − 2 2 − 9 − 6. VISIBILITY CHARTS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2 − 9 − 2 2 − 9 − 7. SITING CRITERIA FOR VISUAL WEATHER OBSERVATIONS . . . . . . . . . . . . . . 2 − 9 − 2 2 − 9 − 8. RUNWAY VISUAL RANGE (RVR) EQUIPMENT . . . . . . . . . . . . . . . . . . . . . . . . . . 2 − 9 − 3 2 − 9 − 9. SPECIFIC AREA MESSAGE ENCODING (SAME) WEATHER RADIOS . . . . . . . 2 − 9 − 3 Section 10. Wind/Altimeter Information 2 − 10 − 1. WIND INSTRUMENT SENSORS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2 − 10 − 1 2 − 10 − 2. WIND INDICATOR CROSS CHECK . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2 − 10 − 1 2 − 10 − 3. ALTIMETER REQUIREMENTS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2 − 10 − 1 2 − 10 − 4. COMPARISON CHECKS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2 − 10 − 2 2 − 10 − 5. DELIVERY OF ALTIMETER SETTING TO ARTCC . . . . . . . . . . . . . . . . . . . . . . . 2 − 10 − 3 2 − 10 − 6. BROADCAST DENSITY ALTITUDE ADVISORY . . . . . . . . . . . . . . . . . . . . . . . . . 2 − 10 − 3

Chapter 3. Facility Equipment

Section 1. General 3 − 1 − 1. BASIC EQUIPMENT . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3 − 1 − 1 3 − 1 − 2. PERIODIC MAINTENANCE . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3 − 1 − 1 3 − 1 − 3. NATIONAL AIRSPACE SYSTEM (NAS) CHANGES . . . . . . . . . . . . . . . . . . . . . . . . 3 − 1 − 2 3 − 1 − 4. TRAFFIC LIGHTS, GATES, AND SIGNALS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3 − 1 − 2 3 − 1 − 5. CLEANING INSTRUMENT COVERS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3 − 1 − 2 3 − 1 − 6. ENGINE GENERATOR TRANSFER PROCEDURES FOR ANTICIPATED POWER FAILURE . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3 − 1 − 2 Table of Contents iv

Section 2. Use of Communications

7/9/26 JO 7210.3EE CHG 3 Section 2. Use of Communications Paragraph Page 3 − 2 − 1. RESPONSIBILITY . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3 − 2 − 1 3 − 2 − 2. AUTHORIZED MESSAGES NOT DIRECTLY ASSOCIATED WITH AIR TRAFFIC SERVICES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3 − 2 − 1 3 − 2 − 3. USE OF OTHER THAN FAA COMMUNICATIONS CIRCUITS . . . . . . . . . . . . . . . 3 − 2 − 1 3 − 2 − 4. FBI USE OF FAA FREQUENCIES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3 − 2 − 1 3 − 2 − 5. AERONAUTICAL ADVISORY STATIONS (UNICOM/MULTICOM) . . . . . . . . . . . 3 − 2 − 2 Section 3. Communications Procedures 3 − 3 − 1. COMMUNICATIONS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3 − 3 − 1 3 − 3 − 2. TELEPHONE COMMUNICATIONS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3 − 3 − 1 3 − 3 − 3. MONITORING FREQUENCIES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3 − 3 − 1 3 − 3 − 4. EMERGENCY FREQUENCIES 121.5 AND 243.0 MHz . . . . . . . . . . . . . . . . . . . . . . 3 − 3 − 1 3 − 3 − 5. BATTERY-POWERED TRANSCEIVERS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3 − 3 − 2 3 − 3 − 6. FACILITY STATUS REPORT . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3 − 3 − 2 3 − 3 − 7. TESTING EMERGENCY LOCATOR TRANSMITTERS . . . . . . . . . . . . . . . . . . . . . 3 − 3 − 2 3 − 3 − 8. VSCS FREQUENCY BACKUP . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3 − 3 − 3 3 − 3 − 9. VSCS RECONFIGURATIONS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3 − 3 − 3 3 − 3 − 10. VTABS (VSCS TRAINING AND BACKUP SYSTEM) . . . . . . . . . . . . . . . . . . . . . . 3 − 3 − 3 3 − 3 − 11. HEADSET TONE INCIDENTS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3 − 3 − 4 3 − 3 − 12. USE OF CORDLESS HEADSETS IN OPERATIONAL AREAS . . . . . . . . . . . . . . . 3 − 3 − 4 Section 4. Recorders 3 − 4 − 1. USE OF RECORDERS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3 − 4 − 1 3 − 4 − 2. ASSIGNMENT OF RECORDER CHANNELS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3 − 4 − 1 3 − 4 − 3. CHECKING AND CHANGING RECORDING EQUIPMENT . . . . . . . . . . . . . . . . . . 3 − 4 − 2 3 − 4 − 4. AUDIO DATA RETENTION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3 − 4 − 3 Section 5. Navigational Aids 3 − 5 − 1. NAVAID MONITORING . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3 − 5 − 1 3 − 5 − 2. SYSTEM COMPONENT MALFUNCTIONS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3 − 5 − 2 3 − 5 − 3. PROCESSING GPS ANOMALY REPORTS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3 − 5 − 2 3 − 5 − 4. ORIGINATING NOTAMs CONCERNING NAVAIDs . . . . . . . . . . . . . . . . . . . . . . . . 3 − 5 − 3 Section 6. Surveillance Source Use 3 − 6 − 1. COMMISSIONING RADAR FACILITIES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3 − 6 − 1 3 − 6 − 2. ATC SURVEILLANCE SOURCE USE . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3 − 6 − 2 3 − 6 − 3. MONITORING OF MODE 3/A RADAR BEACON CODES . . . . . . . . . . . . . . . . . . . 3 − 6 − 3 3 − 6 − 4. RADAR TARGET SIZING . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3 − 6 − 3 3 − 6 − 5. TERMINAL DIGITAL RADAR SYSTEM AND DISPLAY SETTINGS . . . . . . . . . . 3 − 6 − 3 3 − 6 − 6. PREARRANGED COORDINATION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3 − 6 − 4 3 − 6 − 7. OPERATIONAL GUIDANCE FOR FUSION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3 − 6 − 4 Section 7. Video Maps 3 − 7 − 1. TOLERANCE FOR RADAR FIX ACCURACY . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3 − 7 − 1 3 − 7 − 2. RADAR MAPPING STANDARDS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3 − 7 − 1 3 − 7 − 3. DISPLAY MAP DATA . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3 − 7 − 1 3 − 7 − 4. INTENSITY . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3 − 7 − 2 Table of Contents v

Section 8. Other Displays

JO 7210.3EE CHG 3 7/9/26 Paragraph Page 3 − 7 − 5. COMMON REFERENCE POINTS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3 − 7 − 2 Section 8. Other Displays 3 − 8 − 1. MINIMUM VECTORING ALTITUDE CHARTS (MVAC) FOR FACILITIES PROVIDING TERMINAL APPROACH CONTROL SERVICES . . . . . . . . . . . . . . . 3 − 8 − 1 3 − 8 − 2. MINIMUM VECTORING ALTITUDE CHARTS (MVAC) PREPARATION (TERMINAL/MEARTS) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3 − 8 − 1 3 − 8 − 3. ALTITUDE ASSIGNMENTS TO S/VFR AND VFR AIRCRAFT . . . . . . . . . . . . . . . 3 − 8 − 4 3 − 8 − 4. EMERGENCY OBSTRUCTION VIDEO MAP (EOVM) . . . . . . . . . . . . . . . . . . . . . . 3 − 8 − 5 3 − 8 − 5. EMERGENCY ALTITUDE MAP (EAM) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3 − 8 − 6 3 − 8 − 6. ESTABLISHING DIVERSE VECTOR AREA/S (DVA) . . . . . . . . . . . . . . . . . . . . . . . 3 − 8 − 7 Section 9. Color Displays − Terminal 3 − 9 − 1. COLOR USE ON ATC DISPLAYS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3 − 9 − 1

Chapter 4. Correspondence, Conferences, Records, and

Reports

Section 1. General 4 − 1 − 1. CORRESPONDENCE STANDARDS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4 − 1 − 1 4 − 1 − 2. SIGNATURE . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4 − 1 − 1 4 − 1 − 3. SERVICE AREA REVIEW . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4 − 1 − 1 4 − 1 − 4. CORRESPONDENCE REGARDING POLICY/PROCEDURES . . . . . . . . . . . . . . . . 4 − 1 − 1 4 − 1 − 5. IRREGULAR OPERATION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4 − 1 − 1 4 − 1 − 6. PRELIMINARY ENVIRONMENTAL REVIEW . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4 − 1 − 1 Section 2. User Coordination/Conferences/Publicity 4 − 2 − 1. LOCAL COORDINATION/CONFERENCES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4 − 2 − 1 4 − 2 − 2. PILOT/CONTROLLER OUTREACH: OPERATION RAIN CHECK . . . . . . . . . . . . 4 − 2 − 1 4 − 2 − 3. PUBLISHED ITEMS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4 − 2 − 2 4 − 2 − 4. COORDINATION OF ATC PROCEDURES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4 − 2 − 2 Section 3. Letters of Agreement (LOA) 4 − 3 − 1. LETTERS OF AGREEMENT . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4 − 3 − 1 4 − 3 − 2. APPROPRIATE SUBJECTS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4 − 3 − 2 4 − 3 − 3. DEVELOPING LOA . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4 − 3 − 4 4 − 3 − 4. REVIEW BY SERVICE AREA OFFICE . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4 − 3 − 5 4 − 3 − 5. APPROVAL . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4 − 3 − 5 4 − 3 − 6. SPACE LOAs . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4 − 3 − 5 4 − 3 − 7. HOT AIR BALLOON LOAs FOR CLASS C AIRSPACE . . . . . . . . . . . . . . . . . . . . . . 4 − 3 − 6 4 − 3 − 8. ANNUAL REVIEW/REVISIONS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4 − 3 − 6 4 − 3 − 9. CANCELLATION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4 − 3 − 7 4 − 3 − 10. AUTOMATED INFORMATION TRANSFER (AIT) . . . . . . . . . . . . . . . . . . . . . . . . 4 − 3 − 9 Section 4. Application 4 − 4 − 1. OPERATIONS UNDER EXEMPTIONS FROM SECTION 3 OF APPENDIX D TO PART 91 SURFACE AREAS OF CLASS B AND CLASS C AIRSPACE WITHIN WHICH SPECIAL VFR WEATHER MINIMUMS ARE NOT AUTHORIZED FOR FIXED − WING AIRCRAFT . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4 − 4 − 1 Table of Contents vi

Section 5. Other Correspondence

7/9/26 JO 7210.3EE CHG 3 Paragraph Page 4 − 4 − 2. USE OF AIRCRAFT CALL SIGNS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4 − 4 − 1 4 − 4 − 3. RUNWAY SUPERVISORY UNITS (RSU) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4 − 4 − 1 Section 5. Other Correspondence 4 − 5 − 1. LETTERS OF PROCEDURES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4 − 5 − 1 4 − 5 − 2. LETTERS TO AIRMEN . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4 − 5 − 1 4 − 5 − 3. DISPOSITION OF VOLCANIC ACTIVITY REPORTING (VAR) FORMS . . . . . . . 4 − 5 − 2 Section 6. Records 4 − 6 − 1. FACILITY RECORDS MANAGEMENT . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4 − 6 − 1 4 − 6 − 2. COLLECTION OF OPERATIONAL DATA . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4 − 6 − 1 4 − 6 − 3. FORMS PREPARATION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4 − 6 − 1 4 − 6 − 4. FAA FORM 7230 − 4, DAILY RECORD OF FACILITY OPERATION . . . . . . . . . . . . 4 − 6 − 1 4 − 6 − 5. PREPARATION OF FAA FORM 7230 − 4 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4 − 6 − 1 4 − 6 − 6. FAA FORM 7230 − 10, POSITION LOG . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4 − 6 − 3 4 − 6 − 7. AUTOMATED POSITION SIGN ON/OFF . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4 − 6 − 5 4 − 6 − 8. TIME AND ATTENDANCE (T&A) RECORDING . . . . . . . . . . . . . . . . . . . . . . . . . . 4 − 6 − 5 Section 7. Reports 4 − 7 − 1. MONTHLY REPORTS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4 − 7 − 1 4 − 7 − 2. DELAY REPORTING . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4 − 7 − 1 4 − 7 − 3. SYSTEM IMPACT REPORTS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4 − 7 − 1 4 − 7 − 4. UNIDENTIFIED ANOMALOUS PHENOMENA (UAP) REPORTS . . . . . . . . . . . . . 4 − 7 − 1 Section 8. Freedom of Information Act (FOIA) 4 − 8 − 1. ACCIDENT/INCIDENT RECORDINGS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4 − 8 − 1 4 − 8 − 2. RADAR AND/OR COMPUTER DATA . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4 − 8 − 1 4 − 8 − 3. FEES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4 − 8 − 1

Chapter 5. Special Flight Handling

Section 1. Presidential Aircraft 5 − 1 − 1. ADVANCE COORDINATION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5 − 1 − 1 5 − 1 − 2. THE PRESIDENT, VICE PRESIDENT, AND EXEC1F AIRCRAFT MONITORING 5 − 1 − 2 5 − 1 − 3. USE OF FAA COMMUNICATIONS CIRCUITS . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5 − 1 − 3 5 − 1 − 4. SECURITY OF INFORMATION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5 − 1 − 3 5 − 1 − 5. MOVEMENT INFORMATION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5 − 1 − 3 5 − 1 − 6. COORDINATION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5 − 1 − 3 5 − 1 − 7. RESCUE SUPPORT AIRCRAFT . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5 − 1 − 3 Section 2. FAA Aircraft 5 − 2 − 1. IDENTIFYING DEPARTMENT OF TRANSPORTATION (DOT) AND FAA FLIGHTS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5 − 2 − 1 5 − 2 − 2. FLIGHT INSPECTION AIRCRAFT . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5 − 2 − 1 5 − 2 − 3. HIGH ALTITUDE INSPECTIONS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5 − 2 − 2 5 − 2 − 4. RESEARCH AND DEVELOPMENT FLIGHTS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5 − 2 − 2 Section 3. DOE and Other Aircraft 5 − 3 − 1. DEPARTMENT OF ENERGY (DOE) FLIGHTS . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5 − 3 − 1 Table of Contents vii JO 7210.3EE CHG 3 7/9/26 Paragraph Page 5 − 3 − 2. AERIAL SAMPLING/SURVEYING FOR AIRBORNE CONTAMINATION . . . . . . 5 − 3 − 1 5 − 3 − 3. DUE REGARD OPERATIONS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5 − 3 − 1 5 − 3 − 4. WEATHER RECONNAISSANCE FLIGHTS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5 − 3 − 2 5 − 3 − 5. FOREIGN STATE DIPLOMATIC FLIGHTS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5 − 3 − 3 Section 4. Other Flight Requests 5 − 4 − 1. REQUESTS FOR DEVIATION FROM TRANSPONDER REQUIREMENTS . . . . . 5 − 4 − 1 5 − 4 − 2. REQUESTS FOR DEVIATION FROM ADS − B OUT REQUIREMENTS . . . . . . . . . 5 − 4 − 2 5 − 4 − 3. CROP DUSTER/ANTIQUE AIRCRAFT . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5 − 4 − 4 5 − 4 − 4. FLIGHT TEST OPERATIONS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5 − 4 − 4 5 − 4 − 5. SANCTIONED SPEED RECORDS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5 − 4 − 4 5 − 4 − 6. CERTIFYING RECORD ATTEMPTS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5 − 4 − 4 5 − 4 − 7. PHOTOGRAMMETRIC FLIGHTS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5 − 4 − 5 5 − 4 − 8. AEROBATIC PRACTICE AREAS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5 − 4 − 5 5 − 4 − 9. ADS − B OUT OFF OPERATIONS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5 − 4 − 6 5 − 4 − 10. AIRCRAFT CALL SIGNS USED FOR SENSITIVE GOVERNMENT FLIGHTS . 5 − 4 − 6 Section 5. 14 CFR Part 91, UAS Operations 5 − 5 − 1. TYPES AND AUTHORITY . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5 − 5 − 1 5 − 5 − 2. OPERATIONS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5 − 5 − 1 5 − 5 − 3. RESPONSIBILITIES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5 − 5 − 1 5 − 5 − 4. OPERATIONS IN CLASS A AIRSPACE . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5 − 5 − 2 5 − 5 − 5. OPERATIONS IN TERMINAL RADAR SERVICE AREA (TRSA) . . . . . . . . . . . . . 5 − 5 − 2 5 − 5 − 6. OPERATIONS IN CLASS B AIRSPACE . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5 − 5 − 2 5 − 5 − 7. OPERATIONS IN CLASS C AIRSPACE . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5 − 5 − 2 5 − 5 − 8. OPERATIONS IN CLASS D AIRSPACE . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5 − 5 − 3 5 − 5 − 9. OPERATIONS IN CLASS E AIRSPACE . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5 − 5 − 3 5 − 5 − 10. OPERATIONS IN CLASS G AIRSPACE . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5 − 5 − 3 5 − 5 − 11. LETTERS OF AGREEMENT (LOA)/MEMORANDUMS . . . . . . . . . . . . . . . . . . . . 5 − 5 − 3

Part 2. AIR ROUTE TRAFFIC CONTROL CENTERS

Chapter 6. En Route Operations and Services

Section 1. General 6 − 1 − 1. AREAS OF OPERATION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6 − 1 − 1 6 − 1 − 2. SECTORS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6 − 1 − 1 6 − 1 − 3. SECTOR CONFIGURATION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6 − 1 − 1 6 − 1 − 4. AREAS OF SPECIALIZATION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6 − 1 − 1 6 − 1 − 5. OPERATING POSITION DESIGNATORS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6 − 1 − 2 6 − 1 − 6. FLIGHT PROGRESS STRIP USAGE . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6 − 1 − 2 6 − 1 − 7. DISPLAY OF TIME − BASED FLOW MANAGEMENT (TBFM) INFORMATION . 6 − 1 − 3 Section 2. Sector Information Binders 6 − 2 − 1. EN ROUTE OR OCEANIC CONTROLLER TEAM CONCEPT . . . . . . . . . . . . . . . . 6 − 2 − 1 6 − 2 − 2. EN ROUTE SECTOR INFORMATION BINDER . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6 − 2 − 1 Section 3. Operations 6 − 3 − 1. HANDLING OF SIGMETs, CWAs, AND PIREPs . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6 − 3 − 1 Table of Contents viii 7/9/26 JO 7210.3EE CHG 3 Paragraph Page 6 − 3 − 2. RECEIPT OF NOTAM DATA . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6 − 3 − 2 6 − 3 − 3. REVIEW AIRSPACE STRUCTURE . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6 − 3 − 2 6 − 3 − 4. FLIGHT DATA UNIT . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6 − 3 − 2 6 − 3 − 5. CHANGES TO MTR AND MOA PUBLISHED ACTIVITY SCHEDULES . . . . . . . 6 − 3 − 3 Section 4. Services 6 − 4 − 1. ADVANCE APPROACH INFORMATION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6 − 4 − 1 6 − 4 − 2. MINIMUM IFR ALTITUDES (MIA) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6 − 4 − 1 6 − 4 − 3. SPECIAL USE FREQUENCIES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6 − 4 − 1 6 − 4 − 4. PRACTICE INSTRUMENT APPROACHES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6 − 4 − 1 Section 5. Air Carrier Computer Interface Program 6 − 5 − 1. GENERAL . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6 − 5 − 1 6 − 5 − 2. FACILITY RESPONSIBILITIES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6 − 5 − 1 6 − 5 − 3. CRITERIA FOR PARTICIPATION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6 − 5 − 1 6 − 5 − 4. FORMAT CONVENTIONS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6 − 5 − 1 6 − 5 − 5. MESSAGE CONTENT . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6 − 5 − 1 Section 6. En Route Decision Support Tool (EDST) 6 − 6 − 1. GENERAL . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6 − 6 − 1 6 − 6 − 2. OPERATIONS SUPERVISOR-IN-CHARGE RESPONSIBILITIES . . . . . . . . . . . . . . 6 − 6 − 1 6 − 6 − 3. OPERATIONS MANAGER-IN-CHARGE RESPONSIBILITIES . . . . . . . . . . . . . . . . 6 − 6 − 1 6 − 6 − 4. FACILITY MANAGER RESPONSIBILITIES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6 − 6 − 1 6 − 6 − 5. EDST AIRSPACE CONFIGURATION ELEMENTS . . . . . . . . . . . . . . . . . . . . . . . . . 6 − 6 − 2 6 − 6 − 6. STANDARD USE OF AUTOMATED FLIGHT DATA MANAGEMENT . . . . . . . . . 6 − 6 − 2 6 − 6 − 7. EDST OUTAGES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6 − 6 − 3 6 − 6 − 8. RESTRICTIONS INVENTORY AND EVALUATION . . . . . . . . . . . . . . . . . . . . . . . . 6 − 6 − 3 6 − 6 − 9. TRAFFIC COUNTS AND DELAY REPORTING . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6 − 6 − 4 6 − 6 − 10. COMPUTER DATA RETENTION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6 − 6 − 4 6 − 6 − 11. WAIVER TO INTERIM ALTITUDE REQUIREMENTS . . . . . . . . . . . . . . . . . . . . . 6 − 6 − 4 6 − 6 − 12. TRANSFER OF POSITION RESPONSIBILITY . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6 − 6 − 4 Section 7. Advanced Technologies and Oceanic Procedures (ATOP) 6 − 7 − 1. GENERAL . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6 − 7 − 1 6 − 7 − 2. OPERATIONAL SUPERVISOR − IN − CHARGE RESPONSIBILITIES . . . . . . . . . . . 6 − 7 − 1 6 − 7 − 3. ERROR REPAIR POSITION RESPONSIBILITIES . . . . . . . . . . . . . . . . . . . . . . . . . . 6 − 7 − 1 6 − 7 − 4. FACILITY MANAGER RESPONSIBILITIES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6 − 7 − 1 6 − 7 − 5. TRANSFER OF POSITION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6 − 7 − 2 6 − 7 − 6. ATOP CHANNEL CHANGEOVERS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6 − 7 − 2 6 − 7 − 7. OUTAGES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6 − 7 − 2 6 − 7 − 8. CONTROLLER PILOT DATA LINK COMMUNICATIONS . . . . . . . . . . . . . . . . . . . 6 − 7 − 2 Section 8. Reduced Vertical Separation Minimum (RVSM) 6 − 8 − 1. GENERAL . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6 − 8 − 1 6 − 8 − 2. FACILITY MANAGER RESPONSIBILITIES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6 − 8 − 1 6 − 8 − 3. OPERATIONS MANAGER-IN-CHARGE RESPONSIBILITIES . . . . . . . . . . . . . . . . 6 − 8 − 2 6 − 8 − 4. OPERATIONS SUPERVISOR-IN-CHARGE/CONTROLLER-IN-CHARGE RESPONSIBILITIES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6 − 8 − 2 6 − 8 − 5. NON − RVSM REQUIREMENTS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6 − 8 − 2 Table of Contents ix JO 7210.3EE CHG 3 7/9/26 Paragraph Page 6 − 8 − 6. EQUIPMENT SUFFIX AND DISPLAY MANAGEMENT . . . . . . . . . . . . . . . . . . . . . 6 − 8 − 3 6 − 8 − 7. MOUNTAIN WAVE ACTIVITY (MWA) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6 − 8 − 3 6 − 8 − 8. WAKE TURBULENCE AND WEATHER RELATED TURBULENCE . . . . . . . . . . 6 − 8 − 3 6 − 8 − 9. SUSPENSION OF RVSM . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6 − 8 − 3 Section 9. En Route Information Display System (ERIDS) 6 − 9 − 1. GENERAL . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6 − 9 − 1 6 − 9 − 2. REQUIREMENTS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6 − 9 − 1 Section 10. En Route Data Communications 6 − 10 − 1. CONTROLLER PILOT DATA LINK COMMUNICATIONS (CPDLC) . . . . . . . . . . 6 − 10 − 1

Chapter 7. En Route Data

Section 1. Performance Checks 7 − 1 − 1. RADAR PERFORMANCE CHECKS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7 − 1 − 1 7 − 1 − 2. SPECIAL RADAR ACCURACY CHECKS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7 − 1 − 1 Section 2. Deficiencies 7 − 2 − 1. DEFICIENCIES IN SYSTEM . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7 − 2 − 1 7 − 2 − 2. AMPLITRON OR PARAMETRIC AMPLIFIER FAILURE . . . . . . . . . . . . . . . . . . . . 7 − 2 − 1 7 − 2 − 3. ELECTRONIC ATTACK (EA) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7 − 2 − 1

Chapter 8. NAS En Route Automation

Section 1. General 8 − 1 − 1. TRANSITION PROCEDURES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8 − 1 − 1 8 − 1 − 2. ALTRV FLIGHT DATA PROCESSING . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8 − 1 − 1 8 − 1 − 3. COMPUTER DATA RETENTION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8 − 1 − 2 8 − 1 − 4. FLIGHT PLAN DROP INTERVAL . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8 − 1 − 2 Section 2. Procedures 8 − 2 − 1. THREE MILE OPERATIONS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8 − 2 − 1 8 − 2 − 2. ADAPTED ALTIMETER SETTINGS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8 − 2 − 1 8 − 2 − 3. ADAPTATION OF EXTERNAL ALTIMETER SETTINGS . . . . . . . . . . . . . . . . . . . . 8 − 2 − 1 8 − 2 − 4. CONFLICT ALERT FUNCTION PARAMETERS . . . . . . . . . . . . . . . . . . . . . . . . . . . 8 − 2 − 1 8 − 2 − 5. MODE C INTRUDER (MCI) ALERT PARAMETERS . . . . . . . . . . . . . . . . . . . . . . . . 8 − 2 − 2 8 − 2 − 6. E − MSAW ADAPTATION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8 − 2 − 2 8 − 2 − 7. INTERIM ALTITUDE FACILITY DIRECTIVE REQUIREMENTS . . . . . . . . . . . . . 8 − 2 − 2 8 − 2 − 8. REQUIREMENTS FOR ERAM DATA BLOCK CHANGES WITHOUT COORDINATION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8 − 2 − 2 8 − 2 − 9. ERAM HOLD INFORMATION FACILITY DIRECTIVE REQUIREMENTS . . . . . 8 − 2 − 3 8 − 2 − 10. ERAM SPECIAL ACTIVITY AIRSPACE (SAA) ADAPTATION . . . . . . . . . . . . . . 8 − 2 − 3 8 − 2 − 11. ERAM HOLDING PATTERN ADAPTATION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8 − 2 − 3 8 − 2 − 12. ERAM MASTER TOOLBAR MAP BUTTON LABEL . . . . . . . . . . . . . . . . . . . . . . 8 − 2 − 3 8 − 2 − 13. LOCAL INTERIM ALTITUDE . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8 − 2 − 3 Section 3. Displays 8 − 3 − 1. DIGITAL MAP VERIFICATION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8 − 3 − 1 Table of Contents x 7/9/26 JO 7210.3EE CHG 3 Paragraph Page 8 − 3 − 2. DATA DISPLAY FOR BLOCK ALTITUDE FLIGHTS . . . . . . . . . . . . . . . . . . . . . . . 8 − 3 − 1 8 − 3 − 3. SELECTED ALTITUDE LIMITS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8 − 3 − 1 8 − 3 − 4. AUTOMATED WEATHER DISPLAY STATUS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8 − 3 − 1

Chapter 9. Facility Statistical Data, Reports, and Forms

Section 1. Operational Count Data 9 − 1 − 1. IFR AIRCRAFT HANDLED . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9 − 1 − 1 9 − 1 − 2. CATEGORIES OF OPERATIONS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9 − 1 − 1 9 − 1 − 3. CRITERIA FOR IFR AIRCRAFT HANDLED COUNT . . . . . . . . . . . . . . . . . . . . . . . 9 − 1 − 1 9 − 1 − 4. MILITARY AIRCRAFT MOVEMENTS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9 − 1 − 3 9 − 1 − 5. USE OF AUTOMATED COUNTS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9 − 1 − 3 9 − 1 − 6. FAA FORM 7230 − 14, ARTCC OPERATIONS DAILY SUMMARY . . . . . . . . . . . . . 9 − 1 − 3 9 − 1 − 7. INSTRUCTIONS FOR COMPLETING FAA FORM 7230 − 14 . . . . . . . . . . . . . . . . . . 9 − 1 − 3 9 − 1 − 8. DISTRIBUTION AND AMENDMENT . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9 − 1 − 4 Section 2. Instrument Approach Data 9 − 2 − 1. GENERAL . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9 − 2 − 1 9 − 2 − 2. INSTRUMENT APPROACHES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9 − 2 − 1 9 − 2 − 3. AIRPORTS REPORTED . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9 − 2 − 1 9 − 2 − 4. FAA FORM 7230 − 16, APPROACH DATA WORKSHEET . . . . . . . . . . . . . . . . . . . . 9 − 2 − 1 9 − 2 − 5. FAA FORM 7230 − 12, INSTRUMENT APPROACHES MONTHLY SUMMARY . . 9 − 2 − 1 9 − 2 − 6. DISTRIBUTION AND AMENDMENT . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9 − 2 − 2 9 − 2 − 7. FORWARD COPY TO ADJACENT SERVICE AREA . . . . . . . . . . . . . . . . . . . . . . . . 9 − 2 − 2 Section 3. Other Reports and Forms 9 − 3 − 1. FAA FORM 7210 − 8, ELT INCIDENT . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9 − 3 − 1

Part 3. TERMINAL AIR TRAFFIC CONTROL

FACILITIES

Chapter 10. Terminal Operations, Services, and Equipment

Section 1. General 10 − 1 − 1. OPERATING POSITION DESIGNATORS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10 − 1 − 1 10 − 1 − 2. TOWER/RADAR TEAM CONCEPTS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10 − 1 − 1 10 − 1 − 3. MILITARY ATC BOARDS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10 − 1 − 1 10 − 1 − 4. SECTIONAL AERONAUTICAL, TERMINAL AREA, AND OTHER CHARTS . . 10 − 1 − 2 10 − 1 − 5. AREAS OF NONVISIBILITY . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10 − 1 − 2 10 − 1 − 6. SELECTING ACTIVE RUNWAYS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10 − 1 − 2 10 − 1 − 7. USE OF ACTIVE RUNWAYS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10 − 1 − 3 10 − 1 − 8. PROCEDURES FOR OPENING AND CLOSING RUNWAYS . . . . . . . . . . . . . . . . 10 − 1 − 4 10 − 1 − 9. FLIGHT PROGRESS STRIP USAGE . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10 − 1 − 5 10 − 1 − 10. LOW VISIBILITY OPERATIONS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10 − 1 − 5 10 − 1 − 11. MOBILE CONTROL TOWERS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10 − 1 − 6 10 − 1 − 12. PARTICIPATION IN LOCAL AIRPORT DEICING PLAN (LADP) . . . . . . . . . . . 10 − 1 − 6 10 − 1 − 13. PRECISION OBSTACLE FREE ZONE (POFZ) . . . . . . . . . . . . . . . . . . . . . . . . . . . 10 − 1 − 8 Table of Contents xi

Section 2. Position Binders

JO 7210.3EE CHG 3 7/9/26 Section 2. Position Binders Paragraph Page 10 − 2 − 1. POSITION DUTIES AND RESPONSIBILITIES . . . . . . . . . . . . . . . . . . . . . . . . . . . 10 − 2 − 1 10 − 2 − 2. TOWER/RADAR TEAM POSITION BINDERS . . . . . . . . . . . . . . . . . . . . . . . . . . . 10 − 2 − 1 Section 3. Operations 10 − 3 − 1. DISSEMINATION OF WEATHER INFORMATION . . . . . . . . . . . . . . . . . . . . . . . . 10 − 3 − 1 10 − 3 − 2. WIND INSTRUMENTS AT APPROACH CONTROL FACILITIES . . . . . . . . . . . . 10 − 3 − 1 10 − 3 − 3. LOW LEVEL WIND SHEAR/MICROBURST DETECTION SYSTEMS . . . . . . . . 10 − 3 − 1 10 − 3 − 4. RELAY OF RVR VALUES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10 − 3 − 2 10 − 3 − 5. ADVANCE APPROACH INFORMATION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10 − 3 − 2 10 − 3 − 6. ILS HEIGHT/DISTANCE LIMITATIONS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10 − 3 − 3 10 − 3 − 7. LAND AND HOLD SHORT OPERATIONS (LAHSO) . . . . . . . . . . . . . . . . . . . . . . 10 − 3 − 3 10 − 3 − 8. LINE UP AND WAIT (LUAW) OPERATIONS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10 − 3 − 3 10 − 3 − 9. VISUAL SEPARATION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10 − 3 − 4 10 − 3 − 10. TAKEOFF CLEARANCE . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10 − 3 − 5 10 − 3 − 11. MULTIPLE RUNWAY CROSSINGS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10 − 3 − 5 10 − 3 − 12. AIRPORT CONSTRUCTION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10 − 3 − 6 10 − 3 − 13. CHANGE IN RUNWAY LENGTH DUE TO CONSTRUCTION . . . . . . . . . . . . . . 10 − 3 − 6 10 − 3 − 14. TEMPORARY AUTHORIZATION AND USE OF A TAXIWAY AS A RUNWAY 10 − 3 − 7 10 − 3 − 15. APPROACHES TO PARALLEL RUNWAYS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10 − 3 − 8 10 − 3 − 16. GO-AROUND/MISSED APPROACH AND NON-INTERSECTING CONVERGING RUNWAY OPERATIONS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10 − 3 − 8 10 − 3 − 17. EQUIVALENT LATERAL SPACING OPERATIONS (ELSO) . . . . . . . . . . . . . . . . 10 − 3 − 12 Section 4. Services 10 − 4 − 1. AUTOMATIC TERMINAL INFORMATION SERVICE (ATIS) . . . . . . . . . . . . . . . 10 − 4 − 1 10 − 4 − 2. MINIMUM IFR ALTITUDES (MIA) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10 − 4 − 2 10 − 4 − 3. PRE-DEPARTURE CLEARANCE (PDC) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10 − 4 − 2 10 − 4 − 4. CONTROLLER PILOT DATA LINK COMMUNICATIONS (CPDLC) . . . . . . . . . . 10 − 4 − 3 10 − 4 − 5. TDLS APPLICATION SPECIALIST (TAS) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10 − 4 − 4 10 − 4 − 6. PRETAXI CLEARANCE PROCEDURES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10 − 4 − 4 10 − 4 − 7. GATE HOLD PROCEDURES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10 − 4 − 5 10 − 4 − 8. ADVISORY SERVICE TO ARRIVING VFR FLIGHTS . . . . . . . . . . . . . . . . . . . . . . 10 − 4 − 5 10 − 4 − 9. PRACTICE INSTRUMENT APPROACHES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10 − 4 − 6 10 − 4 − 10. SIMULTANEOUS INDEPENDENT APPROACHES . . . . . . . . . . . . . . . . . . . . . . . 10 − 4 − 6 10 − 4 − 11. SIMULTANEOUS WIDELY-SPACED PARALLEL OPERATIONS . . . . . . . . . . . . 10 − 4 − 8 10 − 4 − 12. SIMULTANEOUS CONVERGING INSTRUMENT APPROACHES . . . . . . . . . . 10 − 4 − 9 10 − 4 − 13. SIMULTANEOUS OFFSET INSTRUMENT APPROACHES . . . . . . . . . . . . . . . . 10 − 4 − 11 10 − 4 − 14. REDUCED SEPARATION ON FINAL . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10 − 4 − 12 Section 5. Terminal Radar 10 − 5 − 1. SHUTDOWN OF PAR ANTENNAS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10 − 5 − 1 10 − 5 − 2. RADAR DISPLAY INDICATORS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10 − 5 − 1 10 − 5 − 3. FUNCTIONAL USE OF CERTIFIED TOWER RADAR DISPLAYS . . . . . . . . . . . 10 − 5 − 1 10 − 5 − 4. ASR PERFORMANCE CHECKS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10 − 5 − 2 10 − 5 − 5. DEFICIENCIES IN SYSTEM . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10 − 5 − 3 10 − 5 − 6. RADAR TOLERANCES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10 − 5 − 3 10 − 5 − 7. RECOMMENDED ALTITUDES FOR SURVEILLANCE APPROACHES . . . . . . . 10 − 5 − 4 10 − 5 − 8. ASDE PERFORMANCE CHECKS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10 − 5 − 4 Table of Contents xii

Section 6. Airport Lighting

7/9/26 JO 7210.3EE CHG 3 Section 6. Airport Lighting Paragraph Page 10 − 6 − 1. GENERAL . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10 − 6 − 1 10 − 6 − 2. OPERATION OF LIGHTS WHEN TOWER IS CLOSED . . . . . . . . . . . . . . . . . . . . 10 − 6 − 1 10 − 6 − 3. INCOMPATIBLE LIGHT SYSTEM OPERATION . . . . . . . . . . . . . . . . . . . . . . . . . . 10 − 6 − 1 10 − 6 − 4. APPROACH LIGHT SYSTEMS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10 − 6 − 2 10 − 6 − 5. VISUAL APPROACH SLOPE INDICATOR (VASI) SYSTEMS . . . . . . . . . . . . . . . 10 − 6 − 3 10 − 6 − 6. PRECISION APPROACH PATH INDICATOR (PAPI) SYSTEMS . . . . . . . . . . . . . . 10 − 6 − 4 10 − 6 − 7. RUNWAY AND TAXIWAY LIGHTS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10 − 6 − 4 10 − 6 − 8. RUNWAY FLOODLIGHTS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10 − 6 − 4 10 − 6 − 9. RUNWAY EDGE LIGHTS ASSOCIATED WITH MEDIUM APPROACH LIGHT SYSTEM/RUNWAY ALIGNMENT INDICATOR LIGHTS . . . . . . . . . . . . . . . . . . 10 − 6 − 4 10 − 6 − 10. RUNWAY STATUS LIGHTS (RWSL) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10 − 6 − 5 Section 7. Airport Arrival Rate (AAR) 10 − 7 − 1. PURPOSE . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10 − 7 − 1 10 − 7 − 2. POLICY . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10 − 7 − 1 10 − 7 − 3. DEFINITIONS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10 − 7 − 1 10 − 7 − 4. RESPONSIBILITIES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10 − 7 − 1 10 − 7 − 5. CALCULATING AARs . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10 − 7 − 1 10 − 7 − 6. OPERATIONAL AARs . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10 − 7 − 2

Chapter 11. FAA Contract Tower Operation and

Administration

Section 1. Organizational Responsibilities 11 − 1 − 1. ATO LEVEL OF SUPPORT . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11 − 1 − 1 11 − 1 − 2. FAA HEADQUARTERS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11 − 1 − 1 11 − 1 − 3. ATO SERVICE CENTERS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11 − 1 − 1 11 − 1 − 4. AJT DISTRICT OFFICES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11 − 1 − 1 Section 2. Operations and Staffing 11 − 2 − 1. REQUESTS FOR ADDITIONAL SERVICES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11 − 2 − 1 11 − 2 − 2. FAA STAFFING FOR SPECIAL EVENTS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11 − 2 − 1 11 − 2 − 3. LETTERS OF AGREEMENT (LOA) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11 − 2 − 1 11 − 2 − 4. EMERGENCY AND CONTINGENCY SITUATIONS . . . . . . . . . . . . . . . . . . . . . . . 11 − 2 − 1 11 − 2 − 5. FACILITY DIRECTIVES REPOSITORY (FDR) . . . . . . . . . . . . . . . . . . . . . . . . . . . 11 − 2 − 1 11 − 2 − 6. FAA CONTRACT TOWER (FCT) AIR TRAFFIC CONTROLLER ELIGIBILITY 11 − 2 − 1 Section 3. Training 11 − 3 − 1. TESTING AND CERTIFICATION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11 − 3 − 1 11 − 3 − 2. BRIEFING/TRAINING ITEMS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11 − 3 − 1 11 − 3 − 3. CIC DESIGNATION AT FCT-OPERATED FACILITIES . . . . . . . . . . . . . . . . . . . . . 11 − 3 − 1 Section 4. Documents, Forms, and Charts 11 − 4 − 1. OPERATIONAL DIRECTIVES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11 − 4 − 1 11 − 4 − 2. PROVISION OF INFORMATION AND DATA . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11 − 4 − 1 11 − 4 − 3. FORMS AND CHARTS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11 − 4 − 1 11 − 4 − 4. TRAINING MATERIAL . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11 − 4 − 1 Table of Contents xiii

Section 5. Operational Documents, Directives, and Regulations

JO 7210.3EE CHG 3 7/9/26 Section 5. Operational Documents, Directives, and Regulations Paragraph Page 11 − 5 − 1. FAA DOCUMENTS, DIRECTIVES, AND REGULATIONS . . . . . . . . . . . . . . . . . . 11 − 5 − 1

Chapter 12. National Programs

Section 1. Terminal VFR Radar Services 12 − 1 − 1. PROGRAM INTENT . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12 − 1 − 1 12 − 1 − 2. IMPLEMENTATION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12 − 1 − 1 12 − 1 − 3. TRSA . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12 − 1 − 2 12 − 1 − 4. CLASS C AIRSPACE . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12 − 1 − 3 12 − 1 − 5. CLASS B AIRSPACE . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12 − 1 − 3 Section 2. Data Recording and Retention 12 − 2 − 1. DATA RECORDING . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12 − 2 − 1 12 − 2 − 2. DATA RETENTION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12 − 2 − 1 12 − 2 − 3. FAULT LOG . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12 − 2 − 2 Section 3. VFR Flyway Planning Chart Program 12 − 3 − 1. POLICY . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12 − 3 − 1 12 − 3 − 2. CRITERIA . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12 − 3 − 1 12 − 3 − 3. RESPONSIBILITIES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12 − 3 − 1 Section 4. Helicopter Route Chart Program 12 − 4 − 1. POLICY . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12 − 4 − 1 12 − 4 − 2. CRITERIA . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12 − 4 − 1 12 − 4 − 3. RESPONSIBILITIES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12 − 4 − 1 Section 5. VFR Transition Route Program 12 − 5 − 1. POLICY . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12 − 5 − 1 12 − 5 − 2. CRITERIA . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12 − 5 − 1 12 − 5 − 3. RESPONSIBILITIES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12 − 5 − 1 Section 6. Standard Terminal Automation Replacement System (STARS) 12 − 6 − 1. OPERATIONAL USE . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12 − 6 − 1 12 − 6 − 2. DATA ENTRIES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12 − 6 − 1 12 − 6 − 3. DISPLAY DATA . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12 − 6 − 1 12 − 6 − 4. USE OF STARS QUICK LOOK FUNCTIONS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12 − 6 − 1 12 − 6 − 5. AUTOMATION PROGRAM CHANGES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12 − 6 − 2 12 − 6 − 6. AUTOMATIC ACQUISITION/TERMINATION AREAS . . . . . . . . . . . . . . . . . . . . . 12 − 6 − 2 12 − 6 − 7. MINIMUM SAFE ALTITUDE WARNING (MSAW) AND CONFLICT ALERT (CA) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12 − 6 − 2 12 − 6 − 8. APPROACH RUNWAY VERIFICATION (ARV) . . . . . . . . . . . . . . . . . . . . . . . . . . . 12 − 6 − 3 12 − 6 − 9. MAGNETIC VARIATION AT STARS FACILITIES . . . . . . . . . . . . . . . . . . . . . . . . . 12 − 6 − 3 12 − 6 − 10. MSAW GTM CARTOGRAPHIC CERTIFICATION, UPDATES, AND RECOMPILATION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12 − 6 − 4 12 − 6 − 11. DIGITAL MAP VERIFICATION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12 − 6 − 4 12 − 6 − 12. MODE C INTRUDER (MCI) ALERT PARAMETERS . . . . . . . . . . . . . . . . . . . . . . 12 − 6 − 4 Table of Contents xiv 7/9/26 JO 7210.3EE CHG 3 Paragraph Page 12 − 6 − 13. OPERATIONAL MODE TRANSITION PROCEDURES . . . . . . . . . . . . . . . . . . . . 12 − 6 − 4 12 − 6 − 14. RADAR SELECTION PROCEDURES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12 − 6 − 5 12 − 6 − 15. MULTI − SENSOR RADAR OPERATIONS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12 − 6 − 5 Section 7. Safety Logic Systems Operations Supervisor/CIC Procedures 12 − 7 − 1. ASDE SYSTEM OPERATION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12 − 7 − 1 12 − 7 − 2. ENSURE STATUS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12 − 7 − 1 12 − 7 − 3. MONITOR ALERTS AND ENSURE CORRECTIVE ACTION . . . . . . . . . . . . . . . 12 − 7 − 2 12 − 7 − 4. RAIN CONFIGURATION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12 − 7 − 2 12 − 7 − 5. LIMITED CONFIGURATION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12 − 7 − 2 12 − 7 − 6. WATCH CHECKLIST . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12 − 7 − 3 Section 8. VFR Waypoint Chart Program 12 − 8 − 1. POLICY . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12 − 8 − 1 12 − 8 − 2. DEFINITION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12 − 8 − 1 12 − 8 − 3. CRITERIA . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12 − 8 − 1 12 − 8 − 4. RESPONSIBILITIES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12 − 8 − 2 Section 9. Low Altitude Authorization Notification Capability 12 − 9 − 1. PROGRAM DESCRIPTION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12 − 9 − 1 12 − 9 − 2. UAS FACILITY MAPS (UASFM) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12 − 9 − 1 12 − 9 − 3. SMALL UAS (sUAS) ATC AUTHORIZATIONS . . . . . . . . . . . . . . . . . . . . . . . . . . . 12 − 9 − 1 12 − 9 − 4. FURTHER COORDINATION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12 − 9 − 1 12 − 9 − 5. FACILITY RESPONSIBILITIES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12 − 9 − 2 Section 10. UAS Facility Maps (UASFM) 12 − 10 − 1. POLICY . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12 − 10 − 1 12 − 10 − 2. RESPONSIBILITY . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12 − 10 − 1 12 − 10 − 3. ASSUMPTIONS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12 − 10 − 1 12 − 10 − 4. AUTHORIZATION MAP DESIGN PROCEDURES CLASS B/C/D AIRSPACE . 12 − 10 − 2 12 − 10 − 5. PROCEDURES TO CHANGE UAS FACILITY MAP (UASFM) ALTITUDES . . 12 − 10 − 2 12 − 10 − 6. PART 107 OPERATION APPROVALS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12 − 10 − 3 Section 11. UAS Operations at Towered Airports 12 − 11 − 1. sUAS OPERATIONS OVER NON-MOVEMENT/CLOSED MOVEMENT AREAS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12 − 11 − 1

Chapter 13. Facility Statistical Data, Reports, and Forms

Section 1. General Information 13 − 1 − 1. GENERAL . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 13 − 1 − 1 13 − 1 − 2. COUNTING METHODS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 13 − 1 − 1 13 − 1 − 3. QUESTIONS OR CHANGES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 13 − 1 − 1 13 − 1 − 4. SUMMARY OF STATISTICAL REPORTS AND FORMS . . . . . . . . . . . . . . . . . . . . 13 − 1 − 1 13 − 1 − 5. CATEGORIES OF OPERATIONS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 13 − 1 − 2 Section 2. Itinerant Operations 13 − 2 − 1. TABULATION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 13 − 2 − 1 Table of Contents xv

Section 3. Local Operations

JO 7210.3EE CHG 3 7/9/26 Section 3. Local Operations Paragraph Page 13 − 3 − 1. TABULATION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 13 − 3 − 1 Section 4. Overflight Operations 13 − 4 − 1. TABULATION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 13 − 4 − 1 Section 5. Amending and Reviewing Data 13 − 5 − 1. AMENDED OPSNET DATA . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 13 − 5 − 1 13 − 5 − 2. ANALYSIS AND REVIEW . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 13 − 5 − 1

Part 4. FLIGHT SERVICE STATIONS

Chapter 14. Flight Service Operations and Services

Section 1. General 14 − 1 − 1. OPERATING POSITION DESIGNATORS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 14 − 1 − 1 14 − 1 − 2. TEMPORARY FSS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 14 − 1 − 1 14 − 1 − 3. FLIGHT PLAN AREA . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 14 − 1 − 1 14 − 1 − 4. ICSS INTRODUCTORY ANNOUNCEMENT . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 14 − 1 − 2 Section 2. Position/Service Information Binders 14 − 2 − 1. RESPONSIBILITY . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 14 − 2 − 1 14 − 2 − 2. BOUNDARIES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 14 − 2 − 1 14 − 2 − 3. POSITIONS/SERVICES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 14 − 2 − 1 Section 3. Operations 14 − 3 − 1. AIRPORT CONDITION FILE . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 14 − 3 − 1 14 − 3 − 2. LANDING AREA STATUS CHECKS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 14 − 3 − 1 14 − 3 − 3. LIAISON VISITS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 14 − 3 − 1 14 − 3 − 4. DUTIES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 14 − 3 − 1 14 − 3 − 5. TIE-IN NOTAM RESPONSIBILITY . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 14 − 3 − 1 14 − 3 − 6. REGULATORY NOTAMs FOR PRESIDENTIAL TFR, SPECIAL SECURITY INSTRUCTIONS, OR EMERGENCY AIR TRAFFIC RULES . . . . . . . . . . . . . . . . 14 − 3 − 2 Section 4. Services 14 − 4 − 1. PREFILED FLIGHT PLANS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 14 − 4 − 1 14 − 4 − 2. PRACTICE INSTRUMENT APPROACHES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 14 − 4 − 1 14 − 4 − 3. OPERATION OF AIRPORT LIGHTS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 14 − 4 − 1 14 − 4 − 4. RUNWAY EDGE LIGHTS ASSOCIATED WITH MEDIUM APPROACH LIGHT SYSTEM/RUNWAY ALIGNMENT INDICATOR LIGHTS . . . . . . . . . . . . . . . . . . 14 − 4 − 2 14 − 4 − 5. LOCAL AIRPORT ADVISORY (LAA)/REMOTE AIRPORT ADVISORY (RAA)/ REMOTE AIRPORT INFORMATION SERVICE (RAIS) . . . . . . . . . . . . . . . . . . . . 14 − 4 − 2 14 − 4 − 6. AUTOMATIC FLIGHT INFORMATION SERVICE (AFIS) − ALASKA FSSs ONLY . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 14 − 4 − 3 14 − 4 − 7. TRANSMISSION OF MESSAGES FROM AIRPORT INSPECTORS . . . . . . . . . . . 14 − 4 − 3

Chapter 15. Aviation Meteorological Services and Equipment

Section 1. General 15 − 1 − 1. FAA − NWS AGREEMENT . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 15 − 1 − 1 Table of Contents xvi 7/9/26 JO 7210.3EE CHG 3 Paragraph Page 15 − 1 − 2. CERTIFICATES OF AUTHORITY . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 15 − 1 − 1 15 − 1 − 3. LIAISON WITH AVIATION INTERESTS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 15 − 1 − 1 15 − 1 − 4. TELEPHONE LISTINGS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 15 − 1 − 1 15 − 1 − 5. MINIMUM WEATHER EQUIPMENT . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 15 − 1 − 2 15 − 1 − 6. SUPPLY − SUPPORT . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 15 − 1 − 2 Section 2. Pilot Weather Briefing 15 − 2 − 1. BRIEFING RESPONSIBILITY . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 15 − 2 − 1 15 − 2 − 2. WEATHER CHART DISPLAY . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 15 − 2 − 1 15 − 2 − 3. TELEVISION EQUIPMENT . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 15 − 2 − 1 15 − 2 − 4. FLIGHT PLANNING DISPLAY . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 15 − 2 − 1 15 − 2 − 5. FLIGHT PLANNING FORMS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 15 − 2 − 1 15 − 2 − 6. MILITARY TRAINING ACTIVITY . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 15 − 2 − 1 15 − 2 − 7. TRANSFER OF BRIEFERS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 15 − 2 − 2 Section 3. Broadcasts 15 − 3 − 1. STATION BROADCASTS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 15 − 3 − 1 15 − 3 − 2. COMMERCIAL BROADCAST STATIONS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 15 − 3 − 1

Chapter 16. Equipment

Section 1. General 16 − 1 − 1. RESPONSIBILITY . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 16 − 1 − 1 16 − 1 − 2. AIRCRAFT ORIENTATION PLOTTING BOARD . . . . . . . . . . . . . . . . . . . . . . . . . . 16 − 1 − 1 16 − 1 − 3. LEASED EQUIPMENT SUPPLIES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 16 − 1 − 1 Section 2. Frequencies 16 − 2 − 1. VOR AND VORTAC VOICE CHANNELS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 16 − 2 − 1

Chapter 17. Facility Statistical Data, Reports, and Forms

(Alaska Only)

Section 1. General Information 17 − 1 − 1. FORM USAGE . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 17 − 1 − 1 17 − 1 − 2. TOTAL FLIGHT SERVICES FORMULA . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 17 − 1 − 1 Section 2. Aircraft Contacted 17 − 2 − 1. AIRCRAFT CONTACTED . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 17 − 2 − 1 17 − 2 − 2. LOCAL AIRPORT ADVISORY (LAA)/REMOTE AIRPORT ADVISORY (RAA)/ REMOTE AIRPORT INFORMATION SERVICE (RAIS) . . . . . . . . . . . . . . . . . . . . 17 − 2 − 1 17 − 2 − 3. RADIO CONTACTS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 17 − 2 − 1 Section 3. Flight Plan Count 17 − 3 − 1. FLIGHT PLAN COUNT . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 17 − 3 − 1 17 − 3 − 2. ADDITIONAL ITEMS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 17 − 3 − 1 17 − 3 − 3. FLIGHT PLAN CHANGE EN ROUTE . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 17 − 3 − 1 17 − 3 − 4. FLIGHT PLAN FORMS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 17 − 3 − 1 Table of Contents xvii

Section 4. Pilot Briefing Count

JO 7210.3EE CHG 3 7/9/26 Section 4. Pilot Briefing Count Paragraph Page 17 − 4 − 1. PILOT BRIEFING COUNT . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 17 − 4 − 1 17 − 4 − 2. RETENTION OF FORMS CONTAINING PILOT BRIEFING (“PB”) DATA . . . . . 17 − 4 − 1 Section 5. Other Reports and Information 17 − 5 − 1. COMPLETION OF MONTHLY ACTIVITY RECORD . . . . . . . . . . . . . . . . . . . . . . 17 − 5 − 1 17 − 5 − 2. DISTRIBUTION AND AMENDMENT . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 17 − 5 − 2 Section 6. FSS Lists, Logs, and Tallies (OASIS) 17 − 6 − 1. RECORDING OF FLIGHT INFORMATION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 17 − 6 − 1 17 − 6 − 2. MANAGEMENT OF LISTS AND LOGS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 17 − 6 − 1 17 − 6 − 3. TALLIES PRINTING . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 17 − 6 − 1

Part 5. TRAFFIC MANAGEMENT SYSTEM

Chapter 18. Traffic Management National, Center, and

Terminal

Section 1. Organizational Missions 18 − 1 − 1. TRAFFIC MANAGEMENT SYSTEM MISSION . . . . . . . . . . . . . . . . . . . . . . . . . . 18 − 1 − 1 18 − 1 − 2. DAVID J. HURLEY AIR TRAFFIC CONTROL SYSTEM COMMAND CENTER (ATCSCC) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 18 − 1 − 1 18 − 1 − 3. TRAFFIC MANAGEMENT UNIT (TMU) MISSION . . . . . . . . . . . . . . . . . . . . . . . 18 − 1 − 1 Section 2. Organizational Responsibilities 18 − 2 − 1. AIR TRAFFIC TACTICAL OPERATIONS PROGRAM . . . . . . . . . . . . . . . . . . . . . 18 − 2 − 1 18 − 2 − 2. SERVICE CENTER OPERATIONS SUPPORT GROUP . . . . . . . . . . . . . . . . . . . . . 18 − 2 − 1 18 − 2 − 3. ATCSCC . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 18 − 2 − 1 18 − 2 − 4. FIELD FACILITIES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 18 − 2 − 2 Section 3. Line of Authority 18 − 3 − 1. ATCSCC . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 18 − 3 − 1 18 − 3 − 2. ARTCC . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 18 − 3 − 1 18 − 3 − 3. TERMINAL . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 18 − 3 − 1 Section 4. Supplemental Duties 18 − 4 − 1. TELEPHONE CONFERENCES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 18 − 4 − 1 18 − 4 − 2. SPECIAL INTEREST FLIGHTS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 18 − 4 − 1 18 − 4 − 3. ANALYSIS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 18 − 4 − 2 18 − 4 − 4. OPERATIONS MANAGER (OM) SUPPORT . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 18 − 4 − 2 18 − 4 − 5. DIVERSION RECOVERY . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 18 − 4 − 3 18 − 4 − 6. VOLCANIC ASH . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 18 − 4 − 4 18 − 4 − 7. SPACE LAUNCH OR REENTRY MISHAPS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 18 − 4 − 4 Section 5. Coordination 18 − 5 − 1. COORDINATION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 18 − 5 − 1 18 − 5 − 2. COMMUNICATION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 18 − 5 − 1 xviii Table of Contents 7/9/26 JO 7210.3EE CHG 3 Paragraph Page 18 − 5 − 3. DOCUMENTATION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 18 − 5 − 1 18 − 5 − 4. RESPONSIBILITIES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 18 − 5 − 1 18 − 5 − 5. STATIC COORDINATION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 18 − 5 − 3 18 − 5 − 6. EN ROUTE INTRAFACILITY COORDINATION . . . . . . . . . . . . . . . . . . . . . . . . . . 18 − 5 − 4 18 − 5 − 7. TERMINAL INTERFACILITY COORDINATION . . . . . . . . . . . . . . . . . . . . . . . . . . 18 − 5 − 4 18 − 5 − 8. NATIONAL TRAFFIC MANAGEMENT LOG (NTML) . . . . . . . . . . . . . . . . . . . . . 18 − 5 − 5 18 − 5 − 9. NTML FACILITY CONFIGURATION REQUIREMENTS . . . . . . . . . . . . . . . . . . . 18 − 5 − 5 18 − 5 − 10. NTML PROCEDURES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 18 − 5 − 5 18 − 5 − 11. PROCESSING REQUESTS FOR REROUTES AND RESTRICTIONS FOR FACILITIES WITH NTML . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 18 − 5 − 6 18 − 5 − 12. DELAY REPORTING . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 18 − 5 − 6 18 − 5 − 13. ELECTRONIC SYSTEM IMPACT REPORTS . . . . . . . . . . . . . . . . . . . . . . . . . . . . 18 − 5 − 7 18 − 5 − 14. TARMAC DELAY OPERATIONS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 18 − 5 − 8 Section 6. Trajectory-Based Operations (TBO) 18 − 6 − 1. TRAJECTORY-BASED OPERATIONS (TBO) MISSION . . . . . . . . . . . . . . . . . . . . 18 − 6 − 1 18 − 6 − 2. TBO POLICY . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 18 − 6 − 1 18 − 6 − 3. TIME − BASED MANAGEMENT (TBM) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 18 − 6 − 1 18 − 6 − 4. POLICY . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 18 − 6 − 1 18 − 6 − 5. TYPES OF TBM . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 18 − 6 − 1 18 − 6 − 6. EXCEPTION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 18 − 6 − 1 18 − 6 − 7. TBM DATA . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 18 − 6 − 1 18 − 6 − 8. TBM APPROVAL AUTHORITY . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 18 − 6 − 2 18 − 6 − 9. FIELD FACILITY RESPONSIBILITIES FOR TBM . . . . . . . . . . . . . . . . . . . . . . . . 18 − 6 − 2 18 − 6 − 10. ATCSCC RESPONSIBILITIES FOR TBM . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 18 − 6 − 2 18 − 6 − 11. TBM WITHIN ARTCC AREA OF JURISDICTION . . . . . . . . . . . . . . . . . . . . . . . . 18 − 6 − 2 Section 7. Traffic Management Initiatives 18 − 7 − 1. GENERAL . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 18 − 7 − 1 18 − 7 − 2. BACKGROUND . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 18 − 7 − 1 18 − 7 − 3. POLICY . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 18 − 7 − 1 18 − 7 − 4. TYPES OF TMIs . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 18 − 7 − 1 18 − 7 − 5. EXCEPTION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 18 − 7 − 2 18 − 7 − 6. TMI DATA . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 18 − 7 − 2 18 − 7 − 7. TMI APPROVAL AUTHORITY . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 18 − 7 − 3 18 − 7 − 8. PROCESSING TMI . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 18 − 7 − 3 18 − 7 − 9. FIELD FACILITY RESPONSIBILITIES FOR TMIs . . . . . . . . . . . . . . . . . . . . . . . . 18 − 7 − 3 18 − 7 − 10. ATCSCC RESPONSIBILITIES FOR TMI . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 18 − 7 − 3 18 − 7 − 11. TMIs WITHIN ARTCC AREA OF JURISDICTION . . . . . . . . . . . . . . . . . . . . . . . . 18 − 7 − 4 18 − 7 − 12. TMIs OF 10 MIT OR LESS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 18 − 7 − 4 18 − 7 − 13. TMIs OF 25 MIT OR GREATER . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 18 − 7 − 4 18 − 7 − 14. CAPPING AND TUNNELING . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 18 − 7 − 5 Section 8. Flow Evaluation Area (FEA), Flow Constrained Area (FCA), and Integrated Collaborative Rerouting (ICR) 18 − 8 − 1. GENERAL . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 18 − 8 − 1 18 − 8 − 2. DEFINITIONS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 18 − 8 − 1 18 − 8 − 3. FEA/FCA RESPONSIBILITIES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 18 − 8 − 1 18 − 8 − 4. FEA/FCA PROCEDURES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 18 − 8 − 2 18 − 8 − 5. ARTCC TO ARTCC FEA/FCA COORDINATION . . . . . . . . . . . . . . . . . . . . . . . . . . 18 − 8 − 3 Table of Contents xix JO 7210.3EE CHG 3 7/9/26 Paragraph Page 18 − 8 − 6. RESPONSIBILITIES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 18 − 8 − 3 18 − 8 − 7. PROCEDURES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 18 − 8 − 3 18 − 8 − 8. INTEGRATED COLLABORATIVE REROUTING (ICR) . . . . . . . . . . . . . . . . . . . . 18 − 8 − 3 Section 9. Monitor Alert Parameter 18 − 9 − 1. PURPOSE . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 18 − 9 − 1 18 − 9 − 2. IMPLEMENTATION PROCEDURES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 18 − 9 − 1 18 − 9 − 3. RESPONSIBILITIES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 18 − 9 − 1 18 − 9 − 4. ANALYSIS REQUIREMENTS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 18 − 9 − 2 18 − 9 − 5. RESOLVING RECURRING SECTOR LOADING ISSUES . . . . . . . . . . . . . . . . . . . 18 − 9 − 2 Section 10. Ground Delay Programs 18 − 10 − 1. POLICY . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 18 − 10 − 1 18 − 10 − 2. GENERAL . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 18 − 10 − 1 18 − 10 − 3. BACKGROUND . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 18 − 10 − 1 18 − 10 − 4. DEFINITIONS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 18 − 10 − 1 18 − 10 − 5. VARIABLES IN GDPs . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 18 − 10 − 1 18 − 10 − 6. ATCSCC PROCEDURES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 18 − 10 − 2 18 − 10 − 7. ARTCC PROCEDURES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 18 − 10 − 3 18 − 10 − 8. TERMINAL PROCEDURES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 18 − 10 − 3 18 − 10 − 9. AMENDING EDCTs . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 18 − 10 − 4 18 − 10 − 10. CANCELLATION PROCEDURES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 18 − 10 − 4 18 − 10 − 11. DOCUMENTATION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 18 − 10 − 4 18 − 10 − 12. USER OPTIONS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 18 − 10 − 5 18 − 10 − 13. VFR FLIGHTS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 18 − 10 − 5 Section 11. Airspace Flow Programs (AFP) 18 − 11 − 1. GENERAL . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 18 − 11 − 1 18 − 11 − 2. POLICY . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 18 − 11 − 1 18 − 11 − 3. RESPONSIBILITIES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 18 − 11 − 1 18 − 11 − 4. PROCEDURES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 18 − 11 − 1 Section 12. Collaborative Trajectory Options Program (CTOP) 18 − 12 − 1. GENERAL . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 18 − 12 − 1 18 − 12 − 2. POLICY . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 18 − 12 − 1 18 − 12 − 3. DEFINITIONS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 18 − 12 − 1 18 − 12 − 4. ATCSCC PROCEDURES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 18 − 12 − 1 18 − 12 − 5. ARTCC PROCEDURES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 18 − 12 − 2 18 − 12 − 6. TERMINAL PROCEDURES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 18 − 12 − 2 18 − 12 − 7. AMENDING EDCTs . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 18 − 12 − 2 18 − 12 − 8. CANCELLATION PROCEDURES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 18 − 12 − 2 18 − 12 − 9. DOCUMENTATION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 18 − 12 − 3 Section 13. Ground Stop(s) 18 − 13 − 1. POLICY . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 18 − 13 − 1 18 − 13 − 2. GENERAL . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 18 − 13 − 1 18 − 13 − 3. LOCAL GROUND STOP(S) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 18 − 13 − 1 18 − 13 − 4. NATIONAL GROUND STOP(S) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 18 − 13 − 2 18 − 13 − 5. CANCELLATION PROCEDURES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 18 − 13 − 2 Table of Contents xx

Section 14. Special Traffic Management Programs

7/9/26 JO 7210.3EE CHG 3 Paragraph Page 18 − 13 − 6. DOCUMENTATION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 18 − 13 − 3 Section 14. Special Traffic Management Programs 18 − 14 − 1. SPECIAL EVENT PROGRAMS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 18 − 14 − 1 18 − 14 − 2. COORDINATION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 18 − 14 − 1 18 − 14 − 3. IMPLEMENTATION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 18 − 14 − 1 18 − 14 − 4. AIRPORT RESERVATION OFFICE . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 18 − 14 − 2 Section 15. Severe Weather Management 18 − 15 − 1. GENERAL . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 18 − 15 − 1 18 − 15 − 2. DUTIES AND RESPONSIBILITIES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 18 − 15 − 1 Section 16. Severe Weather Avoidance Plan (SWAP) 18 − 16 − 1. GENERAL . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 18 − 16 − 1 18 − 16 − 2. RESPONSIBILITIES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 18 − 16 − 1 Section 17. Preferred IFR Routes Program 18 − 17 − 1. GENERAL . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 18 − 17 − 1 18 − 17 − 2. RESPONSIBILITIES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 18 − 17 − 1 18 − 17 − 3. DEVELOPMENT PROCEDURES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 18 − 17 − 1 18 − 17 − 4. COORDINATION PROCEDURES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 18 − 17 − 2 18 − 17 − 5. PROCESSING AND PUBLICATION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 18 − 17 − 2 Section 18. North American Route Program 18 − 18 − 1. PURPOSE . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 18 − 18 − 1 18 − 18 − 2. RESPONSIBILITIES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 18 − 18 − 1 18 − 18 − 3. PROCEDURES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 18 − 18 − 1 18 − 18 − 4. REPORTING REQUIREMENTS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 18 − 18 − 2 18 − 18 − 5. USER REQUIREMENTS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 18 − 18 − 2 Section 19. Coded Departure Routes 18 − 19 − 1. PURPOSE . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 18 − 19 − 1 18 − 19 − 2. DEFINITION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 18 − 19 − 1 18 − 19 − 3. POLICY . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 18 − 19 − 1 18 − 19 − 4. RESPONSIBILITIES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 18 − 19 − 1 18 − 19 − 5. CDR DATA FORMAT . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 18 − 19 − 2 Section 20. Route Advisories 18 − 20 − 1. PURPOSE . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 18 − 20 − 1 18 − 20 − 2. POLICY . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 18 − 20 − 1 18 − 20 − 3. EXPLANATION OF TERMS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 18 − 20 − 1 18 − 20 − 4. ROUTE ADVISORY MESSAGES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 18 − 20 − 1 18 − 20 − 5. RESPONSIBILITIES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 18 − 20 − 2 18 − 20 − 6. PROCEDURES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 18 − 20 − 3 Section 21. Operations Plan 18 − 21 − 1. PURPOSE . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 18 − 21 − 1 18 − 21 − 2. DEFINITION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 18 − 21 − 1 Table of Contents xxi

Section 22. National Playbook

JO 7210.3EE CHG 3 7/9/26 Paragraph Page 18 − 21 − 3. RESPONSIBILITIES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 18 − 21 − 1 18 − 21 − 4. PROCEDURES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 18 − 21 − 3 Section 22. National Playbook 18 − 22 − 1. PURPOSE . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 18 − 22 − 1 18 − 22 − 2. POLICY . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 18 − 22 − 1 18 − 22 − 3. DEFINITION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 18 − 22 − 1 18 − 22 − 4. RESPONSIBILITIES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 18 − 22 − 1 18 − 22 − 5. NATIONAL PLAYBOOK DATA FORMAT . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 18 − 22 − 2 18 − 22 − 6. IMPLEMENTATION PROCEDURES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 18 − 22 − 2 Section 23. Traffic Management (TM) Support of Non-Reduced Vertical Separation Minima (RVSM) Aircraft 18 − 23 − 1. PURPOSE . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 18 − 23 − 1 18 − 23 − 2. POLICY . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 18 − 23 − 1 18 − 23 − 3. DEFINITIONS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 18 − 23 − 1 18 − 23 − 4. EXCEPTED FLIGHTS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 18 − 23 − 1 18 − 23 − 5. OPERATOR ACCESS OPTIONS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 18 − 23 − 1 18 − 23 − 6. DUTIES AND RESPONSIBILITIES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 18 − 23 − 2 Section 24. Route Test 18 − 24 − 1. PURPOSE . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 18 − 24 − 1 18 − 24 − 2. DEFINITION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 18 − 24 − 1 18 − 24 − 3. POLICY . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 18 − 24 − 1 18 − 24 − 4. RESPONSIBILITIES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 18 − 24 − 1 Section 25. Time-Based Flow Management (TBFM) 18 − 25 − 1. GENERAL . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 18 − 25 − 1 18 − 25 − 2. PURPOSE . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 18 − 25 − 1 18 − 25 − 3. POLICY . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 18 − 25 − 1 18 − 25 − 4. DEFINITIONS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 18 − 25 − 1 18 − 25 − 5. RESPONSIBILITIES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 18 − 25 − 3 Section 26. Weather Management 18 − 26 − 1. GENERAL . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 18 − 26 − 1 18 − 26 − 2. BACKGROUND . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 18 − 26 − 1 18 − 26 − 3. POLICY . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 18 − 26 − 1 18 − 26 − 4. RESPONSIBILITIES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 18 − 26 − 1

Part 6. REGULATORY AND PROCEDURAL

INFORMATION

Chapter 19. Waivers, Authorizations, and Exemptions

Section 1. Regulatory Waivers and Authorizations 19 − 1 − 1. PURPOSE . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 19 − 1 − 1 19 − 1 − 2. POLICY . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 19 − 1 − 1 Table of Contents xxii 7/9/26 JO 7210.3EE CHG 3 Paragraph Page 19 − 1 − 3. RESPONSIBILITIES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 19 − 1 − 1 19 − 1 − 4. PROCESSING CERTIFICATE OF WAIVER OR AUTHORIZATION (FAA FORM 7711 − 2) REQUESTS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 19 − 1 − 2 19 − 1 − 5. PROCESSING CERTIFICATE OF WAIVER OR AUTHORIZATION RENEWAL OR AMENDMENT REQUESTS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 19 − 1 − 2 19 − 1 − 6. ISSUANCE OF CERTIFICATE OF WAIVER OR AUTHORIZATION (FAA FORM 7711 − 1) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 19 − 1 − 2 19 − 1 − 7. RETENTION OF CERTIFICATES OF WAIVER OR AUTHORIZATION . . . . . . . 19 − 1 − 3 19 − 1 − 8. WAIVER, AUTHORIZATION OR DENIAL PROCEDURE . . . . . . . . . . . . . . . . . . 19 − 1 − 3 19 − 1 − 9. CANCELLATION OF WAIVERS AND AUTHORIZATIONS . . . . . . . . . . . . . . . . . 19 − 1 − 3 Section 2. Elimination of Fixed-Wing Special Visual Flight Rules Operations 19 − 2 − 1. PURPOSE . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 19 − 2 − 1 19 − 2 − 2. POLICY . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 19 − 2 − 1 19 − 2 − 3. RESPONSIBILITIES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 19 − 2 − 1 Section 3. Current Authorizations and Exemptions from Title 14, Code of Federal Regulations 19 − 3 − 1. AUTHORIZATIONS AND EXEMPTIONS FROM TITLE 14, CODE OF FEDERAL REGULATIONS (14 CFR) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 19 − 3 − 1 19 − 3 − 2. AUTHORIZATION AND EXEMPTION REQUESTS . . . . . . . . . . . . . . . . . . . . . . . 19 − 3 − 1 Section 4. Parachute Jump Operations 19 − 4 − 1. NONEMERGENCY PARACHUTE JUMP OPERATIONS . . . . . . . . . . . . . . . . . . . . 19 − 4 − 1 Section 5. Moored Balloons, Kites, Parasail, Unmanned Rockets, and Unmanned Free Balloons/Objects 19 − 5 − 1. MOORED BALLOONS, KITES, PARASAIL, UNMANNED ROCKETS, AND UNMANNED FREE BALLOONS/OBJECTS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 19 − 5 − 1 19 − 5 − 2. DERELICT BALLOONS/OBJECTS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 19 − 5 − 1 Section 6. 14 CFR Part 107, sUAS Operations 19 − 6 − 1. GENERAL . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 19 − 6 − 1 19 − 6 − 2. LOW ALTITUDE AUTHORIZATION AND NOTIFICATION CAPABILITY (LAANC) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 19 − 6 − 1 19 − 6 − 3. MANUAL AIRSPACE AUTHORIZATION PROCEDURES (VIA FAA DRONEZONE) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 19 − 6 − 1 19 − 6 − 4. HEADQUARTERS/SERVICE CENTER AIRSPACE WAIVER PROCESS . . . . . . . 19 − 6 − 2 Section 7. Procedural Waivers 19 − 7 − 1. PURPOSE . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 19 − 7 − 1 19 − 7 − 2. POLICY . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 19 − 7 − 1 19 − 7 − 3. RESPONSIBILITIES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 19 − 7 − 1 19 − 7 − 4. WAIVER REQUESTS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 19 − 7 − 1 19 − 7 − 5. DEVELOPMENT OF SAFETY DOCUMENTATION AND OTHER SAFETY STUDIES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 19 − 7 − 1 19 − 7 − 6. WAIVER RENEWAL PROCESSING . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 19 − 7 − 2 19 − 7 − 7. PERIODICITY OF WAIVER RENEWALS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 19 − 7 − 2 19 − 7 − 8. WAIVER APPROVAL PROCESS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 19 − 7 − 2 Table of Contents xxiii

Chapter 20. Temporary Flight Restrictions (TFRs)

JO 7210.3EE CHG 3 7/9/26

Chapter 20. Temporary Flight Restrictions (TFRs)

Section 1. General Information Paragraph Page 20 − 1 − 1. PURPOSE . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 20 − 1 − 1 20 − 1 − 2. AUTHORITY . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 20 − 1 − 1 20 − 1 − 3. REASONS FOR ISSUING A TFR . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 20 − 1 − 1 20 − 1 − 4. TYPES OF TFRs . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 20 − 1 − 1 20 − 1 − 5. TFR NOTAM CONTENT . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 20 − 1 − 1 20 − 1 − 6. TFR INFORMATION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 20 − 1 − 1 20 − 1 − 7. TFRs OUTSIDE OF THE UNITED STATES AND ITS TERRITORIES . . . . . . . . . 20 − 1 − 2 20 − 1 − 8. TFR QUESTIONS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 20 − 1 − 2 Section 2. Temporary Flight Restrictions for Unmanned Aircraft (49 U.S.C. Section 44812) 20 − 2 − 1. PURPOSE . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 20 − 2 − 1 20 − 2 − 2. TFR CRITERIA . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 20 − 2 − 1 20 − 2 − 3. REQUESTING AUTHORITIES/ELIGIBLE ENTITIES . . . . . . . . . . . . . . . . . . . . . . 20 − 2 − 1 20 − 2 − 4. ISSUING TFRs . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 20 − 2 − 1 20 − 2 − 5. DEGREE OF RESTRICTIONS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 20 − 2 − 1 Section 3. Temporary Flight Restrictions in the Vicinity of Disaster/Hazard Areas (14 CFR Section 91.137) 20 − 3 − 1. PURPOSE . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 20 − 3 − 1 20 − 3 − 2. TFR CRITERIA . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 20 − 3 − 1 20 − 3 − 3. REQUESTING AUTHORITIES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 20 − 3 − 1 20 − 3 − 4. ISSUING TFRs . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 20 − 3 − 1 20 − 3 − 5. DEGREE OF RESTRICTIONS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 20 − 3 − 2 20 − 3 − 6. RESPONSIBILITIES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 20 − 3 − 3 20 − 3 − 7. REVISIONS AND CANCELLATIONS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 20 − 3 − 4 Section 4. Temporary Flight Restrictions in National Disaster Areas in the State of Hawaii (Section 91.138) 20 − 4 − 1. PURPOSE . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 20 − 4 − 1 20 − 4 − 2. REQUESTING AUTHORITIES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 20 − 4 − 1 20 − 4 − 3. DEGREE OF RESTRICTIONS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 20 − 4 − 1 20 − 4 − 4. DURATION OF RESTRICTIONS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 20 − 4 − 1 20 − 4 − 5. ISSUING TFRs . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 20 − 4 − 1 Section 5. Emergency Air Traffic Rules (14 CFR Section 91.139) 20 − 5 − 1. PURPOSE . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 20 − 5 − 1 20 − 5 − 2. REQUESTING AUTHORITIES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 20 − 5 − 1 20 − 5 − 3. ISSUING TFRs . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 20 − 5 − 1 20 − 5 − 4. DEGREE OF RESTRICTIONS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 20 − 5 − 1 Section 6. Flight Restrictions in the Proximity of the Presidential and Other Parties (14 CFR Section 91.141) 20 − 6 − 1. PURPOSE . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 20 − 6 − 1 20 − 6 − 2. REQUESTING AUTHORITIES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 20 − 6 − 1 Table of Contents xxiv 7/9/26 JO 7210.3EE CHG 3 Paragraph Page 20 − 6 − 3. ISSUING TFRs . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 20 − 6 − 1 20 − 6 − 4. DEGREE OF RESTRICTIONS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 20 − 6 − 1 20 − 6 − 5. PROCEDURES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 20 − 6 − 1 Section 7. Flight Limitation in the Proximity of Space Flight Operations (14 CFR Section 91.143) 20 − 7 − 1. PURPOSE . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 20 − 7 − 1 20 − 7 − 2. ISSUING AUTHORITIES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 20 − 7 − 1 20 − 7 − 3. DEGREE OF RESTRICTIONS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 20 − 7 − 1 20 − 7 − 4. AIRPORTS WITHIN AIRCRAFT HAZARD AREAS AND TRANSITIONAL HAZARD AREAS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 20 − 7 − 1 Section 8. Management of Aircraft Operations in the Vicinity of Aerial Demonstrations and Major Sporting Events (14 CFR Section 91.145) 20 − 8 − 1. PURPOSE . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 20 − 8 − 1 20 − 8 − 2. DEGREE OF RESTRICTIONS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 20 − 8 − 1 20 − 8 − 3. REQUESTING AUTHORITIES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 20 − 8 − 1 20 − 8 − 4. AERIAL DEMONSTRATION/AIRSHOW TFRs . . . . . . . . . . . . . . . . . . . . . . . . . . . 20 − 8 − 1 20 − 8 − 5. TFR REQUESTS FOR MAJOR SPORTING EVENTS . . . . . . . . . . . . . . . . . . . . . . . 20 − 8 − 2 20 − 8 − 6. TFR REVISIONS AND CANCELLATIONS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 20 − 8 − 3

Part 7. SYSTEM OPERATIONS SECURITY

Chapter 21. Operations Security: Tactical, Special, and

Strategic

Section 1. Organizational Missions 21 − 1 − 1. SYSTEM OPERATIONS SECURITY MISSION . . . . . . . . . . . . . . . . . . . . . . . . . . . 21 − 1 − 1 21 − 1 − 2. TACTICAL OPERATIONS SECURITY MISSION . . . . . . . . . . . . . . . . . . . . . . . . . . 21 − 1 − 1 21 − 1 − 3. SPECIAL OPERATIONS SECURITY MISSION . . . . . . . . . . . . . . . . . . . . . . . . . . . 21 − 1 − 1 21 − 1 − 4. STRATEGIC OPERATIONS SECURITY MISSION . . . . . . . . . . . . . . . . . . . . . . . . . 21 − 1 − 1 Section 2. Responsibilities 21 − 2 − 1. DESCRIPTION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 21 − 2 − 1 21 − 2 − 2. TACTICAL OPERATIONS SECURITY GROUP RESPONSIBILITIES . . . . . . . . . 21 − 2 − 1 21 − 2 − 3. SPECIAL OPERATIONS SECURITY GROUP RESPONSIBILITIES . . . . . . . . . . . 21 − 2 − 1 21 − 2 − 4. STRATEGIC OPERATIONS SECURITY GROUP RESPONSIBILITIES . . . . . . . . 21 − 2 − 2 21 − 2 − 5. AIR TRAFFIC FACILITY RESPONSIBILITIES . . . . . . . . . . . . . . . . . . . . . . . . . . . 21 − 2 − 3 Section 3. Operational Line of Authority 21 − 3 − 1. AUTHORITY FOR OPERATIONAL SECURITY − RELATED ACTIONS . . . . . . . 21 − 3 − 1 21 − 3 − 2. AIR TRAFFIC SECURITY COORDINATOR (ATSC) . . . . . . . . . . . . . . . . . . . . . . . 21 − 3 − 1 Section 4. Supplemental Duties 21 − 4 − 1. DOMESTIC EVENTS NETWORK (DEN) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 21 − 4 − 1 21 − 4 − 2. PRESIDENTIAL/UNITED STATES SECRET SERVICE (USSS) SUPPORTED VIP MOVEMENT . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 21 − 4 − 1 Table of Contents xxv JO 7210.3EE CHG 3 7/9/26 Paragraph Page 21 − 4 − 3. SPECIAL INTEREST FLIGHTS (SIFs) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 21 − 4 − 2 21 − 4 − 4. CONTINUITY OF OPERATIONS AND CONTINUATION OF GOVERNMENT (COOP/COG) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 21 − 4 − 2 21 − 4 − 5. CLASSIFIED OPERATIONS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 21 − 4 − 2 21 − 4 − 6. INTELLIGENCE ANALYSIS AND COMMUNICATION . . . . . . . . . . . . . . . . . . . . 21 − 4 − 2 21 − 4 − 7. UAS SPECIAL GOVERNMENTAL INTEREST (SGI) OPERATIONS . . . . . . . . . . 21 − 4 − 2 Section 5. Coordination 21 − 5 − 1. COORDINATION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 21 − 5 − 1 21 − 5 − 2. COMMUNICATION AND DOCUMENTATION . . . . . . . . . . . . . . . . . . . . . . . . . . . 21 − 5 − 1 21 − 5 − 3. RESPONSIBILITIES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 21 − 5 − 1 21 − 5 − 4. UAS SGI ADDENDUM REQUEST PROCESS AND COORDINATION . . . . . . . . 21 − 5 − 1 Section 6. Special Security Instruction (SSI) (14 CFR Section 99.7) 21 − 6 − 1. PURPOSE . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 21 − 6 − 1 21 − 6 − 2. REQUESTING AUTHORITIES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 21 − 6 − 1 21 − 6 − 3. DEGREE OF RESTRICTIONS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 21 − 6 − 1 Section 7. Security Notice (SECNOT) 21 − 7 − 1. POLICY . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 21 − 7 − 1 21 − 7 − 2. PURPOSE . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 21 − 7 − 1 21 − 7 − 3. RESPONSIBILITIES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 21 − 7 − 1

Appendices

Appendix 1. [RESERVED] . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Appendix 1 − 1 Appendix 2. [RESERVED] . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Appendix 2 − 1 Appendix 3. Air Carrier Aircraft for Air Traffic Activity Operations Count . . . . . . . . . . . . . . Appendix 3 − 1 Appendix 4. Glideslope Outage Authorization Request . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Appendix 4 − 1 Appendix 5. Checklist for Reported Headset Tone Incidents . . . . . . . . . . . . . . . . . . . . . . . . . . Appendix 5 − 1 Appendix 6. Space LOA Sample Templates . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Appendix 6 − 1

Index

Index . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . I − 1 Table of Contents xxvi

Section 2. Order Use

7/9/26 JO 7210.3EE CHG 3 JO 7210.3EE 2/20/25

Section 2. Order Use

1 − 2 − 1. POLICY

This order prescribes information necessary to effectively operate and administer air traffic service facilities.

When a conflict arises between this order’s provisions and those in other agency issuances, management must request clarification from higher authority and/or assistance from the Operations Support Group (OSG), Service Area Director of Air Traffic Operations, or the Flight Services Safety and Operations Group. Procedures for requesting interpretation or clarification to this order are contained in paragraph 1 − 1 − 9 . In the event a conflict arises between instructions in this order and the terms of a Collective Bargaining Agreement (CBA), management must abide by the CBA.

1 − 2 − 2. ANNOTATIONS

Revised, new, or reprinted pages will be marked as follows: a. The change number and the effective date are printed on each revised or additional page.

b. A reprinted page not requiring a change is reprinted in its original form.

c. Bold vertical lines in the margin of the text mark the location of substantive procedural, operational, or policy changes; e.g., when material affecting the performance of duty is added, revised, or deleted.

d. Statements of fact of a prefatory or explanatory nature relating to directive material are set forth as notes.

e. If a facility has not received the order/changes at least 30 days before the above effective dates, the facility must notify its service area office distribution officer.

1 − 2 − 3. WORD MEANINGS

As used in this order: a. “Must” means a procedure is mandatory.

b. “Should” means a procedure is recommended.

c. “May” and “need not” mean a procedure is optional.

d. “Will” indicates futurity, not a requirement for application of a procedure.

e. “Must not” means a procedure is prohibited.

f. Singular words include the plural, and plural words include the singular.

1 − 2 − 4. ABBREVIATIONS

As used in this order, the following abbreviations have the meanings indicated: (See TBL 1 − 2 − 1 .)

Order Use 1 − 2 − 1 3/15/07 7110.65R CHG 2 JO 7210.3EE CHG 3 7/9/26 JO 7210.3EE 2/20/25 TBL 1 − 2 − 1 Abbreviations Abbreviation Meaning Abbreviation Meaning AAO . . . . . . . . . . . Adverse assumption obstacle ASOS . . . . . . . . . . Automated Surface Observing System AAR . . . . . . . . . . . Adapted arrival route ASP . . . . . . . . . . . . Arrival sequencing program AAR . . . . . . . . . . . Airport arrival rate ASPM . . . . . . . . . . Aviation System Performance Metrics ACDO . . . . . . . . . . Air Carrier District Office ASR . . . . . . . . . . . Airport surveillance radar ACE − IDS . . . . . . . ASOS Controller Equipment − Information ASSC . . . . . . . . . . Airport Surface Surveillance Capability Display System AT . . . . . . . . . . . . . Air Traffic ACID . . . . . . . . . . Aircraft identification ATA . . . . . . . . . . . Air traffic assistant ADAR . . . . . . . . . . Adapted departure arrival route ATC . . . . . . . . . . . Air traffic control ADC . . . . . . . . . . . Aerospace Defense Command ATCAA . . . . . . . . . Air traffic control assigned airspace ADIZ . . . . . . . . . . Air defense identification zone ATCRBS . . . . . . . . Air traffic control radar beacon system ADL . . . . . . . . . . . Aggregate demand list ATCS . . . . . . . . . . Air traffic control specialist ADR . . . . . . . . . . . Adapted departure route ATCSCC . . . . . . . . David J. Hurley Air Traffic Control System Command Center ADR . . . . . . . . . . . Airport departure rate ADS − A . . . . . . . . . Automatic Dependent ATCT . . . . . . . . . . Airport traffic control tower Surveillance − Addressable ATIS . . . . . . . . . . . Automatic terminal information service ADS − B . . . . . . . . . Automatic Dependent ATM . . . . . . . . . . . Air Traffic Manager Surveillance − Broadcast ATO . . . . . . . . . . . Air Traffic Or ganization AFP . . . . . . . . . . . . Airspace Flow Program ATOP . . . . . . . . . . Advanced Technologies and Oceanic AFRES . . . . . . . . . Air Force reserve Procedures AFTN . . . . . . . . . . Aeronautical fixed telecommunications Air Traffic Procedures Bulletin ATPB . . . . . . . . . .

network AIDC . . . . . . . . . . ATS Interfacility Data Communications ATREP . . . . . . . . . Air Traffic representative AIM . . . . . . . . . . . Aeronautical Information Manual AWC . . . . . . . . . . . Aviation Weather Center AIRAC . . . . . . . . . Aeronautical Information Regulation and AWIS . . . . . . . . . . Automated weather information service Control AWOS . . . . . . . . . . Automated Weather Observing System AIS . . . . . . . . . . . . Aeronautical Information Services CA . . . . . . . . . . . . Conflict alert AISR . . . . . . . . . . . Aeronautical Information System CAP . . . . . . . . . . . Civil Air Patrol Replacement CARF . . . . . . . . . . Central Altitude Reservation Function AIT . . . . . . . . . . . . Automated information transfer CAS . . . . . . . . . . . Civil Aviation Security ALD . . . . . . . . . . . Available landing distance CCF . . . . . . . . . . . Combined Control Facility ALS . . . . . . . . . . . Approach light system CCFP . . . . . . . . . . Collaborative Convective Forecast Product ALTRV . . . . . . . . . Altitude reservation CCSD . . . . . . . . . . Collaborative Constraint Situation Display AMASS . . . . . . . . Airport Movement Area Safety System CD . . . . . . . . . . . . Clearance delivery APREQ . . . . . . . . . Approval request CDM . . . . . . . . . . . Collaborative decision making ARAC . . . . . . . . . . Army Radar Approach Control facility (US CDR . . . . . . . . . . . Coded Departure Route(s) Army) CDR . . . . . . . . . . . Continuous Data Recording ARFF . . . . . . . . . . Airport rescue and fire fighting CFR . . . . . . . . . . . Code of Federal Regulations ARINC . . . . . . . . . Aeronautical Radio, Inc.

CIC . . . . . . . . . . . . Controller-in-charge ARO . . . . . . . . . . . Airport Reservations Office CIRNOT . . . . . . . . Circuit Notice ARP . . . . . . . . . . . Airport reference point COB . . . . . . . . . . . Close of business ARSR . . . . . . . . . . Air route surveillance radar CONUS . . . . . . . . Continental/Contiguous/Conterminous ART . . . . . . . . . . . ATO Resource Tool United States ARTCC . . . . . . . . . Air route traffic control center COO . . . . . . . . . . . Chief Operating Officer ARV . . . . . . . . . . . Approach Runway Verification COTC . . . . . . . . . . Computer operator terminal console ASDE . . . . . . . . . . Airport surface detection equipment CPDLC . . . . . . . . . Controller Pilot Data Link Communications ASDE − X . . . . . . . . Airport Surface Detection Equipment System CTRD . . . . . . . . . . Certified Tower Radar Display − Model X CTA . . . . . . . . . . . Controlled times of arrival ASF . . . . . . . . . . . . Airport stream filters CWA . . . . . . . . . . . Center weather advisory ASI . . . . . . . . . . . . Altimeter setting indicator Order Use 1 − 2 − 2 7/9/26 JO 7210.3EE CHG 3 JO 7210.3EE 2/20/25 Abbreviation Meaning Abbreviation Meaning CWSU . . . . . . . . . Center Weather Service Unit FSDO . . . . . . . . . . Flight Standards district office FSL . . . . . . . . . . . . Full service level DAS . . . . . . . . . . . Delay assignment FSM . . . . . . . . . . . Flight Schedule Monitor DASI . . . . . . . . . . . Digital altimeter setting indicator FSS . . . . . . . . . . . . Flight service station DCCWU . . . . . . . . ATCSCC Weather Unit DCL . . . . . . . . . . . Departure Clearance GA . . . . . . . . . . . . General aviation DDSO . . . . . . . . . . Deputy Director of System Operations GC . . . . . . . . . . . . Ground control DEDS . . . . . . . . . . Data entry display system GDP . . . . . . . . . . . Ground delay program(s) DEN . . . . . . . . . . . Domestic Events Network GENOT . . . . . . . . General notice DLS . . . . . . . . . . . Designated Lead Specialist GI . . . . . . . . . . . . . General information message DME . . . . . . . . . . . Distance measuring equipment GS . . . . . . . . . . . . . Ground stop(s) DoD . . . . . . . . . . . Department of Defense HIRL . . . . . . . . . . . High intensity runway lights DOE . . . . . . . . . . . Department of Energy HRPM . . . . . . . . . . Human Resource Policy Manual DOT . . . . . . . . . . . Department of T ransportation IAFDOF . . . . . . . . Inappropriate Altitude for Direction of Flight DP . . . . . . . . . . . . . Instrument Departure Procedure IC . . . . . . . . . . . . . Initial contact DRT . . . . . . . . . . . Diversion Recovery Tool ICAO . . . . . . . . . . International Civil Aviation Or ganization DSP . . . . . . . . . . . . Departure sequencing program ICR . . . . . . . . . . . . Integrated Collaborative Rerouting DTM . . . . . . . . . . . Digital terrain maps ICSS . . . . . . . . . . . Integrated communication center DVA . . . . . . . . . . . Diverse vector area IDS . . . . . . . . . . . . Information Display System DVRSN . . . . . . . . Diversion IFR . . . . . . . . . . . . Instrument flight rules E − MSAW . . . . . . . En Route Minimum Safe Altitude Warning ILS . . . . . . . . . . . . Instrument landing system EAM . . . . . . . . . . . Emergency altitude map INS . . . . . . . . . . . . Immigration and Naturalization Service EASL . . . . . . . . . . Existing automation service level IR . . . . . . . . . . . . . IFR MTR EDCT . . . . . . . . . . Expect departure clearance time ITWS . . . . . . . . . . Integrated Terminal Weather System EDST . . . . . . . . . . En Route Decision Support Tool LAA . . . . . . . . . . . Local airport advisory EI . . . . . . . . . . . . . Early Intent LAANC . . . . . . . . Low Altitude Authorization Notification Capability ELT . . . . . . . . . . . . Emergency locator transmitter LAAS . . . . . . . . . . Low altitude alert system EOVM . . . . . . . . . Emergency obstruction video map LADP . . . . . . . . . . Local Airport Deicing Plan EOSH . . . . . . . . . . Environmental and Occupational Safety and Health LAHSO . . . . . . . . . Land and hold short operations EPIC . . . . . . . . . . . El Paso Intelligence Center LAWRS . . . . . . . . Limited aviation weather reporting station ERAM . . . . . . . . . En Route Automation Modernization LC . . . . . . . . . . . . . Local control ERIDS . . . . . . . . . En Route Information Display System LLWAS . . . . . . . . . Low level wind shear alert system ERT . . . . . . . . . . . . Embedded route text LLWAS NE . . . . . . Low Level Wind Shear Alert System Network Expansion ESL . . . . . . . . . . . . Emergency service level LLWAS − RS . . . . . Low Level Wind Shear Alert System ESP . . . . . . . . . . . . En Route sequencing program Relocation/Sustainment FAA . . . . . . . . . . . Federal Aviation Administration LLWS . . . . . . . . . . Low Level Wind Shear FCA . . . . . . . . . . . Flow Constrained Area LOA . . . . . . . . . . . Letter of agreement FCFSS . . . . . . . . . . Federal Contract Flight Service Station LOGT . . . . . . . . . . Log/tally print time FDEP . . . . . . . . . . Flight data entry and printout LTA . . . . . . . . . . . . Letter to Airmen FDIO . . . . . . . . . . . Flight data input/output MA . . . . . . . . . . . . Monitor alert FEA . . . . . . . . . . . Flow Evaluation Area MALS/RAIL . . . . . Medium approach light system and runway FICO . . . . . . . . . . . Flight Inspection Central Operations alignment indicator lights FOIA . . . . . . . . . . . Freedom of Information Act MAPPS . . . . . . . . . Management Association for Private FOUO . . . . . . . . . . For Official Use Only Photogrammetric Surveyors FP . . . . . . . . . . . . . Flight plan MCI . . . . . . . . . . . Mode C intruder FPL . . . . . . . . . . . . Full performance level MDM . . . . . . . . . . Main display monitor FRD . . . . . . . . . . . Fixed Radial Distance MEA . . . . . . . . . . . Minimum en route IFR altitude FSA . . . . . . . . . . . . Flight schedule analyzer Order Use 1 − 2 − 3 3/15/07 7110.65R CHG 2 JO 7210.3EE CHG 3 7/9/26 JO 7210.3EE 2/20/25 Abbreviation Meaning Abbreviation Meaning MEARTS . . . . . . . Micro En Route Automated Radar Tracking P − ACP . . . . . . . . . Prearranged coordination procedures System PAR . . . . . . . . . . . Precision approach radar METAR . . . . . . . . Aviation Routine Weather Report PB . . . . . . . . . . . . . Pilot briefing MIA . . . . . . . . . . . Minimum IFR altitude PCS . . . . . . . . . . . . Power Conditioning System MIAWS . . . . . . . . . Medium Intensity Airport Weather System PDC . . . . . . . . . . . Pre − Departure Clearance MIT . . . . . . . . . . . . Miles − in − trail PIC . . . . . . . . . . . . Pilot-in-command MOA . . . . . . . . . . . Military operations area PIREPs . . . . . . . . . Pilot weather reports MOCA . . . . . . . . . Minimum obstruction clearance altitude POC . . . . . . . . . . . Point of Contact MOR . . . . . . . . . . . Mandatory Occurrence Report PVD . . . . . . . . . . . Planned view display MOU . . . . . . . . . . . Memorandum of understanding RA . . . . . . . . . . . . Radar Associate MSL . . . . . . . . . . . Mean sea level RAA . . . . . . . . . . . Remote Airport Advisory MTI . . . . . . . . . . . . Moving target indicator RADLO . . . . . . . . Regional air defense liaison officer MTM . . . . . . . . . . Maintenance TDLS Menu RAIL . . . . . . . . . . . Runway alignment indicator lights MTR . . . . . . . . . . . Military training route RAIS . . . . . . . . . . . Remote Airport Information Service MVA . . . . . . . . . . . Minimum vectoring altitude RAPCON . . . . . . . Radar Approach Control facility (USAF, USN NAA . . . . . . . . . . . National aeronautical association and USMC) NADIN . . . . . . . . . National airspace data interchange network RATCF . . . . . . . . . Radar Air Traffic Control Facility (USN and USMC) NAR . . . . . . . . . . . National Automation Request RCAG . . . . . . . . . . Remote center air/ground facility NAR . . . . . . . . . . . North American Routes RCC . . . . . . . . . . . Rescue coordination center NAS . . . . . . . . . . . National Airspace System RMT . . . . . . . . . . . Route Management Tool NASA . . . . . . . . . . National Aeronautics and Space Administration ROC . . . . . . . . . . . Regional operations center NASE . . . . . . . . . . National Airway Systems Engineering ROG . . . . . . . . . . . Route Options Generation NAVAID . . . . . . . . Navigational aid ROT . . . . . . . . . . . Runway occupancy time NCIC . . . . . . . . . . National crime information center RSU . . . . . . . . . . . Runway supervisory unit NFDD . . . . . . . . . . National Flight Data Digest RVR . . . . . . . . . . . Runway visual range NHOP . . . . . . . . . . National hurricane operations plan SAA . . . . . . . . . . . Special activity airspace NM . . . . . . . . . . . . Nautical mile SAMS . . . . . . . . . . Special Use Airspace Management System NNCC . . . . . . . . . . National Network Control Center SATCOM . . . . . . . Satellite Communication(s) NOAA . . . . . . . . . National Oceanic and Atmospheric SAWS . . . . . . . . . . Stand Alone Weather System Administration SDP . . . . . . . . . . . . Surveillance Data Processing NOM . . . . . . . . . . . National Operations Manager SE . . . . . . . . . . . . . Systems engineer NORAD . . . . . . . . North American Aerospace Defense SECM . . . . . . . . . . Safety and Environmental Compliance Command Manager NOS . . . . . . . . . . . National Ocean Service SGI . . . . . . . . . . . . Special Government Interest NOTAM . . . . . . . . Notice to Airmen SIA . . . . . . . . . . . . Status information area NRP . . . . . . . . . . . North American Route Program SID . . . . . . . . . . . . Standard Instrument Departure NTML . . . . . . . . . . National Traffic Management Log SIGMET . . . . . . . . Significant meteorological information NTMO . . . . . . . . . National Traffic Management Officer SMGCS . . . . . . . . . Surface movement guidance and control system NTSB . . . . . . . . . . National Transportation Safety Board NWS . . . . . . . . . . . National Weather Service SMIS . . . . . . . . . . . Safety Management Information System NWSOP . . . . . . . . National winter season operations plan SMO . . . . . . . . . . . System Management Office SMR . . . . . . . . . . . Surface Movement Radar OASIS . . . . . . . . . Operational and Supportability Implementation System SOP . . . . . . . . . . . . Standard operating procedure OM . . . . . . . . . . . . Operations Manager SP . . . . . . . . . . . . . Support Specialist(s) OMIC . . . . . . . . . . Operations Manager-in-Charge SPECI . . . . . . . . . . Nonroutine (Special) Aviation Weather Report OPR . . . . . . . . . . . Office of primary responsibility STARS . . . . . . . . . Standard terminal automation replacement OS . . . . . . . . . . . . . Operations Supervisor system OSIC . . . . . . . . . . . Operations Supervisor − in − Charge STMC . . . . . . . . . . Supervisor Traffic Management Coordinator Order Use 1 − 2 − 4

Chapter 2. Administration of Facilities

7/9/26 JO 7210.3EE CHG 3 JO 7210.3EE 2/20/25

Chapter 2. Administration of Facilities

Section 1. General

2 − 1 − 1. FACILITY REQUIREMENTS Facilities must coordinate with various lines of business (LOB), staff offices, and ATO Service Units directly on mutual procedural or operational requirements. When the resolution of procedural or operational problems is not possible, or when a directive is incompatible with another directive or agreement, the facility must notify its higher authority management structure for resolution assistance.

a. Air Route Traffic Control Centers (ARTCCs) and terminal air traffic facilities are responsible to the respective Air Traffic Service Area office.

b. Flight Service Stations (FSS) are responsible to the Flight Service Safety and Operations Group.

c. The Air Traffic Control System Command Center (ATCSCC) is responsible to the Director of NAS Operations.

2 − 1 − 2. FACILITY STANDARD OPERATING PROCEDURES (SOP) The ATM must issue an SOP specifying, at a minimum, required procedures for maintaining a safe and efficient operation and the jurisdictional boundaries for each operational position/sector.

NOTE − Although FAA Order JO 1320.62, Air Traffic Organization Directives Management, states that an SOP is not an authorized way to issue policy and thus should not be identified as a directive, ATMs have historically issued SOPs as such and may continue to do so.

a. Review SOPs at least annually and update as necessary.

b. Review and, if necessary, update SOPs when new or revised instrument flight procedures are published or pertinent national procedures are implemented or changed.

NOTE − Information related to subscribing for alerts regarding upcoming changes to instrument flight procedures is available at the Instrument Flight Procedures Information Gateway: https://www.faa.gov/air_traffic/flight_info/aeronav/procedures/ .

REFERENCE − FAA Order JO 7210.3, Para 2 − 1 − 6 , Checking Accuracy of Published Data.

FAA Order JO 7210.3, Para 4 − 1 − 1 , Correspondence Standards .

FAA Order JO 7210.3, Para 4 − 3 − 3 , Developing LOA.

FAA Order JO 7210.3, Para 4 − 3 − 8 , Annual Review/Revisions.

c. Ensure noise abatement procedure commitments are included in the SOP or facility directives and identified as such.

NOTE − Noise abatement procedure commitments are the result of the NEPA process or other formal/informal agreements.

d. Where emergency airport information is available via ERAM or STARS, include in the SOP a description of the functionality, to include any local adaptations or uses. Where no such automated functionality is available, the ATM must ensure the SOP addresses emergency airport information and where it must be made available in the operation.

2 − 1 − 3. POSITION/SECTOR BINDERS Air traffic managers must develop and maintain binders for each position/sector within the facility. In addition to the above, this must include a supervisor position binder. The supervisor position binder should address General 2 − 1 − 1 3/15/07 7110.65R CHG 2 JO 7210.3EE CHG 3 7/9/26 JO 7210.3EE 2/20/25 procedures that will enhance controller performance in areas such as scanning, coordination, use of proper phraseology, and proficiency/remedial training. The binders must contain as a minimum, but not be limited to, the information listed in the En Route, Terminal, Flight Service Option Specific Guidelines. The binder must contain information that is necessary for the safe and efficient operation of each position/sector, including examples and formats where appropriate. A copy of each binder must be in a location easily accessible by each position/sector. Data may be stored and displayed via electronic means, e.g., on Information Display Systems (IDS), where available. Air traffic managers in terminal facilities may determine the need for individual binders for associated/coordinator positions.

2 − 1 − 4. REFERENCE FILES Air traffic managers must maintain current sets of orders, facility directives, Letters of Agreement (LOA), aeronautical charts, pertinent International Civil Aviation Organization (ICAO) documents and related publications so that they may be readily available for operational use and study by facility personnel. Also, the air traffic manager must maintain reference materials at appropriate work areas. These materials must consist of pertinent directives, agreements, emergency and overdue aircraft procedures, and a location listing of airports within the area of responsibility including runway alignment, lighting, surface, and length as a minimum.

Current telephone numbers of user companies/organizations identifying the source who has the capability of contacting no radio (NORDO) aircraft may also be listed. Air traffic managers must determine the applicability of other materials to be included.

NOTE − The air traffic manager will ensure that the user list is kept current.

2 − 1 − 5. RELEASE OF INFORMATION a. It is FAA policy to make factual information available to persons, properly and directly concerned, except information held confidential for good cause.

b. Flight Track Data is defined in this order as all flight data related to one or more individual flights, inclusive of plot, track, altitude, heading, positional, and identification data (e.g., call sign, aircraft registration number, aircraft type, beacon code, origination, route of flight, and destination). Flight Track Data is contained in any NAS or ATO information system, automation platform, and/or database that contains data on individual flights.

Flight Track Data can be contained and provided in digital, written, graphic, or oral form.

c. Flight Track Data on sensitive U.S. Government flights conducted for the purposes of national defense, homeland security, intelligence, and law enforcement is considered Sensitive Flight Data (SFD). SFD contains multiple types of Sensitive Unclassified Information (SUI), which must be protected from unauthorized disclosure as required by Federal law, government-wide regulation, and agency policy. SFD is not marked or identified as SFD or SUI at the facility level, which means that agency personnel have no authoritative method to differentiate between Flight Track Data that is nonsensitive and Flight Track Data that is SFD. Therefore, in instances where agency personnel are unable to validate that certain Flight Track Data is nonsensitive (i.e., not inclusive of SFD), they must protect that Flight Track Data as SUI.

d. Except as provided in this and other FAA orders, or when specifically authorized to do so by the Secretary of Transportation or the Administrator, agency personnel must not release Flight Track Data to an individual or entity outside of the FAA in response to any request.

1. Agency personnel must not release Flight Track Data to an entity outside the FAA unless it is first determined that the request is being made for an official purpose and/or an ongoing investigation by a U.S.

Government agency or law enforcement organization personnel.

2. Agency personnel must not release Flight Track Data considered SFD on U.S. Government aircraft conducting military, homeland security, intelligence, law enforcement, presidential, or other sensitive flights to an entity outside the FAA except as operationally required to assist such flights. In the event that the employee is not able to determine if the Flight Track Data being requested is SFD, the employee must not release the data in question except as operationally required to assist that flight.

General 2 − 1 − 2 7/9/26 JO 7210.3EE CHG 3 JO 7210.3EE 2/20/25 3. Each request must be handled in the following manner: (a) Positively identify the requestor by name, organization or affiliation, and point of contact information (including a telephone call-back number and, if possible, email address).

(b) Inquire about the purpose of the request to determine whether the request is being made for an official purpose and by a duly authorized representative of a U.S. Government agency or law enforcement organization in support of an ongoing investigation.

(c) For requests received from any U.S. Government agency or law enforcement organization, the only information entered into the facility Daily Record of Facility Operation, FAA Form 7230 − 4, must be that called for by subparagraph d3(a) above, with a brief notation as to whether the request was granted or not.

(d) Notify facility management of all incoming requests.

4. If the request is from an individual not associated with any U.S. Government agency or law enforcement organization, agency personnel must deny the request and may inform the requester that information may be sought under the Freedom of Information Act (FOIA). A FOIA request should be filed in writing with the FOIA Officer, AFN − 400, 800 Independence Avenue SW, Washington, DC 20591, or make an electronic request at https://www.faa.gov/foia/email_foia .

5. If it cannot be ascertained whether the purpose of the request from a U.S. Government agency or law enforcement organization is for an official purpose regarding a time-sensitive issue, agency personnel must contact facility management for guidance. If local management is unable to determine whether or not a request should be granted, the official may contact the National Tactical Security Operations (NTSO) Air Traffic Security Coordinator (ATSC) at (540) 422 − 4423/24/25.

e. FAA Contract Flight Service Stations (FCFSSs) must handle the release of information in accordance with contract requirements.

f. Any requests made by entities external to the FAA seeking connectivity to FAA systems for access to NAS data or NAS automation system data must first be directed to HQ FAA System Operations Security, Operations Security Plans and Procedures NAS Data Release Board (NDRB) Secretariat via email at 9 − AJR − NDRB − Executive − Secretariat@faa.gov .

2 − 1 − 6. CHECKING ACCURACY OF PUBLISHED DATA Air traffic managers and air traffic representatives (ATREPs) must ensure, upon receipt of official publications, that a review of data pertaining to their facilities and areas of concern is accomplished to ensure accuracy and completeness. When pertinent national procedures, aeronautical data (to include weather reporting locations), or flight procedures are created or changed, review facility standard operating procedures (SOPs) directives, position/sector binders, reference files, and/or letters of agreement (LOAs) and initiate corrections and briefings as required.

NOTE − 1. Information related to subscribing for alerts regarding upcoming changes to instrument flight procedures is available at the Instrument Flight Procedures Information Gateway: https://www.faa.gov/air_traffic/flight_info/aeronav/procedures .

2. Additional digital aeronautical products and services are available via the following websites: a. https://www.faa.gov/air_traffic/flight_info/aeronav/procedures b. http://aerochart.faa.gov 3. Information on aeronautical data changes, including weather reporting locations, is available for free at the Aeronautical Information Services (AJV − A), Aeronautical Data web portal. Check 28-Day Subscription and Transmittal Letters at https://www.faa.gov/air_traffic/flight_info/aer onav/aero_data/ .

4. Notice to Airmen information may be viewed on the Aeronautical Information System Replacement (AISR) or at https://notams.aim.faa.gov/notamSear ch .

General 2 − 1 − 3 3/15/07 7110.65R CHG 2 JO 7210.3EE CHG 3 7/9/26 JO 7210.3EE 2/20/25 REFERENCE − FAA Order JO 7210.3, Para 2 − 1 − 2 , Facility Standard Operating Procedures (SOP).

FAA Order JO 7210.3, Para 2 − 1 − 3 , Position/Sector Binders.

FAA Order JO 7210.3, Para 2 − 2 − 11 , Personnel Briefings Regarding Orders, Published Aeronautical Data and Flight Procedures.

FAA Order JO 7210.3, Para 4 − 3 − 3 , Developing LOA.

FAA Order JO 7210.3, Para 4 − 3 − 8 , Annual Review/Revisions.

FAA Order 7930.2, Notice to Airmen (NOTAM).

FAA Order JO 8260.19, Flight Procedures and Airspace.

FAA Order JO 8260.3, United States Standard for Terminal Instrument Procedures (TERPS).

FAA Order JO 8260.43, Flight Procedures Management Program.

2 − 1 − 7. AIR TRAFFIC SERVICE DURING PLANNED AND UNPLANNED OUTAGES The air traffic manager (ATM) must develop and maintain guidelines to provide continuity of required services during planned and, to the degree possible, during unplanned outages.

a. The ATM must collaborate with Technical Operations (Tech Ops) during any projected planned maintenance tasks that may impact air traffic control (ATC). The ATM must ensure affected air traffic stakeholders or appropriate subject matter experts (SMEs) are notified of planning meetings.

b. The ATM must review all project risk plans (PRP) received from Tech Ops. A PRP is a living document that promotes coordination and communication and reduces the risk to the National Airspace System (NAS) associated with project implementation. After review, the ATM must forward concur or non − concur via the notification email or directly through the corporate work plan portal link provided in the email. The ATM may forward questions or comments regarding the PRP directly through the notification email or by contacting the point of contact identified in the notification email.

c. Facility Standard Operating Procedures (SOP) must include the use of the Operational Risk Management Plan (ORMP), which is the formal document for review and approval that includes the plan for ATC to protect continuity of service.

NOTE − Operational Risk Management (ORM) training is available via eLMS.

1. The ORMP must be used in conjunction with local procedures to support the completion of formal ORM maintenance activities and projects.

2. Certain maintenance tasks that do not meet the criteria identified in subparagraph c 1 may still have the potential for operational consequences locally. Air Traffic and Technical Operations should jointly identify these additional maintenance activities that will require an ORMP.

d. The ATM must develop an ORM section in the facility SOP. The facility SOP must identify persons or positions authorized to review and/or approve ORMPs for the facility. Additionally, the SOP must identify communication procedures to ensure team members are notified in a timely manner of their team participation responsibilities.

e. All air traffic personnel identified in an ORMP are team members. Additional team members may be added for informational and increased situational awareness purposes and should address any concerns through the point of contact (POC)/reviewer or approver. The required air traffic team members consist of POC/reviewer and approver. Air traffic team members must: 1. Add additional team members as necessary.

2. Participate in ORMP meetings.

3. Review and comment on the ORMP.

4. Assess operational risks, identify any conflicting activities, and propose mitigations.

5. Maintain situational awareness until completion of the activity.

6. Contact the air traffic POC if the situation changes or the ORMP requires reassessment.

General 2 − 1 − 4 7/9/26 JO 7210.3EE CHG 3 JO 7210.3EE 2/20/25 f. The air traffic POC/reviewer is responsible for coordination of the ORMP meeting with all affected air traffic stakeholders. The air traffic POC/reviewer: 1. Reviews the composition of the ORMP team and ensures the appropriate air traffic team members and/or air traffic approver have been assigned. When more than one facility is affected, ORMPs may require multiple reviewers or approvers.

2. Adds team members as appropriate.

3. Participates in ORMP meetings.

4. Ensures the completeness and feasibility of executing the ORMP, (shares responsibility with the air traffic approver).

5. Identifies any conflicting activities.

6. When the ORMP has been submitted for Air Traffic review, completes the air traffic mitigation plan element and submits the ORMP for approval. The System Support Center (SSC) manager will submit the plan to the Air Traffic and Tech Ops approvers.

7. Ensures the affected air traffic personnel are briefed and prepared to implement mitigations prior to commencing work.

g. The Air Traffic and Tech Ops approvers are responsible for the final review of the ORMP. Plans approved by Air Traffic and Tech Ops approvers are forwarded to Tech Ops personnel to perform the agreed − upon work.

If a plan is not approved, the approver will select the Take 5 button in the ORMP tool and will notify the SSC manager or the initiator of their concern. The approvers: 1. Ensure the completeness and feasibility of executing the ORMP (shared responsibility with the air traffic POC/reviewer).

2. Approve the ORMP or select the Take 5 button with comments for additional consideration or follow-up.

3. Change role assignments or team members as necessary.

4. Identify any conflicting activities.

5. Ensure the High Visibility Event flag is set when it meets the appropriate definition outlined below.

NOTE − High Visibility Events are those that require upper management awareness because of their potentially significant impact on the NAS. These are events that if the worst − case scenario occurs, even with mitigations in place, could cause a hazardous situation in the NAS, change Operational Contingency Level (OCL), create a significant increase in workload for ATC, or cause aircraft to be held or diverted, especially at High Impact facilities.

h. The majority of interactions with Tech Ops will not involve a PRP or an ORMP. Therefore, the facility must develop and incorporate procedures into the facility SOP for the coordination of maintenance activities which may affect the ability of the facility to provide air traffic services. These procedures must be consistent with the Principles of ORM outlined below and take into consideration the facility’s unique operational circumstances.

Air traffic personnel will use these procedures when coordinating and executing planned outages and maintenance tasks with Tech Ops.

i. Principles of ORM.

1. Situational Awareness. Understand the current state and dynamics of the operation and remain vigilant for future changes and developments. Considerations include: (a) Peak and off − peak traffic periods.

(b) Weather conditions.

(c) Known concurrent activities that could impact, or be impacted by this activity. Example: VIP movement, airshows, other outages, etc.

General 2 − 1 − 5 3/15/07 7110.65R CHG 2 JO 7210.3EE CHG 3 7/9/26 JO 7210.3EE 2/20/25 (d) Additional outages in your facility or adjacent facility.

(e) Current staffing/operational oversight.

(f) Other communication/surveillance equipment available as an alternate means of providing air traffic services.

2. Plan Actions. The method and resources needed to accomplish the activity. Considerations include: (a) Review break rotations/staffing plan to ensure positions are staffed accordingly.

(b) Review applicable (e.g., FAA Order JO 1900.47) Air Traffic Control Operational Contingency Plans.

(c) Brief affected staff prior to outages of the credible risks and potential impacts including worst-case scenarios and alternate procedures.

(d) Identify the Tech Ops POC if immediate contact is needed.

(e) Test back-up equipment before releasing the primary equipment to be worked on (where applicable).

3. Identify operational consequences. Identify the NAS systems and air traffic stakeholders that will, or could potentially be affected during the execution of the plan. Considerations include: (a) Credible risks and potential impacts including worst − case scenarios that could affect air traffic’s ability to provide service.

(b) Affected facilities, sectors/areas, positions, or other stakeholders participating in, or potentially impacted by the activity.

(c) Adverse effects to ATC personnel safety.

4. Communicate. An ongoing exchange of information between Technical Operations and air traffic personnel is essential for the review of the potential operational consequences and development of mitigation strategies. The information must be received, understood, and, in some cases, approved. Considerations include: (a) Identified credible risks and potential impacts including worst-case scenarios.

(b) Mitigation Strategies.

(1) Include using the back-up equipment/systems, alternate channels, etc.

(2) Confirm proper operation of support equipment, standby equipment and/or backup systems prior to conducting the scheduled activity.

(3) Confirm Technical Operations and Air Traffic are prepared to implement their mitigation strategies.

(c) Notify Tech Ops immediately of any circumstances that may affect the procedure/task, e.g., change in operational hours, unusual circumstances, or operational configurations.

(d) “Take − 5,” if needed (to gain more information or reassess approval).

(e) Discuss and/or document effectiveness of plan for future reference or training.

5. Coordinate. Considerations include: (a) Coordinating the activity with the appropriate adjacent facilities.

(b) Additional coordination and notification requirements should there be a change to planned activity.

(c) Notify Regional Operations Center (ROC), Domestic Events Network (DEN), or facility management (when applicable).

(d) Verify the equipment status and configuration upon completion of the activity.

(e) Ensuring that Out for Maintenance (OFM) and Return to Service (RTS) are recorded on FAA Form 7230 − 4, Daily Record of Facility Operation.

General 2 − 1 − 6 7/9/26 JO 7210.3EE CHG 3 JO 7210.3EE 2/20/25 j. For unplanned outages, air traffic managers must develop and maintain operational plans that provide continuity of services to the extent dictated by the outage. The plans must be in accordance with FAA Order JO 1900.47.

k. For unplanned outages of airport traffic control towers, air traffic managers, in coordination with the local airport operator, must ensure operational plans for the temporary use of Common Traffic Advisory Frequency (CTAF) do not exceed 48 hours, unless an extension is approved by the Service Area Director of Operations because of unforeseen extenuating circumstances.

REFERENCE − FAA Order JO 1900.47, Air Traffic Control Operational Contingency Plans.

14 CFR 91.129, Operations in Class D Airspace.

2 − 1 − 8. OPERATIONS DURING A STAFFING CONSTRAINT The following steps must be followed when traffic management initiatives (TMI), ATC − 0, or any reduction in ATC services are being considered due to staffing constraints: a. The Air Traffic Manager (ATM) or designee must contact the General Manager (GM) or Assistant General Manager (AGM) or designee and provide the factors of the staffing shortage, expected duration, facility mitigations implemented, and any other related information. If the situation can be mitigated by other means and no TMIs, ATC − 0 declaration, or reduction in services is required, the GM or AGM or designee will determine if a Staffing Trigger report should be initiated and coordinated with the Director of Operations (DO), Deputy Director of Operations (DDO), or designee.

b. If it is determined that TMIs are required, ATC − 0 is unavoidable, or a reduction in services is required, then the GM, AGM, or designee must notify the DO, DDO, or designee for their concurrence. The GM or AGM or designee must obtain DO, DDO, or designee approval before submitting a Staffing Trigger report to the National Operations Manager (NOM) and Joint Air Traffic Operations Command (JATOC).

NOTE − 1. Situations involving a minor disruption of air traffic services or a short duration ATC − 0 situation that does not have an impact on the NAS should be reported to the DO, DDO, or designee. The DO, DDO, or designee will determine if a Staffing Trigger report is to be submitted to the NOM. (e.g., a facility is opening a few minutes late without flight delays, airborne holding, or flight diversions.)

2. The Staffing Trigger report is a collection of key data elements related to a staffing constraint that is captured and available for the JATOC and NOM for upward distribution.

REFERENCE − FAA Order JO 7110.65, Para 11 − 1 − 2, Duties and Responsibilities.

FAA Order JO 7210.3, Chapter 18, Section 7, Traffic Management Initiatives.

2 − 1 − 9. HANDLING BOMB THREAT INCIDENTS Air Traffic facilities must establish procedures to carry out their functions in accordance with FAA Order 1600.69, FAA Facility Security Management Program. The following provisions must be incorporated into facility plans: a. All air traffic facilities must notify the National Tactical Security Operations (NTSO) Air Traffic Security Coordinator (ATSC) team through the Domestic Events Network (DEN), the respective regional operations center, and other appropriate Service Area office element when a bomb threat occurs.

b. All personnel in the facility will be advised when a bomb threat has been received and of pertinent information regarding the bomb threat.

c. The decision to evacuate a facility will be made by the air traffic manager or his/her designee.

d. If the decision is made to evacuate and air safety is not a factor, immediately release nonessential personnel, instruct aircraft to contact the appropriate facility designated in the facility contingency plan, advise adjacent facilities as appropriate (ARTCCs should advise the ATCSCC of pending evacuation), broadcast that the facility is being evacuated, and evacuate the building.

General 2 − 1 − 7 3/15/07 7110.65R CHG 2 JO 7210.3EE CHG 3 7/9/26 JO 7210.3EE 2/20/25 e. If the decision is made to evacuate and air safety is a factor, immediately release nonessential personnel, resolve traffic conflicts (aircraft on radar vectors should be cleared to resume normal navigation), instruct aircraft to contact the appropriate facility designated in the facility contingency plan, advise adjacent facilities (ARTCCs should advise the ATCSCC), broadcast that the facility is being evacuated, and evacuate the building as rapidly as personnel can be released. The appropriate actions should be accomplished quickly to minimize personnel exposure. Further, the air traffic manager or his/her designee will determine which personnel will remain on duty until the traffic situation is resolved. Personnel designated to perform this function normally will be selected from the supervisory ranks or persons volunteering temporary services. To be effective this action should be planned in advance. There are various ways in which this can be accomplished. One simple method is that at the beginning of each watch, supervisors will plan their watch coverage should the need to evacuate arise.

f. The evacuation plans will also include recall procedures.

g. Consideration should be given to establishing an alternate site to provide limited flight service or airport air traffic and approach control services.

NOTE − Processes for the establishment of alternate sites and divestiture of airspace/responsibilities are outlined in FAA Order JO 1900.47 and facility Operational Contingency Plans (OCPs).

h. During bomb threat situations, facility air traffic managers or their designees should exercise discretion regarding admittance of visitors to their facilities.

i. Facilities will take action to increase the security whenever such action is feasible. Measures to protect administrative and operational areas and equipment rooms should be taken. FAA Order 1600.69, FAA Facility Security Management Program, provides additional guidance for the protection of agency facilities, installations, equipment, etc. Examples are: 1. Increase security forces and measures.

2. Ensure that facilities are kept tidy so that out-of-place articles can be easily detected. This concept should be emphasized to all personnel including contractors and their employees.

3. Room or area monitors can be assigned to “look over” the area at frequent intervals for suspicious objects.

In this regard, air traffic personnel assigned temporary administrative duties would be given building warden responsibilities.

REFERENCE − FAA Order JO 7210.3, Para 2 − 8 − 2 , Medical Clearance Requirements.

4. Outside areas should be kept as neat as possible. Landscaping should, if possible, be done in a manner that will not enhance clandestine activities.

j. Although it is envisioned that the foregoing will be accomplished within existing resources, planning (including budgeting) should be initiated to establish a secure environment.

k. Release information on bomb threat incidents in accordance with the procedures established in current directives. Where no applicable procedures have been established, all information must be treated as “For Official Use Only.” 2 − 1 − 10. HANDLING MANPADS INCIDENTS a. Air traffic managers must coordinate with federal, local, and other law enforcement agencies, as needed, to develop notification and contingency plans during a threat or attack from Man − Portable Air Defense Systems (MANPADS).

b. Air traffic managers must establish procedures to ensure the dissemination of MANPADS alert level 2 (credible threat)/alert level 3 (reported attack) and post-event activity via ATIS and/or controller-to-pilot transmissions. These reports must continue until notified otherwise by the Domestic Events Network (DEN) Air Traffic Security Coordinator (ATSC).

General 2 − 1 − 8 7/9/26 JO 7210.3EE CHG 3 JO 7210.3EE 2/20/25 REFERENCE − FAA Order JO 7110.65, Para 2 − 9 − 3, Content.

FAA Order JO 7110.65, Para 10 − 2 − 13, MANPADS Alert.

FAA Order JO 7610.4, Para 3 − 1 − 3, Responsibilities.

c. Air traffic managers must ensure the Operations Manager/OS/controller-in-charge (CIC) notifies the DEN ATSC of any MANPADS threat or attack as soon as possible. In the event of an observed or reported MANPADS launch, the initial report to the DEN ATSC must include the following information: 1. Call sign (if known); 2. Type aircraft (if known); 3. Coordinated Universal time; 4. Position/location of event; 5. Altitude (if known); and 6. Any other pertinent information (e.g., contrail sighting, additional pilot or ATC observation reports, law enforcement contact, etc.).

2 − 1 − 11. AIRPORT EMERGENCY PLANS a. Operational instructions covering airport emergency service at airports served by an ATCT and/or FSS must be issued by the air traffic manager (the ATCT manager at airports with both facilities) in the form of a LOA.

Procedures and/or LOAs for alerting airport emergency equipment at other public − use airports served by the ATCT and/or FSS must also be developed, if deemed appropriate.

NOTE − Facility managers or their designee should meet with Airport Rescue and Fire Fighting (ARFF) personnel on an annual basis to review the local airport emergency service LOA and the effectiveness of local procedures.

REFERENCE − FAA Advisory Circular AC 150/5210 − 7, Aircraft Rescue and Fire Fighting Communications.

b. Responsibility for the prompt dispatch of equipment upon alert notice by the FAA ATCT or the FSSs is the joint responsibility of the airport management and the emergency equipment operator. The amount of equipment and number of personnel responding to the emergency will be determined by the equipment operator and should be kept to the minimum required. After receiving the alert and the route to be taken, the personnel operating the equipment are responsible for handling the emergency.

c. Procedures for alerting airport emergency equipment, including additional equipment which may be located off the airport, must consist only of: 1. Stating the nature and the location of the emergency by means of a signalling system; e.g., a siren and/or telephone. When required, the tower must indicate the route to be taken by the emergency equipment. FSSs must not specify such routes.

2. Specifying, when required, the category of alert applicable to the emergency.

3. Initiating the alert when, in the opinion of any of the following, a potential or actual emergency exists: (a) The FAA specialists on duty.

(b) The pilot of the aircraft concerned.

(c) The operator of the aircraft or his/her representative.

(d) A representative of the airport management.

d. Alert Phases: Operations personnel may categorize local alerts if the category or phase designations have been coordinated locally and agreed to. It may be desirable for emergency equipment to be alerted on a standby or ready basis by use of a two-phase or three-phase alert system, but keep these actions as inconspicuous as possible without impairing efficiency. A three-phase alert may be set up as follows: General 2 − 1 − 9 3/15/07 7110.65R CHG 2 JO 7210.3EE CHG 3 7/9/26 JO 7210.3EE 2/20/25 1. Alert I: Indicating an aircraft approaching the airport is in minor difficulty; e.g., feathered propeller, oil leak, etc. The emergency equipment and crews would standby at the equipment house for further instructions.

2. Alert II: Indicating an aircraft approaching the airport is in major difficulty; e.g., engine on fire, faulty landing gear, no hydraulic pressure, etc. This could mean emergency equipment would proceed to a predetermined location (end of runway, etc.) to await development of the potential emergency.

3. Alert III: Indicating an aircraft involved in an accident on or near the airport and emergency equipment should proceed immediately to the scene.

e. After alerting the emergency equipment, notify only the local aircraft operator or his/her representative and the airport management.

NOTE − Airport management is responsible for notifying other agencies or personnel.

REFERENCE − Advisory Circular AC 150/5210 − 7, Aircraft Rescue and Fire Fighting Communications.

2 − 1 − 12. EXPLOSIVES DETECTION K − 9 TEAMS At many of our major airports a program has been established by the FAA and the Law Enforcement Assistance Administration to make available an explosives detection K − 9 team. ATC facilities must take the following actions should they receive an aircraft request for the location of the nearest explosives detection K − 9 team: a. The facility will relay the pilot’s request to the FAA Washington Operations Center, AEO − 100, telephone: commercial (202) 267 − 3333; ETN 521 − 0111; or DSN 851 − 3750 providing the aircraft’s identification and position.

b. AEO − 100 will provide the facility with the nearest location. The facility will have AEO − 100 standby while the information is relayed to the pilot.

c. After it has been determined that the aircraft wishes to divert to the airport location provided, the air traffic facility will ascertain estimated arrival time and advise AEO − 100. AEO − 100 will then notify the appropriate airport authority at the diversion airport. In the event the K − 9 team is not available at this airport, AEO − 100 will relay this information to the air traffic facility providing them with the secondary location. ATC will then relay this to the pilot concerned for appropriate action.

2 − 1 − 13. INTERSECTION TAKEOFFS Air traffic managers at ATCTs and at FSS facilities that provide LAA will prepare an airport diagram showing intersection takeoff information as follows: a. Indicate the actual remaining runway length from each intersection; round all actual measurements “down” to the nearest 50 feet. Obtain measurements from an authentic source and record them on the diagram.

NOTE − Some airports publish “declared distances” for a particular runway. These are published in the Chart Supplement or the Aeronautical Information Publication (AIP), and there is no requirement that facility personnel be made aware of them.

These distances are a means of satisfying airport design criteria and are intended to be used by pilots and/or operators for preflight performance planning only. There are no special markings, signage, or lighting associated with declared distances, and they do not limit the actual runway available for use by an aircraft. Therefore, they cannot be used for any air traffic control purpose. If pilots inquire about the existence of declared distances, refer them to the Chart Supplement or the AIP.

b. If the airport authority requests that certain intersection takeoffs be denied, so indicate on the diagram.

EXAMPLE − /NO TKOFF/ c. Indicate any access points to a runway from which an intersection takeoff may be made.

General 2 − 1 − 10 7/9/26 JO 7210.3EE CHG 3 JO 7210.3EE 2/20/25 2 − 1 − 14. AIRCRAFT IDENTIFICATION PROBLEMS FAA CONTRACT TOWERS NOT APPLICABLE To reduce any potential misunderstandings of aircraft identifications caused by duplicate, phonetically similar-sounding, or hard to distinguish registration numbers or call signs operating in the same area, facility managers must ensure that those occurrences are processed using the Similar Sounding Call Sign Submission Tool. Where possible, facility managers must ensure computers in operating quarters are provided with a bookmarked hyperlink to https://ksn2.faa.gov/ATO/AJT-BURST-Team-Tools/SSCS/SitePages/Home.aspx .

Where no internet-connected computers are accessible in operations areas, specify procedures in a facility directive for forwarding pertinent information to personnel that can make the entry into the tool as soon as practical. Ensure that the following additional actions are taken.

a. Scheduled air carrier aircraft: When two or more air carriers with duplicate flight numbers or phonetically similar-sounding call signs operate within 30 minutes of each other at the same airport or within the same sector and cause an identification problem on a recurring basis, request that the flight identification numbers be changed by: NOTE − Recurrent situations would be aircraft proceeding primarily the same direction through the same sectors three or more times a week, at least two weeks out of four consecutive weeks.

1. For carriers listed at the following web address, http://tfms.faa.gov/fly/airlinephones/airlinephones.html , contact the appropriate airline office.

2. For carriers not listed on the website, contact the operator or the chief pilot of the carrier concerned.

Changes to the list can be provided to the ATCSCC Facility Automation Office via the Traffic Management Officer (TMO) or the Deputy Director of System Operations (DDSO).

b. Military aircraft : Contact base operations of the departure airport and request that action be taken to have the flight identifications changed when duplicate, phonetically similar, or hard to distinguish call signs are causing a flight identification problem. If additional assistance is required, immediately advise the military representative assigned to the Service Area office.

c. Civil aircraft other than air carrier: Advise Mission Support Services, Aeronautical Information Services, at Callsigns@faa.gov when two or more designated call signs are found to be phonetically similar or difficult to pronounce and are causing a flight identification problem.

d. The designated facility officer must maintain a record of actions taken using the Similar Sounding Call Sign Documentation Tool accessed via https://ksn2.faa.gov/ATO/AJT-BURST-Team-Tools/SSCS/SitePages/ Home.aspx .

2 − 1 − 15. APPROACH CONTROL AIRSPACE With the advancement of technologies, the air traffic services provided by en route facilities and terminal facilities are becoming more integrated. Terminal airspace should be adjusted to match the services provided.

Although en route services are an ARTCC function, terminal facilities may be expected to provide some en route service. There are some areas in which an ARTCC may not have adequate radar coverage or resources, and in these areas it may be necessary to expand the terminal airspace to provide service. Conversely, at locations with nonradar approach control facilities, en route facilities may have radar coverage, and better service would be provided if some approach control airspace is recalled to the ARTCC. At certain locations, the en route facility may be able to absorb all the airspace of a nonradar approach control. Prior to implementing airspace changes, en route and terminal facility managers must work together to ensure the delegated approach control airspace best meets the needs of the airspace area.

2 − 1 − 16. AUTHORIZATION FOR SEPARATION SERVICES BY TOWERS a. Nonapproach control towers, not equipped with a tower radar display, may be authorized to provide appropriate separation between consecutive departures based upon time or diverging courses, and between arrivals and departures, provided: General 2 − 1 − 11 3/15/07 7110.65R CHG 2 JO 7210.3EE CHG 2 1/22/26 JO 7210.3EE 2/20/25 1. A LOA exists with the IFR facility having control jurisdiction which authorizes the separation responsibilities and prescribes the procedures to be used; 2. The agreement has been approved by the Service Area Director of Air Traffic Operations; and 3. There is no delegation of airspace to the tower.

b. Towers equipped with certified tower radar displays (CTRD) may be authorized to provide separation services in accordance with paragraph 10 − 5 − 3 , Functional Use of Certified Tower Radar Displays.

c. An authorization for towers to provide separation services other than those prescribed in subparagraphs a and b must be supported by a staff study prepared by the authorizing facility that addresses at least: 1. The proposed procedures.

2. Operational benefits.

3. Operational impact.

4. Why the IFR facility is unable to provide an equal or superior level of service without the delegation of airspace for separation responsibility.

5. Improved services to users.

6. Additional radar training.

7. The measures taken to ensure that the local controller’s ability to satisfy the FAA’s air traffic responsibilities regarding aircraft operating on the runways or within the surface area is not impaired.

8. On-site spares, maintenance support/restoration requirements.

9. Savings and/or additional costs.

10. The number of additional people required.

d. The staff study must, following OSG review and concurrence by the District General Manager, be forwarded to the Service Area Director of Air Traffic Operations for approval.

2 − 1 − 17. BIRD HAZARDS The air traffic manager of the ATCT must establish procedures to: a. Ensure that any reported bird strikes or trend toward an increase in bird activity on or around the airport served by the ATCT are reported to airport management.

b. Ensure that coordination will be accomplished with airport management for the possible issuance of NOTAMs when flocks of birds roost on the runways.

NOTE − It is the responsibility of airport management to issue any such NOTAMs.

c. Participate in local bird hazard programs when established by airport management.

2 − 1 − 18. PROHIBITED/RESTRICTED AREAS AND STATIONARY ALTRVS FAA Order JO 7110.65, Air Traffic Control, prescribes separation requirements from special use, ATC-assigned airspace, and stationary ALTRVs. The intent in prescribing this separation requirement is to establish separation minima between nonparticipating aircraft and certain aircraft operations inside that airspace. Some prohibited/restricted areas and stationary ALTRVs are established for security reasons or to contain hazardous activities, and do not require a boundary separation minima. These areas may be exempted from vertical and lateral separation minima when identified by facility management. In making a determination to exempt specific areas, air traffic facility managers must be guided by the following: General 2 − 1 − 12 7/9/26 JO 7210.3EE CHG 3 JO 7210.3EE 2/20/25 e. Adjacent Airport Operations.

1. Aircraft that will enter the designated airspace after departing controlled airports within or adjacent to security areas must be provided security services by the appropriate ATC facility having jurisdiction over the affected airspace. Procedures for handling this situation must be covered in a Letter of Agreement (LOA) or facility directive as appropriate.

2. Aircraft departing uncontrolled airports within security areas must be handled using procedures contained in a NOTAM or rule designating the area where ATC security services are required.

2 − 1 − 22. AIRPORT TRAFFIC PATTERNS a. The Service Area Directors of Air Traffic Operations are the focal point to review traffic patterns. Traffic patterns at airports without an operating control tower should be established in accordance with Advisory Circular, AC 90 − 66, Non − Towered Airport Flight Operations.

b. FAA Order JO 7400.2, Procedures for Handling Airspace Matters, will be the source for handling technical matters pertaining to the establishment or the revision of traffic patterns.

2 − 1 − 23. OBSTACLE IDENTIFICATION SURFACES, OBSTACLE FREE ZONES, RUNWAY SAFETY AREAS, APPROACH/ DEPARTURE HOLD AREAS, AND CLEARWAYS a. Facility air traffic managers must monitor planned airport construction projects, work with the regional airports office and the airport manager in determining the need to modify any taxi routes normally used, and request notification from the airport manager when adequate signage and marking are completed on the new/different taxi routes, while ensuring that local procedures provide protected airspace from adjacent, nonintersecting runways and taxiways where simultaneous use could create hazards for arriving and departing aircraft. These procedures must be reviewed whenever new runways or taxiways are programmed or whenever new/different aircraft are scheduled to provide service to the airport.

b. Ensure that aircraft on the ground do not penetrate marked Obstacle Identification Surfaces, Obstacle Free Zones, Runway Safety Areas, Approach/Departure Hold Areas , Clearways, or other airspace designed to provide protection for departures and arrivals.

c. At locations where potential for conflict exists, take action to rectify the situation by developing proposed solutions and establishing local procedures to define conditions when the Approach/Departure Hold Areas and other surfaces must be protected. These procedures must be included in a facility directive and the signage at the intended hold position must be consistent with the phraseology identified in FAA Order JO 7110.65, paragraph 3 − 7 − 2, Taxi and Ground Movement Operations.

d. ATMs must consult with the airport authority, Flight Standards, Airports, and the Regional Runway Safety Program Manager (RSPM) when developing proposed solutions and establishing local procedures. The RSPM will assist the ATM, as needed, in initiating contact with Flight Standards and Airports.

REFERENCE − P/CG Term – Appr oach/Departur e Hold.

2 − 1 − 24. FACILITY IDENTIFICATION a. TERMINAL/EN ROUTE: Requests for permanent changes or waivers to facility identification require that the ATM document the benefit to the Agency and the customer. The ATM must submit the request through the District General Manager to the Service Area Director of Air Traffic Operations. The Service Area Director of Air Traffic Operations has approval authority. Large, combined, or consolidated facilities may be authorized multiple identification nomenclature at the discretion of the Service Area Director of Air Traffic Operations.

REFERENCE − FAA Order JO 7110.65, Para 2 − 4 − 19, Facility Identification.

b. FSS: Requests for permanent changes or waivers to facility identification require that the ATM document the benefit to the Agency and the customer. The Flight Service Safety and Operations Group must review the General 2 − 1 − 15 3/15/07 7110.65R CHG 2 JO 7210.3EE CHG 3 7/9/26 JO 7210.3EE 2/20/25 request and forward its recommendation to the Director of Flight Service. The Director of Flight Service has approval authority.

REFERENCE − FAA Order JO 7110.10, Para 2 − 5 − 2, Facility Identification.

c. If a facility identification change is approved, the ATM must ensure all applicable facility directives, LOAs, and aeronautical publications reflect the new identification. A Letter to Airmen must be published notifying users of the change.

2 − 1 − 25. DISPOSITION OF OBSOLETE CHARTS a. Obsolete charts may only be disposed of by destroying, including recycling, or by giving to flight schools and other training institutions where the charts are to be used only for training in the classroom. Under no circumstances should obsolete charts be given to pilots or the general public, regardless if they are marked obsolete or not.

b. There are hundreds of changes that appear on each new edition of a chart. When pilots are given obsolete charts they are not aware of critical changes that have occurred. Further, the use of such a chart could result in a Code of Federal Regulations (CFR) violation or an accident which would have serious legal implications for the agency.

2 − 1 − 26. OUTDOOR LASER DEMONSTRATIONS FAA Order JO 7400.2, Procedures for Handling Airspace Matters, Chapter 29, Outdoor Laser Operations, contains procedures for processing outdoor laser demonstration requests.

2 − 1 − 27. COMBINE/RECOMBINE AN ATCT/TRACON Prior to consideration for any ATCT/TRACON to combine or recombine, a detailed staff study will be required from the facility explaining the benefit to the agency and the customer. After the Terminal Operations Service Area office review, the staff study must be forwarded to the Director of Terminal Planning. A decision to combine or recombine an ATCT/TRACON will require coordination with the ATO Chief Operating Officer.

2 − 1 − 28. SUBMISSION OF AIR TRAFFIC CONTROL ASSIGNED AIRSPACE (ATCAA) DATA Air Traffic Service Area offices submit data on all ATCAAs used on a continuing/constant basis, and any subsequent changes to the ATCAA database to System Operations Airspace and Aeronautical Information Management for the purpose of updating the Special Use Airspace Management System (SAMS) and Aeronautical Information System. Include the following as applicable: a. Transmittal memorandum containing a brief overview of the ATCAA, and/or changes to, FAA headquarters, and System Operations Airspace and Aeronautical Information Services. Summarize the ATCAAs or any amendments made to ATCAAs including additional changes, etc.

b. A separate attachment that contains a description of the area to include latitude/longitude points, boundaries, altitudes, times, controlling agency, using agency, and any other relative information.

NOTE − If only part of the description of an existing area is being amended, the attachment should show just the changed information rather than the full legal description.

c. A sectional aeronautical chart depicting the final boundaries of the proposed area, including any subdivisions.

d. Any other information that should be considered by FAA headquarters.

NOTE − ATCAA descriptive data will normally be submitted 9 weeks prior to the requested/required airspace effective date.

General 2 − 1 − 16 7/9/26 JO 7210.3EE CHG 3 JO 7210.3EE 2/20/25 2 − 1 − 29. SUBMISSION OF SUA AND PAJA FREQUENCY INFORMATION The Aeronautical Information Services maintain a national database of Special Use Airspace (SUA) and Parachute Jump Area (PAJA) controlling sector contact information. The database is used to publish frequencies for pilots to obtain status information for SUAs and PAJAs. Facility managers should ensure that the following information is forwarded to Aeronautical Information Services: a. Contact frequencies for existing SUAs and PAJAs within your area of jurisdiction.

b. Any changes to contact frequencies for existing SUAs and PAJAs within your area of jurisdiction.

c. Contact frequencies for any new SUAs or PAJAs within your area of jurisdiction.

2 − 1 − 30. REPORTING UNAUTHORIZED LASER ILLUMINATION OF AIRCRAFT Consistent with the provisions of Air Traffic Service, Duty and Operational Priorities; all Air Traffic Control facilities, FAA Contract Towers , and Flight Service Stations must report unauthorized laser illumination incidents as follows: a. Contact local law enforcement or the Federal Bureau of Investigation (FBI) as soon as possible providing location, description, and other pertinent information regarding the incident; b. Report the incident to the Domestic Events Network (DEN) Air Traffic Security Coordinator (ATSC); c. Record the incident via the Comprehensive Electronic Data Analysis and Reporting (CEDAR) program or, if CEDAR is not available, via the appropriate means, in accordance with FAA Order JO 7210.632, Air Traffic Organization Occurrence Reporting; d. Provide the following information when reporting the incident via the DEN and CEDAR: 1. UTC date and time of event.

2. Call Sign, or aircraft registration number.

3. Type of aircraft.

4. Nearest major city.

5. Altitude.

6. Location of event (e.g., latitude/longitude and/or Fixed Radial Distance (FRD)).

7. Brief description of the event.

8. Any other pertinent information.

9. Law enforcement contact information.

NOTE − Facilities without direct access to the DEN should forward the information through the Washington Operations Center Complex (WOCC) to the DEN.

REFERENCE − FAA Order JO 7110.65, Para 2 − 9 − 3, Content.

FAA Order JO 7110.65, Para 10 − 2 − 14, Unauthorized Laser Illumination of Aircraft.

2 − 1 − 31. REPORTING SUSPICIOUS AIRCRAFT/PILOT ACTIVITIES a. Facility air traffic managers must ensure that the operations manager, operations supervisor, or controller-in-charge promptly reports any suspicious aircraft/pilot activities to the National Tactical Security Operations (NTSO) Air Traffic Security Coordinator (ATSC) team on the Domestic Events Network (DEN).

REFERENCE − FAA Order JO 7110.65, Para 2 − 1 − 2, Duty Priority.

NOTE − Additional information for ATC on identifying suspicious situations is located in FAA Order JO 7610.4, Sensitive Procedures and Requirements for Special Operations, Chapter 7, Section 3, Suspicious Aircraft/Pilot Activity.

General 2 − 1 − 17 3/15/07 7110.65R CHG 2 JO 7210.3EE CHG 3 7/9/26 JO 7210.3EE 2/20/25 b. The NTSO ATSC must be notified as soon as possible of any suspicious activity, including the following: 1. Radio communications are lost or not established. Consider any IFR aircraft that is NORDO for more than 5 minutes as suspicious. This includes all aircraft (for example, general aviation, law enforcement, military, MEDEVAC) regardless of transponder code. ATC actions taken to establish communications with the NORDO aircraft must be reported to the NTSO ATSC.

2. An aircraft fails to turn on or changes from its assigned transponder beacon code (other than approved emergency/radio failure beacon code).

3. An aircraft deviates from its assigned route of flight/altitude and refuses to return to it when instructed.

4. Phantom or deceptive transmissions such as impersonating a pilot or controller relaying ATC instructions, or unusual questions about military activities or sensitive/secure areas.

REFERENCE − FAA Order JO 7110.65, Para 2 − 4 − 6, False or Deceptive Communications.

5. Inconsistent or abnormal repetitive aircraft activity such as: flights over/near sites of interest or prohibited/restricted airspace; unanticipated speed or rate of climb/descent; or missed crossing restrictions or reporting points.

6. Pilot reports flight difficulties with no eventual explanation or response to ATC.

7. Any air carrier, cargo, or scheduled air taxi that requests to divert from its original destination or route for any reason other than weather or routine route changes should be considered by ATC as suspicious activity.

8. Any general aviation arriving from an international departure point that requests to divert from the original U.S. destination airport.

9. Other general aviation and non-scheduled air taxi or charter services that request to divert from the original destination or route for any unusual reason (e.g., reasons other than weather, company request, passenger request, mechanical, etc.) should be considered by ATC as suspicious activity.

10. All reported or identified balloon activities of unknown origin or intent that are near, entering or within U.S. territorial airspace, and/or other balloon flights that deviate from coordinated mission parameters.

11. Any other situation that may indicate a suspicious aircraft.

REFERENCE − FAA Order JO 7210.3, Para 2 − 1 − 34 , Reporting Suspicious UAS Activities.

12. Any situation or pilot activity (for example, background noise, change in pilot’s voice characteristics, etc.) that may indicate a hijacked aircraft. Due to air to ground communications capabilities (e.g., data links, cellular phones), controllers may learn of a hijack situation from alternate sources (for example, airline air operations center) rather than from the aircrew itself.

2 − 1 − 32. REPORTING DIVERTED AIRCRAFT ARRIVING FROM INTERNATIONAL LOCATIONS Any aircraft departing from an international location that diverts to a U.S. Airport, or is diverted and lands at a U.S. airport different from the original U.S. destination airport, must be reported to the Domestic Events Network (DEN) Air Traffic Security Coordinator (ATSC). In addition, any diverted aircraft that ATC identifies as suspicious (in accordance with paragraph 2 − 1 − 31 ) must be promptly reported to the DEN ATSC.

NOTE − Weather, airport/runway conditions, or other unforeseen reasons may necessitate an aircraft to divert or be diverted on short notice. Reporting via the DEN assists U.S. Customs and Border Protection (CBP) with real-time notification of the airport change.

2 − 1 − 33. REPORTING INOPERATIVE OR MALFUNCTIONING ADS − B TRANSMITTERS FAA Flight Standards Service (AFS), Safety Standards Division is responsible for working with aircraft operators to correct ADS − B malfunctions. Reports of inoperative or malfunctioning ADS − B transmitters must be forwarded to adsbfocusteam@faa.gov and must include the following information: General 2 − 1 − 18 7/9/26 JO 7210.3EE CHG 3 JO 7210.3EE 2/20/25 2. The OS must comply with the required tasks in paragraph 2 − 6 − 1 , Watch Supervision.

3. The OS may provide watch supervision in their two approved areas simultaneously provided the following conditions are met: (a) The supervisor must have direct line of sight to both areas.

(b) May only be assigned during mid-shift configurations and/or during facility defined times included in the approval.

NOTE − This does not apply when the OS is assigned the Operations Manager in Charge (OMIC) position during midnight operations.

2 − 6 − 3. CIC DESIGNATION AT FAA-OPERATED FACILITIES CIC designation at FAA-operated facilities differs from CIC designation at FAA Contract Tower (FCT) facilities due to administrative differences. For FCT CIC policy, see Chapter 11 of this order.

a. At FAA-operated facilities, candidates for CIC must: 1. Be certified for 6 months in the area/facility where CIC duties will be performed. The Service Area Director of Air Traffic Operations may issue a facility waiver for the 6-month requirement where a more immediate assignment is needed. Waivers to facilities will be valid for 2 years.

2. Be operationally current.

3. Be selected by the ATM.

b. Specialists who have been designated as a CIC and subsequently transfer to another facility are not required to fulfill the requirement of subparagraph 2 − 6 − 3 a 1 at the new facility; however, they must meet all other prerequisites.

c. In facilities that use CICs to provide midwatch coverage, specialists that provide such coverage must be designated as a CIC only for the purpose of providing midwatch coverage upon facility/area certification and completion of the local CIC training course. Air traffic managers must ensure the local CIC training course is completed within 30 days of facility/area certification/rating.

d. In combined radar/tower facilities, specialists certified in the tower may be designated as CIC in the tower, provided all the above prerequisites are met.

2 − 6 − 4. CONTROLLER-IN-CHARGE (CIC) SELECTION PROCESS a. All eligible employees who meet the prerequisites of subparagraphs 2 − 6 − 3 a1 and 2 must be considered for selection as CIC. Air traffic managers, when determining facility requirements for CICs, must consider the following: 1. Facility operational needs.

2. Scheduling concerns.

3. Staffing concerns.

4. Special events.

5. Other issues.

b. When facility requirements are established, air traffic managers may designate a panel to forward recommendations for CIC candidates to the designated selecting official. A facility may have one recommendation panel for each area of specialization.

c. The recommendation panel must consider the following knowledge, skills, and abilities (KSA) in reviewing each candidate. These KSAs must include but are not limited to: Watch Supervision − Terminal/En Route 2 − 6 − 3 3/15/07 7110.65R CHG 2 JO 7210.3EE CHG 2 1/22/26 JO 7210.3EE 2/20/25 1. Problem solving and analytical ability.

2. Planning and organizing.

3. Decisiveness.

4. Judgement.

5. Communication skill.

6. Interpersonal skill.

d. The recommendation panel must forward its recommendations to the air traffic manager or his/her designee. Written feedback must be provided to the selecting official for all candidates not recommended including dissenting opinions.

e. Candidates who are not selected to be a CIC, upon request, must be advised of the reasons for nonselection.

If applicable, specific areas the employee needs to improve must be identified. Employees may request assistance from their immediate supervisor in developing options to improve the identified areas.

NOTE − These provisions do not apply to midwatch CIC coverage.

2 − 6 − 5. CONSOLIDATING POSITIONS a. Assign personnel to positions as required by activity, equipment, and facility function. Positions may be consolidated in consideration of activity and the qualifications of the personnel involved.

b. To the extent staffing resources permit, and where the position is established, the tower associate (local assist) position must be staffed. This position is considered essential to the operational integrity and safety levels required to minimize the potential for surface errors and land-over incidents. Nonlocal control functions must not be consolidated/combined at the local control position except during periods of significantly reduced traffic levels.

c. When conducting line up and wait (LUAW) operations, local control position must not be consolidated/combined with any other non-local control position.

REFERENCE − FAA Order JO 7210.3, Para 10 − 3 − 8 , Line Up and Wait (LUAW) Operations.

2 − 6 − 6. RELIEF PERIODS a. Personnel performing watch supervision duties are responsible for ensuring that breaks are administered in an equitable manner and applied so as to promote the efficiency of the agency. They are also responsible for ensuring that breaks are of a reasonable duration.

NOTE − Breaks to recuperate are provided to enable employees to engage in activities necessary to rejuvenate themselves in order to effectively manage fatigue.

b. Personnel performing watch supervision duties are responsible for knowing the whereabouts of employees to ensure their availability for position assignments.

c. Personnel performing watch supervision duties must not condone or permit individuals to sleep during any period duties are assigned. Any such instance must be handled in accordance with applicable Agency policy and the applicable collective bargaining agreement.

2 − 6 − 7. BASIC WATCH SCHEDULE a. Facility watch schedules must take into account normal traffic flow, thereby permitting the posting of a continuing schedule for an indefinite period of time. Facility management is responsible for ensuring watch schedules are in accordance with collective bargaining agreements.

Watch Supervision − Terminal/En Route 2 − 6 − 4

Section 10. Wind/Altimeter Information

7/9/26 JO 7210.3EE CHG 3 JO 7210.3EE 2/20/25

Section 10. Wind/Altimeter Information

2 − 10 − 1. WIND INSTRUMENT SENSORS Air traffic managers must designate in a facility directive which wind sources must be used for operational purposes.

a. Towers equipped with LLWAS may use direct dial or LLWAS wind information for weather observations, except where automated wind information is available.

b. Approach control facilities may use direct dial, LLWAS, or automated display wind information for operational purposes.

c. FSSs must use direct dial or automated display wind information for operational purposes.

d. Other exceptions must be referred to the Manager of System Safety and Procedures for approval.

2 − 10 − 2. WIND INDICATOR CROSS CHECK All FAA facilities having an associated NWS office or military weather station using the same sensing equipment must compare wind direction and speed indicator readings at the beginning of each work day with those of the NWS or military weather station, keeping in mind that the NWS wind direction equipment are oriented to true north. Apply the magnetic variation to ensure a correct reading. Coordinate the time of the cross − check and the associated procedures with the meteorologist-in-charge or other appropriate officer. Wind instrument errors must be handled as follows: a. If an FAA wind direction indicator is out of tolerance with other indicators on the same sensor by 5 degrees, or if the wind speed indicator reveals a disparity of plus or minus 5 knots, notify the appropriate maintenance personnel immediately for corrective action.

b. If the indicators show an error of over 10 degrees or 10 knots, the equipment must be considered inoperative. In this case, obtain further wind information from other properly functioning wind instruments in the tower, local FSS, the NWS, or military weather office. Notify the appropriate maintenance personnel of all outages.

2 − 10 − 3. ALTIMETER REQUIREMENTS a. At least two sources of altimeter setting information or an approved pressure standard are required in a TRACON, Radar Approach Control facility (RAPCON), Terminal Radar Approach Control in tower cab (TRACAB), Combined Control Facility (CCF), Radar Air Traffic Control Facility (RATCF), Army Radar Approach Control (ARAC), tower cab, and a FSS that takes weather observations and/or provides Local Airport Advisories (LAA). When two or more facilities are located on the same airport, the requirement may be reduced to one source of altimeter setting information per facility. Aircraft altimeters must not be used in reporting altimeter settings.

NOTE − Stand alone RADAR approach control facilities (TRACON, RAPCON, RATCF, CCF) not associated with a control tower are only required to maintain altimeter settings for those airports under their jurisdiction.

b. Each of the following systems is considered to be one (1) source of altimeter setting information for the purposes of this paragraph: 1. Automated Surface Observing System (ASOS) 2. Automated Weather Observing System (AWOS) 3. Stand Alone Weather Sensor (SAWS) Wind/Altimeter Information 2 − 10 − 1 JO 7210.3EE 2/20/25 4. Surface Weather System (SWS) 5. Digital Altimeter Setting Indicator (DASI) 6. Altimeter Setting Indicator (ASI) c. ASOS, AWOS, SAWS, and SWS systems are considered approved pressure standards for the purposes of this paragraph.

2 − 10 − 4. COMPARISON CHECKS a. Comparison checks against another source of altimeter setting information are not required for ASOS, AWOS, SAWS or SWS.

NOTE − ASOS, AWOS, SAWS, and SWS are equipped with a minimum of two (2) and as many as three (3) digital pressure transducers.

b. Facilities equipped with ASI or DASI: 1. Compare the reading of each ASI daily with a collocated ASOS/AWOS/SAWS/SWS or with the altimeter setting issued by an associated facility with a commissioned ASOS/AWOS/SAWS/SWS that is located either on the airport or within the distances set forth in subparagraphs c and d.

2. When the differences between the two altimeter settings exceeds 0.05 in. Hg. at nonprecision approach locations or 0.02 in. Hg. at precision approach locations, remove the instrument from service and notify Technical Operations personnel. When all ASI instruments in the facility are found to exceed the tolerances, report the altimeter setting as missing.

3. When the difference is less than the tolerances specified in subparagraph 2 above, the value (+ or − ) is applied as the correction factor to determine the operational altimeter setting.

(a) On dial − type display ASIs, post the correction factor directly on the face of the instrument. Use the same comparison procedures and determine the correction factor for each instrument in the facility.

(b) On DASI systems, local facility procedures must be developed in coordination with the associated Technical Operations office to make routine comparison checks with ASOS/AWOS/SAWS/SWS and adjust the DASI to display the correct altimeter setting.

NOTE − Facilities that have DASI equipment that is not FAA owned or maintained must accomplish the procedures in paragraph 2 − 10 − 4 , b1, b2 and b3(a) monthly.

c. At ASI or DASI locations that are not collocated with a commissioned ASOS/AWOS/SAWS/SWS, make a comparison against the altimeter setting issued by an adjacent facility with a commissioned ASOS/AWOS/SAWS/SWS.

1. At locations where precision approaches are conducted, the facility used for comparison must be located within 10 NM, and at both locations the wind speed must be 12 knots or less with no gusts above 15 knots.

2. At all other locations the distance must not exceed 25 NM, and at both locations the wind speed must be 15 knots or less with no gusts above 20 knots.

3. The difference in elevation does not exceed 100 feet at precision approach locations and 200 feet at all other locations.

4. The station’s temperature at both locations must be within 30 degrees Fahrenheit of the standard atmosphere temperature for the station’s elevation.

Wind/Altimeter Information 2 − 10 − 2

Chapter 3. Facility Equipment

7/9/26 JO 7210.3EE CHG 3 JO 7210.3EE 2/20/25

Chapter 3. Facility Equipment

Section 1. General

3 − 1 − 1. BASIC EQUIPMENT a. The basic operating equipment for ARTCCs consists of flight progress boards, radar displays, communications, and automation equipment. At facilities utilizing ATOP, additional equipment consists of Air Traffic Situation Displays and Auxiliary Displays. This equipment is arranged in individual units called sectors and laid out in accordance with plans maintained by Technical Operations and Air Traffic Services. Air traffic managers may recommend changes to these plans.

b. The basic operating equipment for terminals consists of a control desk, frequency control panel, weather instruments, recorders and, as required, “data communication,” radar, and automation equipment arranged in many different configurations according to the type of facility and generally conforming to plans by the ATO per FAA Order JO 6480.7, Airport Traffic Control Tower (ATCT) and Terminal Radar Approach Control (TRACON) Design Policy. Air traffic managers may recommend changes to these plans.

1. At terminal facilities where certified information display system (IDS) equipment is installed, the IDS must be the display source for the time, DASI, RVR, wind (including wind shear ribbon display terminals), and weather data from ASOS, AWOS, SAWS, SWS, etc.

2. If all control positions are using a certified IDS, no more than one legacy display for each type (DASI, RVR, etc.) may remain in the tower and/or TRACON for back-up purposes.

3. Facilities that use uncertified IDS must ensure the information is cross-checked with the actual source for accuracy in accordance with the facility’s daily watch checklist (for example, ASOS, RVR, LLWAS, etc.).

NOTE − For facilities using certified systems, these comparisons are performed by technical operations personnel.

4. Air traffic facilities that use electronic IDS must ensure that all displayed information is current.

Facilities must ensure that any information with a scheduled expiration is removed from the controller display at the time of expiration. If the system is capable of automatically removing expired information, it must be configured to do so.

NOTE − This includes Notice to Airmen (NOTAM) information which may be viewed on the Aeronautical Information System Replacement (AISR) or at: https://notams.aim.faa.gov/notamSear ch .

c. The basic operating equipment for FSSs consists of radio and landline communications equipment, automation equipment, flight progress boards, pilot briefing equipment, recorders, data communications equipment, displays of aeronautical and meteorological information, and aircraft orientation plotting boards. Air traffic managers may recommend changes to these plans.

3 − 1 − 2. PERIODIC MAINTENANCE a. Requests from Technical Operations personnel for approval to shut down air traffic system components for periodic maintenance are forwarded to the air traffic facility having approval authority.

b. If conditions prevent approval of the shutdown at the time requested, the OMIC/OSIC should cooperate fully and work with Technical Operations personnel in arranging an alternative time. Ordinarily, shutdowns of air traffic system components should be planned to occur during the hours of least traffic activity regardless of the time of day.

NOTE − The OMIC/OSIC should coordinate with System Operations Traffic Management in determining alternate times.

General 3 − 1 − 1 JO 7210.3EE 2/20/25 c. When a NAVAID shutdown will affect another facility’s operation, the facility having approval authority must coordinate with other facilities concerned.

3 − 1 − 3. NATIONAL AIRSPACE SYSTEM (NAS) CHANGES When programs are initiated which will result in inauguration, commissioning, alteration, or decommissioning of NAS components (NAVAIDs, facilities, services, etc.), supervisors must ensure, to the extent practicable, that effective dates coincide with the U.S. 56 − day cycle effective dates for charting publications.

3 − 1 − 4. TRAFFIC LIGHTS, GATES, AND SIGNALS Air traffic personnel must not operate traffic lights, gates, signals, or similar devices for restricting or preventing transit of persons or vehicles between airport movement areas and other on/off airport areas, or to control vehicular traffic on streets, highways, rail, or other similar areas when traffic thereon may be incompatible with aircraft operations. The control of such traffic is the responsibility of airport management or other appropriate authorities.

3 − 1 − 5. CLEANING INSTRUMENT COVERS Air traffic managers must ensure that personnel use a moist cloth when cleaning glass or plastic instrument covers to preclude the creation of static charges.

NOTE − FSS OASIS facilities should exercise caution in the handling of flat panel monitors. Do not touch the screen with any object, including hands. Damage to the screen will occur. Detailed instructions for the care of the monitors can be found in the WINGS Systems Users Guide.

3 − 1 − 6. ENGINE GENERATOR TRANSFER PROCEDURES FOR ANTICIPATED POWER FAILURE a. STMCIC or OSIC at terminal facilities and ARTCCs must inform the systems engineer (SE) or other appropriate Technical Operations supervisor of any severe storm activity approaching the facility. The STMCIC or OSIC must advise the OMIC.

b. At facilities without an operational power conditioning system (PCS), the STMCIC or OSIC must coordinate with the SE or other appropriate Technical Operations supervisor to determine a mutually acceptable time to change to/from generator power.

NOTE − 1. Air traffic and Technical Operations personnel are required to monitor weather reports and radar to determine when severe storm activity is approaching a facility. At least 30 minutes prior to the estimated arrival of a severe storm in the area of a facility, maintenance personnel will start engine generators at facilities as indicated in appropriate agency directives. (These include the Facilities Master File; FAA Order JO 6030.31, National Airspace System Failure Response; local contingency/emergency plans, or any other directives pertaining to restoration of services.) This 30 − minute start − up requirement does not apply at facilities where at least one of the following conditions exists: a. The facility has an operational PCS.

b. Maintenance personnel are not on duty at the time action is required.

c . Air traffic has remote control of the engine generators.

2. After coordinating with air traffic , Technical Operations must (depending on the type of auxiliary power system) either place the facility on generator power or place the generator on the loadbank until the storm activity has left the area. (The change back to commercial power will be made at the coordinated time.)

3. It is important to note that at facilities with an operational PCS, no action other than the initial storm notification is required since the transfer to generator power occurs automatically with no power interruption when commercial power fails.

REFERENCE − FAA Order JO 6030.31, National Airspace System Failure Response.

General 3 − 1 − 2

Section 3. Communications Procedures

7/9/26 JO 7210.3EE CHG 3 JO 7210.3EE 2/20/25

Section 3. Communications Procedures

3 − 3 − 1. COMMUNICATIONS Facility air traffic managers must establish a facility Contingency Plan that addresses procedures for providing interim communications during power outages, and other significant events.

3 − 3 − 2. TELEPHONE COMMUNICATIONS a. Answer public access telephones by stating the facility’s name and type. The employee may state his/her name at his/her discretion. If, for any reason, a caller specifically requests identification, the employee should provide his/her assigned operating initials in lieu of the actual name. Contract facilities must answer public access lines by stating the name of the service provider and type.

EXAMPLE − ARTCC: (The facility’s name) Center; for example, “Washington Center.” FSS: (The facility’s name) Flight Service; for example, “Juneau Flight Service” or “(Service Provider Name) Flight Service.” ATCT: (The facility’s name) Tower; for example, “Atlanta Tower.” Approach Control: (The facility’s name) Approach Control; for example, “Dulles Approach Control.” b. Answer local airport, private exchange (PX), or interdepartmental system type telephones as outlined above, except omit the location name; e.g., Center, Tower, Flight Service, etc.

c. Where the public access telephone is recorded, a beeper tone is not required. In place of the “beep” tone, the FCC has substituted a mandatory requirement that persons to be recorded must be given notice that they are to be recorded and give consent. This notice is given to the public through an entry in the Aeronautical Information Manual (AIM). Consent to the record is assumed by the individual when placing the call to an operational facility.

d. When equipment capabilities exist, every effort should be made to conduct conversations regarding ATC services, aircraft accidents, incidents, and contingency operations on a recorded line.

e. Recorded telephone lines must be identified in the facility SOP.

3 − 3 − 3. MONITORING FREQUENCIES a. Frequencies allocated to a facility must be continuously monitored except: 1. ARTCCs need not monitor 121.5 and 243.0 MHz if other ATC facilities monitor those frequencies in a given area.

2. FSSs equipped with ICSS equipment may reconfigure the ICSS to allow the temporary selection, muting, or rerouting of 121.5 and 243.0 MHz during the period of an interfering signal; e.g., continuous emergency locator transmitter (ELT), stuck mike, etc.

b. Facilities must establish procedures to ensure that frequencies used on a shared basis; e.g., single frequency approach operations, are continuously monitored by one of the positions of operation.

3 − 3 − 4. EMERGENCY FREQUENCIES 121.5 AND 243.0 MHz a. Air traffic facilities must have transmit and receive capability on emergency frequencies 121.5 and 243.0 MHz as necessary to meet emergency frequency network requirements.

b. At locations having more than one type of facility, such as a FSS and a tower, or a FSS, a tower, and an ARTCC, a common transmitter and receiver may be shared where practicable. Where this is done, the transmitter must be equipped with a lockout device to avoid inadvertent interference between facilities.

Communications Procedures 3 − 3 − 1 JO 7210.3EE 2/20/25 c. When facilities are in proximity and no derogation of services will result, transmit/receive capability should not be provided for each facility. The following requirements must be maintained: 1. Geographical area coverage must not be derogated.

2. Facilities without emergency frequency capability must have appropriate landlines for rapid relay of emergency information.

d. The two emergency channels must not be terminated on the same key in the transmitter − receiver selector panels. Neither emergency frequency must be terminated with any other frequency.

e. To preclude inadvertent use of these frequencies, a mechanical or other appropriate device must be provided which will require deliberate removal or bypass before any emergency frequency transmit key can be moved to the locked − operate position.

f. UHF emergency frequency 243.0 MHz is installed in military aircraft using an override arrangement. As a result, transmissions on this frequency are received by all military aircraft within the transmitter’s area of coverage. Unnecessary emissions on this frequency derogate communications on ATC frequencies and may interfere with valid emergency communications. Reduce transmissions on 243.0 MHz to the absolute minimum consistent with safety.

g. As a minimum, conduct two − way, ground − to − air checks during low activity periods: 1. Once a week.

2. Following equipment repairs.

3. Following Technical Operations maintenance checks.

h. Control facilities should limit broadcasts on 243.0 MHz to the facility in the area of desired coverage and must ensure that broadcasts are not continued unnecessarily.

3 − 3 − 5. BATTERY-POWERED TRANSCEIVERS Facilities equipped with battery-powered transceivers must ensure they are maintained in a state of readiness.

Transceivers identified for use during a Contingency Plan Event must be checked weekly for receive and transmit capability on both battery and commercial power. These checks facilitate controller familiarization.

REFERENCE − FAA Order JO 7210.3, Subpara 4 − 6 − 5 g , Preparation of FAA Form 7230 − 4.

3 − 3 − 6. FACILITY STATUS REPORT Facility air traffic managers must notify System Operations and Safety by message, attention Manager of System Safety and Procedures, with an information copy to the appropriate Service Area office, of changes in the operational status of communication facilities not covered by FAA Order 7900.2, Reporting of Electronic Navigation Aids and Communication Facilities Data to Aeronautical Information Services. The following data must be reported (include the RIS AT 7230 − 12 in the text): a. The date and time FAA assumes operation of or decommissions an operations center, message center, data switching center, domestic or international aeronautical fixed telecommunication network (AFTN) “data communication circuit,” or international voice circuit.

b. Change in the hours of operation of any of the above and the effective date.

c. Changes required in weather schedule publications and communications systems drawings.

3 − 3 − 7. TESTING EMERGENCY LOCATOR TRANSMITTERS a. The frequencies 121.6, 121.65, 121.7, 121.75, 121.8, 121.85, and 121.9 MHz are authorized to ELT test stations and for use in ELT exercises by the Air Force, Coast Guard, and other search and rescue organizations.

Communications Procedures 3 − 3 − 2 2/20/25 JO 7210.3EE a. Between ARTCCs: 1. Radar handoff procedures.

2. Interfacility coordination procedures.

3. Delegation of responsibility for IFR control jurisdiction.

b. Between ATCTs: 1. Tower en route control service.

2. Interfacility coordination procedures.

c. Between Flight Service Stations: Procedures for maintaining master flight plan files.

d. Between an ARTCC and an ATCT: 1. Approach control service.

2. Interfacility coordination procedures.

3. Tower/center en route control service.

e. Between an ARTCC and an FSS: Procedures for the assignment of DVFR and VFR beacon codes.

f. Between an ATCT and an FSS: Operation of airport lighting.

g. Between an ARTCC or an approach control facility and a nonapproach control tower, an FSS, an airport manager, or a local operator: Special VFR Operations. (See FIG 4 − 3 − 1 .)

h. Between an ARTCC or an approach control facility and a nonapproach control tower: 1. Authorization for separation services.

2. Interfacility coordination procedures.

3. Opposite direction operations procedures.

REFERENCE − FAA Order 7210.3, Para 2 − 1 − 38 , Opposite Direction Operations.

i. Between an ARTCC and another government agency: 1. Interfacility coordination for control of ADC aircraft.

2. Delegation of responsibility for approach control services.

3. MTR procedures.

j. Between a tower and another government agency: 1. Simulated flameout procedures.

2. Control of helicopter SVFR flights.

3. Operation of aircraft − arresting barriers.

4. MTR procedures.

k. Between a tower and/or FSS and an airport manager/aircraft operator at airports upon which the tower and/or FSS is located: 1. Airport emergency service.

2. Operation of airport lighting.

3. Reporting airport conditions, to include how all PIREP braking action reports of “good to medium,” “medium,” “medium to poor,” “poor,” or “nil” are to be immediately transmitted to airport management, and an agreement on actions by air traffic personnel for the immediate cessation of operations on runways subject to “nil” braking action reports.

Letters of Agreement (LOA) 4 − 3 − 3 3/15/07 7110.65R CHG 2 JO 7210.3EE CHG 3 7/9/26 JO 7210.3EE 2/20/25 REFERENCE − Advisory Circular AC 150/5200 − 30D, Airport Winter Safety and Operations.

4. Control of vehicular traffic on airport movement areas.

5. Specific activities allowed in the RSA during aircraft operations.

REFERENCE − FAA Order JO 7210.3, Para 2 − 1 − 23 , Obstacle Identification Surfaces, Obstacle Free Zones, Runway Safety Areas, Appr oach/Departur e Hold Areas, and Clearways.

AC − 150/5210 − 20A, Appendix C.

6. Operations under an exemption from part 91, appendix D, section 3, the surface area of Class B, Class C, Class D, or Class E airspace within which Special VFR weather minimums are not authorized.

REFERENCE − Advisory Circular AC 150/5210 − 7C, Airport Rescue and Fire Fighting Communications.

l. Between a tower and/or FSS and an airport manager/aircraft operator at airports upon which the tower is located but the FSS is not: Reporting airport runway conditions.

m. Between an air traffic control facility and a fixed site operating under Section 44809. For all operations occurring on-airport, follow procedures in FAA Order JO 7200.23, Processing of Unmanned Aircraft Systems Requests, Chapter 2, Processing of Section 44809 Authorization Requests.

4 − 3 − 3. DEVELOPING LOA Air traffic managers must take the following action when developing an LOA: (See examples FIG 4 − 3 − 1 and FIG 4 − 3 − 2 . For space example LOAs, see Appendix 6.)

a. Determine, through coordination, which FAA facility is principally responsible for processing the LOA.

b. Confine the material in each agreement to a single subject or purpose.

c. Describe the responsibilities and procedures applicable to each facility and organization involved. Review pertinent national procedures or local instrument flight procedures and incorporate into the new LOA(s) as necessary.

NOTE − Information related to subscribing for alerts regarding upcoming changes to instrument flight procedures is available at the Instrument Flight Procedures Information Gateway: https://www.faa.gov/air_traffic/flight_info/aeronav/procedures/ .

REFERENCE − FAA Order JO 7210.3, Para 2 − 1 − 2 , Facility Standard Operating Procedures (SOP).

FAA Order JO 7210.3, Para 2 − 1 − 6 , Checking Accuracy of Published Data.

FAA Order JO 7210.3, Para 4 − 3 − 8 , Annual Review/Revisions.

d. Delegate responsibility for control of IFR aircraft, where necessary, by taking the following action: 1. Describe the area within which responsibility is delegated. The area may be depicted in chart form.

2. Define the conditions governing use of the area. These include altitudes, routing configuration, and limitations or exceptions to the use of the applicable airspace.

3. Specify the details of control procedures to be used. These include clearance limits, reporting points, handoff points, and release points.

4. Identify clearance limits designated as Instrument Approach Fixes when they are to be used for holding aircraft.

5. Specify communications and coordination procedures.

e. Coordinate with other FAA facilities and military or civil organizations as appropriate.

f. Attach charts or other visual presentations, when appropriate, to depict the conditions of the LOA.

g. Coordinate with the Regional Flight Standards Division, All Weather Operations Program Manager if aircraft operations or pilot procedures will be affected.

Letters of Agreement (LOA) 4 − 3 − 4 7/9/26 JO 7210.3EE CHG 3 JO 7210.3EE 2/20/25 h. Prepare a single supplement, if necessary, to augment the letter at a facility and attach it to the basic LOA.

Do not repeat material from the basic LOA.

i. After coordination, send two copies of the proposed LOA, including supplements, to the service area office for approval if required.

4 − 3 − 4. REVIEW BY SERVICE AREA OFFICE a. The Service Area office must review the proposed LOA, ensure coordination with other interested offices and affected user groups, as necessary, and approve the LOA if satisfactory. Coordination includes mandatory review of the LOA by a Service Center Environmental Protection Specialist (EPS) in accordance with paragraph 4 − 1 − 6 .

b. The Service Area office may, in writing, delegate to air traffic managers, air traffic managers designees, ATREPs, or Region Air Defense Liaison Officer (RADLOs) the authority to develop, coordinate, approve, and implement LOAs except for: 1. Those which prescribe procedures or minima contrary to those contained in FAA Order JO 7110.65, Air Traffic Control, unless appropriate military authority has authorized application of reduced separation between military aircraft; or REFERENCE − FAA Order JO 7110.65, Para 1 − 1 − 10, Procedural Letters of Agreement (LOAs).

2. Those between an IFR facility and a tower to authorize the separation services prescribed in paragraph 2 − 1 − 16 , Authorization for Separation Services by Towers, and paragraph 10 − 5 − 3 , Functional Use of Certified Tower Radar Displays.

4 − 3 − 5. APPROVAL Upon receipt of Service Area office approval, the air traffic manager must: a. Prepare the LOA in final form incorporating the Service Area office guidance. Development of the LOA includes an environmental impact review by the appropriate Service Center EPS in accordance with paragraph 4 − 1 − 6 of this order.

b. Establish an effective date, acceptable to all parties involved, that permits sufficient time for distribution and for participating facilities and user groups to familiarize personnel, revise directives, flight charts, etc., and complete other actions.

c. Sign the LOA and obtain signatures of other authorities as required.

d. Distribute copies of the signed LOA to each participating facility or organization, the Service Area office, and other interested offices. Distribution of supplements outside the facility is not required.

e. Ensure that current, new, or revised LOA, Standard Operating Procedures (SOP), and FAA Facility Orders (FO) are posted in the Facility Directives Repository (FDR) before the effective date of the document.

EXCEPTION. LOAs containing contingency plan information must not be posted to the FDR. LOAs with such information must be posted to the National OCP database.

REFERENCE − FAA Order JO 7210.3, Para 2 − 2 − 14 , Facility Directives Repository (FDR).

4 − 3 − 6. SPACE LOAs LOAs exist between ATC facilities and Federal Ranges; space launch/reentry sites; and launch and/or reentry service providers (LSPs). FAA Order JO 7400.2, Procedures for Handling Airspace Matters, contains responsibilities and procedures for Commercial Space operations. The following lists the roles and responsibilities of organizations and individuals involved in the space LOA process: Letters of Agreement (LOA) 4 − 3 − 5 3/15/07 7110.65R CHG 2 JO 7210.3EE CHG 3 7/9/26 JO 7210.3EE 2/20/25 NOTE − This paragraph does not apply to on-orbit activities or operations.

a. The respective ATO Service Center OSG will serve as facilitator of the LOA development.

b. ATO Service Center OSG will coordinate with the appropriate Service Area, ATO Space Operations, the Office of Commercial Space Transportation (AST), the Office of Airports, and other offices having responsibilities in accordance with the operation.

c. Each LOA must include, but is not limited to: 1. Names and contact information for all parties involved.

2. Operating procedures to include communications, real-time coordination, Notice to Airmen (NOTAM) content issuance, contingency, and emergency procedures and notifications.

3. For Federal Range LOAs: a brief description of the launch/reentry site and any limitations on operations.

If no limitations or restrictions are needed, notate this in the LOA as “No Restrictions.” NOTE − Possible restrictions may include but are not limited to restrictions on operating hours, restrictions on vehicle size, and restrictions on number of operations.

4. For launch/reentry operation LOAs: description of operation to include but not limited to vehicle type and characteristics; anticipated frequency of operations; requested airspace and altitude, and notional Aircraft Hazard Area (AHA) information. When possible, this should include vehicle telemetry data transmittal.

5. For launch/reentry site LOAs: brief description of the launch/reentry site, types of anticipated operations, and anticipated frequency of proposed operations.

6. For launch/reentry sites controlled and used by a single LSP, a single LOA for launch/reentry site and operation may be utilized. Contents of the LOA must comply with c 1 through c5.

4 − 3 − 7. HOT AIR BALLOON LOAs FOR CLASS C AIRSPACE Air traffic managers at facilities that conduct hot air balloon operations within Class C airspace must enter into an LOA with balloon operators or festival representatives specifying procedures and conditions for operations.

The LOA must be developed using a hot air balloon LOA template obtained from the Service Center Operations Support Group.

4 − 3 − 8. ANNUAL REVIEW/REVISIONS a. Review LOAs at least annually and update as necessary. Examine current LOAs for practices and/or procedures that are no longer required. Reviewing includes both content and relevance that achieve full operational efficiency and customer flexibility. Review and, if necessary, update LOAs when new/revised instrument flight procedures are published or national procedures are implemented or changed.

NOTE − Information related to subscribing for alerts regarding upcoming changes to instrument flight procedures is available at the Instrument Flight Procedures Information Gateway: https://www.faa.gov/air_traffic/flight_info/aeronav/procedures/.

REFERENCE − FAA Order JO 7210.3, Para 2 − 1 − 2 , Facility Standard Operating Procedures (SOP).

FAA Order JO 7210.3, Para 2 − 1 − 6 , Checking Accuracy of Published Data.

FAA Order JO 7210.3, Para 4 − 3 − 3 , Developing LOA.

b. Process revisions to LOAs and attachments or supplements thereto as page replacements. Mark the revisions as follows: 1. Place an asterisk or vertical line to the left of each new or revised paragraph or section to signify new material.

2. Identify page revisions by the “REV” number, e.g., “REV 1,” and the effective date in the lower right hand corner of each revised page.

Letters of Agreement (LOA) 4 − 3 − 6 7/9/26 JO 7210.3EE CHG 3 JO 7210.3EE 2/20/25 c. Coordinate revisions to a LOA in the same manner and degree as for the original LOA.

4 − 3 − 9. CANCELLATION After appropriate coordination with LOA signatories and the Service Area, cancel any agreement which is no longer applicable. Ensure that the FDR is updated.

Letters of Agreement (LOA) 4 − 3 − 7 3/15/07 7110.65R CHG 2 JO 7210.3EE CHG 3 7/9/26 JO 7210.3EE 2/20/25 FIG 4 − 3 − 1 Format for a Control Facility/FSS Letter of Agreement (Name) Center/Approach Control and (Name) FSS LETTER OF AGREEMENT EFFECTIVE: _____________________________________________ SUBJECT: Special VFR Operations within (Name) Airport Surface Area 1. PURPOSE: To provide operating procedures for Special VFR flight handling in the (name) surface area without individual coordination.

2. SCOPE: The procedures outlined herein are for use in the conduct of Special VFR operations within the (name) Airport surface area at or below _____ feet. These procedures are applicable only to aircraft equipped with functioning 2 − way radio in order to effect a recall when required by traffic or weather conditions.

3. RESPONSIBILITIES: Upon request by the (name) FSS, the Center/Approach Control Facility may authorize Special VFR operations in the (name) Airport surface area for specific periods of time. The Center/Approach Control Facility must retain the authority to withdraw the provi - sions of this agreement at any time.

4. PROCEDURES: a. Local Special VFR operations. The (name) FSS must not authorize more than one aircraft to operate simultaneously in the surface area unless pilots agree that they will maintain visual separation with other aircraft operating in the surface area.

b. IFR Arrivals and Departures. Special VFR operations must be controlled by the (name) Center/Approach Control during the fol - lowing periods: (1) From 10 minutes prior to the estimated time of arrival of an IFR aircraft over the approach fix until it is on the ground (IFR arrivals must not be cleared for an approach until the FSS confirms that there are no Special VFR operations in progress.)

(2) From 10 minutes prior to the estimated time of departure of an IFR aircraft until it departs the surface area.

c. Special VFR Arrivals and Departures: (1) The (name) FSS may authorize aircraft to enter, depart, or fly through the surface area when no Special VFR opera - tions are in progress. Authorization must be granted as outlined in 4a.

(2) Aircraft desiring to enter the surface area during times Special VFR operations are in progress must be instructed to maintain VFR conditions outside the surface area pending recall and landing of aircraft operating in the surface area.

d. Predesigned clearance phraseologies. To authorize Special VFR operations or to issue instructions or other messages pertinent thereto, the (name) FSS must use the following phraseology: (1) To authorize operations: A − T − C CLEARS (identification) TO ENTER/OUT OF/THROUGH (name) SURFACE AREA. MAINTAIN SPECIAL VFR CONDITIONS AT OR BELOW (altitude). REPORT LANDING COMPLETED/LEAVING SURFACE AREA, or A − T − C CLEARS (identification) TO OPERATE WITHIN (name) SURFACE AREA. MAINTAIN SPECIAL VFR CONDITIONS AT OR BELOW (altitude).

(2) To deny operations when visibility is less than one mile: VISIBILITY (value). A − T − C UNABLE TO ISSUE DEPARTURE/ENTRY CLEARANCE.

(3) To suspend operations: SPECIAL VFR AUTHORIZATION DISCONTINUED. RETURN TO AIRPORT OR DEPART SURFACE AREA.

ADVISE INTENTIONS ............ (after response), REPORT LANDING COMPLETED/LEAVING SURFACE AREA.

(4) To advise an aircraft to remain outside the surface area: A − T − C ADVISES (identification) TO MAINTAIN VFR OUTSIDE THE (name) SURFACE AREA PENDING ARRIVAL/RECALL/DEPARTURE OF SPECIAL VFR AIRCRAFT.

Air Traffic Manager, (Name) FSS Air Traffic Manager, (Name) AR TCC/Approach Control Letters of Agreement (LOA) 4 − 3 − 8 7/9/26 JO 7210.3EE CHG 3 JO 7210.3EE 2/20/25 FIG 4 − 3 − 2 Format for an ARTCC/Air Division Letter of Agreement (Name) Air Route Traffic Control Center and (Name) Air Division LETTER OF AGREEMENT EFFECTIVE:______________________________________ SUBJECT: Interfacility Coordination for the Control of Aerospace Defense Command Interceptor Aircraft 1. PURPOSE: (List responsibility and describe necessary coordination.)

2. CANCELLATION: (As required.)

3. SCOPE: (Specify area, names, and types of facilities involved.)

4. RESPONSIBILITIES: (Specify.)

5. PROCEDURES: a. ATC − Assigned Airspace. (List procedures to be followed for requesting and authorizing airspace, handling aircraft to and from the airspace, and notifying when no longer required.)

b. Transfer of Control. (Specify transfer procedures.)

c. Departure. (Specify required advanced time for filing flight plans. Outline additional items required in the flight plan; e.g., type of departure, CONAD control facility, and IND position number.)

d. En Route. (including information that ATC is responsible for effecting separation in assigned airspace whenever nonparticipating aircraft are cleared to operate within such airspace.)

e. Arrivals. (Outline handoff procedures and special instructions.)

f. General. (Self − explanatory.)

6. ATTACHMENTS (List, as required, items such as chart of ATC − assigned airspace areas, common reference/handoff points, etc.)

Air Traffic Manager, (Name) ARTCC Commander, (Name) Air Division (Title of other appropriate authority) 4 − 3 − 10. AUTOMATED INFORMATION TRANSFER (AIT) a. Radar identification, altitude, and en route fourth line control information approval may be transferred via full data blocks without using point − out procedures or verbal coordination. Air traffic managers wishing to authorize the use of the AIT process must establish AIT procedures adapted to local traffic situations and use the process only within the context of those specific procedures. These precoordinated procedures and the controller responsibilities must be specifically defined in facility directives.

REFERENCE − FAA Order JO 7110.65, Para 5 − 4 − 10, En Route Fourth Line Data Block Usage.

b. The controller who first transfers radar identification will also transfer aircraft communications. Either the transferring or the receiving controller, whoever is specified in a facility AIT directive, may issue the altitude change, if any. Additionally, facility AIT directives must require that any deviation from the specified procedure invalidates the procedure for that situation and requires that verbal coordination be completed as per FAA Order JO 7110.65, Air Traffic Control, paragraph 2 − 1 − 14, Coordinate Use of Airspace, paragraph 2 − 1 − 15, Control Transfer, paragraph 5 − 4 − 5, Transferring Controller Handoff, paragraph 5 − 4 − 6, Receiving Controller Handoff, or paragraph 5 − 4 − 7, Point Out. The following are general examples of the AIT process.

1. Transfer of radar identification only: EXAMPLE − Controller A initiates a transfer of radar identification to controller B before the aircraft enters controller B’s airspace.

Controller B accepts the transfer of radar identification before the aircraft enters his/her airspace. Controller B, traffic Letters of Agreement (LOA) 4 − 3 − 9 3/15/07 7110.65R CHG 2 JO 7210.3EE CHG 3 7/9/26 JO 7210.3EE 2/20/25 permitting, then initiates a transfer of radar identification to controller C before the aircraft enters controller C’s airspace.

Controller A transfers aircraft communications to controller C before the aircraft enters controller C’s airspace and after observing that controller C has accepted the transfer of radar identification.

2. Transfer of radar identification and altitude control: EXAMPLE − 1. Controller A initiates a transfer of radar identification to controller B; controller B accepts the transfer. Controller B amends either the interim or assigned altitude in the data block to an altitude within his/her altitude stratum as prescribed in a facility directive. Controller B initiates a transfer of radar identification to controller C before the aircraft enters controller C’s airspace. Controller A, after observing controller B initiate a transfer of radar identification to controller C, clears the aircraft to the altitude displayed in the data block by controller B. Controller A, after observing that controller C has accepted the transfer of radar identification, transfers aircraft communication to controller C before the aircraft enters controller C’s airspace.

2. Controller C may clear the aircraft to the altitude displayed by controller B if so established in a facility AIT directive.

3. The following is an example of a precoordinated AIT procedure which might be written in a facility directive: EXAMPLE − The following procedure is established for implementation under the (AIT) process and is agreed to by the South and East areas. Aircraft departing ELP via J26 to ROW requesting FL 280 or above must be handled as follows: (a) Sector 20 must clear the aircraft to FL 270 within its airspace and then initiate a transfer of radar identification to sector 63.

(b) Sector 63 must accept the transfer of radar identification then display either an assigned or interim altitude in the data block.

(c) Sector 63 must then initiate a transfer of radar identification to sector 23 before the aircraft enters sector 23’s airspace.

(d) Sector 20, after observing the assigned/interim altitude displayed in the data block and that a transfer of radar identification has been initiated to sector 23, must then clear the aircraft to the appropriate altitude.

(e) Sector 20 must transfer communications of the aircraft to sector 23 before the aircraft enters sector 23’s airspace and after observing sector 23’s acceptance of the transfer or radar identification.

Letters of Agreement (LOA) 4 − 3 − 10 7/9/26 JO 7210.3EE CHG 3 JO 7210.3EE 2/20/25 2. Flight service stations may use an automated version of FAA Form 7230 − 4 or establish local forms and procedures for recording, disseminating, and documenting the resolution of MORs. Local forms used for recording this information are considered supplements to FAA Form 7230 − 4 and must be filed with it.

i. Place a large letter “E” in the left hand margin beside entries on equipment malfunctions. The “E” must also be used when equipment is restored to service. The “E” is not required for facilities using local forms if procedures are established in accordance with subparagraph g.

NOTE − The “E” is to be used on entries related to equipment problems which require Technical Operations involvement. The “E” is not required for routine maintenance items or for carryover entries on previously entered equipment malfunctions.

j. Employees other than the person responsible for the watch who make an entry must initial or enter initials for each of their own entries.

k. Use additional forms as necessary to complete the reporting of the day’s activity.

l. Make an entry closing out FAA Form 7230 − 4 at the close of business.

m. The air traffic manager, or his/her designee, must initial the form after reviewing the entries to ensure that the facility operation is adequately and accurately described.

4 − 6 − 6. FAA FORM 7230 − 10, POSITION LOG a. Air traffic managers must ensure that FAA Form 7230 − 10, Position Log, or an automated sign on/off procedure is used for position sign on/off. FAA Form 7230 − 10 must be prepared daily. All logs, including automated ones, must reflect 24 hours or the facility’s official operating hours, if less than 24 hours daily.

b. Position logs must be used as the sole-source record for on the job training instructor (OJTI) and evaluator time and premium pay. As a supporting document for time and attendance (T&A) purposes, position logs which document on the job training (OJT) time must be retained for one year prior to destruction.

c. Prepare FAA Form 7230 − 10 as follows: 1. Field 1 must contain the facility three-letter identification code.

2. Field 2 must contain the facility position/sector identifier that is a maximum of five letters and/or numbers, starting in the first space on the left side of the field. Unused spaces must be left blank.

3. Field 3 must contain a maximum of two letters to show the position type, as follows: (a) ARTCCs: Starting on the left side of the field, use position codes as follows: TBL 4 − 6 − 1 Field 3 − ARTCC Designator Position A Assistant Controller D Nonradar Control F Flight Data H or RA Handoff, Tracker or Radar Associate R Radar Control TM Traffic Management O Other Positions (b) Terminals: Use two-letter position codes as follows: Records 4 − 6 − 3 3/15/07 7110.65R CHG 2 JO 7210.3EE CHG 3 7/9/26 JO 7210.3EE 2/20/25 TBL 4 − 6 − 2 Field 3 − Terminal Designator Position Tower AC Approach Control Cab CC Coordinator Cab CD Clearance Delivery FD Flight Data GA Ground Control Assistant GC Ground Control GH Gate Hold LA Local Control Assistant LC Local Control SC Supervision Cab TRACON AP Approach Control TRACON AR Arrival Radar CI Coordinator TRACON DI Data TRACON DR Departure Radar FM Final Monitor Radar FR Final Radar HO Handoff TRACON NR Nonradar Approach Control PR Precision Approach Radar SI Supervision TRACON SR Satellite Radar Tower/TRACON TM Traffic Management (c) FSSs: Use two-letter codes, as follows: TBL 4 − 6 − 3 Field 3 − FSS Designator Position BC Broadcast FD Flight Data IF Inflight NO NOTAM OT Other PF Preflight WO Weather Observer 4. Field 4 must contain the date in digit format. All spaces must be used.

5. Field 5 must contain the UTC time that the employee assumes responsibility for the position or the UTC time that the position is combined with another. For employees receiving OJT instruction or evaluation, field 5 must contain the UTC time that the OJT instruction or evaluation begins.

Records 4 − 6 − 4 7/9/26 JO 7210.3EE CHG 3 JO 7210.3EE 2/20/25 6. Field 6 must contain the operating initials of the employee working the position.

7. Field 7 must contain the UTC time that the employee is relieved of responsibility for the position or the UTC time that the position is decombined. For employees receiving OJT instruction or evaluation, field 7 must contain the UTC time that the OJT instruction or evaluation ends.

8. Field 8 must contain the appropriate code identified at the bottom of page 1 of the form.

9. Field 9 must contain the identifier of the position being combined with (per field 2). Field 9 may be left blank if the same entry is appropriate and entered in field 10.

10. Field 10 must contain the type of position being combined with (per field 3).

11. If the second page (back-side) of FAA Form 7230 − 10 is used, then fields 1, 2, 3 and 4 on that page must also be completed.

12. When a mistake is made in filling out fields 5, 6, 7, 8, 9, or 10 − if the portion of the line that is incorrect can be legibly corrected, then line out that portion only and write the correct information. If the incorrect portion cannot be legibly corrected, then line out the entire line and write the correct information on the next line.

4 − 6 − 7. AUTOMATED POSITION SIGN ON/OFF a. FLIGHT SERVICE STATION . Use of automated position sign on/off procedures is approved for FSS facilities. Facility managers are responsible for ensuring the accuracy of sign on/off data. Facilities must ensure sign on/off data is forwarded to concerned facilities along with other data required for accident packages. Sign on/off data must be retained for six months, in accordance with FAA Order 1350.14, Records Management. Data can be retained either electronically or on paper. FAA Form 7230 − 10, Position Log, is only required to be used during those times that the automated procedure is not available.

b. TERMINAL/EN ROUTE . Use of automated position sign on/off procedures is approved for terminal and en route facilities. The information requirements described in paragraph 4 − 6 − 6 , FAA Form 7230 − 10, Position Log, for FAA Form 7230 − 10 also apply to the automated procedure, except that times on/off the position may be displayed to the second rather than to the minute. Before implementation, facilities must receive Service Area Director of Air Traffic Operations approval and must verify the accuracy of the automated sign on/off procedure by conducting a 30-day trial period. After verifying the automated procedure’s accuracy, an actual FAA Form 7230 − 10 is only required to be used during those times that the automated procedure is not available.

4 − 6 − 8. TIME AND ATTENDANCE (T&A) RECORDING Record the actual times an employee works and is absent on a daily basis. Facilities may use any of the following methods for documenting time and attendance reported to the servicing payroll office.

a. The supervisor’s or timekeeper’s observation and subsequent recording of employees’ hours worked.

When this method is used, leave usage must be documented via OPM (Formerly Standard Form 71), Request for Leave or Approved Absence, or a locally produced form/electronic format documented by facility directive.

b. Personnel log. A locally produced sign in/out form documented by facility directive, or FAA Form 7230 − 4.

1. When employees arrive, they must sign their name and record their time of arrival. When employees leave, they must record their time of departure and initial the form.

2. The personnel log must contain a statement or certification signed by each shift supervisor affirming the form’s accuracy and approving the entries made by personnel while under their supervision. This statement must include the specific period of time for which each supervisor is providing certification.

3. The personnel log may also be used to document leave usage provided: (a) The employee records the amount and type of leave used on the day the leave is used.

(b) Since leave use is covered by the Privacy Act, local management must inform all employees that they may use OPM (Formerly Standard Form 71), Request for Leave or Approved Absence instead of indicating their Records 4 − 6 − 5 3/15/07 7110.65R CHG 2 JO 7210.3EE CHG 3 7/9/26 JO 7210.3EE 2/20/25 leave use on the log (or any other group format employed). This notification must be in writing, signed by the employee and retained in facility files, or the notification may be included in a facility directive which authorizes the group form.

c. Facilities may develop forms other than the personnel log to facilitate the documentation of leave and absence, provided: 1. The form includes, as a minimum, the employee request for leave, and the supervisor ’s approval/disapproval.

2. Each form and its use must be contained in a facility directive.

3. Group forms must allow for the Privacy Act alternative addressed above.

d. Initialing time and attendance reports may be used to document leave usage where this capability still exists.

e. Time clocks or other automated timekeeping devices. These devices may be linked to a supporting computer system for purposes of recording.

Records 4 − 6 − 6

Section 3. DOE and Other Aircraft

2/20/25 JO 7210.3EE

Section 3. DOE and Other Aircraft

5 − 3 − 1. DEPARTMENT OF ENERGY (DOE) FLIGHTS DOE contracts for civil pilots to operate public aircraft to transport radioactive and/or high explosive materials within the conterminous United States. They will operate principally during daylight hours and, although they will be made in VFR conditions insofar as possible, an instrument flight plan will be filed and IFR procedures followed.

5 − 3 − 2. AERIAL SAMPLING/SURVEYING FOR AIRBORNE CONTAMINATION a. The USAF Technical Application Center (AFTAC), Department of Energy (DOE), or other U.S.

Government agencies will use aircraft with the “SAMP” call sign to perform aerial sampling/surveying of suspected foreign or domestic nuclear, chemical, or hazardous material contamination. A planned aerial sampling/surveying schedule is established by the USAF. Although sampler/survey aircraft are flight planned to the suspected area of airborne contamination, the aircraft are likely to require altitude and route changes which cannot be anticipated prior to departure. The purpose of those altitude and route changes is to permit direct contact with and sampling/surveying of the airborne contamination whose exact location and altitude distribution cannot be accurately predicted.

b. The sponsoring agency will notify ATC facilities of the “SAMP” aerial sampling/surveying mission prior to departure.

c. ATC facilities must report any issues associated with “SAMP” aerial sampling/surveying flights to the Domestic Events Network (DEN) Air Traffic Security Coordinator (ATSC).

d. The Air Traffic Control System Command Center (ATCSCC) must issue a nuclear debris report as an ATCSCC numbered advisory if such report is received from AFTAC, DOE, or other U.S. government agencies.

REFERENCE − FAA Order JO 7110.65, Para 2 − 1 − 4, Operational Priority.

FAA Order JO 7110.65, Para 2 − 4 − 20, Aircraft Identification.

FAA Order JO 7110.65, Para 9 − 2 − 17, SAMP Flights.

5 − 3 − 3. DUE REGARD OPERATIONS a. Article 3 of the International Civil Aviation Organization (ICAO) Chicago Convention of 1944 includes the following: 1. This Convention must be applicable to civil aircraft and must not be applicable to state aircraft.

2. Aircraft used in military, customs and police services must be deemed to be state aircraft.

3. The contracting States undertake, when issuing regulations for their state aircraft, that they will have due regard for the safety of navigation of civil aircraft.

b. Department of Defense and U.S. Customs Service have specified that one of the following conditions must be met for flight operations outside U.S. Domestic airspace which are conducted under the “due regard” or “operational” prerogative of state aircraft and not in accordance with standard ICAO flight procedures. Under these conditions the PIC assumes the responsibility for separating his/her aircraft from all other air traffic.

1. Aircraft must be operated in visual meteorological conditions (VMC); or 2. Aircraft must be operated within radar surveillance and radio communications of a surface radar facility; or 3. Aircraft must be equipped with airborne radar that is sufficient to provide separation from other aircraft; or DOE and Other Aircraft 5 − 3 − 1 3/15/07 7110.65R CHG 2 JO 7210.3EE CHG 3 7/9/26 JO 7210.3EE 2/20/25 4. Aircraft must be operated within Class G airspace.

c. Search and rescue actions for flights conducted under due regard provision are the responsibility of the parent organization.

5 − 3 − 4. WEATHER RECONNAISSANCE FLIGHTS The U.S. Air Force Reserve (AFRES) 53rd Weather Reconnaissance Squadron (53WRS) and the National Oceanic & Atmospheric Administration (NOAA) Aircraft Operations Center (AOC) are responsible for flying weather reconnaissance/research missions. 53WRS aircraft conducting these missions will utilize the call − sign “TEAL,” and aircraft from NOAA AOC will utilize the call-sign “NOAA.” Due to the unique nature of these missions it is necessary to provide a degree of special handling to ensure that sufficient meteorological data is collected. The routes flown are dictated by storm movement, not traffic flows. The nature of these weather phenomena may result in very little time between the filing of a flight plan and the actual departure.

a. WINTER SEASON MISSIONS.

1. Winter season missions are flown in support of the National Winter Season Operations Plan (NWSOP).

The Chief, Aerial Reconnaissance Coordination, All Hurricanes (CARCAH) will publish the Winter Season Plan of the Day (WSPOD) by 1830 UTC. The WSPOD provides mission information and includes aircraft type and call sign, departure airfield, route of flight, and dropsonde release points.

NOTE − 1. The 53WRS and NOAA AOC are responsible for coordinating airspace access directly with DoD for missions on the U.S. east coast.

2. The current season NWSOP is available at https://www.icams- portal.gov/resources.htm .

2. TEAL or NOAA flights may request CARCAH to relay an en route clearance request to the ARTCC if the flight is unable to contact ATC.

NOTE − ATC responsibilities pertaining to clearance requests via CARCAH are described in FAA Order JO 7110.65, paragraph 9 − 2 − 19, Weather Reconnaissance Flights 3. ATC will provide TEAL and NOAA aircraft priority handling in accordance with FAA Order JO 7110.65, paragraph 2 − 1 − 4, Operational Priority.

b. HURRICANE AND TROPICAL CYCLONE MISSIONS.

1. These reconnaissance/research missions are flown in support of the National Hurricane Operations Plan (NHOP) and in accordance with: (a) The Memorandum of Agreement between the National Oceanic and Atmospheric Administration (NOAA) Aircraft Operations Center (AOC), U.S. Air Force Reserve Command 53rd Weather Reconnaissance Squadron (WRS), and the Federal Aviation Administration (FAA) Air Traffic Organization (ATO) in Support of the National Hurricane Operations Plan; and (b) Associated letters of agreement.

rd 2. Prior to an NHOP reconnaissance/ research mission, the 53 WRS or NOAA AOC will: (a) Provide the Mission Coordination Sheet to the appropriate ARTCC and the ATCSCC at least one hour prior to the mission.

NOTE − The Mission Coordination Sheet describes the reconnaissance/research mission and includes, for example, the aircraft call sign, departure airfield, and route of flight.

(b) Submit a request to the appropriate ARTCC for a Weather Reconnaissance Area (WRA) NOTAM at least one hour prior to the mission.

(c) File a flight plan as soon as practicable before departure time.

DOE and Other Aircraft 5 − 3 − 2 7/9/26 JO 7210.3EE CHG 3 JO 7210.3EE 2/20/25 NOTE − Providing the Mission Coordination Sheet does not pre-empt the mission commander’s responsibility to file a flight plan, nor does it constitute an ATC clearance.

3. The ATCSCC must: (a) Review the Tropical Cyclone Plan of the Day (TCPOD) by 1830 UTC.

(b) Activate the Hurricane Desk, if required.

(c) Review the Mission Coordination Sheet.

(d) Designate the primary ARTCC when the reconnaissance/research flights are expected to operate through airspace managed by multiple ATC facilities.

(e) Assist ATC facilities with traffic flow priorities if the hurricane reconnaissance/ research flight will impact terminal traffic.

4. The ARTCC(s) must: (a) Review the Mission Coordination Sheet.

(b) Coordinate with all impacted ATC facilities within their area(s) of responsibility; (c) Coordinate with SUA Using Agencies in accordance with WRA Letters of Agreement (LOA), unless other coordination procedures are established by an agreement.

NOTE − An example of an agreement containing other coordination procedures for SUA is the LOA between Washington Center, New York Center, Boston Center, Jacksonville Center, Air Traffic Control System Command Center and Fleet Area Control and Surveillance Facility, Virginia Capes that defines coordination and control procedures governing the use of SUA operated by FACSFAC VACAPES.

(d) Issue the WRA NOTAM, as applicable.

NOTE − Any questions about the WRA NOTAM should be directed to the ARTCC that originated the NOTAM, not CARF .

(e) Relay any operational concerns to the ATCSCC for further evaluation and coordination.

(f) When designated by the ATCSCC as the Primary ATC Facility, or when the reconnaissance/research flights are expected to operate only through airspace managed by your facility, ARTCC responsibilities include: (1) When necessary, coordinate with CARCAH and aircrew(s) on flight plan specifics.

(2) If the mission profile changes, coordinate with the ATCSCC and ensure other affected ATC facilities are aware of the change.

(3) Advise the ATCSCC and other affected ATC facilities of any mission cancellation or delay information received from the flying unit.

(g) Should it become necessary for ATC to contact a TEAL or NOAA flight and all other methods of communication are not possible (e.g., direct radio, New York Radio, San Francisco Radio, aircraft relay), CARCAH may be requested to relay messages to/from the aircraft. CARCAH may phone the appropriate ATC facility to authenticate the request.

5. Requests to change any portion of the NHOP or MOA must be coordinated with ATO System Operations Security.

5 − 3 − 5. FOREIGN STATE DIPLOMATIC FLIGHTS Diplomatic clearances that authorize foreign state aircraft (military or non-military) to operate in U.S. territorial airspace for a specific time and purpose are approved by the U.S. State Department. Foreign state diplomatic flights are non-priority. Contact the FAA System Operations Support Center (SOSC) (202 − 267 − 8276 or email 9 − ATOR − HQ − RT − REQ@faa.gov ) with questions or issues concerning foreign state diplomatic flights.

DOE and Other Aircraft 5 − 3 − 3

Section 2. Sector Information Binders

7/9/26 JO 7210.3EE CHG 3 JO 7210.3EE 2/20/25

Section 2. Sector Information Binders

6 − 2 − 1. EN ROUTE OR OCEANIC CONTROLLER TEAM CONCEPT There are no absolute divisions of responsibilities regarding position operations. The tasks to be completed remain the same whether one, two, or three people are working positions within a facility/sector. The team, as a whole, has the responsibility for the safe and efficient operation of that facility/sector.

6 − 2 − 2. EN ROUTE SECTOR INFORMATION BINDER The en route sector information outline is to be used for guidance in developing facility sector binders for each sector of operation. The pertinent items in subparagraph a through subparagraph e below must be incorporated into each sector binder. The format of the binder must be determined by the air traffic manager and must contain all information necessary for the safe and efficient operation of each sector. A sector specific binder is required for each operational sector and is to be in a location easily accessible by each position/sector.

a. Sector Narrative: General description of normal traffic flows and adjacent sector/facility coordination and potential trouble spots.

b. Assignment of airspace: 1. Delegation of Approach Control airspace.

2. Sectors normally combined.

EXAMPLE − Which sector assumes responsibility when combined or which sector assumes responsibility for approach control airspace.

3. Military airspace delegation.

c. Sector Information.

1. Frequency Information.

(a) Primary frequency.

(b) Back-up frequency.

(c) Primary and back-up frequency remote center air/ground facility (RCAG).

(d) Back-up emergency communication (BUEC) operation priorities.

(e) Position location.

(f) Location of emergency frequencies and RCAG.

(g) Special Use frequencies and RCAG.

2. Indirect access (IA) dial codes.

3. Sector Description (map, video map, and/or narrative).

(a) Lateral limits.

(b) Vertical limits.

4. Specify unique sector equipment configurations.

d. Sector Procedures.

1. Sector specific directives.

2. LOAs or LOA procedures applicable to that sector.

Sector Information Binders 6 − 2 − 1 JO 7210.3EE 2/20/25 3. Areas of limited radio/radar coverage.

4. Mandatory speed restrictions.

5. Mandatory heading requirements.

6. Mandatory altitude requirements.

7. Sector handoff/point out procedures if different from requirements of FAA Order JO 7110.65, Air Traffic Control, Chapter 5, Section 4, Transfer of Radar Identification.

8. Transfer of control points other than airspace boundaries.

9. Radar arrival routes and restrictions for airports within facility/sector jurisdiction.

10. Normally used sector holding fixes to include published/unpublished hold, allowable altitudes, maximum speed, maximum length, direction of turn, direction from fix, and if applicable, published procedures involved.

11. Special strip or flight data requirements of sector.

12. Authorized jump areas in Class A airspace within area of jurisdiction.

13. Special routes for dangerous cargo or inert devices flights in area of jurisdiction.

14. Sensitive/classified activities to be avoided by special interest flights.

15. IFR Military Training Routes (IR) in area of jurisdiction.

16. Aerial refueling routes, including air refueling initial point (ARIP), air refueling control point (ARCP), and egress fix(es).

17. Special use and ATC-assigned airspace within area of jurisdiction.

e. Flight Data Requirements.

1. Primary and back-up printers.

2. Alternative methods for relaying/requesting information.

3. Data that requires expeditious handling including, flight plan data, weather information, traffic management messages, and miscellaneous data.

4. Specify flight progress strips to be posted and the location to place them.

5. Sources to obtain weather information.

6. Sources and data required for display in SIAs.

Sector Information Binders 6 − 2 − 2

Section 3. Operations

7/9/26 JO 7210.3EE CHG 3 JO 7210.3EE 2/20/25

Section 3. Operations

6 − 3 − 1. HANDLING OF SIGMETs, CWAs, AND PIREPs a. SIGMETs and CWAs: 1. The CWSU meteorologist is the focal point for the review of SIGMETs to determine application to the ARTCC area of responsibility and may issue a CWA to modify or redefine the SIGMET information.

2. The CWSU meteorologist may also issue a CWA in advance of a SIGMET when the observed or the expected weather conditions meet SIGMET criteria or when conditions do not meet SIGMET criteria but are considered significant.

3. The weather coordinator (WC) has the primary responsibility for the inter/intrafacility dissemination of AIRMETs (except over CONUS), SIGMETs, urgent PIREPs (UUA), routine PIREPs (UA), and CWAs, and must ensure that sufficient information is disseminated to facilitate the required alert broadcasts.

NOTE − In recognition that there are several uses/definitions for the acronym CONUS, references herein to CONUS are specific to the contiguous United States (i.e., “lower 48”).

REFERENCE − FAA Order JO 7210.3, Chapter 18, Section 26, Weather Management.

FAA Order JO 7110.65, Para 2 − 6 − 6, Hazardous Inflight Weather Advisory.

4. Terminal ATC facilities must relay the SIGMET and the CWA information to towers under their jurisdiction.

b. PIREPs: 1. The WC is the focal point for handling PIREP requests and for the dissemination of urgent and routine PIREPs within the ARTCC and to terminal ATC facilities.

2. The CWSU meteorologist solicits PIREPs through the weather coordinator or directly from the controllers when required.

(a) Both solicited and unsolicited PIREPs that meet the urgent PIREP criteria must be distributed immediately via AISR, or other distribution systems such as the Aviation Weather Center’s webpage.

(b) Solicited and unsolicited routine PIREPs must be distributed in a timely manner.

c. Classify PIREPs as follows: 1. URGENT: Weather phenomena reported by a pilot which represents a hazard or a potential hazard to flight operations. Disseminate reports of the following conditions as URGENT PIREPs: (a) Tornadoes, funnel clouds, or waterspouts.

(b) Severe or extreme turbulence (including clear air turbulence).

(c) Severe icing.

(d) Hail.

(e) Low level wind shear (LLWS). For the safety of light aircraft, classify low level wind shear PIREPs as UUA if the pilot reports airspeed fluctuations of 10 knots or more. Classify reports of low level wind shear with airspeed fluctuations less than 10 knots as routine. If airspeed fluctuation is not reported, classify the PIREP as UUA.

NOTE − LLWS is defined as wind shear within 2,000 feet of the surface.

(f) Volcanic eruptions, ash clouds, and/or the detection of sulfur gases (H S or SO ) in the cabin should 2 2 be reported; however, if a pilot only reported the smell of H S or SO in the cabin and confirmed no volcanic 2 2 ash clouds were present, classify the report as a ROUTINE PIREP.

Operations 6 − 3 − 1 3/15/07 7110.65R CHG 2 JO 7210.3EE CHG 3 7/9/26 JO 7210.3EE 2/20/25 NOTE − The smell of sulfur gases in the cockpit may indicate volcanic activity that has not yet been detected or reported and/or possible entry into an ash-bearing cloud. SO is identifiable as the sharp, acrid odor of a freshly struck match. H S has 2 2 the odor of rotten eggs.

(g) Any other weather phenomena reported which are considered by the specialist as being hazardous or potentially hazardous to flight operations.

2. ROUTINE: Classify all other PIREPs as routine.

3. Expanded information on the categorization of PIREPs and reporting format is located in FAA Order JO 7110.10, Chapter 8, Section 1, Pilot Weather Reports.

6 − 3 − 2. RECEIPT OF NOTAM DATA ARTCC air traffic managers must coordinate with other air traffic facilities in their area to ensure that adequate procedures are established for the receipt and distribution of NOTAMs. NOTAM distribution may be accomplished via the Aeronautical Information System Replacement (AISR) or accessed at https://notams.aim.faa.gov/notamSearch as a source for NOTAM information.

6 − 3 − 3. REVIEW AIRSPACE STRUCTURE Although magnetic radials are used in planning airways/routes, conversion to true radials is required for designation. The final magnetic radials are not determined until the airspace action is charted. As a result, differences from planned magnetic radials may occur in the conversion of true to magnetic radials. Differences may also occur later due to changes in the magnetic variation, which is recomputed every 5 years. These differences could contribute to the misapplication of the VFR altitude hemispheric rule. Therefore, ARTCC air traffic managers must conduct a continuing review of the airway and jet route structures and proposed new airspace cases and bring any differences to the attention of the Service Area Director of Air Traffic Operations.

6 − 3 − 4. FLIGHT DATA UNIT a. The Flight Data Unit (FDU) is responsible for processing and disseminating operational information necessary for NAS operations.

b. The FDU must provide system support during outage(s) of critical systems and/or software. These responsibilities include data recovery, manual processing, and disseminating information or data products as necessary for safe and efficient operations.

c. The Air Traffic Manager (ATM) must: 1. Ensure all FDU responsibilities and procedures listed below are established in local orders or directives.

2. Assign additional duties of a recurring nature based on unique facility requirements.

3. Provide FDU specialists a copy of, or access to, the following; (a) FAA Order JO 7110.10, Flight Services.

(b) FAA Order JO 7110.65, Air Traffic Control.

(c) FAA Order JO 7900.5, Surface Weather Observing − METAR.

(d) FAA Order 7930.2, Notice to Airmen (NOTAM).

(e) Position binder, which includes: (1) Procedures for accomplishing assigned position related duties and responsibilities.

(2) Examples and formats for seldom used procedures.

(3) Cross references to documents and lists contained in other publications which may be used where applicable.

Operations 6 − 3 − 2 7/9/26 JO 7210.3EE CHG 3 JO 7210.3EE 2/20/25 d. Unless otherwise specified in a facility directive or a letter of agreement, the Flight Data Communications Specialist (FDCS) performs the following: 1. Flight Plan Data.

(a) Process domestic flight plan(s) proposals, corrections, amendments, and remove strip requests.

(b) Process international flight plan(s) proposals, corrections, amendments, remove strip requests, and departure messages.

(c) Process military flight plans.

(d) Provide data search assistance for Search and Rescue (SAR) information requests.

2. Weather Products: (a) Support the TMU weather coordinator with inter/intrafacility dissemination of the weather data products described in the Weather Management section of this order. This should include both urgent PIREPs (UUA) and routine PIREPs (UA).

REFERENCE − FAA Order JO 7210.3, Para 18 − 26 − 4 , Weather Management, Subpara b1.

(b) Provide inter/ intrafacility dissemination of international weather products as needed.

(c) Perform altimeter and weather data checks and system updates as required.

(d) Provide backup services for terminal facility PIREP and METAR entries.

REFERENCE − FAA Order JO 7110.65, Para 2 − 6 − 3, Weather Information, Subpara c.

3. NOTAMs: (a) Process and disseminate FDC, Special Use Airspace (SUA), and Temporary Flight Restriction (TFR) NOTAMs.

(b) Provide assistance with formatting and inputting Special Activity Airspace (SAA) NOTAMs.

(c) Process and disseminate NOTAM D information as necessary, to include ERIDS backup services.

4. System/Administrative Messages: Process and disseminate the following messages: (a) GENOTs, (b) CIRNOTs, (c) Oceanic track, (d) ALTRV movement/change.

5. Classified National Security Information (CNSI) and Communications Security (COMSEC): Handle, safeguard, and protect CNSI and COMSEC material in accordance with national policies, FAA orders, and local SOPs.

6. Clearance Relay: (a) Responds to telephone requests for ATC clearances received from pilots by contacting the appropriate sector within the ARTCC or approach control facility and relays clearance issued to the pilot verbatim.

(b) Advises appropriate ARTCC sector or approach control facility of IFR Flight Plan cancellations received over the telephone.

6 − 3 − 5. CHANGES TO MTR AND MOA PUBLISHED ACTIVITY SCHEDULES ARTCCs must use the procedures as outlined in FAA Order 7930.2, Notice to Airmen (NOTAM), paragraph 6-1-2, Special Activity Airspace (SAA), when MTR or MOA activity is scheduled to occur at other than published or charted times.

Operations 6 − 3 − 3

Section 9. En Route Information Display System

7/9/26 JO 7210.3EE CHG 3 JO 7210.3EE 2/20/25

Section 9. En Route Information Display System

(ERIDS)

6 − 9 − 1. GENERAL ERIDS is a real time, interactive, electronic information display system that is used as a replacement for paper sources of information. ERIDS provides controllers, supervisors, and traffic management personnel with access to aeronautical data, weather data, airspace charts, ATC procedures, NOTAMs, PIREPs, and other sources of ATC information.

6 − 9 − 2. REQUIREMENTS a. Where available, ERIDS must be used to provide controllers with the following information: 1. Sector binder information.

REFERENCE − FAA Order JO 7210.3, Para 6 − 2 − 2 , En Route Sector Information Binder.

FAA Order JO 7210.3, Para 2 − 1 − 3 , Position/Sector Binders.

2. Notices to Airmen (NOTAMs). Facilities using ERIDS for NOTAM distribution must develop a backup plan in the event ERIDS becomes unavailable/unusable.

3. National directives.

4. United States Government flight information publications/DoD flight information publications.

5. Other air traffic information and lists determined by facility directives.

b. ERIDS may be used to record and disseminate PIREPs.

c. ERIDS must not be used to disseminate dynamic operational information; for example, miles-in-trail restrictions, runway in use, weather information other than PIREPS, etc.

d. Facilities must develop local procedures to meet the following requirements: 1. Facilities using ERIDS must ensure that the provisions of FAA Order JO 7210.3, paragraph 6 − 2 − 2 , are met in the event of an ERIDS outage or degradation.

2. Facilities using ERIDS in lieu of sector information binders must ensure that all information is available and maintained for each operational sector in accordance with the provisions of FAA Order JO 7210.3, paragraph 6 − 2 − 2 .

En Route Information Display System (ERIDS) 6 − 9 − 1

Section 10. En Route Data Communications

7/9/26 JO 7210.3EE CHG 3 JO 7210.3EE 2/20/25

Section 10. En Route Data Communications

6 − 10 − 1. CONTROLLER PILOT DATA LINK COMMUNICATIONS (CPDLC) All ARTCC ATMs must ensure that the following requirements are incorporated into facility documents, as appropriate, prior to the operational use of CPDLC.

a. CPDLC shutdowns must be coordinated with all affected personnel and users unless operational conditions require an emergency shutdown of the service.

1. The Operations Manager-in-Charge (OMIC) must coordinate with each area to ensure controllers stop using CPDLC.

2. Controllers must use voice to broadcast a message alerting pilots to the shutdown.

NOTE − A NOTAM may be issued for a longer-term outage.

3. Controllers must take action to ensure that any open or abnormally closed uplinks at the time of the shutdown will be resolved, by voice, with each aircraft.

b. A record of the operational status of CPDLC and its components must be maintained to include system on/off status, initial contact (IC) on/off status, service provider outages, service volume antenna outages, and other pertinent information.

c. Ensure Operations Supervisor (OS) and Controllers-in-Charge (CIC) brief the operational status of CPDLC and its components when relieved of position.

d. Establish procedures to update the frequency management tables to accurately reflect current frequency assignments.

NOTE − Frequency management tables are used by the CPDLC system to determine the proper radio frequency to use when sending a transfer of communication (TOC) uplink to an aircraft.

e. Establish procedures to coordinate any changes to frequency management tables that will impact adjacent facilities.

NOTE − 1. When a frequency is out of service, any adjacent ARTCC that might use that frequency in a TOC uplink has to be informed so its frequency management tables can be updated.

2. Prior to CPDLC implementation, sector combinations and frequency assignments were normally coordinated across facility boundaries between controllers at the operational positions. With the implementation of CPDLC, controllers should forward that information to the OS/CIC on duty so that the frequency management tables can be updated.

f. Blocked List Procedures 1. Contact ZTL or ZLC flight data unit to manually have an aircraft added or removed from the Blocked List.

2. When aircraft are automatically added to the blocked list by the system, for reasons other than excessive logons, flight data personnel at ZTL and ZLC are directed to remove them from the blocked list manually.

NOTE − Aircraft that are added to the blocked list for excessive logons will not be automatically removed from the blocked list by flight data personnel at ZTL and ZLC.

g. Technical Operations (TO) personnel must be notified when an outage or problem occurs with any element of the Terminal Data Link System (TDLS).

En Route Data Communications 6 − 10 − 1

Section 2. Instrument Approach Data

7/9/26 JO 7210.3EE CHG 3 JO 7210.3EE 2/20/25

Section 2. Instrument Approach Data

9 − 2 − 1. GENERAL ARTCCs are responsible for the tabulation and reporting of instrument approach data for those nontower, nonapproach control, or VFR tower airports under the ARTCC’s jurisdiction to which instrument approaches are conducted. Instrument approach data are used primarily to determine the need and priority order of approach aids, such as ILS and VOR. Therefore, it is not necessary to report instrument approaches made to purely military airports unless the FAA is responsible for providing the aids for that airport. One count must be recorded for each approach meeting the criteria.

9 − 2 − 2. INSTRUMENT APPROACHES a. An instrument approach is an approach made to an airport by an aircraft on an IFR flight plan when the visibility is less than 3 miles or the ceiling is at or below the minimum initial approach altitude.

b. Where no weather reporting service is available at nontower satellite airports, the following criteria in descending order must be used to determine valid instrument approaches.

1. A pilot report.

2. If the flight has not canceled its IFR flight plan prior to reaching the initial approach fix.

3. The official weather as reported for any airport located within 30 miles of the airport to which the approach is made.

9 − 2 − 3. AIRPORTS REPORTED Instrument approaches must be reported for all airports where instrument approaches are conducted. Reporting is the responsibility of the facility having the authority for clearing the approach. Therefore, the ARTCC is responsible to report instrument approaches for the nontower airports and nonapproach control (VFR) airports in its area. At airports where there is an FAA VFR tower, the ARTCC and the tower must determine which facility must maintain the count. If the tower counts the approaches, it must forward the appropriate totals to the ARTCC for inclusion in the center’s monthly report. (VFR towers do not report instrument approaches to Washington.)

When the ARTCC provides approach control on a part − time basis; i.e., during periods when the primary approach control facility is closed, the ARTCC must forward the instrument approach count for those hours to the primary approach control facility for inclusion in their monthly report.

9 − 2 − 4. FAA FORM 7230 − 16, APPROACH DATA WORKSHEET FAA Form 7230 − 16 is a worksheet furnished for the purpose of recording instrument approaches. It does not have a specific arrangement allowing each facility to tailor it to its own needs. Instrument approaches will be counted by the standard air carrier, air taxi, general aviation, and military categories. At the end of the month, the totals, by airport, will be transferred to FAA Form 7230 − 12. FAA Form 7230 − 16 must be retained in the facility’s files.

9 − 2 − 5. FAA FORM 7230 − 12, INSTRUMENT APPROACHES MONTHLY SUMMARY FAA Form 7230 − 12 is a monthly form, submitted by both ARTCC and terminal approach control facilities, for reporting the number of instrument approaches made at airports for the month. The facility’s name and location will be entered; two digits each will be used for the month and the year (January would be 01), and the three-letter identifier filled in at the top of the form. ARTCCs must check box H: ARTCC or CCF. ARTCCs must not enter any data in the block for instrument approaches terminating at a primary approach airport. ARTCCs list all Instrument Approach Data 9 − 2 − 1 3/15/07 7110.65R CHG 2 JO 7210.3EE CHG 3 7/9/26 JO 7210.3EE 2/20/25 airports, using a three-character identifier, under the heading “Instrument Approaches to Nonapproach Control Airport,” with the respective monthly totals by category. If an ARTCC has more airports than can be listed on the front, continue on the back of the form. In this case, the ARTCC’s identifier and the month and the year must be entered again on the back. Only ARTCCs and approach controls submit this form. Under no circumstances should two facilities report the same airport. Therefore, it may be necessary for facilities to make arrangements to ensure no duplicate reporting of instrument approaches.

9 − 2 − 6. DISTRIBUTION AND AMENDMENT a. Distribute FAA Form 7230 − 12 as follows (it may be combined in one envelope with the other monthly forms): 1. The original and one copy to the Service Area office not later than the 2nd workday (Monday − Friday) of the following month.

2. One copy to the facility’s files (with FAA Form 7230 − 16).

3. One copy to the local airport officials as requested.

b. Correct any errors in the forms sent in last month by completing a new form, circling the revised fields, and marking the form “AMENDED COPY.” Amended copies of forms more than 1 month old will not be accepted unless approval has been obtained from Safety and Operations Support by the Service Area office. Send amended copies along with the current reporting month’s forms to the Service Area office.

9 − 2 − 7. FORWARD COPY TO ADJACENT SERVICE AREA If the report contains data for an airport which is under the administrative jurisdiction of another Service Area office, forward a copy to that Service Area office.

Instrument Approach Data 9 − 2 − 2 8/7/25 JO 7210.3EE CHG 1 JO 7210.3EE 2/20/25 1. 800’ ceiling and 2 SM visibility – arrival/departure runway.

2. Weather less than 2 SM visibility - departure only runway.

b. Ensure training for operational personnel is completed prior to any runway length changes that include the following: 1. Use of the term “full length.” 2. Use of the term “shortened.” 3. Review of current and future national “Runway Construction Changes” training materials.

c. Provide continued training and/or briefings for the duration of the construction project to ensure operational personnel are advised of construction changes as the project progresses.

REFERENCE − FAA Order JO 7110.65, Para 2 − 9 − 3, Content.

FAA Order JO 7110.65, Para 3 − 7 − 1, Ground Traffic Movement.

FAA Order JO 7110.65, Para 3 − 9 − 1, Departure Information.

FAA Order JO 7110.65, Para 3 − 9 − 4, Line Up and Wait (LUAW).

FAA Order JO 7110.65, Para 3 − 9 − 10, Takeoff Clearance.

FAA Order JO 7110.65, Para 3 − 10 − 1, Landing Information.

FAA Order JO 7110.65, Para 3 − 10 − 5, Landing Clearance.

FAA Order JO 7210.3, Para 10 − 3 − 12 , Airport Construction.

FAA Order JO 7210.3, Para 10 − 4 − 1 , Automatic Terminal Information Service (ATIS).

10 − 3 − 14. TEMPORARY AUTHORIZATION AND USE OF A TAXIWAY AS A RUNWAY The airport owner/operator has principal authority to determine the use of the airport surface in accordance with applicable laws, regulations, and FAA policies. Accordingly, the airport traffic control tower does not have authority to use a taxiway as a runway unless otherwise authorized in writing by the airport owner/operator and the Service Area Director of Operations. In limited circumstances, such as airport construction or special events, an ATM may recommend temporary use of a taxiway as a runway but must first obtain written authorization from the airport owner/operator and take actions as specified below.

REFERENCE − 14 CFR Part 139, Certification of Airports AC 150/5300 − 13, Airport Design.

AC 150/5340 − 1, Standards for Airport Marking AC 150/5340 − 18, Standards for Airport Sign Systems AC 150/5370 − 2, Operational Safety on Airports During Construction.

NOTE − The airport owner/operator must submit the appropriate airspace case to the FAA in advance of the planned effective date of the change in airport use. The owner/operator will be provided a Determination Letter on the outcome of the airspace case to include any special requirements. The ATM should obtain a copy of the Determination Letter from the airport owner/operator for awareness.

a. The airport owner/operator and ATM must plan and coordinate any temporary authorization for the use of a taxiway as a runway. The ATM must notify the General Manager and the OSG once these discussions have started.

REFERENCE − FAA Order JO 7210.3, Para 4 − 2 − 1 , Local Coor dination/Confer ences.

b. The OSG must assist the General Manager and ATM for use of the planned authorization. This includes but is not limited to OSG coordination with Flight Standards Service.

c. Authorization for an operating airport traffic control tower to use a taxiway as a runway is limited to VFR weather conditions, sunrise to sunset, for same runway separation (SRS) Category I and II aircraft only, per FAA Order JO 7360.1, Aircraft Type Designators. Any proposal for an authorization outside of these limitations requires additional coordination with Airports Division, Flight Standards Service, and/or the OSG, as well as submission of a waiver request per Chapter 1 of this order.

REFERENCE − FAA Order JO 7110.65, Para 3 − 9 − 6, Same Runway Separation.

Operations 10 − 3 − 7 3/15/07 7110.65R CHG 2 JO 7210.3EE CHG 3 7/9/26 JO 7210.3EE 2/20/25 d. Upon receipt of written authorization from the airport owner/operator to temporarily use a taxiway as a runway, and any supporting documentation to include the OE/AAA determination letter (if any), the ATM must notify the General Manager and the OSG.

e. The General Manager must review the written authorization and determine if it should be forwarded, with documentation, to the Service Area Director of Air Traffic Operations.

f. The ATM must ensure actions necessary for operational safety, both before and during the temporary use period, are taken (e.g., safety risk management, Letter to Airmen, and/or NOTAM). The length of time necessary for the parties to take these actions will vary based on operational complexity and airport considerations.

g. Authorization from the Service Area Director of Air Traffic Operations must not exceed one year from the effective date. An extension may be granted for an additional period up to one year to complete arrangements to return to normal operations.

h. The ATM must timely notify the General Manager of any need for an extension, but no later than 30 days prior to expiration of the authorization. If at the end of a 24-month period from the initial authorization the taxiway is still needed as a runway, additional justification and a new request for authorization must be initiated by the ATM.

10 − 3 − 15. APPROACHES TO PARALLEL RUNWAYS a. Where vectors are provided to intercept parallel final approach courses, facilities must review and, where necessary, address speed requirements to reduce the potential for overshoot situations.

b. When determining speed requirements, consider, at a minimum, the following: 1. Airspace constraints.

2. Field elevation.

3. Fleet mix.

4. Airport layout.

5. Traffic flow(s).

6. Local weather.

c. When speed requirements are implemented, those requirements must be contained in a facility directive.

10 − 3 − 16. GO-AROUND/MISSED APPROACH AND NON-INTERSECTING CONVERGING RUNWAY OPERATIONS Tower facility directives must address procedures for go-arounds and/or missed approaches for all runway configurations.

a. Facilities must give consideration, at a minimum, to the following factors: 1. Operational position configuration.

2. Communication and/or control transfer.

3. Runway configuration.

4. Evaluation of existing waivers (for example, reduced separation on final).

5. Wake turbulence.

6. Weather conditions.

7. Type of approach (instrument or visual).

REFERENCE − P/CG Term − Go − around.

Operations 10 − 3 − 8 7/9/26 JO 7210.3EE CHG 3 JO 7210.3EE 2/20/25 P/CG Term − Low Approach.

P/CG Term − Missed Approach.

FAA Order JO 7110.65, Para 3 − 8 − 1, Sequence/Spacing Application.

FAA Order JO 7110.65, Para 3 − 8 − 2, Touch-and-Go or Stop-and − Go or Low Approach.

FAA Order JO 7110.65, Para 4 − 8 − 11, Practice Instrument Approaches.

FAA Order JO 7110.65, Para 4 − 8 − 12, Low Approach and Touch-and-Go.

FAA Order JO 7110.65, Para 5 − 5 − 4, Minima.

FAA Order JO 7110.65, Para 5 − 6 − 3, Vectors Below Minimum Altitude.

FAA Order JO 7110.65, Para 5 − 8 − 4, Departure and Arrival.

FAA Order JO 7110.65, Para 5 − 8 − 5, Departures and Arrivals on Parallel or Nonintersecting Diverging Runways.

FAA Order JO 7110.65, Para 7 − 2 − 1, Visual Separation.

FAA Order JO 7210.3, Para 10 − 4 − 12 , Simultaneous Converging Instrument Approaches, Subpara b4(b).

FAA Order JO 7110.308, Para 6b1(d), Para 6c2(i).

b. Where facilities vector aircraft conducting go-arounds or missed approaches below the minimum altitude for instrument operations, facility directives including LOAs, where applicable, must include: 1. Authorized headings or range of headings from each runway end to be used for vectoring aircraft conducting missed approaches/go-arounds until reaching the MVA/MIA. Authorized headings must be evaluated by the Service Center FPT if newly designated, and when changes are made; and 2. The display of those prominent obstacles on a video map, consistent with the assigned flight path, that influence the determination of the authorized headings. Prominent obstacles, as defined in the Pilot/Controller Glossary, can be determined with the assistance of the Service Center FPT. When no prominent obstacles are identified, the facility directive must include a statement of this determination.

3. A statement that air traffic is responsible for terrain and obstruction avoidance when vectoring aircraft, not on a published procedure below the MVA/MIA during climbout, and are assumed to climb at the minimum climb gradient of 200 feet/NM.

REFERENCE − FAA Order JO 7110.65, Para 5 − 6 − 3, Vectors Below Minimum Altitude.

FAA Order 1050.1, Environmental Impacts: Policies and Procedures.

c. Non-intersecting Converging Runway Operations (CRO): 1. ATMs must develop procedural mitigations if non-intersecting CRO operations are conducted and a 1 NM extension of the runway centerline crosses the centerline of the other runway or the 1 NM extension of a runway crosses the 1 NM extension of another runway. A facility directive must: (a) Specify procedures to ensure that an arrival that executes a go-around does not conflict with a departure off the non-intersecting converging runway. (See FIG 10 − 3 − 2 and FIG 10 − 3 − 3 .)

Operations 10 − 3 − 9 3/15/07 7110.65R CHG 2 JO 7210.3EE CHG 3 7/9/26 JO 7210.3EE 2/20/25 FIG 10 − 3 − 2 Departure/Arrival Non-Intersecting Converging Runway Operations FIG 10 − 3 − 3 Departure/Arrival Non-Intersecting Converging Runway Operations Operations 10 − 3 − 10 7/9/26 JO 7210.3EE CHG 3 JO 7210.3EE 2/20/25 (b) Specify procedures to ensure that an arrival that executes a go-around does not conflict with an arrival to the non-intersecting converging runway. (See FIG 10 − 3 − 4 .)

FIG 10 − 3 − 4 Arrival/Arrival Non-Intersecting Converging Runway Operations (c) Define technological tools that assist with locally developed procedures, where applicable.

NOTE − Tools available for ATM consideration may include, but are not limited to: a. Arrival Departure Window (ADW) b. ASDE-X/ASSC Virtual Runway Intersection Point (VRIP) c. Cutoff Points (CP) developed with the use of enhanced TARGETS.

REFERENCE − FAA Order JO 7110.65, Para 3 − 9 − 9, Nonintersecting Converging Runway Operations.

(d) Specify procedures to be used when conditions dictate intersecting runway separation standards must be applied.

REFERENCE − FAA Order JO 7110.65, Para 3 − 9 − 8, Intersecting Runway/Intersecting Flight Path Operations.

FAA Order JO 7110.65, Para 3 − 10 − 4, Intersecting Runway/Intersecting Flight Path Operations.

2. A facility may be permitted to conduct independent non-intersecting CRO without the use of mitigations for runway pairs in subparagraph c1 above when: Operations 10 − 3 − 11 3/15/07 7110.65R CHG 2 JO 7210.3EE CHG 3 7/9/26 JO 7210.3EE 2/20/25 (a) A safety analysis and/or simulation modeling is conducted for the non-intersecting CRO runway pair and the arrival/departure configuration meets the FAA target level of safety. For example, SCIA (see paragraph 10 − 4 − 12 ) or Dependent Converging Instrument Approaches (DCIA) (see FAA Order JO 7110.110) implementation may serve as an alternative to developing mitigations under subparagraph c1 above.

(b) Runway configurations and operational constraints for which these provisions are applied must be specified in a facility directive.

NOTE − The above provisions will only be considered after review of a facility Safety Risk Management Document (SRMD).

3. All non-intersecting CRO procedures under subparagraph c above must be approved by the Director, Strategic Operations, Headquarters, AJT − 1.

d. The ATM must review facility go-around/missed approach and/or non-intersecting CRO procedures on an annual basis and revise as necessary.

10 − 3 − 17. EQUIVALENT LATERAL SPACING OPERATIONS (ELSO) At locations conducting 10 degree course divergence for simultaneous or successive RNAV departures on the same runway or parallel runways that are separated by 2,500 feet or more, air traffic managers must complete the following: a. Create radar video map overlays that depict the initial departure tracks from each affected runway end.

b. Develop and administer initial controller training for ELSO. Annual proficiency training on local ELSO procedures are required.

c. Include in the facility Standard Operating Procedures or a Letter of Agreement with a satellite tower, that the OM/OS/CIC assess the feasibility of continuing ELSO when wind conditions dictate that aircraft cannot consistently fly the intended RNAV track. This is due to the detrimental effects of a strong cross wind component affecting initial departure tracks.

Operations 10 − 3 − 12

Section 2. Operations and Staffing

2/20/25 JO 7210.3EE

Section 2. Operations and Staffing

11 − 2 − 1. REQUESTS FOR ADDITIONAL SERVICES a. The FCT contracts specify the terms under which ATC services will be provided, including hours of operation for each FCT.

b. FAA personnel must not require actions of the contractor that fall outside the scope of the contract; for example, extension of the hours of operation or requests for additional staffing. Only the CO can effect modifications to a contract.

11 − 2 − 2. FAA STAFFING FOR SPECIAL EVENTS AJT district offices must coordinate with AJT − 22 whenever FAA staffing for special events (for example, Sun ’n Fun, EAA AirVenture Oshkosh, etc.) will be needed at an FCT, and provide staffing and supervisory schedules for the tower during the event.

NOTE − At no time can an FAA controller act in a supervisory capacity (OM/OS/CIC/Trainer, etc.) over an FCT controller, nor can an FCT controller act in a supervisory capacity over an FAA controller.

11 − 2 − 3. LETTERS OF AGREEMENT (LOA) FCTs are authorized to negotiate with, and enter into LOAs with FAA facilities, National Airspace System (NAS) users, and airport operators/tenants in accordance with FAA directives.

a. The AJT district must provide assistance to the FCT air traffic manager for the development of local procedures, facility LOAs, etc.

b. The contractor must comply with the service area’s LOA processing procedures.

c. Within 90 days of assuming air traffic manager responsibilities, the FCT Air Traffic Manager (ATM) will conduct and document a review of the facility LOAs to determine if they are operationally valid and accurately reflect the facility’s procedures.

11 − 2 − 4. EMERGENCY AND CONTINGENCY SITUATIONS FAA facilities must provide assistance to FCTs during emergency and/or contingency situations. Requests outside the scope of an LOA or approved contingency plan must be coordinated through the Service Center.

11 − 2 − 5. FACILITY DIRECTIVES REPOSITORY (FDR) In addition to other required directives, FCT ATMs will ensure the most current version of all facility LOAs are uploaded into the Facility Directives Repository. Directives deemed proprietary will have only the dated or revision − numbered cover page uploaded.

NOTE − LOAs containing contingency plan information must not be posted to the FDR. LOAs with such information must be posted to the National Operational Contingency Plan database.

11 − 2 − 6. FAA CONTRACT TOWER (FCT) AIR TRAFFIC CONTROLLER ELIGIBILITY a. A person must meet the requirements of Title 14 Code of Federal Regulations (14 CFR), Aeronautics and Space, part 65 and part 67, and have held a previous Control Tower Operator (CTO) certificate or FAA Air Traffic Safety Oversight (AOV) credential with a tower rating.

Operations and Staffing 11 − 2 − 1 3/15/07 7110.65R CHG 2 JO 7210.3EE CHG 3 7/9/26 JO 7210.3EE 2/20/25 b. Persons not holding a previous CTO certificate or AOV credential with a tower rating must have a valid Enhanced Air Traffic Collegiate Training Initiative (E − CTI) tower endorsement letter or graduated from an FAA-approved Control Tower Operator Partnership (CTO − P) school.

c. There is no maximum age restriction for FCT air traffic controllers.

Operations and Staffing 11 − 2 − 2

Section 3. Training

7/9/26 JO 7210.3EE CHG 3 JO 7210.3EE 2/20/25

Section 3. Training

11 − 3 − 1. TESTING AND CERTIFICATION a. The AJT district must ensure that facility rating, control tower operator (CTO) certification, or FAA Air Traffic Safety Oversight Credentials are performed. The FCT ATM must contact the district in a timely manner to schedule CTO certification.

b. At Limited Aviation Weather Reporting Stations ( LAWRS) designated FCTs, the FCT ATM must arrange initial LAWRS observer training and testing and coordinate certification or certificate transfer with AJT − 22 via email requests to 9 − AJT − HQ − ASWO@faa.gov .

11 − 3 − 2. BRIEFING/TRAINING ITEMS a. ATO Headquarters organizations, Service Center Offices, and districts must ensure that required briefing materials are distributed in a format that can be utilized by FCT facilities.

b. AJT districts must ensure that all required briefing items are forwarded to their assigned FCTs.

11 − 3 − 3. CIC DESIGNATION AT FCT-OPERATED FACILITIES CIC designation at FCT-operated facilities differs from CIC designation at FAA-operated facilities due to administrative differences. For FCTs, candidates for CIC must: a. Have been prior certified FAA/DoD/military controllers, or have FCT CIC experience, with assessment by the ATM that the candidate’s experience is suitable for CIC designation. Candidates hired via Enhanced Air Traffic Collegiate Training Initiative or Control Tower Operator Partnership (CTO − P) must have been certified for 6 months in the facility where CIC duties will be performed. The Service Area Director of Air Traffic Operations may issue a facility waiver for the 6-month requirement where a more immediate assignment is needed. Waivers to facilities will be for 2 years.

b. Be operationally current.

c. Be selected by the ATM.

Training 11 − 3 − 1

Section 3. Operations

2/20/25 JO 7210.3EE

Section 3. Operations

14 − 3 − 1. AIRPORT CONDITION FILE Maintain a current file of all public use civil landing areas within the FSSs flight plan area. Post the latest available information regarding airport conditions and facilities on the current FAA Airport Master Record (FAA Form 5010-1). Review the National Flight Data Digest, and post changes not previously received.

14 − 3 − 2. LANDING AREA STATUS CHECKS To the extent that their operational duties permit, FSS air traffic managers are encouraged to visit airports and to contact airport managers. Operational changes in airport conditions, facilities, or services that are observed by or reported to the FSS must be transmitted to System Operations Airspace and Aeronautical Information Services.

14 − 3 − 3. LIAISON VISITS As practicable: a. Visit attended landing areas at least once each year. Visit unattended fields at the discretion of the FSS air traffic manager. Rotate liaison visits among professional level specialists.

b. Make familiarization flights over the FSSs flight plan area and particularly the area within 100 miles of the station. This will enable specialists to acquire and maintain knowledge of the landmarks and the facilities used in aircraft orientation and pilot briefings. Combine familiarization flights and liaison visits as practicable.

14 − 3 − 4. DUTIES Typical duties for liaison visits and familiarization flights include: a. Acquiring knowledge of airports, facilities, and topography.

b. Becoming familiar with landmarks.

c. Becoming familiar with the operation of aircraft equipment and navigation procedures.

d. Discussing FAA services.

e. Checking arrangements for handling NOTAMs.

f. Checking arrangements for the search of airports for missing aircraft.

g. Checking arrangements for alerting airport emergency equipment.

h. Checking the listing of airports and other facilities in aeronautical publications and their depiction on aeronautical charts.

i. Collecting information for the Airport Condition File and the aircraft orientation board.

j. Ascertaining the number of based aircraft and/or itinerant operations for planning FX or other communications needs to the associated FSS.

k. Obtaining pilots’ opinions of the services provided by the station.

l. Practicing aircraft orientation procedures.

14 − 3 − 5. TIE-IN NOTAM RESPONSIBILITY Tie-in FSSs must make arrangements with other agencies and facilities (NWS, U.S. Army, control tower, etc.)

for the proper exchange of NOTAM information.

Operations 14 − 3 − 1 3/15/07 7110.65R CHG 2 JO 7210.3EE CHG 3 7/9/26 JO 7210.3EE 2/20/25 14 − 3 − 6. REGULATORY NOTAMs FOR PRESIDENTIAL TFR, SPECIAL SECURITY INSTRUCTIONS, OR EMERGENCY AIR TRAFFIC RULES a. Upon receipt of these messages, the watch supervisor, controller-in-charge (CIC), or designated lead specialist (DLS) at the designated FSS must ensure that the applicable NOTAM is received at each of the remaining facilities.

b. The watch supervisor, CIC, or DLS of the designated FSS must be responsible for: 1. Logging the Presidential TFR (14 CFR section 91.141), Special Security Instructions flight restriction (14 CFR section 99.7), or Emergency Air Traffic Rules (14 CFR section 91.139) regulatory NOTAM in the facility log.

2. Notifying the specialists on duty that a Presidential TFR, Special Security Instructions, or Emergency Air Traffic Rules regulatory NOTAM has been issued, if applicable.

3. Posting the applicable Presidential TFR, Special Security Instructions, or Emergency Air Traffic Rules regulatory NOTAM in the facility status information area.

4. As part of the FSS watch checklist, the watch supervisor, CIC, or DLS must check to ensure that every applicable Presidential TFR, Special Security Instructions flight restriction, or Emergency Air Traffic Rules regulatory NOTAM has been received in the facility.

NOTE − The purpose of this procedure is to ensure that all flight service specialists are aware of applicable regulatory NOTAMs for Presidential TFRs, Special Security Instructions flight restrictions, or Emergency Air Traffic Rules so that pilots are briefed appropriately.

Operations 14 − 3 − 2

Section 4. Supplemental Duties

7/9/26 JO 7210.3EE CHG 3 JO 7210.3EE 2/20/25

Section 4. Supplemental Duties

18 − 4 − 1. TELEPHONE CONFERENCES a. The ATCSCC is involved in several daily telephone conferences (TELCONs). TELCONs are initiated and hosted by the ATCSCC for field facilities, the appropriate Vice Presidents, and the Chief Operating Officer.

Supplemental conference capability is available through the FAA’s Remote Transmitter Site and the Washington Operations Center.

b. TMUs/TMCs utilize TELCONs when the need arises to discuss, evaluate, or problem solve any issues.

These conference calls should include the appropriate ARTCC TMU, adjacent terminal facilities/towers, the ATCSCC, and the service area TM branch or Service Area office office responsible for TM.

c. TMUs/TMCs should actively participate in facility briefings and user meetings in order to promote, educate, and inform all concerned about the function, role, and responsibilities of TM.

d. TELCONs are also used to maintain operational “Hotlines.” The objective of Hotlines is to provide rapid communications between FAA facilities, customers and other aviation interests when complex air traffic and airspace issues are being managed. Hotlines allow many participants the capability to problem − solve complicated issues and reduces the amount of coordination needed to implement collaborated strategies.

Hotlines may be initiated at the request of both the FAA and other aviation entities that substantiate its use. The operational Hotlines are authorized for customer attendance; however, they may be limited to listen-only capability.

1. The ATCSCC administers, facilitates, and manages operational Hotlines.

2. Hotlines are used to communicate: (a) Airport and airspace capacity issues.

(b) Constraint/capacity mitigation strategies.

(c) Route availability information and route alternatives.

(d) Weather information.

(e) Equipment Outages.

(f) Customer preferences for initiatives and alternatives.

(g) Special circumstances, contingency requirements and emergency events.

(h) All required coordination and information sharing necessary in regard to the event.

(i) Coordination that can be accomplished quickly and precisely with all parties. If an item requires extensive coordination, other communication sources will be used.

(j) Items that are not considered sensitive or classified in nature.

NOTE − Examples of sensitive or classified items include VIP movement and military requirements or exercises.

e. TMOs are responsible for ensuring that ARTCC and TRACON TMUs participate in the “Plan, Execute, Review, Train, Improve” (PERTI) Webinar each day at 2:30 p.m. eastern time.

18 − 4 − 2. SPECIAL INTEREST FLIGHTS ATCSCC, ARTCC, and CCF: Follow procedures in FAA Order JO 7610.14, Non-Sensitive Procedures and Requirements for Special Operations, Chapter 7, Miscellaneous Military and Civil Flight Activities, Section 4, Special Interest Flights, regarding special interest flights from State Department designated special interest Supplemental Duties 18 − 4 − 1 JO 7210.3EE 2/20/25 countries. Forward all issues concerning special interest flights to the DEN ATSC for relay to the appropriate authorities.

18 − 4 − 3. ANALYSIS a. The TMU analysis function or individuals assigned analysis functions must be responsible for the collection and analysis of all available data as it pertains to traffic capacity, traffic flows, points of congestion, peak hours, etc. Specific areas of consideration include, but are not limited to: 1. Sector demand (by hours).

2. Sector flows (route/altitudes).

3. Sector loading points.

4. Sector traffic breakdown by category of user.

5. Normal initiatives necessary to prevent sector saturation.

6. Alternatives to prevent saturation and relieve congestion/conflicts.

NOTE − Alternatives must take into consideration other facility/sector capabilities.

7. Total facility traffic count and potential user demand.

8. Sector staffing required to support potential user demand.

9. Location of delays (by sector and airport).

b. Coordination with user organizations must be effected, when appropriate.

18 − 4 − 4. OPERATIONS MANAGER (OM) SUPPORT Facility TMUs must maintain a working knowledge of the major related fields of air traffic operations/responsibilities to effectively support the STMCIC in dealing with special situations that may arise on a daily basis. Reference sources that identify these related areas are listed below.

a. Emergency plan: Numerous interfacility letters of agreement are normally located at the STMCIC complex concerning plans which have been established to provide continuity in the event of a disaster or emergency conditions that would limit air traffic service. Additionally, in these binders are instructions concerning security control of air traffic and air navigation aids, defense readiness, and physical security plans.

b. Accident procedures/bomb threats/search and rescue procedures: 1. FAA Order JO 8020.16, Air Traffic Organization Aircraft Accident and Incident Notification, Investigation, and Reporting.

2. Bomb threats.

3. National Search and Rescue Manual.

4. FAA Order 1270.1, Freedom of Information Act Program.

c. EA activity: FAA Order JO 7610.4, Sensitive Procedures and Requirements for Special Operations.

d. Hijack situations: 1. FAA Order JO 7610.4, Sensitive Procedures and Requirements for Special Operations.

2. FAA Order JO 7110.65, Air Traffic Control.

e. Suspect Aircraft: FAA Order JO 7110.67, Air Traffic Management Security Services for Special Operations.

Supplemental Duties 18 − 4 − 2 2/20/25 JO 7210.3EE f. Special flight operations: FAA Order JO 7110.65, Chapter 9, Special Flights.

NOTE − In order to provide the maximum TM services, TM personnel should be utilized to perform non − TM functions only as a last resort.

18 − 4 − 5. DIVERSION RECOVERY a. A diversion is a flight that is required to land at other than its original destination for reasons beyond the control of the pilot/company, e.g., periods of significant weather. Diversion recovery is an initiative orchestrated by the ATCSCC and system users to minimize the impact of system disruption. Diversion recovery will be utilized during and after periods of significant weather or other phenomena that has adversely impacted the system resulting in flight diversions. The goal of the diversion recovery initiative is to ensure that flights which have already been penalized by having to divert to another airport, do not receive additional penalties or delays.

Flights identified for diversion recovery must receive priority handling over other flights from their point of departure.

b. Diversion flights are identified by having “DVRSN” in the Remarks section of the flight plan, or the user inputs the information into the Diversion Recovery Tool (DRT). The following protocols will be utilized in diversion recovery procedures: 1. A flight on the DRT, as listed in TBL 18 − 4 − 1 , is requesting priority. FAA facilities must ensure the auto − detect feature is not activated on their DRT. FAA facilities must view the “general aviation” and “comments” columns when utilizing the DRT.

2. “High” priority indicates the user’s preference within one company.

3. “Yes” priority indicates that special handling is requested for the flight.

4. The user submitted preferred priorities may be modified where necessary to maintain the efficiency of the system.

c. The ATCSCC must: 1. Implement diversion recovery.

2. Transmit an advisory to inform both field facilities and users that a diversion recovery initiative has been implemented and the DRT has been activated.

3. Adjust the initiative as necessary to meet changing conditions.

4. Transmit an advisory when the DRT has been deactivated.

d. The ARTCCs must: 1. Implement diversion recovery as directed by the ATCSCC.

2. Notify the ATCSCC if they do not intend to use the DRT. In such cases, the ATCSCC must send the Center a general message with the information as stated in TBL 18 − 4 − 1 , every 60 minutes until diversion recovery is no longer in effect.

3. Provide expeditious handling in returning to the system those flights identified by the ATCSCC/DRT as diversion flights.

4. Forward user diversion recovery requests to towers and TRACONs. (See TBL 18 − 4 − 1 ).

NOTE − DVRSN will be placed in the remarks section of the flight plan by the user.

e. Towers and TRACONs must: 1. Provide expeditious handling in returning to the system those flights identified by the ARTCC/DRT as diversion flights.

Supplemental Duties 18 − 4 − 3 3/15/07 7110.65R CHG 2 JO 7210.3EE CHG 3 7/9/26 JO 7210.3EE 2/20/25 2. Notify the overlying ARTCC TMU if they will utilize the DRT.

TBL 18 − 4 − 1 User Recovery Priority Request Format The following flights are requesting priority handling to their original destination. Please advise the appropriate FAA facilities of this request.

ACID Diverted ETD CTD DEST DCNTR ACNTR PRIORITY COMMENTS To ZZZ111 MDW 2210Z − ORD ZAU ZAU − − ZZZ222 PIT 2200Z − ORD ZOB ZAU HIGH − ZZZ555 ATL 2300Z 2320Z IAD ZTL ZDC − − Note: *ETD=Proposed Wheels − up Time.

18 − 4 − 6. VOLCANIC ASH a. Upon receipt of a validated report of volcanic activity and/or ash cloud movement, the ARTCC TMU whose geographic area of responsibility is impacted by such activity must: 1. Assess areas of potential or actual ash cloud location.

2. Notify the ATCSCC and the other facilities in their area of jurisdiction that may be affected. Provide as much information as possible, including PIREPS and other pertinent information that has been received.

b. Upon receipt of a Volcanic Ash Advisory (VAA), Volcanic Ash SIGMET, or ARTCC notification, the ATCSCC must: 1. Retransmit the VAA received from the Washington or Anchorage VAACs to air traffic control facilities and stakeholders via a numbered ATCSCC advisory. The VAA will also be displayed on the ATCSCC website in the advisories database.

2. Conduct, as needed, conference calls to assess constraints and TMIs associated with the volcanic ash.

NOTE − The FAA does not have the capability to predict or depict volcano eruptions or ash cloud density and movements. It is not the responsibility of the FAA to provide separation between aircraft and volcanic activity or ash clouds.

18 − 4 − 7. SPACE LAUNCH OR REENTRY MISHAPS a. A debris-generating space launch or reentry vehicle mishap is an emergency situation in the NAS. All efforts should be made to safely mitigate aircraft exposure to falling debris.

b. Upon notification of a debris-generating space launch or reentry vehicle mishap, or the activation of a debris response area (DRA), the ARTCC/Terminal TMU whose geographic area of responsibility is impacted must, to the extent possible, take actions to help mitigate aircraft exposure to falling debris.

c. The facility must ensure participation in hotlines hosted by ATO Space Operations (AJR − 1800) for tactical space operations with potential impact to their airspace. The roles and responsibilities must be defined in a facility directive.

REFERENCE − FAA Order JO 7210.3, Para 4 − 3 − 6 , Space LOAs.

FAA Order JO 7400.2, Para 31–3–1, Responsibilities, Subpara b.

d. Facility reporting for mishaps should include playback data (CDR, FALCON, NVR, etc.) covering the affected area/airspace during the period when debris was reported falling.

REFERENCE − FAA Order JO 7110.65, Para 10–5–2 Debris-Generating Space Launch or Reentry Vehicle Mishaps.

FAA Order JO 7210.632 Air Traffic Organization Occurrence Reporting, Appendix A.

Supplemental Duties 18 − 4 − 4

Section 5. Coordination

7/9/26 JO 7210.3EE CHG 3 JO 7210.3EE 2/20/25

Section 5. Coordination

18 − 5 − 1. COORDINATION Coordinate through verbal and automated methods. At times, it may be required to utilize both methods to ensure complete communication and situational awareness.

18 − 5 − 2. COMMUNICATION When time permits, utilize communication techniques that emphasize collaboration and consensus decision-making. Use tools that provide for common situational awareness to the extent possible.

18 − 5 − 3. DOCUMENTATION The National Traffic Management Log (NTML) is utilized to record TM activities in the facility. It does not replace the facility log; however it may be utilized as the facility log when documented in a facility directive.

Facilities with the NTML are required to make data entries. At non-NTML facilities, the first facility overlying the non-NTML facility is responsible for entering the NTML entries. This enables all facilities to be knowledgeable of conditions throughout the NAS.

18 − 5 − 4. RESPONSIBILITIES a. All facilities must: 1. Communicate and coordinate: (a) Events that have an adverse impact on the NAS.

(b) TBM operations.

(c) Traffic management initiatives (TMI).

2. Use the NTML to document events, TBM operations, and traffic management initiatives (TMI).

b. The ATCSCC must: 1. Provide an FAA ATCSCC data entry web page for facilities identified in TBL 18 − 5 − 1 , Aviation System Performance Metrics Airport Traffic Control Towers.

2. Transmit these data to other FAA offices for analysis.

3. Provide the NTML to all ARTCC TMUs and designated terminals.

4. Communicate directly with facility and service area representatives for a critique of operations and future plans for TM.

5. Coordinate directly with service area representatives on plans, procedures, and operations that affect interfacility traffic flows.

6. Consult with weather information providers to ensure the receipt of timely weather forecasts (including the collaborative convective forecast), observed terminal weather sequences, and any weather data that may have a significant impact on the NAS.

7. Coordinate with the TMUs in the day-to-day operations of the NAS and resolve operational TM disagreements between facilities.

8. Conference affected ARTCC TMUs as needed when contacted by a terminal facility.

9. Initiate telecons and Hotlines with customers and facilities, as necessary, to obtain input and to provide operational information, as well as other significant events affecting the NAS.

Coordination 18 − 5 − 1 3/15/07 7110.65R CHG 2 JO 7210.3EE CHG 3 7/9/26 JO 7210.3EE 2/20/25 10. Subscribe to the NTML entries pertinent to its position of operation.

11. Indicate the implementation or termination of extended flight plan drop times, when notified by field facilities, via numbered ATCSCC advisory.

c. ARTCC TMUs and designated terminals must: 1. Advise the ATCSCC of situations and conditions that may require implementation of TMIs or are of national interest including but not limited to: equipment, staffing, hurricane preparedness, forest fires, unexpected runway closure, outage, NAS capacity impacts, or status of TBM operations.

2. Present unresolved conflicts between adjacent TMUs to the ATCSCC for resolution.

3. Notify the ATCSCC if a significant change in capacity is expected or has occurred.

4. Be the contact for their underlying facilities about coordinating any TM issues, TBM operations, initiatives, programs, or information. Data received from underlying facilities must be forwarded to the ATCSCC in a timely manner.

5. Advise the ATCSCC if an operational Hotline is requested including: (a) Facility participation required.

(b) Requested customer participation and assist the ATCSCC in determining if the Hotline will be limited to “listen-only” customer capability.

(c) Other aviation/airport resources requested.

6. Advise the ATCSCC when extended flight plan drop times have been implemented or terminated.

d. Terminal facilities must: 1. Coordinate with the appropriate ARTCC TMU and ensure it is kept aware of situations and conditions that may require the implementation or adjustment of TM initiatives or change in status to TBM operations.

2. Report to the ARTCC TMU any significant change in capacity that is expected or has occurred.

3. Present TM conflicts to the ARTCC TMU.

4. Consult with the ATCSCC, the affected ARTCC TMU, terminals, and customer organizations about the development and implementation of procedures, when appropriate.

e. Terminal facilities listed in TBL 18 − 5 − 1 must: 1. Enter the runway configurations (specifying runway numbers) and their associated AAR and ADR using the NTML.

NOTE − Local procedures must be established to determine whether the tower or TRACON is responsible for these entries.

2. Enter the hourly arrival and departure counts starting at 0700 and ending at 2259 local using the ATCSCC-supplied web page.

NOTE − These counts must include IFR/VFR arrivals and departures that are fixed wing itinerants. Helicopter and local operations must not be included in the traffic count.

3. Investigate and resolve issues about their web page.

4. Forward suggestions for NTML improvement to the District TMO. The TMO will consult with the ATCSCC.

f. The information for subparagraph e above applies to any airport in a ground delay program.

g. Field facility specialists with the NTML must: 1. Enter sign on/off times and initials.

Coordination 18 − 5 − 2

Section 26. Weather Management

2/20/25 JO 7210.3EE

Section 26. Weather Management

18 − 26 − 1. GENERAL This section prescribes policy and responsibilities to ensure required weather products and services are provided in a timely manner.

18 − 26 − 2. BACKGROUND The FAA (AJR) maintains an Inter-Agency Agreement (IA) with the National Oceanic and Atmospheric Administration/National Weather Service (NWS) for the provision of meteorological services to FAA facilities and specifies assignment of NWS meteorologists to the ATCSCC and to each ARTCC. The meteorologists provide ATC operational personnel advised of weather conditions that may be hazardous to aviation or impede the flow of air traffic in the NAS sixteen hours a day/seven days a week. Specific duties of the meteorologists are outlined below in paragraph 18 − 26 − 4 for FAA personnel awareness. Additional details can be found in the IA Statement of Work (SOW) and NWS Instruction 10-803, Support to Air Traffic Control Facilities.

18 − 26 − 3. POLICY Facility managers will designate an operational ATC representative to serve as the Weather Coordinator (WC).

The WC position is required for all shifts and is the primary interface between the NWS meteorologist and the facilities air traffic staff. The WC position is located in the TMU of each ARTCC. This position is a 24 hour position and can be combined with the OMIC when there are no TMU personnel present. All personnel assigned to this function must receive training for the associated responsibilities. If weather conditions warrant and workload permits, the WC may perform other operational or administrative functions.

18 − 26 − 4. RESPONSIBILITIES a. Facility Managers must: 1. Have operational responsibility for the NWS meteorologists although responsibility for day to day activities can be delegated to the TMO. For example, if weather conditions warrant that the CWSU staff needed to be continued beyond the typical 16 hour day, the TMO could approve this.

2. Work with the local NWS Meteorologist-in-Charge (MIC) to ensure local orders and procedures define the NWS support expected and that compliance in the provision of the support is attained.

3. Ensure NWS meteorologists receive facility and air traffic control system familiarization training, as appropriate.

4. Forward any unresolved issues with NWS support to the appropriate Service Area and the FAA COTR for the IA.

5. Maintain a copy of the current IA and SOW.

b. The Weather Coordinator must: 1. Disseminate inter/intrafacility SIGMETs, AIRMETs (except over CONUS), CWAs, urgent PIREPs (UUA), and routine PIREPs (UA).

2. Provide assistance in the collection and dissemination of other significant weather information. WC priority of duties and responsibilities include: (a) Inter/intrafacility dissemination of SIGMETs.

(b) Dissemination of CWAs within the ARTCC.

Weather Management 18 − 26 − 1 3/15/07 7110.65R CHG 2 JO 7210.3EE CHG 3 7/9/26 JO 7210.3EE 2/20/25 (c) Dissemination of urgent PIREPs within the ARTCC.

(d) Dissemination of CWAs to other facilities.

(e) Dissemination of AIRMETs within the ARTCC.

(f) Inter/intrafacility dissemination of Meteorological Impact Statements as required.

(g) Dissemination of other weather intelligence within the ARTCC as specified by local requirements.

(h) Receipt and handling of requests for PIREP/SIGMET / AIRMET/CWAs and other pertinent weather information.

(i) Notify Enroute Watch Supervision when barometric pressure within an ARTCC area of jurisdiction is greater than, or forecast to be greater than, 31.00 inches mercury (31” Hg).

c. NWS meteorologists’ duties include: 1. Provide meteorological advice and consultation to ARTCC operational personnel and other designated FAA air traffic facilities, terminal, and FSS, within the ARTCC area of responsibility.

2. Provide scheduled and unscheduled briefings and products as needed per the IA SOW, NWS Instruction 10-803, and the operational direction of the Facility Manager. Examples include: (a) Scheduled Briefings generally consist of forecast weather conditions pertinent to the ARTCC area during a specified period, plus an extended outlook. These briefings are scheduled and provided as required by the facility manager.

(b) Unscheduled products include the Meteorological Impact Statement (MIS) which is an unscheduled planning forecast describing conditions expected to begin within 4 to 12 hours which will, in the forecaster’s judgment, impact the flow of air traffic within the ARTCC’s area of responsibility and the Center Weather Advisory (CWA) which is an unscheduled air traffic and aircrew advisory statement for conditions currently in existence or beginning within the next 2 (two) hours.

3. The MIC will work with the Facility Manager to ensure local orders and procedures define the NWS support expected, to include operating hours. The MIC will also ensure back-up support plans are in place when and if the meteorologists at the center are not available.

Weather Management 18 − 26 − 2 7/9/26 JO 7210.3EE CHG 3 JO 7210.3EE 2/20/25 20 − 3 − 6. RESPONSIBILITIES a. All FAA personnel approving or issuing TFRs must ensure that restrictions meet regulatory criteria and are issued in accordance with FAA directives.

b. The ATO Director of System Operations Security (or designee) must: 1. Review and, if warranted, approve TFRs issued for law enforcement activities in accordance with the provisions of 14 CFR section 91.137.

2. Act as the operational representative for media concerns regarding active 14 CFR 91.137 TFRs.

c. ATO service area director (or designee) must: 1. Review all flight restrictions in their jurisdiction issued in accordance with 14 CFR 91.137 for compliance with regulations, directives, and policy (e.g., correct format, valid criteria).

2. Coordinate with affected air traffic facilities, event personnel, and local authorities when applicable.

3. Coordinate with the Domestic Events Network (DEN) air traffic security coordinator (ATSC) when hijacking situations are involved.

d. ARTCC/CCF/HCF air traffic managers (or designee) having jurisdiction over the area concerned must: 1. Accept requests for and, if warranted, establish TFRs in accordance with the provisions of 14 CFR sections 91.137(a)(1) and 91.137(a)(2).

2. Contact the System Operations Support Center (SOSC) at (202) 267 − 8276 to obtain approval for TFRs requested for law enforcement activities.

3. Inform all affected facilities of the TFR; including location, altitude, and effective times.

4. Coordinate with SUA using agencies when a TFR may impact SUA activities.

5. Notify the Regional Operations Center when a 91.137(a)(1) TFR has been issued. Ensure information is passed to Service Center Operations Support Group (OSG) and SOSC personnel.

6. Ensure IFR traffic is routed around the TFR, unless prior approval is obtained from the on-scene coordinator. No aircraft is authorized to enter a 14 CFR section 91.137(a)(1) TFR unless it is taking part in the relief activity.

7. Ensure the TFR is monitored for both IFR and VFR unauthorized traffic and a Mandatory Occurrence Report (MOR) is submitted for all TFR violators.

8. Maintain a chronological log of all TFR related actions on FAA Form 7230 − 4, Daily Record of Facility Operation Log, to include: (a) The name and the organization of the person requesting the TFR.

(b) A brief description of the situation.

(c) The estimated duration of the restrictions.

(d) The name of the agency responsible for on − scene emergency activities and the telephone or other communications contact.

(e) A description of the location of the affected area.

9. Act as, or designate, an ATC coordination facility. If assistance is required, the coordination facility must serve as a primary “communication facility” for communications between the emergency control authorities and affected aircraft.

10. Issue flight restrictions, NOTAM, and appropriate cancellation in a timely manner.

e. All air traffic facilities must: Temporary Flight Restrictions in the Vicinity of Disaster/Hazard Areas (14 CFR Section 20 − 3 − 3 91.137) 3/15/07 7110.65R CHG 2 JO 7210.3EE CHG 2 1/22/26 JO 7210.3EE 2/20/25 1. To the maximum extent possible, render assistance to the agency requesting the TFR.

2. Disseminate TFR information to all affected pilots in the area by all possible means.

3. Direct all media requests for information concerning TFRs to the FAA Office of Communications (AOC) through the Washington Operations Center at (202) 267 − 3333.

20 − 3 − 7. REVISIONS AND CANCELLATIONS a. When restrictions are necessary beyond the published termination date/time, the ARTCC must ensure that a revised NOTAM and an appropriate cancellation are issued.

b. When the ARTCC within whose area the restrictions are established receives information from the ATO service area or the agency that requested the restrictions that the restrictions are no longer required, the ARTCC must take action to cancel them. If the information is received by another facility, that facility must notify the ARTCC, which will take appropriate action.

c. When it is obvious that the restrictions are no longer required but a cancellation request has not been received, the ARTCC must take action to ascertain the status of the restrictions from the ATO service area or the agency that requested the restrictions, and if appropriate, cancel them.

Temporary Flight Restrictions in the Vicinity of Disaster/Hazard Areas (14 CFR Section 20 − 3 − 4 91.137)

Appendix 6. Space LOA Sample Templates

JO 7210.3EE 2/20/25 7/9/26 JO 7210.3EE CHG 3

Appendix 6. Space LOA Sample Templates

Instructions for Letter of Agreement Template: Launch and Reentry Operator [Name(s) of affected Air Traffic Control Facilities (Controlling Facility listed first)], ATO Space Operations, [Operator] Letter of Agreement Effective: Subject: Coordination of [Operator] Launch/Reentry Operations from [name and location of Launch and (if applicable) Reentry site] 1. Purpose: State the purpose of the Letters of Agreement (LOA), type of operation (launch, launch with reentry), and location of operation (name and location of launch and (if applicable) Reentry site). If LOA is for a one-time operation, state that.

Sample text: This Letters of Agreement (LOA) provides procedures for the integration and appropriate coordination of [licensed/permitted] [ Vehicle Type: horizontal/vertical] [launch/launch with reentry/hover-test] operations into the National Airspace System (NAS) from [name and location of launch and (if applicable) Reentry site].

2. Cancellation: Include any previous LOA canceled by this one [Subject and Effective Date of LOA being canceled].

State agreement to review LOA annually.

Sample text: This LOA will remain in effect until canceled by any signatory entity and will be reviewed annually throughout the life of the [license/permit] or when modifications are made to the [license/permit].

3. Scope: List the pertinent ATC facilities, Operator, and any additional stakeholders, including ATO Space Operations, Federal Ranges, and military facilities as applicable. State distribution of the LOA. The distribution should include, at a minimum, all signatories and the Office of Commercial Space Transportation (AST).

Sample Text: This LOA is pertinent to [ATC facilities], [additional stakeholders], and [Operator]. It is to be distributed to all signatories and stakeholders].

4. Responsibilities: State the responsibilities of the Operator, Controlling Facility, and as needed, any other stakeholders and/or affected facilities.

a. Operator must fulfill requirements provided in the Sample Text for this section.

b. Controlling Facility must fulfill requirements provided in the Sample Text for this section and 1. Fill out the Points of Contact Table (Attachment B).

2. Fill out the Actions Timetable (Attachment C).

c. (As needed) Other stakeholders and affected facilities must: 1. Ensure appropriate personnel are aware of the provisions of this agreement.

Sample text for Operator : a. [Operator] must: 1. Ensure all Operator [and their designees] personnel operating within the scope of this agreement are knowledgeable of, understand, and comply with the provisions of this agreement.

2. Establish, make available, and be prepared to execute approved contingency plan(s).

Space LOA Sample Templates Appendix 6 − 1 JO 7210.3EE 2/20/25 3/15/07 7110.65R CHG 2 JO 7210.3EE CHG 3 7/9/26 a) Unless an established contingency plan has been approved by all necessary parties, [Operator] must coordinate requirements and get approval from [Controlling Facility] for contingency plan(s) at least [XX] calendar days prior to each operation.

3. Follow the procedures in Section 5 and the Action Timetable (Attachment C) with regards to communications and notifications.

4. Notify the parties in the Points of Contact Table (Attachment B) immediately if scheduled operations are canceled.

5. (As needed) Develop separate agreements with foreign Air Navigation Service Providers when airspace coordination outside of the U.S. Flight Information Region is needed for the operation.

Sample text for Controlling Facility : b. [Controlling Facility] must: 1. Ensure all personnel responsible for providing air traffic service within the scope of this agreement are knowledgeable of, understand, and comply with the provisions of this agreement. This includes notification to other affected facilities.

2. Ensure appropriate [Controlling Facility] personnel are aware of and prepared to execute approved contingency plan(s).

3. Communicate with necessary facilities and ascertain their readiness to execute approved contingency plan(s).

4. Except when real time notifications of actual start of activity and end of activity times are provided to the facility via ATO Space Operations coordination, take appropriate actions to restrict airspace use during the effective times of the aircraft hazard area(s).

5. Take additional measures for public safety deemed necessary by 14 CFR parts 400 − 460.

Sample text as needed : c. (As needed) [Other stakeholders and affected facilities] must: 1. Ensure appropriate personnel are aware of the provisions of this agreement.

2. Ensure appropriate personnel are aware of and prepared to execute approved contingency plan(s).

d. Deviations from responsibilities and/or procedures established in this LOA must be coordinated prior to each operation, and responsibilities must be clearly defined in each case.

5. Procedures: Specify timeline and details for activities to take place prior to, during, and upon completion of operation.

Specify frequency of proposed operations and any limitations when considering dates and times of operations.

Include any restrictions on days of week and/or times of day operations that may or may not occur. Restrictions may include times when military operations require use of certain airspace. Specify procedure(s) for handling anomalies and emergencies. Information conveyed should include the location of event (latitude and longitude, represented as degree − minute − second) (when available), vehicle state, projected time the hazard will no longer be present, and any other pertinent details.

Sample text : a. [Operator] must: 1. Provide a Launch/Reentry Forecast Package to the parties specified in the Points of Contact Table (Attachment B), except Central Altitude Reservation Function (CARF), at least once every [XX] months. These forecasts will include a best estimate of all anticipated launches for the upcoming [XX] months.

2. Provide [Controlling Facility] a pre-planning package a minimum of [XX] calendar days prior to the planned operation. At a minimum, the package should include: a) The launch/reentry window.

b) The best estimate of the geographic definition of the hazard area(s) (latitude and longitude, represented as degree − minute − second) (when available) for the primary date and any back-up date(s).

c) (As needed) Any support aircraft’s type and call sign.

Appendix 6 − 2 Space LOA Sample Templates JO 7210.3EE 2/20/25 7/9/26 JO 7210.3EE CHG 3 3. (As needed) Submit Altitude Reservation (ALTRV) request(s) to CARF (and email a copy of the request to the [Controlling Facility]) a minimum of [XX] days prior to the planned operation.

4. Verify the issuance of the appropriate NOTAMs.

5. No less than [XX] minutes in advance of a planned operation, notification will be given by [Operator] to [Controlling Facility] of intent for the [launch/hover-test] to take place.

6. During the operation, a [Operator] representative must participate on an FAA Hotline teleconference with [Controlling Facility] and ATO Space Operations (see Actions Timetable, Attachment C, for phone number).

Communication on the FAA Hotline teleconference must be established no less than [XX] minutes prior to planned operation.

a) The [Operator] representative must be able to provide real-time verbal indications of the status of the operation, its progress along the launch/reentry trajectory, and occurrence of significant events.

b) Participation by representative(s) from [other stakeholders and affected facilities] is advised.

7. Notify [Controlling Facility] upon completion of the operation.

8. (As needed) Contact CARF and request that the appropriate ALTRVs be canceled.

9. In the event of an anomaly, a [Operator] representative must immediately notify [Controlling Facility], via FAA Hotline teleconference, of the occurrence of the anomaly. Information communicated should include, at a minimum: a) The last known state of the vehicle.

b) The location of the off-nominal event (latitude and longitude, represented as degree − minute − second) (when available).

c) The predicted location(s) impacted (latitude and longitude, represented as degree − minute − second) (when available).

d) Projected time the hazard(s) will no longer be present (when known).

e) Other information that will provide estimated positions of hazards.

10. In the event of an emergency, [Operator] must immediately contact [Controlling Facility], via FAA Hotline teleconference and email all the parties listed in the Points of Contact Table (Attachment B). Information conveyed should include, at a minimum: a) The last known state of the vehicle.

b) The location of the event (latitude and longitude, represented as degree − minute − second) (when available).

c) The predicted location(s) impacted (latitude and longitude, represented as degree − minute − second) (when available).

d) Projected time the hazard(s) will no longer be present (when known).

e) Other information that will provide estimated positions of hazards.

b. [Controlling Facility]: 1. Upon notification of a completed operation, [Controlling Facility] must cancel appropriate airspace restrictions and/or NOTAMs.

2. In the event when [Controlling Facility] becomes aware of a condition that would make the launch/reentry unsafe, [Controlling Facility] must immediately contact, via FAA Hotline, [Operator] and all other parties listed in the Points of Contact Table (Attachment B).

6. Attachments a. Signatures b. Points of Contact Table c. Actions Timetable d. Only include graphics that are applicable to this scenario: Space LOA Sample Templates Appendix 6 − 3 JO 7210.3EE 2/20/25 3/15/07 7110.65R CHG 2 JO 7210.3EE CHG 3 7/9/26  Launch/Reentry Site Description/Map  Aircraft Hazard Area Description/Map  Temporary Flight Restriction Description/Map  Air Traffic Control Assigned Airspace Description/Map e. Commercial Launch/Reentry Site LOA Appendix 6 − 4 Space LOA Sample Templates JO 7210.3EE 2/20/25 7/9/26 JO 7210.3EE CHG 3 Attachment A: Signatures ______________________ ______________________ [Controlling Facility] [Operator] ______________________ [ATO Space Operations] ______________________ [as appropriate, other stakeholders, including Federal Ranges and military facilities] Space LOA Sample Templates Appendix 6 − 5 JO 7210.3EE 2/20/25 3/15/07 7110.65R CHG 2 JO 7210.3EE CHG 3 7/9/26 Attachment B: Points of Contact Table The following table should be completed by the [Controlling Facility] and the information should be verified prior to every operation.

Office Phone # Email Responsibility [Operator] [Controlling Facility] Supervisor in Charge [Controlling Facility] Traffic Management Unit ATO Space Operations Central Altitude Reservation Function (CARF) National Traffic Management Office (NTMO) Attachment C: Actions Timetable The following table should be completed by [Controlling Facility]. In coordination with the [Controlling Facility], [Operator] must ensure that the following actions are completed at the defined intervals.

Date Time Event Remarks Completed T – [XX] months Operator should provide best estimate Submit Launch/reentry Suggestion: of all known launch/reentry dates for Forecast Package upcoming six months.

T – 6 months T – [XX] calendar days Coordinate Operator should coordinate with ATO Suggestion: launch/reentry Space Operations and as appropriate, corridor/hazard area(s) other affected facilities.

T – 30 – 60 calendar days T – [XX] calendar Operator should provide a description days Submit Pre-Planning of the Aircraft Hazard Area(s), along Suggestion: Package with date(s) and time(s) for T – 10 calendar launch/reentry.

days Appendix 6 − 6 Space LOA Sample Templates JO 7210.3EE 2/20/25 7/9/26 JO 7210.3EE CHG 3 Date Time Event Remarks Completed Operator is responsible for coordinating all necessary ALTRV T – [XX] calendar requests. Requests should be File an Altitude days submitted via email to Reservation (ALTRV) ___________@FAA.gov A copy of the Suggestion: request with CARF (as request should also be emailed to T – 5 − 14 calendar needed) [Controlling Facility].

days Contact: Operator should contact [Controlling Facility] for issuance of TFR(s) and Verify issuance of NOTAM(s) (as needed).

appropriate airspace T – [XX] hours notices (NOTAMs and Per 14 CFR § 91.143, TFRs need to be TFRs) issued at least ___ hours in advance of the scheduled operation.

T – [XX] hours Operator contacts [Controlling and repeat again Facility] via [telephone/email] and at Provide operational provides operational status report, T – [XX] hours status report which includes confirmation of intent Suggestion: T – 24 and specifics of operation.

hours and 3 hours [FAA Hotline telephone #] The operation will be delayed or terminated if the Operator does not T – [XX] minutes Establish Hotline establish communications via FAA Suggestion: connection Hotline teleconference.

T – 60 − 30 minutes Operator must have a representative on the FAA Hotline teleconference until the operation is complete.

Operator provides operational status report. This report includes T – [XX] minutes confirmation that the operation will Provide operational take place as scheduled.

Suggestion: T – 30 status report minutes As necessary, Operator should continue to communicate any significant operational changes.

Space LOA Sample Templates Appendix 6 − 7 JO 7210.3EE 2/20/25 3/15/07 7110.65R CHG 2 JO 7210.3EE CHG 3 7/9/26 Date Time Event Remarks Completed T – [XX] minutes and repeat at T – Receive final clearance Operator must receive clearance or [XX] minutes or confirmation of confirmation of continued approved Suggestion: T – 10 continued approved mission status from [Controlling minutes and T – 5 mission status Facility] to proceed with operation.

minutes Maintain real-time Operator must provide real-time During operation communication via FAA verbal indications on the status of the Hotline teleconference vehicle.

Notify ATC and CARF ATC must be notified when operation (if applicable) of is complete. TFR(s), ALTRV(s), and completion or any other necessary notices should be cancellation of operation canceled as soon as practicable.

Post-operation or mission A debrief should occur ideally within cancellation __ hours, but no later than __ hours of Schedule post-operation the completion of the operation. A debrief debrief should be conducted even if no off − nominal activity occurred.

Appendix 6 − 8 Space LOA Sample Templates JO 7210.3EE 2/20/25 7/9/26 JO 7210.3EE CHG 3 Instructions for Letter of Agreement Template: Launch and Reentry Site Letter of Agreement Effective: Subject: Operations at [Name and location of Launch and Reentry Site] 1. Purpose: State the purpose of the Letters of Agreement (LOA), type(s) of anticipated operation ( if launch: [horizontal/vertical]) [launch/reentry], frequency of proposed operation(s) (if known), and name and location of Launch and Reentry Site.

Sample text: This LOA establishes a framework for the coordination and planning of procedures for [licensed/permitted] ( if launch: [horizontal/vertical]) [launch/reentry] operations into the National Airspace System from [name and location of Launch and Reentry Site].

2. Cancellation: Include any previous LOA canceled by this one [Subject and Effective Date of LOA being canceled]. State agreement to review LOA annually.

Sample text: This LOA will remain in effect until canceled by any signatory entity and will be reviewed annually throughout the life of the license or when modifications are made to the license.

3. Scope: List the affected ATC facilities; Launch/Reentry Site Operator; and any additional stakeholders, including ATO Space Operations, Federal Ranges, and military facilities, as applicable.

State that this LOA does not guarantee the approval of operations from the Launch and Reentry Site. Once a Vehicle Operator has been identified and its operations approved, responsibilities and procedures will be outlined in a separate letter of agreement with each Vehicle Operator.

State that this LOA does not confer any proprietary, property, or exclusive right in the use of airspace or outer space referenced in Code of Federal Regulation (CFR) 420.41.

State distribution of the LOA. The distribution should include, at a minimum, all signatories.

Sample text: This LOA is pertinent to [ATC facilities and stakeholders; including ATO Space Operations] and [Launch/Reentry Site Operator]. It does not guarantee the approval of operations from the Launch/Reentry Site.

Once a Vehicle Operator has been identified and its operations approved, responsibilities and procedures will be outlined in a separate LOA with each Vehicle Operator.

This LOA does not confer any proprietary, property, or exclusive right in the use of airspace or outer space referenced in Code of Federal Regulation (CFR) 420.41.

This LOA is to be distributed to the signatories, additional stakeholders, and the Office of Commercial Space Transportation (AST).

4. Responsibilities: State the responsibilities of the Site Operator, Controlling Facility, and as needed, any other stakeholders and/or affected facilities. All parties named within this letter of agreement will work collaboratively to develop the following: a. Procedures for notification and scheduling of operations, to include procedures for the issuance of Notices to Airmen, Altitude Reservations and Special Activity Airspace access.

b. Plans for communication between the operator and the FAA as necessary, before, during, and after a scheduled operation.

Space LOA Sample Templates Appendix 6 − 9 JO 7210.3EE 2/20/25 3/15/07 7110.65R CHG 2 JO 7210.3EE CHG 3 7/9/26 [Name(s) of affected Air Traffic Control Facilities (Controlling Facility listed first)], ATO Space Operations, [Launch and Reentry Site Operator] c. Plans and procedures for cancellations, contingencies, and emergencies.

d. Plans and procedures for any other measures deemed necessary by the FAA to ensure public health and safety.

Sample text: a. [Launch/Reentry Site Operator] is responsible for the management, operation, and maintenance of the Launch/Reentry Site. This includes the coordination with users of its facility and the responsibility for ensuring all necessary information regarding operations is provided to the appropriate ATC facilities.

b. The FAA is responsible for the safe, orderly, and expeditious flow of known air traffic under its control. It is also responsible for the dissemination of pertinent information to the aviation community.

c. All parties named in this LOA will work collaboratively to develop procedures and other such measures deemed necessary to protect public health and safety.

5. Attachments State the responsibilities of the Site Operator, Controlling Facility, and as needed, any other stakeholders and/or affected facilities. All parties named within this letter of agreement will work collaboratively to develop the following: A. Signatures B. Points of Contact Table C. Graphics/Maps  Physical Site Description/Map  Airspace Description/Map(s) Appendix 6 − 10 Space LOA Sample Templates JO 7210.3EE 2/20/25 7/9/26 JO 7210.3EE CHG 3 [Name(s) of affected Air Traffic Control Facilities (Controlling Facility listed first)], ATO Space Operations, [Launch and Reentry Site Operator] Attachment A: Signatures ______________________ ______________________ [Controlling Facility] [Launch/Reentry Site Operator] ______________________ [ATO Space Operations] ______________________ [As appropriate, other stakeholders, including Federal Ranges and military facilities.]

Space LOA Sample Templates Appendix 6 − 11 JO 7210.3EE 2/20/25 3/15/07 7110.65R CHG 2 JO 7210.3EE CHG 3 7/9/26 [Name(s) of affected Air Traffic Control Facilities (Controlling Facility listed first)], ATO Space Operations, [Launch and Reentry Site Operator] Attachment B: Points of Contact Table The following table should be completed by the [Controlling Facility] and the information should be verified prior to every operation.

Office Phone # Email Responsibility [Controlling Facility] Airspace and Procedures Office [Controlling Facility] Traffic Management Unit ATO Space Operations [Launch and Reentry Site Oper - ator] Appendix 6 − 12 Space LOA Sample Templates JO 7210.3EE 2/20/25 7/9/26 JO 7210.3EE CHG 3 Instructions for Letter of Agreement Template: Federal Range Letter of Agreement Effective: Subject: Operations at [Name of Federal Range] 1. Purpose: State the purpose of the Letters of Agreement (LOA), name of Federal range. Facilities and stakeholders included in LOA.

Sample text: This LOA establishes a framework for the coordination and planning of procedures for launch and reentry operations into the National Airspace System (NAS) from [name of Federal Range]. The following describes responsibilities and requirements for [list included facilities and stakeholders].

2. Cancellation: Include any previous LOA canceled by this one [Subject and Effective Date of LOA being canceled]. State agreement to review LOA annually.

Sample text: This agreement cancels the [Subject and effective date of LOA being canceled].

This LOA will remain in effect until canceled by any signatory entity and will be reviewed annually or when modifications are required.

3. Scope: List the affected ATC facilities; Federal Range site Operator; and any additional stakeholders, including ATO Space Operations, and military facilities, as applicable. State distribution of the LOA. The distribution should include, at a minimum, all signatories.

Sample text: This LOA is pertinent to [ATC facilities and stakeholders, including ATO Space Operations] and [Federal range].

It does not guarantee the approval of operations from the [Federal range] This LOA does not confer any proprietary, property, or exclusive right in the use of airspace or outer space referenced in Code of Federal Regulation (CFR) 420.41.

This LOA is to be distributed to the signatories, additional stakeholders, and the Office of Commercial Space Transportation (AST).

4. Responsibilities: State the responsibilities of the [Federal range], Controlling Facility, and as needed, any other stakeholders and/or affected facilities. All parties named within this letter of agreement will work collaboratively to develop the following: a. Procedures for notification and scheduling of operations, to include procedures for the issuance of Notices to Airmen, Altitude Reservations and Special Activity Airspace access.

b. Plans for communication between the [Federal range] and the FAA as necessary, before, during, and after a scheduled operation.

[Name(s) of affected Air Traffic Control Facilities (Controlling Facility listed first)], ATO Space Operations, [Launch and Reentry Site Operator] c. Plans and procedures for cancellations, contingencies, and emergencies.

d. Plans and procedures for any other measures deemed necessary by the FAA to ensure public health and safety.

Sample text: Space LOA Sample Templates Appendix 6 − 13 JO 7210.3EE 2/20/25 3/15/07 7110.65R CHG 2 JO 7210.3EE CHG 3 7/9/26 a. [Federal range] is responsible for the management, operation, and maintenance of all facilities and equipment at [Federal range]. This responsibility includes the coordination with users of its facility and the responsibility for ensuring all necessary information regarding operations is provided to the appropriate ATC facilities.

b. The FAA is responsible for the safe, orderly, and expeditious flow of known air traffic under its control. It is also responsible for the dissemination of pertinent information to the aviation community.

c. All parties named in this LOA will work collaboratively to develop procedures and other such measures deemed necessary to protect public health and safety.

5. Restrictions to Operations List any constraint to operations from Federal range.

Sample text: a. None; Or a. No launch or recovery operations between sunset and sunrise.

b. Launch vehicles limited to a max launch weight of 11,000,000 pounds.

6. Attachments Must include at a minimum A. and B. but not limited to.

A. Signatures B. Points of Contact Table (examples of additional attachments)  Physical Site Description/Map  Airspace Description/Map(s)  Launch/Reentry Site Description/Map  Aircraft Hazard Area Description/Map  Temporary Flight Restriction Description/Map  Air Traffic Control Assigned Airspace Description/Map  Action Timetable Appendix 6 − 14 Space LOA Sample Templates JO 7210.3EE 2/20/25 7/9/26 JO 7210.3EE CHG 3 [Name(s) of affected Air Traffic Control Facilities (Controlling Facility listed first)], ATO Space Operations, [Launch and Reentry Site Operator] Attachment A: Signatures ______________________ [Controlling Facility] ______________________ [Federal Range] ______________________ [ATO Space Operations] ______________________ [As appropriate, other stakeholders and military facilities.]

Space LOA Sample Templates Appendix 6 − 15 JO 7210.3EE 2/20/25 3/15/07 7110.65R CHG 2 JO 7210.3EE CHG 3 7/9/26 [Name(s) of affected Air Traffic Control Facilities (Controlling Facility listed first)], ATO Space Operations, [Launch and Reentry Site Operator] Attachment B: Points of Contact Table example Office Phone # Email Responsibility [Operator] [Controlling Facility] Supervisor in Charge [Controlling Facility] Traffic Management Unit ATO Space Operations Central Altitude Reservation Function (CARF) National Traffic Management Office (NTMO) Appendix 6 − 16 Space LOA Sample Templates 7/9/26 JO 7210.3EE CHG 3

Index

[References are to page numbers] AIRBORNE CONTAMINATION, 5 − 3 − 1

A

Aircraft ABBREVIATIONS, 1 − 2 − 1 DOE, 5 − 3 − 1 Aerial Sampling/Surveying, 5 − 3 − 1 ACCIDENT/INCIDENT RECORDINGS, 4 − 8 − 1 Due Regard Operations, 5 − 3 − 1 ADAPTATION OF EXTERNAL ALTIMETER Weather Reconnaissance Flights, 5 − 3 − 2 SETTINGS, 8 − 2 − 1 Flight Inspection, 5 − 2 − 1 ADAPTED ALTIMETER SETTINGS, 8 − 2 − 1 High Altitude Inspections, 5 − 2 − 2 Identification Problems, 2 − 1 − 11 Administration of Facilities Identifying DOT/FAA, 5 − 2 − 1 ATS Continuity, 2 − 1 − 4 R & D Flight, 5 − 2 − 2 Authorization for Separation, 2 − 1 − 11 Checking Published Data, 2 − 1 − 3 AIRCRAFT CALL SIGNS USED FOR Duty Familiarization, 2 − 2 − 1 SENSITIVE GOVERNMENT FLIGHTS, Equipment Trouble, 2 − 2 − 7 5 − 4 − 6 Facility Directives Repository, 2 − 2 − 7 AIRCRAFT ORIENTATION PLOTTING FACILITY REQUIREMENTS, 2 − 1 − 1 BOARD, 16 − 1 − 1 FACILITY STANDARD OPERATING PROCEDURES (SOP), 2 − 1 − 1 Airport, Traffic Patterns, 2 − 1 − 15 Handling MANPADS Incidents, 2 − 1 − 8 Airport Arrival Rate (AAR), 10 − 7 − 1 Position Responsibilities, 2 − 2 − 1 Position/Sector Binders, 2 − 1 − 1 Airport Construction, 10 − 3 − 6 Reference Files, 2 − 1 − 2 Change in Runway Length, 10 − 3 − 6 Release of Information, 2 − 1 − 2 Airport Emergency Plans, 2 − 1 − 9 Sign In/Out and On/Off Procedures, 2 − 2 − 4 VSCS Equipment, 2 − 2 − 7 Airport Lighting, 10 − 6 − 1 ADS − B OUT OFF OPERATIONS, 5 − 4 − 6 AIRPORTS, SUSPICIOUS ACTIVITIES, 2 − 7 − 1 ADS − B TRANSMITTERS, REPORTING Altimeter Requirements, 2 − 10 − 1 INOPERATIVE OR MALFUNCTIONING Altimeter Setting to ARTCC, 2 − 10 − 3 ADS − B TRANSMITTERS , 2 − 1 − 18 Altitude Assignments, S/VFR and VFR, 3 − 8 − 4 ADVANCE APPROACH INFORMATION, 6 − 4 − 1 , 10 − 3 − 2 ALTRV FLIGHT DATA PROCESSING, 8 − 1 − 1 ADVISORY SERVICE TO ARRIVING VFR AMPLITRON OR PARAMETRIC AMPLIFIER FLIGHTS, 10 − 4 − 5 FAILURE, 7 − 2 − 1 AERIAL SAMPLING/SURVEYING, 5 − 3 − 1 Appearance, 2 − 7 − 1 AERONAUTICAL ADVISORY STATIONS Approach Control Airspace, 2 − 1 − 11 (UNICOM/MULTICOM), 3 − 2 − 2 Approach Light Systems, 10 − 6 − 2 Air Traffic Control Assigned Airspace (ATCAA), APPROACH RUNWAY VERIFICATION (ARV), 2 − 1 − 16 12 − 6 − 3 AIR TRAFFIC FACILITY RESPONSIBILITIES, APPROACHES TO PARALLEL RUNWAYS, 21 − 2 − 3 10 − 3 − 8 AIR TRAFFIC PROCEDURES BULLETIN, AREAS OF NONVISIBILITY, 10 − 1 − 2 2 − 2 − 5 Air Traffic Security Coordinator (ATSC), 21 − 3 − 1 ARFF, 2 − 1 − 9 Air Traffic Tactical Operations Programs, 18 − 2 − 1 ARTCC to ARTCC Coordination Index I − 1 JO 7210.3EE CHG 3 7/9/26 [References are to page numbers] Procedures, 18 − 8 − 3 CALCULATING AARs, 10 − 7 − 1 Responsibilities, 18 − 8 − 3 Capping and Tunneling, 18 − 7 − 5 ARTCC to ARTCC FEA/FCA Coordination, CATEGORIES OF OPERATIONS, 9 − 1 − 1 18 − 8 − 3 CHANGES TO MTR AND MOA PUBLISHED ARV. See APPROACH RUNWAY ACTIVITY SCHEDULES, 6 − 3 − 3 VERIFICATION (ARV) CHARTS ASDE PERFORMANCE CHECKS, 10 − 5 − 4 Disposition of Obsolete, 2 − 1 − 16 EOVM, 3 − 8 − 5 ASR PERFORMANCE CHECKS, 10 − 5 − 2 Minimum Vectoring Altitude, 3 − 8 − 1 ATC SURVEILLANCE SOURCE USE, 3 − 6 − 2 OTHER CHARTS, 10 − 1 − 2 SECTIONAL AERONAUTICAL CHARTS, ATIS, 10 − 4 − 1 10 − 1 − 2 ATOP, 6 − 7 − 1 TERMINAL AREA CHARTS, 10 − 1 − 2 ATOP Channel Changeovers, 6 − 7 − 2 CIC DESIGNATION AT FCT-OPERATED ATPB. See AIR TRAFFIC PROCEDURES FACILITIES, 11 − 3 − 1 BULLETIN CLARIFICATIONS, TO THIS ORDER, 1 − 1 − 2 ATSC. See Air Traffic Security Coordinator CLASS B AIRSPACE, 12 − 1 − 3 AUDIO DATA RETENTION, 3 − 4 − 3 CLASS C AIRSPACE, 12 − 1 − 3 AUTHORIZED MESSAGES NOT DIRECTLY Classified Operations, 21 − 4 − 2 ASSOCIATED WITH AIR TRAFFIC CLEANING INSTRUMENT COVERS, 3 − 1 − 2 SERVICES, 3 − 2 − 1 Color Displays − Terminal, Color Use on ATC Automated Position Sign On/Off, 4 − 6 − 5 Displays, 3 − 9 − 1 AUTOMATED WEATHER DISPLAY STATUS, Combine/Recombine an ATCT/TRACON, 2 − 1 − 16 8 − 3 − 1 Communications, 3 − 3 − 1 AUTOMATIC ACQUISITION/TERMINATION Battery − powered Transceivers, 3 − 3 − 2 AREAS, 12 − 6 − 2 CIRNOT Handling, 2 − 2 − 5 AUTOMATION PROGRAM CHANGES, 12 − 6 − 2 Emergency Frequencies, 3 − 3 − 1 Facility Status Report, 3 − 3 − 2 GENOT Handling, 2 − 2 − 5

B

Monitoring Frequencies, 3 − 3 − 1 Telephone, 3 − 3 − 1 BACKUP/AUGMENTATION OF WEATHER Testing ELT, 3 − 3 − 2 OBSERVATIONS, 2 − 9 − 1 Use of Communications, 3 − 2 − 1 FBI Use, 3 − 2 − 1 Bird Hazards, 2 − 1 − 12 VSCS Frequency Backup, 3 − 3 − 3 Blood Donors, 2 − 8 − 2 VSCS Reconfigurations, 3 − 3 − 3 Bomb Threats, 2 − 1 − 7 VTABS, 3 − 3 − 3 Comparison Checks, 2 − 10 − 2 Briefing, Air Traffic Procedures Bulletin, 2 − 2 − 5 COMPUTER DATA RETENTION, 8 − 1 − 2 Briefings, Order Changes, 2 − 2 − 6 Conferences Coordination of Procedures, 4 − 2 − 2 Local, 4 − 2 − 1

C

Published Items, 4 − 2 − 2 C − UAS, 2 − 1 − 20 CONFLICT ALERT FUNCTION PARAMETERS, CA, 12 − 6 − 2 8 − 2 − 1 I − 2 Index 7/9/26 JO 7210.3EE CHG 3 [References are to page numbers] Continuity of Operations and Continuation of DISSEMINATION OF WEATHER Government (COOP/COG), 21 − 4 − 2 INFORMATION, 10 − 3 − 1 Domestic Events Network (DEN), 21 − 4 − 1 CONTROLLER PILOT DATA LINK COMMUNICATIONS (CPDLC), 6 − 10 − 1 DRONEZONE, 19 − 6 − 1 COOP/COG. See Continuity of Operations and Continuation of Government

E

Coordination Communication and Documentation, 21 − 5 − 1 , E − MSAW ADAPTATION, 8 − 2 − 2 21 − 6 − 1 EAM. See EMERGENCY ALTITUDE MAP Coordination, 21 − 5 − 1 (EAM) Local, 4 − 2 − 1 EDST. See En Route Decision Support Tool Responsibilities, 21 − 5 − 1 , 21 − 6 − 1 (EDST) Correspondence ELECTRONIC ATTACK (EA), 7 − 2 − 1 Disposition of VAR, 4 − 5 − 2 Irregular Operation, 4 − 1 − 1 ELT Incident, 9 − 3 − 1 Letters of Procedures, 4 − 5 − 1 EMERGENCY ALTITUDE MAP (EAM), 3 − 8 − 6 Letters to Airmen, 4 − 5 − 1 Policy/Procedures, 4 − 1 − 1 En Route Preliminary Environmental Review, 4 − 1 − 1 Areas of Operation, 6 − 1 − 1 Service Area Review, 4 − 1 − 1 Areas of Specialization, 6 − 1 − 1 Standards, 4 − 1 − 1 Computer Interface, 6 − 5 − 1 Flight Progress Strip, Usage, 6 − 1 − 2 COUNTER UNMANNED AIRCRAFT General, 6 − 1 − 1 SYSTEMS (C − UAS), 2 − 1 − 20 Operating Position Designators, 6 − 1 − 2 Operations, 6 − 3 − 1 CPDLC. See CONTROLLER PILOT DATA LINK Sector Information Binders, 6 − 2 − 1 COMMUNICATIONS (CPDLC) Sectors, 6 − 1 − 1 CRITERIA FOR IFR AIRCRAFT HANDLED Configuration, 6 − 1 − 1 COUNT, 9 − 1 − 1 Services, 6 − 4 − 1 CWAs, 6 − 3 − 1 EN ROUTE CONTROLLER TEAM CONCEPT, 6 − 2 − 1 En Route Data

D

Deficiencies, 7 − 2 − 1 Performance, 7 − 1 − 1 DATA DISPLAY FOR BLOCK ALTITUDE En Route Data Communications, 6 − 10 − 1 FLIGHTS, 8 − 3 − 1 CONTROLLER PILOT DATA LINK COMMU - DATA RECORDING, 12 − 2 − 1 NICATIONS (CPDLC), 6 − 10 − 1 DATA RETENTION, 12 − 2 − 1 En Route Decision Support Tool (EDST), 6 − 6 − 1 Computer Data Retention, 6 − 6 − 4 DEBRIS RESPONSE AREAS, DISPLAYING ON Outages, 6 − 6 − 3 THE SITUATION DISPLAY, 2 − 1 − 24 Responsibilities, Facility Manager, 6 − 6 − 1 DEFICIENCIES IN SYSTEM, 7 − 2 − 1 , 10 − 5 − 3 Responsibilities, Operations Manager − in − Charge, 6 − 6 − 1 DEN. See Domestic Events Network Responsibilities, Operations Supervisor − in − Density Altitude Broadcast, 2 − 10 − 3 Charge, 6 − 6 − 1 Restrictions Inventory and Evaluation, 6 − 6 − 3 Derelict Balloons/Objects, 19 − 5 − 1 Standard Use of Automated Flight Data Manage - DIGITAL MAP VERIFICATION, 8 − 3 − 1 , 12 − 6 − 4 ment, 6 − 6 − 2 Index I − 3 JO 7210.3EE CHG 3 7/9/26 [References are to page numbers] Traffic Counts and Delay Reporting, 6 − 6 − 4 Maintenance, 3 − 1 − 1 Transfer of Position Responsibility, 6 − 6 − 4 FACILITY SECURITY, 2 − 7 − 1 URET Airspace Configuration Elements, 6 − 6 − 2 Facility Statistical Data Waiver, Interim Altitude Requirements, 6 − 6 − 4 Amending and Reviewing Data, 13 − 5 − 1 En Route Information Display System, 6 − 9 − 1 General, 13 − 1 − 1 General, 6 − 9 − 1 Instrument Approach, 9 − 2 − 1 Itinerant Operations, 13 − 2 − 1 EN ROUTE SECTOR INFORMATION BINDER, Local Operations, 13 − 3 − 1 6 − 2 − 1 Operational Count, 9 − 1 − 1 Equipment Other Reports and Forms, 9 − 3 − 1 Frequencies, 16 − 2 − 1 Overflight Operations, 13 − 4 − 1 VOR AND VORTAC VOICE CHANNELS, Facility Statistical Data (Alaska Only) 16 − 2 − 1 Aircraft Contacted, 17 − 2 − 1 General, 16 − 1 − 1 Flight Plan Count, 17 − 3 − 1 AIRCRAFT ORIENTATION PLOTTING FSS Lists, Logs, and Tallies (OASIS), 17 − 6 − 1 BOARD, 16 − 1 − 1 General, 17 − 1 − 1 LEASED EQUIPMENT SUPPLIES, 16 − 1 − 1 Pilot Briefing Count, 17 − 4 − 1 EQUIVALENT LATERAL SPACING Reports and Information, 17 − 5 − 1 OPERATIONS (ELSO), 10 − 3 − 12 FALCON REPLAY SYSTEM, 2 − 1 − 25 ERAM HOLD INFORMATION FACILITY Familiarization/Currency Requirements, 2 − 3 − 1 DIRECTIVE REQUIREMENTS, 8 − 2 − 3 FAULT LOG, 12 − 2 − 2 ERAM HOLDING PATTERN ADAPTATION , FDR. See Facility Directives Repository 8 − 2 − 3 FEA/FCA PROCEDURES, 18 − 8 − 2 ERAM MASTER TOOLBAR MAP BUTTON FEA/FCA RESPONSIBILITIES, 18 − 8 − 1 LABEL, 8 − 2 − 3 FEES, 4 − 8 − 1 ERAM SPECIAL ACTIVITY AIRSPACE (SAA) FLIGHT DATA UNIT, 6 − 3 − 2 ADAPTATION , 8 − 2 − 3 Flight Inspection Activity Map, 5 − 2 − 2 ERIDS, 6 − 9 − 1 FLIGHT PLAN DROP INTERVAL, 8 − 1 − 2 Establishing Diverse Vector Area, 3 − 8 − 7 FLIGHT PROGRESS STRIP USAGE, 10 − 1 − 5 Explosives Detection, 2 − 1 − 10 Flight Request Aerobatic Practice, 5 − 4 − 5 Certifying Record Attempts, 5 − 4 − 4 Crop Duster/Antique, 5 − 4 − 4

F

Deviation, 5 − 4 − 1 Flight Test, 5 − 4 − 4 FAA FACILITIES, SUSPICIOUS ACTIVITIES, 2 − 7 − 1 Photogrammetric Flights, 5 − 4 − 5 Sanctioned Speed, 5 − 4 − 4 Facility Flight Requests, Deviation from ADS − B Out Identification, 2 − 1 − 15 Requirements, 5 − 4 − 2 Visitors, 2 − 7 − 2 Flight Service Operations FACILITY COMPLEMENTS, 2 − 5 − 2 General, 14 − 1 − 1 Facility Directives Repository (FDR), 2 − 2 − 7 Operations, 14 − 3 − 1 Positions/Services, 14 − 2 − 1 Facility Equipment Services, 14 − 4 − 1 Basic, 3 − 1 − 1 Flight Plan, Prefiled, 14 − 4 − 1 Color Displays − Terminal, 3 − 9 − 1 Generator Transfer Procedures, 3 − 1 − 2 Flight Service Station I − 4 Index 7/9/26 JO 7210.3EE CHG 3 [References are to page numbers] Operations INCOMPATIBLE LIGHT SYSTEM OPERATION, Landing Area, Status Check, 14 − 3 − 1 10 − 6 − 1 Liaison Visits, 14 − 3 − 1 Information, Law Enforcement, 2 − 2 − 6 REGULATORY NOTAMs FOR PRESIDEN - Intelligence Analysis and Communication, 21 − 4 − 2 TIAL TFR, SPECIAL SECURITY IN - INTERIM ALTITUDE FACILITY DIRECTIVE STRUCTIONS, OR EMERGENCY AIR REQUIREMENTS, 8 − 2 − 2 TRAFFIC RULES, 14 − 3 − 2 Tie − In NOTAM Responsibility, 14 − 3 − 1 INTERPRETATIONS, TO THIS ORDER, 1 − 1 − 2 Position/Service Information Binders, Position/ Services, 14 − 2 − 1

J

FOREIGN STATE DIPLOMATIC FLIGHTS, JOB REQUIREMENTS, 2 − 2 − 1 5 − 3 − 3 Forms 7210 − 8, 9 − 3 − 1 , 9 − 3 − 3

L

7230 − 10, 4 − 6 − 3 , 4 − 6 − 8 LADP, 10 − 1 − 6 7230 − 12, 9 − 2 − 1 , 9 − 2 − 2 LAND AND HOLD SHORT OPERATIONS 7230 − 13, 17 − 5 − 2 7230 − 14, 9 − 1 − 3 , 9 − 1 − 4 (LAHSO), 10 − 3 − 3 7230 − 16, 9 − 2 − 1 Law Enforcement, Cooperation with, 2 − 7 − 1 7230 − 4, 4 − 6 − 1 , 4 − 6 − 7 , 18 − 5 − 5 LAWRS Hours of Operation, 2 − 9 − 1 7233 − 1, 17 − 3 − 1 , 17 − 4 − 1 Legal Liabilities of Personnel, 2 − 2 − 1 7233 − 4, 17 − 3 − 1 , 17 − 4 − 1 7233 − 5, 17 − 4 − 1 LETTERS OF AGREEMENT, 4 − 3 − 1 Preparation, 4 − 6 − 1 Aircraft Call Signs, 4 − 4 − 1 APPROPRIATE SUBJECTS, 4 − 3 − 2 FUNCTIONAL USE OF CERTIFIED TOWER APPROVAL, 4 − 3 − 5 RADAR DISPLAYS, 10 − 5 − 1 AUTOMATED INFORMATION TRANSFER (AIT), 4 − 3 − 9 CANCELLATION, 4 − 3 − 7

G

DEVELOPING, 4 − 3 − 4 HOT AIR BALLOON LOAs FOR CLASS C Gate Hold Procedures, 10 − 4 − 5 AIRSPACE, 4 − 3 − 6 GO − AROUND, 10 − 3 − 8 Operations Under Exemptions, 4 − 4 − 1 PROCEDURAL, 1 − 1 − 3 REVIEW, 4 − 3 − 5 REVISIONS, 4 − 3 − 6

H

RSU, 4 − 4 − 1 HANDLING OF SIGMETs, CWAs, AND PIREPs, Space LOA Templates, Appendix 6 − 1 6 − 3 − 1 SPACE LOAs, 4 − 3 − 5 LINE UP AND WAIT (LUAW) OPERATIONS, HEADSET TONE INCIDENTS, 3 − 3 − 4 10 − 3 − 3 Hours of Duty, 2 − 4 − 1 LOA. See LETTERS OF AGREEMENT Service Hours, 2 − 4 − 1 Status of Service, 2 − 4 − 1 LOCAL INTERIM ALTITUDE, 8 − 2 − 3 Low Altitude Authorization Notification Capability, 12 − 9 − 1

I SMALL UAS (sUAS) ATC AUTHORIZA -

TIONS, 12 − 9 − 1 IFR AIRCRAFT HANDLED, 9 − 1 − 1 LOW LEVEL WIND SHEAR/MICROBURST ILS HEIGHT/DISTANCE LIMITATIONS, 10 − 3 − 3 DETECTION SYSTEMS, 10 − 3 − 1 Index I − 5 JO 7210.3EE CHG 3 7/9/26 [References are to page numbers] LOW VISIBILITY OPERATIONS, 10 − 1 − 5 MSAW GTM CARTOGRAPHIC CERTIFICATION, UPDATES, AND LUAW, 10 − 3 − 3 RECOMPILATION, 12 − 6 − 4 MULTI − SENSOR RADAR OPERATIONS, 12 − 6 − 5

M

MULTIPLE RUNWAY CROSSINGS, 10 − 3 − 5 MAGNETIC VARIATION AT STARS FACILITIES, 12 − 6 − 3

N

MANPADS, Handling MANPADS Incidents, 2 − 1 − 8 NAS Changes, 3 − 1 − 2 Maps, Video NAS En Route Automation Common Reference Points, 3 − 7 − 2 Displays, 8 − 3 − 1 Intensity, 3 − 7 − 2 General, 8 − 1 − 1 Mapping Standards, 3 − 7 − 1 Procedures, 8 − 2 − 1 Tolerance for Fix Accuracy, 3 − 7 − 1 National Playbook, 18 − 22 − 1 Video Map Data, 3 − 7 − 1 National Programs Medical, 2 − 8 − 1 Data Recording and Retention, 12 − 2 − 1 Alcohol, 2 − 8 − 2 Helicopter Route Chart, 12 − 4 − 1 Clearance Requirements, 2 − 8 − 1 Standard Terminal Automation Replacement Sys - Drugs and Sedatives, 2 − 8 − 1 tem (STARS), 12 − 6 − 1 Special Evaluations, 2 − 8 − 1 APPROACH RUNWAY VERIFICATION Status, 2 − 8 − 2 (ARV), 12 − 6 − 3 Meteorological Services and Equipment Terminal VFR Radar Services, 12 − 1 − 1 Broadcasts, 15 − 3 − 1 VFR Planning Chart, 12 − 3 − 1 General, 15 − 1 − 1 VFR Transition Route Program, 12 − 5 − 1 Weather Briefing, 15 − 2 − 1 National Traffic Management Log, 18 − 5 − 1 MIA. See MINIMUM IFR ALTITUDES (MIA) Navigational Aids Malfunctions, 3 − 5 − 2 MILITARY AIRCRAFT MOVEMENTS, 9 − 1 − 3 Monitoring, 3 − 5 − 1 MILITARY ATC BOARDS, 10 − 1 − 1 Originating NOTAMs, 3 − 5 − 3 Military Operations Interface Offices, 1 − 1 − 3 NON-INTERSECTING CONVERGING RUNWAY OPERATIONS, 10 − 3 − 8 MINIMUM IFR ALTITUDES (MIA), 6 − 4 − 1 , 10 − 4 − 2 NONAVIATION WEATHER SERVICE, 2 − 9 − 2 MINIMUM SAFE ALTITUDE WARNING (MSAW) AND CONFLICT ALERT (CA),

O

12 − 6 − 2 MINIMUM VECTORING ALTITUDE CHARTS Ocean21 (MVAC) PREPARATION Controller Pilot Data Link Communications, (TERMINAL/MEARTS), 3 − 8 − 1 6 − 7 − 2 Error Repair Position Responsibilities, 6 − 7 − 1 MISSED APPROACH, 10 − 3 − 8 Facility Manager Responsibilities, 6 − 7 − 1 MOBILE CONTROL TOWERS, 10 − 1 − 6 General, 6 − 7 − 1 Operational Supervisor − In − Charge Responsibili - MODE C INTRUDER (MCI) ALERT ties, 6 − 7 − 1 PARAMETERS, 8 − 2 − 2 , 12 − 6 − 4 Outages, 6 − 7 − 2 MSAW, 12 − 6 − 2 Transfer of Position, 6 − 7 − 2 I − 6 Index 7/9/26 JO 7210.3EE CHG 3 [References are to page numbers] OPERATING INITIALS, 2 − 2 − 3 Practice Instrument Approaches, 6 − 4 − 1 , 10 − 4 − 6 PRE-DEPARTURE CLEARANCE (PDC), 10 − 4 − 2 OPERATING POSITION DESIGNATORS, 10 − 1 − 1 Precision Approach Path Indicator (PAPI) Systems, 10 − 6 − 4 OPERATION OF LIGHTS WHEN TOWER IS CLOSED, 10 − 6 − 1 Precision Obstacle Free Zone (POFZ), 10 − 1 − 8 OPERATIONAL AARs, 10 − 7 − 2 Presidential Aircraft Communications Circuits, Use of, 5 − 1 − 3 OPERATIONAL GUIDANCE FOR FUSION, Coordination, 5 − 1 − 1 , 5 − 1 − 3 3 − 6 − 4 Monitoring, 5 − 1 − 2 Operational Line of Authority Movement, 5 − 1 − 3 Air Traffic Security Coordinator (ATSC), 21 − 3 − 1 Rescue Support, 5 − 1 − 3 AUTHORITY FOR OPERATIONAL SECURI - Security of Information, 5 − 1 − 3 TY − RELATED ACTIONS, 21 − 3 − 1 Presidential Movement, 21 − 4 − 1 OPERATIONAL MODE TRANSITION Pretaxi Clearance Procedures, 10 − 4 − 4 PROCEDURES, 12 − 6 − 4 Procedural Information, Waivers, 19 − 7 − 1 OPERATIONAL SECURITY − RELATED PROCEDURES FOR OPENING AND CLOSING ACTIONS, AUTHORITY, 21 − 3 − 1 RUNWAYS, 10 − 1 − 4 Operations and Staffing, 11 − 2 − 1 PROCESSING GPS ANOMALY REPORTS, Operations Security, Strategic and Tactical 3 − 5 − 2 Coordination, 21 − 5 − 1 Prohibited/Restricted Areas, 2 − 1 − 12 Operational Line of Authority, 21 − 3 − 1 Organizational Missions, 21 − 1 − 1 PURPOSE, Coordination, 21 − 6 − 1 Supplemental Duties, 21 − 4 − 1 Opposite Direction Operations, 2 − 1 − 22

Q

Organizational Missions Special Operations Security Mission, 21 − 1 − 1 Quality Assurance Review, 4 − 6 − 1 System Operations Security Mission, 21 − 1 − 1 Tactical Operations Security Mission, 21 − 1 − 1

R

Organizational Responsibilities, 11 − 1 − 1 Outdoor Laser Demonstrations, 2 − 1 − 16 RADAR AND/OR COMPUTER DATA, 4 − 8 − 1 RADAR DISPLAY INDICATORS, 10 − 5 − 1 RADAR PERFORMANCE CHECKS, 7 − 1 − 1

P

RADAR SELECTION PROCEDURES, 12 − 6 − 5 PARTICIPATION IN LOCAL AIRPORT RADAR TOLERANCES, 10 − 5 − 3 DEICING PLAN (LADP), 10 − 1 − 6 RAIN CONFIGURATION, 12 − 7 − 2 PDC. See PRE-DEPARTURE CLEARANCE RECEIPT OF NOTAM DATA, 6 − 3 − 2 (PDC) RECOMMENDED ALTITUDES FOR PILOT CONTACT INFORMATION, 2 − 1 − 25 SURVEILLANCE APPROACHES, 10 − 5 − 4 Pilot/Controller Outreach Operation Rain Check, Recorders, Tape 4 − 2 − 1 Assignment of Channels, 3 − 4 − 1 PIREPs, 6 − 3 − 1 Use of, 3 − 4 − 1 POSITION DUTIES AND RESPONSIBILITIES, Recording Equipment, Checking and Changing, 10 − 2 − 1 3 − 4 − 2 Index I − 7 JO 7210.3EE CHG 3 7/9/26 [References are to page numbers] Records UNIDENTIFIED ANOMALOUS PHENOME - Collection of Data, 4 − 6 − 1 NA (UAP), 4 − 7 − 1 Facility, 4 − 6 − 1 REQUIREMENTS FOR ERAM DATA BLOCK CHANGES WITHOUT COORDINATION , Reduced Separation on Final, 10 − 4 − 12 8 − 2 − 2 Reduced Vertical Separation Minimum, 6 − 8 − 1 Responsibilities, 21 − 2 − 1 Equipment Suffix and Display Management, RESTRICTED DRUGS, 2 − 8 − 2 6 − 8 − 3 Facility Manager Responsibilities, 6 − 8 − 1 REVIEW AIRSPACE STRUCTURE, 6 − 3 − 2 General, 6 − 8 − 1 Route Advisories, 18 − 20 − 1 Mountain Wave Activity, 6 − 8 − 3 Non − RVSM Operator Coordination Require - Route Test, 18 − 24 − 1 , 18 − 25 − 1 ments, 6 − 8 − 2 Runway Operations Manager − In − Charge Responsibilities, Intersection Takeoffs, 2 − 1 − 10 6 − 8 − 2 Obstacle Identification, 2 − 1 − 15 Operations Supervisor − In − Charge/Controller − In − Charge Responsibilities, 6 − 8 − 2 RUNWAY AND TAXIWAY LIGHTS, 10 − 6 − 4 Suspension of RVSM, 6 − 8 − 3 RUNWAY EDGE LIGHTS ASSOCIATED WITH Wake Turbulence and Weather Related Turbu - MEDIUM APPROACH LIGHT lence, 6 − 8 − 3 SYSTEM/RUNWAY ALIGNMENT INDICATOR LIGHTS, 10 − 6 − 4 REENTRY MISHAPS, 18 − 4 − 4 RUNWAY FLOODLIGHTS, 10 − 6 − 4 Regulatory Information RUNWAY STATUS LIGHTS (RWSL), 10 − 6 − 5 Authorizations and Exemptions, 19 − 3 − 1 Fixed − wing SVFR, 19 − 2 − 1 RUNWAY VISUAL RANGE (RVR) Moored Balloons, Kites, and Unmanned Rockets, EQUIPMENT, 2 − 9 − 3 19 − 5 − 1 RVR EQUIPMENT, 2 − 9 − 3 Parachute Jump, 19 − 4 − 1 Temporary Flight Restrictions, 20 − 1 − 1 RWSL, 10 − 6 − 5 Waivers and Authorizations, 19 − 1 − 1 REGULATORY NOTAMs FOR PRESIDENTIAL

S

TFR, SPECIAL SECURITY INSTRUCTIONS, OR EMERGENCY AIR SAA. See SPECIAL ACTIVITY AIRSPACE TRAFFIC RULES, 14 − 3 − 2 Safety Logic Systems Operations Supervisor/CIC RELAY OF RVR VALUES, 10 − 3 − 2 Procedures, 12 − 7 − 1 REPORTING Safety Logic Systems Supervisor/CIC Procedures DEATH, ILLNESS, OR OTHER PUBLIC ASDE, 12 − 7 − 1 HEALTH RISK ON BOARD AIRCRAFT, Ensure Status, 12 − 7 − 1 Limited Configuration, 12 − 7 − 2 2 − 1 − 21 Monitor Alerts and Ensure Corrective Action, DIVERTED AIRCRAFT ARRIVING FROM INTERNATIONAL LOCATIONS, 2 − 1 − 18 12 − 7 − 2 INOPERATIVE OR MALFUNCTIONING Watch Checklist, 12 − 7 − 3 ADS − B TRANSMITTERS, 2 − 1 − 18 SAFETY MANAGEMENT SYSTEM, 1 − 1 − 3 SUSPICIOUS UAS ACTIVITIES, 2 − 1 − 19 SAME, 2 − 9 − 3 Reports SATR, 2 − 1 − 13 Delay Reporting, 4 − 7 − 1 Monthly, 4 − 7 − 1 SECTIONAL AERONAUTICAL CHARTS, System Impact, 4 − 7 − 1 10 − 1 − 2 I − 8 Index 7/9/26 JO 7210.3EE CHG 3 [References are to page numbers] Security, 2 − 7 − 1 SPECIAL RADAR ACCURACY CHECKS, 7 − 1 − 1 Security Notice (SECNOT), 21 − 7 − 1 Special Security Instructions (SSI) (14 CFR SECURITY OF JOINT − USE RADAR DATA, Section 99.7), 21 − 6 − 1 2 − 7 − 2 SPECIAL USE FREQUENCIES, 6 − 4 − 1 SELECTED ALTITUDE LIMITS, 8 − 3 − 1 SPECIFIC AREA MESSAGE ENCODING SELECTING ACTIVE RUNWAYS, 10 − 1 − 2 (SAME) WEATHER RADIOS, 2 − 9 − 3 SFRA, 2 − 1 − 13 Standard Terminal Automation Replacement System (STARS), 12 − 6 − 1 SHUTDOWN OF PAR ANTENNAS, 10 − 5 − 1 STARS. See Standard Terminal Automation SIFs. See Special Interest Flights Replacement System (STARS) SIGMETs, 6 − 3 − 1 STRATEGIC OPERATIONS SECURITY GROUP RESPONSIBILITIES, 21 − 2 − 2 SIMULTANEOUS CONVERGING INSTRUMENT APPROACHES, 10 − 4 − 9 STRATEGIC OPERATIONS SECURITY MISSION, 21 − 1 − 1 SIMULTANEOUS INDEPENDENT APPROACHES, 10 − 4 − 6 SUA and PAJA Frequency Information, 2 − 1 − 17 sUAS, 19 − 6 − 1 Simultaneous Offset Instrument Approaches, 14 CFR Part 107 Operations, 19 − 6 − 1 10 − 4 − 11 AIRSPACE WAIVER PROCESS, 19 − 6 − 2 SIMULTANEOUS WIDELY − SPACED LOW ALTITUDE AUTHORIZATION AND PARALLEL OPERATIONS, 10 − 4 − 8 NOTIFICATION CAPABILITY (LAANC), 19 − 6 − 1 SINGLE PERSON MIDNIGHT OPERATIONS, MANUAL AIRSPACE AUTHORIZATION 2 − 6 − 6 PROCEDURES (VIA FAA SINGLE SITE COVERAGE STAGE A DRONEZONE), 19 − 6 − 1 OPERATIONS, 8 − 2 − 1 OPERATIONS OVER NON-MOVEMENT/ SITUATION DISPLAY CLOSED MOVEMENT AREAS, 12 − 11 − 1 DISPLAYING DEBRIS RESPONSE AREAS, Supplemental Duties 2 − 1 − 24 Classified Operations, 21 − 4 − 2 DISPLAYING REENTRY AREAS, 2 − 1 − 24 Continuity of Operations and Continuation of DISPLAYING SPACE LAUNCH, 2 − 1 − 24 Government (COOP/COG), 21 − 4 − 2 Domestic Events Network (DEN), 21 − 4 − 1 Small Unmanned Aircraft System(s). See sUAS Intelligence Analysis and Communication, SMS. See SAFETY MANAGEMENT SYSTEM 21 − 4 − 2 Presidential Movement, 21 − 4 − 1 SPACE LAUNCH MISHAPS, 18 − 4 − 4 Special Interest Flights (SIFs), 21 − 4 − 2 SPECIAL ACTIVITY AIRSPACE, 2 − 1 − 13 Surveillance Source Use SCHEDULING, COORDINATION, AND DIS - Commissioning Facilities, 3 − 6 − 1 SEMINATION, 2 − 1 − 13 Monitoring Mode 3/A Codes, 3 − 6 − 3 SPECIAL AIR TRAFFIC RULES, 2 − 1 − 13 Prearranged Coordination, 3 − 6 − 4 System and Display Setting, 3 − 6 − 3 SPECIAL FLIGHT RULES AREA, 2 − 1 − 13 Target Sizing, 3 − 6 − 3 Special Interest Flights (SIFs), 21 − 4 − 2 SUSPICIOUS ACTIVITIES AROUND SPECIAL INTEREST SITES, 2 − 1 − 24 AIRPORTS OR FAA FACILITIES, 2 − 7 − 1 SPECIAL OPERATIONS SECURITY GROUP Suspicious Aircraft/Pilot Activities, 2 − 1 − 17 RESPONSIBILITIES, 21 − 2 − 1 System Operations Security, Operations Security: Special Operations Security Mission, 21 − 1 − 1 Tactical, Special, and Strategic, 21 − 1 − 1 Index I − 9 JO 7210.3EE CHG 3 7/9/26 [References are to page numbers] System Operations Security Mission, 21 − 1 − 1 TIME − BASED MANAGEMENT (TBM), 18 − 6 − 1 APPROVAL AUTHORITY, 18 − 6 − 2 ATCSCC RESPONSIBILITIES, 18 − 6 − 2 FIELD FACILITY RESPONSIBILITIES,

T

18 − 6 − 2 T & A Recording, 4 − 6 − 5 POLICY, 18 − 6 − 1 TBM WITHIN ARTCC AREA OF JURISDIC - TACTICAL OPERATIONS SECURITY GROUP TION, 18 − 6 − 2 RESPONSIBILITIES , 21 − 2 − 1 TYPES, 18 − 6 − 1 Tactical Operations Security Mission, 21 − 1 − 1 TOWER/RADAR TEAM CONCEPTS, 10 − 1 − 1 Takeoff Clearance, 10 − 3 − 5 TOWER/RADAR TEAM POSITION BINDERS, TAS. See TDLS APPLICATION SPECIALIST 10 − 2 − 1 (TAS) Traffic Lights, Gates, and Signals, 3 − 1 − 2 TAXIWAY AS A RUNWAY, TEMPORARY Traffic Management AUTHORIZATION AND USE, 10 − 3 − 7 ARTCC to ARTCC FEAFCA Coordination, TBM, 18 − 6 − 1 18 − 8 − 3 Coded Departure Routes, 18 − 19 − 1 TBO, 18 − 6 − 1 Coordination, 18 − 5 − 1 TDLS APPLICATION SPECIALIST (TAS), Flow Constrained Area (FCA), 18 − 8 − 1 10 − 4 − 4 Flow Evaluation Area (FEA), Flow Constrained TEMPORARY AUTHORIZATION AND USE OF Area (FCA), Ingetrated Collaborative A TAXIWAY AS A RUNWAY, 10 − 3 − 7 Rerouting (ICR), 18 − 8 − 1 Ground Delay Programs, 18 − 10 − 1 Temporary Flight Restrictions, 20 − 1 − 1 Ground Stop(s), 18 − 11 − 1 , 18 − 13 − 1 Disaster/Hazard Areas, 20 − 3 − 1 Initiatives, 18 − 7 − 1 Emergency Air Traffic Rules, 20 − 5 − 1 Line of Authority, 18 − 3 − 1 National Disaster Areas in the State of Hawaii, Monitor Alert Parameter, 18 − 9 − 1 20 − 4 − 1 North American Route Program, 18 − 12 − 1 , Proximity of Space Flight Operations, 20 − 7 − 1 18 − 18 − 1 Proximity of the Presidential and Other Parties, Organizational Missions, 18 − 1 − 1 20 − 6 − 1 Preferred IFR Routes Program, 18 − 17 − 1 Unmanned Aircraft, 20 − 2 − 1 Responsibilities, 18 − 2 − 1 Vicinity of Aerial Demonstrations, 20 − 8 − 1 Severe Weather Management, 18 − 15 − 1 Vicinity of Major Sporting Events, 20 − 8 − 1 Special Programs, 18 − 14 − 1 TERMINAL AREA CHARTS, 10 − 1 − 2 Supplemental Duties, 18 − 4 − 1 SWAP, 18 − 16 − 1 Terminal Operations, Services, and Equipment Airport Arrival Rate (AAR), 10 − 7 − 1 Traffic Management (TM) Support of General, 10 − 1 − 1 Non − Reduced Vertical Separation Minima Lighting, 10 − 6 − 1 (RVSM) Aircraft, 18 − 23 − 1 Operations, 10 − 3 − 1 Trajectory − Based Operations (TBO), 18 − 6 − 1 Position Binders, 10 − 2 − 1 MISSION, 18 − 6 − 1 Radar, 10 − 5 − 1 POLICY, 18 − 6 − 1 Services, 10 − 4 − 1 CONTROLLER PILOT DATA LINK COM - TRANSITION PROCEDURES, 8 − 1 − 1 MUNICATIONS (CPDLC), 10 − 4 − 3 TRANSPORTATION SECURITY TFRs. See Temporary Flight Restrictions ADMINISTRATION AND FAA JOINT OPERATING PROCEDURES, 2 − 1 − 24 Time Checks, 2 − 4 − 1 Time Standards, 2 − 4 − 1 TRSA, 12 − 1 − 2 I − 10 Index 7/9/26 JO 7210.3EE CHG 3 [References are to page numbers] USE OF OTHER THAN FAA

U

COMMUNICATIONS CIRCUITS, 3 − 2 − 1 UAP. See UNIDENTIFIED ANOMALOUS USE OF STARS QUICK LOOK FUNCTIONS, PHENOMENA (UAP) 12 − 6 − 1 UAS 14 CFR Part 91 Operations, 5 − 5 − 1

V

CLASS A AIRSPACE, 5 − 5 − 2 CLASS B AIRSPACE, 5 − 5 − 2 VFR Flyway Planning Chart Program, 12 − 3 − 1 CLASS C AIRSPACE, 5 − 5 − 2 VFR Transition Route Program, 12 − 5 − 1 CLASS D AIRSPACE, 5 − 5 − 3 CLASS E AIRSPACE, 5 − 5 − 3 VFR Waypoint Chart Program, 12 − 8 − 1 CLASS G AIRSPACE, 5 − 5 − 3 Criteria, 12 − 8 − 1 LETTERS OF AGREEMENT (LOA), 5 − 5 − 3 Definition, 12 − 8 − 1 MEMORANDUMS, 5 − 5 − 3 Policy, 12 − 8 − 1 RESPONSIBILITIES, 5 − 5 − 1 Responsibilities, 12 − 8 − 2 TERMINAL RADAR SERVICE AREA (TR - Visual Approach Slope Indicator (VASI) Systems, SA), 5 − 5 − 2 10 − 6 − 3 TYPES AND AUTHORITY, 5 − 5 − 1 DETECTION SYSTEMS, 2 − 1 − 20 VISUAL SEPARATION, 10 − 3 − 4 Facility Maps (UASFM). See UAS Facility Maps Volcanic Ash, 18 − 4 − 4 (UASFM) Operations at Towered Airports, 12 − 11 − 1 sUAS OPERATIONS OVER NON-MOVE -

W

MENT/CLOSED MOVEMENT AREAS, 12 − 11 − 1 Waivers, Procedural, 19 − 7 − 1 REPORTING SUSPICIOUS ACTIVITIES, APPROVAL PROCESS, 19 − 7 − 2 2 − 1 − 19 PERIODICITY OF WAIVER RENEWALS, SPECIAL GOVERNMENT INTEREST (SGI) 19 − 7 − 2 OPERATIONS, 21 − 4 − 2 RENEWAL PROCESSING, 19 − 7 − 2 PROCESS AND COORDINATION, 21 − 5 − 1 REQUESTS, 19 − 7 − 1 UAS Facility Maps (UASFM) SAFETY DOCUMENTATION AND OTHER ASSUMPTIONS, 12 − 10 − 1 SAFETY STUDIES, 19 − 7 − 1 AUTHORIZATION MAP DESIGN PROCE - WAIVERS TO THIS ORDER, 1 − 1 − 3 DURES CLASS B/C/D AIRSPACE, Watch Coverage, 2 − 5 − 1 12 − 10 − 2 Area Supervision, 2 − 5 − 1 PART 107 OPERATION APPROVALS, Consolidating Positions, 2 − 5 − 2 12 − 10 − 3 CONTROLLER − IN − CHARGE (CIC), 2 − 5 − 3 POLICY, 12 − 10 − 1 DESIGNATED LEAD SPECIALIST (DLS), PROCEDURES TO CHANGE ALTITUDES, 2 − 5 − 3 12 − 10 − 2 Holiday Staffing, 2 − 5 − 2 RESPONSIBILITY, 12 − 10 − 1 Overtime Duty, 2 − 5 − 2 UASFM. See UAS Facility Maps (UASFM) Relief Periods, 2 − 5 − 2 Schedules, 2 − 5 − 1 Unauthorized Laser Illumination of Aircraft, Supervision Coverage, 2 − 5 − 1 2 − 1 − 17 Supervisors Hours of Duty (Alaska Only), 2 − 5 − 2 UNIDENTIFIED ANOMALOUS PHENOMENA Watch Supervision (UAP), 4 − 7 − 1 Assignments, 2 − 6 − 2 Unmanned Aircraft System(s). See UAS Basic Watch Schedule, 2 − 6 − 4 USE OF ACTIVE RUNWAYS, 10 − 1 − 3 CIC, 2 − 6 − 1 Index I − 11 JO 7210.3EE CHG 3 7/9/26 [References are to page numbers] CIC DESIGNATION AT FAA-OPERATED FA - Dissemination, 2 − 9 − 1 CILITIES, 2 − 6 − 3 Record Center, 2 − 9 − 2 Consolidating Positions, 2 − 6 − 4 Visibility Charts, 2 − 9 − 2 Controller − in − Charge Selection, 2 − 6 − 3 Visual Observations, 2 − 9 − 2 Holiday Staffing, 2 − 6 − 5 Wind Indicator Cross Check, 2 − 10 − 1 Manager, 2 − 6 − 1 Overtime Duty, 2 − 6 − 5 Wind Instrument Sensors, 2 − 10 − 1 Relief Periods, 2 − 6 − 4 Supervisor, 2 − 6 − 1 WIND INSTRUMENTS AT APPROACH Weather/Visibility, 2 − 9 − 1 CONTROL FACILITIES, 10 − 3 − 1 I − 12 Index Federal Aviation JO 7210.3EE CHG 3 Administration 7/9/26

BRIEFING GUIDE

A V L I A A R T E I O D N E F A N D M O I I T N A I R S T

U.S. DEPARTMENT OF TRANSPORTATION

FEDERAL AVIATION ADMINISTRATION

Initiated By: AJV − 0 Vice President, Mission Support Services JO 7210.3EE CHG 3 7/9/26 Table of Contents Paragraph Title Page Number 1 − 2 − 1 POLICY . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . BG − 3 1 − 2 − 4 ABBREVIATIONS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . BG − 4 BG − 5 2 − 1 − 1 INTERREGIONAL REQUIREMENTS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . BG − 3 2 − 1 − 2 BG − 7 FACILITY STANDARD OPERATING PROCEDURES DIRECTIVE . . . . . . . . . .

2 − 1 − 24 FACILITY IDENTIFICATION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . BG − 8 2 − 1 − 26 OUTDOOR LASER DEMONSTRATIONS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . BG − 8 2 − 6 − 3 CONTROLLER-IN-CHARGE (CIC) DESIGNATION . . . . . . . . . . . . . . . . . . . . . . . BG − 9 3 − 3 − 1 SERVICE “F” COMMUNICATIONS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . BG − 10 4 − 3 − 6 COMMERCIAL SPACE LOAs . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . BG − 11 4 − 6 − 6 FAA FORM 7230 − 10, POSITION LOG . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . BG − 12 4 − 6 − 7 AUTOMATED POSITION SIGN ON/OFF . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . BG − 12 5 − 3 − 4 WEATHER RECONNAISSANCE FLIGHTS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . BG − 13 6 − 2 − 2 EN ROUTE SECTOR INFORMATION BINDER . . . . . . . . . . . . . . . . . . . . . . . . . . . BG − 4 6 − 3 − 1 HANDLING OF SIGMETs, CWAs, AND PIREPs . . . . . . . . . . . . . . . . . . . . . . . . . . . BG − 5 6 − 10 − 1 CONTROLLER PILOT DATA LINK COMMUNICATIONS (CPDLC) . . . . . . . . . . BG − 15 10 − 3 − 16 GO-AROUND/MISSED APPROACH . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . BG − 16 11 − 2 − 6 FAA CONTRACT TOWER (FCT) AIR TRAFFIC CONTROLLER ELIGIBILITY BG − 21 11 − 3 − 3 CIC DESIGNATION AT FCT-OPERATED FACILITIES . . . . . . . . . . . . . . . . . . . . . BG − 22 14 − 3 − 6 REGULATORY NOTAMs FOR PRESIDENTIAL TFR, SPECIAL SECURITY INSTRUCTIONS, OR EMERGENCY AIR TRAFFIC RULES . . . . . . . . . . . . . . . . BG − 22 18 − 4 − 7 SPACE LAUNCH OR REENTRY VEHICLE MISHAPS . . . . . . . . . . . . . . . . . . . . . BG − 23 18 − 5 − 4 RESPONSIBILITIES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . BG − 24 18 − 26 − 4 RESPONSIBILITIES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . BG − 5 Appendix 6 Commercial Space LOA Sample Templates . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . BG − 24 BG − 2 Briefing Guide 7/9/26 JO 7210.3EE CHG 3 1. PARAGRAPH NUMBER AND TITLE: 1 − 2 − 1. POLICY 2 − 1 − 1. INTERREGIONAL REQUIREMENTS 2. BACKGROUND: Review of paragraphs 1–2–1 and 2–1–1 revealed the need to update organization titles as they had changed. Editorial edits were necessary to bring the language up to date, and to provide guidance for requesting clarifications as well as updating language that speaks to potential conflicts between instructions in the order and labor union agreements.

3. CHANGE: OLD NEW 1 − 2 − 1. POLICY 1 − 2 − 1. POLICY This order prescribes information necessary to This order prescribes information necessary to effectively operate and administer air traffic service effectively operate and administer air traffic service facilities. When a conflict arises between its facilities. When a conflict arises between this provisions and those in other agency issuances, order’s provisions and those in other agency supervisors must request clarification from t heir issuances, management must request clarification respective En Route and Oceanic Operations Area, from higher authority and/or assistance from the Terminal Operations Area , or Flight Service Safety Operations Support Group (OSG), Service Area and Operations Group. In the event a conflict arises Director of Air Traffic Operations , or the Flight between instructions in this order and the terms of Services Safety and Operations Group. Procedures a labor union contract , supervisors must abide by for requesting interpretation or clarification to the contract . this order are contained in paragraph 1–1–9. In the event a conflict arises between instructions in this order and the terms of a Collective Bargaining Agreement (CBA) , management must abide by the CBA .

OLD NEW 2 − 1 − 1. INTERREGIONAL REQUIREMENTS 2 − 1 − 1. FACILITY REQUIREMENTS Add Facilities must coordinate with various lines of business (LOB), staff offices, and ATO Service Units directly on mutual procedural or opera - tional requirements. When the resolution of procedural or operational problems is not possible, or when a directive is incompatible with another directive or agreement, the facility must notify its higher authority management structure for resolution assistance.

Briefing Guide BG − 3 JO 7210.3EE CHG 3 7/9/26 a. An air route traffic control center (ARTCC) is a. Air Route Traffic Control Centers responsible to an En Route and Oceanic Operations (ARTCCs) and terminal air traffic facilities are Area Office. Terminal and Flight Service facilities responsible to the respective Air Traffic Service located within an ARTCC operational area must Area office.

comply with the En Route and Oceanic Operations Area Office directives governing interfacility operational requirements. Although these facilities are not under its administrative jurisdiction, the En Route and Oceanic Operations Area Office responsible for the administration of the ARTCC must provide these directives to the appropriate facilities in ARTCC operational areas. These facilities must coordinate directly on mutual procedural or operational requirements.

b. When the resolution of procedural or b. Flight Service Stations (FSS) are responsible operational problems is not possible or when the En to the Flight Service Safety and Operations Route and Oceanic Operations Area Office Group.

directives are incompatible with those published by the administratively responsible area office, the facility must notify its own Terminal Operations Area or Flight Service Safety and Operations Group for resolution.

Add c. The Air Traffic Control System Command Center (ATCSCC) is responsible to the Director of NAS Operations.

1. PARAGRAPH NUMBER AND TITLE: 1 − 2 − 4. ABBREVIATIONS 6 − 2 − 2. EN ROUTE SECTOR INFORMATION BINDER 2. BACKGROUND: The contraction RCAG is incorrectly listed as “remote communications air/ground facility.” The acronym is properly identified in the Aeronautical Information Manual (AIM), FAA Order JO 6500.28 (Remote Communications Requirements for Air Traffic Control Facilities), the Aeronautical Information Publication (AIP), and FAA Order 7930.2 (Notice to Airmen (NOTAM)) as “remote center air/ground (RCAG).” This update corrects the acronym to align with FAA orders and publications.

3. CHANGE: OLD NEW 1–2–4. ABBREVIATIONS 1–2–4. ABBREVIATIONS As used in this order, the following abbreviations No Change have the meanings indicated: (See TBL 1 − 2 − 1.)

TBL 1 − 2 − 1 No Change Abbreviations RCAG . . . . . . . . . . Remote communications air ground facility RCAG . . . . . . . . . . Remote center air / ground facility BG − 4 Briefing Guide 7/9/26 JO 7210.3EE CHG 3 OLD NEW 6 − 2 − 2. EN ROUTE SECTOR INFORMATION 6 − 2 − 2. EN ROUTE SECTOR INFORMATION BINDER BINDER Title through c1(b) No Change (c) Primary and back-up frequency remote (c) Primary and back-up frequency remote communications air − ground facility (RCAG). center air / ground facility (RCAG).

1. PARAGRAPH NUMBER AND TITLE: 1 − 2 − 4. ABBREVIATIONS 6 − 3 − 1. HANDLING OF SIGMETs, CWAs, AND PIREPs 18 − 26 − 4. RESPONSIBILITIES 2. BACKGROUND: A field facility reported that paragraph 6 − 3 − 1, Handling of SIGMETs, CWAs, and PIREPs, featured language inconsistent with other FAA orders concerning the reporting of low-level wind shear and volcanic activity. During research into this change, it was determined that the Leased Service A System (LSAS) is no longer in use, prompting additional edits.

3. CHANGE: OLD NEW 1–2–4. ABBREVIATIONS 1–2–4. ABBREVIATIONS As used in this order, the following abbreviations No Change have the meanings indicated: (See TBL 1 − 2 − 1.)

TBL 1 − 2 − 1 No Change Abbreviations Add AISR . . . . . . . . . Aeronautical Information System Replacement LSAS . . . . . . . . . . . Leased Service A System Delete OLD NEW 6 − 3 − 1. HANDLING OF SIGMETs, CWAs, 6 − 3 − 1. HANDLING OF SIGMETs, CWAs, AND PIREPs AND PIREPs Title through a4 No Change b . PIREPs: No Change 1. The WC is the focal point for handling PIREP 1. The WC is the focal point for handling PIREP requests and for the dissemination of urgent and requests and for the dissemination of urgent and routine PIREPs within the ARTCC and to terminal routine PIREPs within the ARTCC and to terminal ATC facilities without Leased Service A System ATC facilities.

(LSAS) which are or may be affected .

2. The CWSU meteorologist solicits PIREPs No Change through the weather coordinator or directly from the controllers when required.

(a) Both solicited and unsolicited PIREPs that (a) Both solicited and unsolicited PIREPs that meet the urgent PIREP criteria must be distributed meet the urgent PIREP criteria must be distributed immediately via the LSAS . immediately via AISR, or other distribution systems such as the Aviation Weather Center’s webpage .

Briefing Guide BG − 5 JO 7210.3EE CHG 3 7/9/26 (b) Solicited and unsolicited routine PIREPs No Change must be distributed in a timely manner.

c. PIREP classification: Categorize PIREPs as c. Classify PIREPs as follows: follows: c1 through c1(d) No Change (e) Low level wind shear. (e) Low level wind shear (LLWS) . For the safety of light aircraft, classify low level wind shear PIREPs as UUA if the pilot reports airspeed fluctuations of 10 knots or more.

Classify reports of low level wind shear with airspeed fluctuations less than 10 knots as routine. If airspeed fluctuation is not reported, classify the PIREP as UUA.

NOTE − NOTE − D efined as wind shear within 2,000 feet of the surface. LLWS is d efined as wind shear within 2,000 feet of the surface.

(f) Volcanic eruptions and volcanic ash clouds. (f) Volcanic eruptions , ash clouds , and/or the detection of sulfur gases (H S or SO ) in the 2 2 cabin should be reported; however, if a pilot only reported the smell of H S or SO in the cabin and 2 2 confirmed no volcanic ash clouds were present, classify the report as a ROUTINE PIREP .

Add NOTE − The smell of sulfur gases in the cockpit may indicate volcanic activity that has not yet been detected or reported and/or possible entry into an ash-bearing cloud. SO is identifiable as the sharp, acrid odor of a freshly struck match. H S has the odor of rotten eggs.

(g) Detection of sulfur gases (SO or H S), Delete 2 2 associated with volcanic activity, in the cabin.

NOTE − Delete The smell of sulfur gases in the cockpit may indicate volcanic activity that has not yet been detected or reported and/or possible entry into an ash-bearing cloud. SO is identifiable as the sharp, acrid odor of a freshly struck match. H S has the odor of rotten eggs.

c1( h ) Re − letter c1( g ) 2. ROUTINE: Classify all solicited and 2. ROUTINE: Classify all other PIREPs as unsolicited PIREPs as routine unless otherwise routine.

indicated .

Add 3. Expanded information on the categoriza - tion of PIREPs and reporting format is located in FAA Order JO 7110.10, Chapter 8, Section 1, Pilot Weather Reports.

OLD NEW 18 − 26 − 4. RESPONSIBILITIES 18 − 26 − 4. RESPONSIBILITIES Title through b2(c) No Change (d) Dissemination of CWAs to other facilities (d) Dissemination of CWAs to other facilities.

(via other than LSAS) .

BG − 6 Briefing Guide 7/9/26 JO 7210.3EE CHG 3 (e) Dissemination of AIRMETs within the No Change ARTCC.

(f) Inter/intrafacility dissemination of (f) Inter/intrafacility dissemination of Meteorological Impact Statements as required (via Meteorological Impact Statements as required.

other than LSAS) .

1. PARAGRAPH NUMBER AND TITLE: 2 − 1 − 2. FACILITY STANDARD OPERATING PROCEDURES DIRECTIVE 2. BACKGROUND: Emergency airport information is available via functions unique to En Route Automation Modernization (ERAM) system and the Standard Terminal Automation Replacement System (STARS). This change adds a requirement for those facilities where this function is available, Standard Operating Procedures (SOP) must include a description of the functionality and its uses.

3. CHANGE: OLD NEW 2 − 1 − 2. FACILITY STANDARD OPERATING 2 − 1 − 2. FACILITY STANDARD OPERATING PROCEDURES DIRECTIVE PROCEDURES (SOP) The air traffic manager must issue a Standard The ATM must issue an SOP specifying , at a Operating Procedures (SOP) Directive. The minimum, required procedures for maintaining a directive must specify , as a minimum, the required safe and efficient operation and the jurisdictional procedures for maintaining a safe and efficient boundaries for each operational position/sector.

operation and the jurisdictional boundaries for each operational position/sector.

NOTE − Add Although FAA Order JO 1320.62, Air Traffic Organization Directives Management, states that an SOP is not an authorized way to issue policy and thus should not be identified as a directive, ATMs have historically issued SOPs as such and may continue to do so.

a. Review SOPs at least annually and update as a. Review SOPs at least annually and update as necessary. Examine current SOPs for practices necessary.

and/or procedures that are no longer required.

Review includes both content and relevance that achieve full operational efficiency and customer flexibility.

b. Review and, if necessary, update SOPs when No Change new or revised instrument flight procedures are published or pertinent national procedures are implemented or changed.

NOTE − No Change Information related to subscribing for alerts regarding upcoming changes to instrument flight procedures is available at the Instrument Flight Procedures Information Gateway: https://www.faa.gov/air_traffic/flight_info/ aeronav/procedures/ .

Briefing Guide BG − 7 JO 7210.3EE CHG 3 7/9/26 REFERENCE − No Change FAA Order JO 7210.3, Para 2 − 1 − 6, Checking Accuracy of Published Data.

FAA Order JO 7210.3, Para 4 − 1 − 1, Correspondence Standards.

FAA Order JO 7210.3, Para 4 − 3 − 3, Developing LOA.

FAA Order JO 7210.3, Para 4 − 3 − 8, Annual Review/Revisions.

c. Ensure noise abatement procedure c. Ensure noise abatement procedure commit - commitments are included in the SOP or other ments are included in the SOP or facility directives facility directives and identified as such. and identified as such.

NOTE − No Change Noise abatement procedure commitments are the result of the NEPA process or other formal/informal agreements.

Add d. Where emergency airport information is available via ERAM or STARS, include in the SOP a description of the functionality, to include any local adaptations or uses. Where no such automated functionality is available, the ATM must ensure the SOP addresses emergency airport information and where it must be made available in the operation.

1. PARAGRAPH NUMBER AND TITLE: 2 − 1 − 24. FACILITY IDENTIFICATION 2 − 1 − 26. OUTDOOR LASER DEMONSTRATIONS 2. BACKGROUND: Routine review of several paragraphs in Chapter 2 revealed the need to update outdated organizational references in paragraph 2 − 1 − 24 and 2 − 1 − 26. Paragraph 2 − 1 − 24, Facility Identification, has been updated to reflect the current approver for facility identification and has been split into two subparagraphs based on applicability. Paragraph 2 − 1 − 26, Outdoor Laser Demonstrations, contains only a pointer to FAA Order JO 7400.2, Procedures for Handling Airspace Matters, where laser demonstration procedures are wholly contained.

3. CHANGE: OLD NEW 2 − 1 − 24. FACILITY IDENTIFICATION 2 − 1 − 24. FACILITY IDENTIFICATION a . Service Area Directors are the focal point to a. TERMINAL/EN ROUTE: Requests for review/approve requests for waivers for facility permanent changes or waivers to facility identification changes in FAA Order JO 7110.65, identification require that the ATM document Air Traffic Control, paragraph 2 − 4 − 19, Facility the benefit to the Agency and the customer. The Identification, subparagraphs a, b, and c. The Flight ATM must submit the request through the District General Manager to the Service Area Service Safety and Operations Group (AJR − B100) is the focal point to review/approve requests for Director of Air Traffic Operations. The Service waivers for facility identification changes in FAA Area Director of Air Traffic Operations has Order JO 7110.10, Flight Services, paragraph approval authority. Large, combined, or consol - 2 − 5 − 2, Facility Identification. If the waiver request idated facilities may be authorized multiple is approved, the Service Area Director or the identification nomenclature at the discretion of Director of Flight Service, as appropriate, must the Service Area Director of Air Traffic ensure that all aeronautical publications are Operations.

changed to reflect the new identification and that a Letter to Airmen is published notifying the users of the change.

BG − 8 Briefing Guide 7/9/26 JO 7210.3EE CHG 3 REFERENCE − Add FAA Order JO 7110.65, Para 2 − 4 − 19, Facility Identification.

b. Service Area Directors must forward a copy of b. FSS: Requests for permanent changes or the approval to System Operations Services. waivers to facility identification require that the ATM document the benefit to the Agency and the customer. The Flight Service Safety and Operations Group must review the request and forward its recommendation to the Director of Flight Service. The Director of Flight Service has approval authority.

REFERENCE − Add FAA Order JO 7110.10, Para 2 − 5 − 2, Facility Identification.

Add c. If a facility identification change is approved, the ATM must ensure all applicable facility directives, LOAs, and aeronautical publications reflect the new identification. A Letter to Airmen must be published notifying users of the change.

OLD NEW 2 − 1 − 26. OUTDOOR LASER 2 − 1 − 26. OUTDOOR LASER DEMONSTRATIONS DEMONSTRATIONS Add FAA Order JO 7400.2, Procedures for Handling Airspace Matters, Chapter 29, Outdoor Laser Operations, contains procedures for processing outdoor laser demonstration requests.

a. The Area Directors of Terminal Operations Delete Services are the focal point for reviewing/approv - ing requests for outdoor laser demonstrations.

b. FAA Order JO 7400.2, Procedures for Handling Delete Airspace Matters, is the source for processing outdoor laser demonstration requests.

1. PARAGRAPH NUMBER AND TITLE: 2 − 6 − 3. CONTROLLER-IN-CHARGE (CIC) DESIGNATION 2. BACKGROUND: Review of this paragraph revealed several opportunities to streamline procedures and make editorial updates to reflect current organizational structure and responsibilities.

3. CHANGE: OLD NEW 2 − 6 − 3. CONTROLLER-IN-CHARGE ( CIC ) 2 − 6 − 3. CIC DESIGNATION AT DESIGNATION FAA-OPERATED FACILITIES Add CIC designation at FAA-operated facilities differs from CIC designation at FAA Contract Tower (FCT) facilities due to administrative differences. For FCT CIC policy, see Chapter 11 of this order.

a. Prior to being designated as a CIC, specialists a. At FAA-operated facilities, candidates for must meet the following prerequisites : CIC must : Briefing Guide BG − 9 JO 7210.3EE CHG 3 7/9/26 1. Have been certified for 6 months in the 1. Be certified for 6 months in the area/facility area/facility CIC duties to be performed. (The where CIC duties will be performed. The Service Director of En Route and Oceanic Operations Area Area Director of Air Traffic Operations may Office or Terminal Operations Service Area Office issue a facility waiver for the 6 - month requirement may issue a facility waiver for the 6 month where a more immediate assignment is needed.

requirement where a more immediate assignment is Waivers to facilities will be valid for 2 years.

needed. Waivers to facilities will be for 1 year, with renewals based on the result of a yearly evaluation by the area office director.)

2. Be operationally current. No Change 3. Be s elected by the air traffic manager or 3. Be selected by the ATM .

his/her designee .

4. Successfully complete CIC training. Delete b. Specialists who have been designated as a CIC No Change and subsequently transfer to another facility are not required to fulfill the requirement of subparagraph 2 − 6 − 3a1 at the new facility; however, they must meet all other prerequisites.

c. In facilities that use CICs to provide midwatch No Change coverage, specialists that provide such coverage must be designated as a CIC only for the purpose of providing midwatch coverage upon facility/area certification and completion of the local CIC training course. Air traffic managers must ensure the local CIC training course is completed within 30 days of facility/area certification/rating.

NOTE − Delete In combined radar/tower facilities, specialists who are certified in the tower cab may be designated as CIC in the tower, provided all of the above prerequisites are met.

Add d. In combined radar/tower facilities, specialists certified in the tower may be designated as CIC in the tower, provided all the above prerequisites are met.

1. PARAGRAPH NUMBER AND TITLE: 3 − 3 − 1. SERVICE “F” COMMUNICATIONS 2. BACKGROUND: Review of paragraph 3 − 3 − 1 revealed that the reference to Service “F” is obsolete. This presented an opportunity to make editorial updates.

3. CHANGE: OLD NEW 3 − 3 − 1. SERVICE “F” COMMUNICATIONS 3 − 3 − 1. COMMUNICATIONS Facility air traffic managers must establish Facility air traffic managers must establish a procedures to provide interim communications in facility Contingency Plan that addresses proce - the event that local or long-line standard Service dures for providing interim communications “F” fail. These must include the use of telephone during power outages, and other significant conference circuits and the use of airline or other events .

facilities .

BG − 10 Briefing Guide 7/9/26 JO 7210.3EE CHG 3 1. PARAGRAPH NUMBER AND TITLE: 4 − 3 − 6. COMMERCIAL SPACE LOAs 2. BACKGROUND: In Spring of 2024, Air Traffic Safety Oversight Service (AOV) conducted an audit to determine compliance with policy and procedural requirements for integrating space launch/reentry vehicle operations in the NAS. An observation of noncompliance with letter of agreement (LOA) guidance and a recent update to FAA Order JO 1000.45, Application of the Acceptable Level of Risk to Space Missions in the National Airspace System, prompted a review of FAA Order JO 7210.3, Facility Operation and Administration, paragraph 4 − 3 − 6, Commercial Space LOAs, resulting in proposed updates to procedures to address gaps and provide clarity.

3. CHANGE: OLD NEW 4 − 3 − 6. COMMERCIAL SPACE LOAs 4 − 3 − 6. SPACE LOAs LOAs exist between ATC facilities and commercial LOAs exist between ATC facilities and Federal space launch/reentry site, launch , and/or reentry Ranges; space launch/reentry site s; and launch operations proponents . FAA Order JO 7400.2, and/or reentry service providers (LSPs) . FAA Procedures for Handling Airspace Matters contains Order JO 7400.2, Procedures for Handling responsibilities and procedures for Commercial Airspace Matters , contains responsibilities and Space operations. The following lists the roles and procedures for Commercial Space operations. The responsibilities of organizations and individuals following lists the roles and responsibilities of involved in the commercial space LOA process: organizations and individuals involved in the space LOA process: Add NOTE − This paragraph does not apply to on-orbit activities or operations.

a through c1 No Change Add 2. Operating procedures to include communications, real-time coordination, Notice to Airmen (NOTAM) content issuance, contingency, and emergency procedures and notifications.

Add 3. For Federal Range LOAs: a brief description of the launch/reentry site and any limitations on operations. If no limitations or restrictions are needed, notate this in the LOA as “No Restrictions.” NOTE − Add Possible restrictions may include but are not limited to restrictions on operating hours, restrictions on vehicle size, and restrictions on number of operations.

2 . For launch/reentry operation LOAs: 4 . For launch/reentry operation LOAs: D escription of operation to include vehicle type and d escription of operation to include but not limited characteristics; anticipated frequency of to vehicle type and characteristics; anticipated frequency of operations; requested airspace and operations; and requested airspace , altitude, vehicle positioning data transmittal, and Aircraft Hazard altitude, and notional Aircraft Hazard Area Area (AHA) information . (AHA) information. When possible, this should include vehicle telemetry data transmittal .

Briefing Guide BG − 11 JO 7210.3EE CHG 3 7/9/26 3 . For launch/reentry site LOAs: B rief 5 . For launch/reentry site LOAs: b rief description of the launch/reentry site, types of description of the launch/reentry site, types of anticipated operations, and anticipated frequency anticipated operations, and anticipated frequency of proposed operations. of proposed operations.

4. Operating procedures to include communica- Delete tions, real-time coordination, NOTAM content issuance, contingency, and emergency.

Add 6. For launch/reentry sites controlled and used by a single LSP, a single LOA for launch/reentry site and operation may be utilized. Contents of the LOA must comply with c1 through c5.

1. PARAGRAPH NUMBER AND TITLE: 4 − 6 − 6. FAA FORM 7230 − 10, POSITION LOG 4 − 6 − 7. AUTOMATED POSITION SIGN ON/OFF 2. BACKGROUND: Review of paragraphs 4 − 6 − 6 and 4 − 6 − 7 revealed an opportunity to provide several editorial updates.

3. CHANGE: OLD NEW 4 − 6 − 6. FAA FORM 7230 − 10, POSITION LOG 4 − 6 − 6. FAA FORM 7230 − 10, POSITION LOG Title through c1 No Change 2. Field 2 must contain a position identifier that 2. Field 2 must contain the facility is a maximum of five letters and/or numbers, position /sector identifier that is a maximum of five starting in the first space on the left side of the field. letters and/or numbers, starting in the first space on Unused spaces must be left blank. the left side of the field. Unused spaces must be left blank.

(a) ARTCCs: ARTCCs must use sector Delete identifiers which have been approved by the En Route and Oceanic Area Office.

(b) TERMINALS and FSSs : When there is Delete more than one position of a particular type, establish and use individual identifiers for each position.

When only one position of a particular type exists, this field may be left blank.

BG − 12 Briefing Guide 7/9/26 JO 7210.3EE CHG 3 OLD NEW 4 − 6 − 7. AUTOMATED POSITION SIGN 4 − 6 − 7. AUTOMATED POSITION SIGN ON/OFF ON/OFF Title through a No Change b. TERMINAL/EN ROUTE. No Change Use of automated position sign on/off procedures is Use of automated position sign on/off procedures is approved for terminal and en route facilities. The approved for terminal and en route facilities. The information requirements described in paragraph information requirements described in paragraph 4 − 6 − 6, FAA Form 7230 − 10, Position Log, for FAA 4 − 6 − 6, FAA Form 7230 − 10, Position Log, for FAA Form 7230 − 10 also apply to the automated Form 7230 − 10 also apply to the automated procedure, except that times on/off the position may procedure, except that times on/off the position may be displayed to the second rather than to the minute.

be displayed to the second rather than to the minute.

Before implementation, facilities must receive En Before implementation, facilities must receive Route and Oceanic Operations Area or Terminal Service Area Director of Air Traffic Operations Operations Area office approval and must verify the approval and must verify the accuracy of the accuracy of the automated sign on/off procedure by automated sign on/off procedure by conducting a conducting a 30 day trial period. After successfully 30 - day trial period. After verifying the automated verifying the automated procedure’s accuracy, an procedure’s accuracy, an actual FAA Form actual FAA Form 7230 − 10 is only required to be 7230 − 10 is only required to be used during those used during those times that the automated times that the automated procedure is not available.

procedure is not available.

1. PARAGRAPH NUMBER AND TITLE: 5 − 3 − 4. WEATHER RECONNAISSANCE FLIGHTS 2. BACKGROUND: The National Winter Season Operations Plan (NWSOP) updates annually; therefore, it was decided that the responsibilities outlined therein should not be contained in FAA Order JO 7210.3. With this understanding, several subparagraphs under 5 − 3 − 4a1 have been deleted and replaced with the NWSOP website link for the most current information. Additionally, hurricane and tropical cyclone mission responsibilities have been updated to ensure timely information is used for planning and dissemination by the ATCSCC and the ARTCCs.

3. CHANGE: OLD NEW 5 − 3 − 4. WEATHER RECONNAISSANCE 5 − 3 − 4. WEATHER RECONNAISSANCE FLIGHTS FLIGHTS Title through a No Change 1. Winter season missions are flown in support 1. Winter season missions are flown in support of the National Winter Season Operations Plan of the National Winter Season Operations Plan (NWSOP). The NWSOP states the 53WRS and (NWSOP). The Chief, Aerial Reconnaissance NOAA AOC will : Coordination, All Hurricanes (CARCAH) will publish the Winter Season Plan of the Day (WSPOD) by 1830 UTC. The WSPOD provides mission information and includes aircraft type and call sign, departure airfield, route of flight, and dropsonde release points.

(a) Ensure the appropriate ARTCC(s) has Delete access to the Winter Season Plan of the Day (WSPOD) prior to the mission: Briefing Guide BG − 13 JO 7210.3EE CHG 3 7/9/26 NOTE − Delete The WSPOD describes the mission and includes, for example, type aircraft call sign, departure airfield, and route of flight.

(b) Coordinate the mission directly with the Delete ARTCC(s) upon receipt of the mission tasking: NOTE − Delete The 53WRS and NOAA AOC are responsible for coordinating airspace access directly with DoD for missions on the U.S. east coast.

(c) File a flight plan as soon as practicable prior Delete to departure time: (d) Request a NOTAM by filing directly with Delete the U.S. NOTAM office: (e) Coordinate dropsonde instrument releases Delete with ATC prior to release and broadcast on 121.5 and 243.0 to advise any traffic in the area of the pending drop: NOTE − Delete 1. A dropsonde is a cardboard cylinder weighing less than a pound, that has a parachute attached, and is used for collecting weather data.

2. ATC responsibilities pertaining to dropsonde releases Delete are described in FAA Order JO 7110.65, paragraph 9 − 2 − 20, Weather Reconnaissance Flights.

Add NOTE − 1. The 53WRS and NOAA AOC are responsible for coordinating airspace access directly with DoD for missions on the U.S. east coast.

Add 2. The current season NWSOP is available at https://www.icams-portal.gov/resources.htm .

2. TEAL or NOAA flights may request the 2 . TEAL or NOAA flights may request Chief, Aerial Reconnaissance Coordinator, All CARCAH to relay an en route clearance request to Hurricanes ( CARCAH ) to relay an en route the ARTCC if the flight is unable to contact ATC.

clearance request to the ARTCC if the flight is unable to contact ATC.

NOTE − NOTE − ATC responsibilities pertaining to clearance requests via ATC responsibilities pertaining to clearance requests via CARCAH are described in FAA Order JO 7110.65, CARCAH are described in FAA Order JO 7110.65, paragraph 9 − 2 − 19 , Weather Reconnaissance Flights.

paragraph 9 − 2 − 20 , Weather Reconnaissance Flights .

a3 through b3(b) No Change (c) Review the Mission Coordination Sheet (c) Review the Mission Coordination Sheet.

and prepare a public Flow Evaluation Area (FEA) based on the latitude/longitude points specified in the Mission Coordination Sheet when a mission is scheduled to be flown. The FEA naming convention is the aircraft call sign. Modify the FEA when requested by the affected facilities .

BG − 14 Briefing Guide 7/9/26 JO 7210.3EE CHG 3 (d) Coordinate with the impacted ARTCCs as (d) D esignate the primary ARTCC when the required, and d esignate a primary ARTCC when the reconnaissance/research flights are expected to reconnaissance/research flights are expected to operate through airspace managed by multiple ATC operate through airspace managed by multiple ATC facilities.

facilities.

b3(e) through b4(e) No Change (f) When designated by ATCSCC as the (f) When designated by the ATCSCC as the Primary ATC Facility, ARTCC responsibilities Primary ATC Facility, or when the reconnais - include: sance/research flights are expected to operate only through airspace managed by your facility, ARTCC responsibilities include: (1) When necessary, coordinate with the (1) When necessary, coordinate with Chief, Aerial Reconnaissance Coordinator, All CARCAH and aircrew(s) on flight plan specifics.

Hurricanes ( CARCAH ) and aircrew(s) on flight plan specifics.

(2) If the mission profile changes, coordinate (2) If the mission profile changes, coordinate with the ATCSCC for FEA modifications, ensure with the ATCSCC and ensure other affected ATC other affected ATC facilities are aware of the facilities are aware of the change.

change.

1. PARAGRAPH NUMBER AND TITLE: 6 − 10 − 1. CONTROLLER PILOT DATA LINK COMMUNICATIONS (CPDLC) 2. BACKGROUND: The Controller Pilot Data Link Communications (CPDLC) capability is in use in all FAA Air Route Traffic Control Centers and at select airports 24 hours a day, which dictated the need to move CPDLC policies and procedures previously placed in FAA Order JO 7210.79, Controller Pilot Data Link Communications (CPDLC) in the ERAM Environment, into FAA Order JO 7210.3 effective January 22, 2026.

The January 2026 publication did not include the Blocked List Procedures, which is now being incorporated into this publication.

3. CHANGE: OLD NEW 6 − 10 − 1. CONTROLLER PILOT DATA LINK 6 − 10 − 1. CONTROLLER PILOT DATA LINK COMMUNICATIONS (CPDLC) COMMUNICATIONS (CPDLC) Title through e NOTE 2 No Change Add f. Blocked List Procedures Add 1. Contact ZTL or ZLC flight data unit to manually have an aircraft added or removed from the Blocked List.

Add 2. When aircraft are automatically added to the blocked list by the system, for reasons other than excessive logons, flight data personnel at ZTL and ZLC are directed to remove them from the blocked list manually.

Briefing Guide BG − 15 JO 7210.3EE CHG 3 7/9/26 NOTE − Add Aircraft that are added to the blocked list for excessive logons will not be automatically removed from the blocked list by flight data personnel at ZTL and ZLC.

f. Technical Operations (TO) personnel must be g. Technical Operations (TO) personnel must be notified when an outage or problem occurs with any notified when an outage or problem occurs with any element of the Terminal Data Link System (TDLS). element of the Terminal Data Link System (TDLS).

1. PARAGRAPH NUMBER AND TITLE: 10 − 3 − 16. GO-AROUND/MISSED APPROACH 2. BACKGROUND: A review of paragraph 10 − 3 − 16 identified a need to revise procedures for arrival/arrival and arrival/departure operations with intersecting flight paths on non-intersecting converging runways to address arrival traffic that conducts a go-around or missed approach. Previous versions of the paragraph did not explicitly require air traffic managers to develop procedural mitigations in these scenarios. The provision strengthens the use of technological tools that can assist with local procedure development and introduces a new requirement for arrival/arrival operations on converging non-intersecting runways be evaluated. Procedures, such as Simultaneous Converging Instrument Approaches (SCIA) and Dependent Converging Instrument Approaches (DCIA) may serve as alternatives procedural mitigations and are referenced in the paragraph. Additional references for intersecting runway/intersecting flight path operations are included as ATMs may elect to treat non-intersecting runways as runways that intersect for operational purposes.

3. CHANGE: OLD NEW 10 − 3 − 16. GO-AROUND/MISSED 10 − 3 − 16. GO-AROUND/MISSED APPROACH APPROACH AND NON-INTERSECTING CONVERGING RUNWAY OPERATIONS Add Tower facility directives must address procedures for go-arounds and/or missed approaches for all runway configurations.

a. Tower facility directives must address a. F acilities must give consideration, at a procedures for go-arounds and/or missed minimum, to the following factors: approaches. The procedures must require controllers to issue control instructions as necessary to establish separation. During the development or review of these procedures, f acilities must give consideration, at a minimum, to the following factors: a1 through b3 REFERENCE No Change c. Facility air traffic managers may develop c. N on-intersecting C onverging R unway procedural mitigations for n on-intersecting Operations (CRO): c onverging r unway s when a 1 NM extension of the runway centerline crosses the centerline of the other runway or the 1 NM extensions of a runway cross the extension of another runway. Facility directives must: BG − 16 Briefing Guide 7/9/26 JO 7210.3EE CHG 3 Add 1. ATMs must develop procedural mitigations if non-intersecting CRO operations are conducted and a 1 NM extension of the runway centerline crosses the centerline of the other runway or the 1 NM extension of a runway crosses the 1 NM extension of another runway. A facility directive must: 1. Specify procedures to ensure that an arrival (a) Specify procedures to ensure that an arrival that executes a go-around does not conflict with a that executes a go-around does not conflict with a departure off the non-intersecting converging departure off the non-intersecting converging runway. runway. (See FIG 10 − 3 − 2 and FIG 10 − 3 − 3.)

OLD Add Add Add Add NEW FIG 10 − 3 − 2 Departure/Arrival Non-Intersecting Converging Runway Operations Briefing Guide BG − 17 JO 7210.3EE CHG 3 7/9/26 FIG 10 − 3 − 3 Departure/Arrival Non-Intersecting Converging Runway Operations Add (b) Specify procedures to ensure that an arrival that executes a go-around does not conflict with an arrival to the non-intersecting converging runway. (See FIG 10 − 3 − 4.)

OLD Add Add BG − 18 Briefing Guide 7/9/26 JO 7210.3EE CHG 3 NEW FIG 10 − 3 − 4 Arrival/Arrival Non-Intersecting Converging Runway Operations 2. Define technological tools that could assist in (c) Define technological tools that assist with the locally developed procedures. locally developed procedures , where applicable .

3. Specify procedures to be used when Delete conditions dictate that intersecting runway separation standards must be applied.

Briefing Guide BG − 19 JO 7210.3EE CHG 3 7/9/26 NOTE − NOTE − The locally developed procedure will ensure that the Tools available for ATM consideration may include, but potential go around aircraft will not conflict with a are not limited to: departing aircraft that is departing the non-intersecting a. Arrival Departure Window (ADW) converging runways. All locally developed procedures b. ASDE-X/ASSC Virtual Runway Intersection Point will be approved by the Director, Operational Policy and (VRIP) Implementation, AJT − 2. ATMs will determine what tools c. Cutoff Points (CP) developed with the use of are needed in the development of local procedures. These enhanced TARGETS.

may include, but are not limited to: a. Arrival Departure Window (ADW) b. ASDE-X/ASSC Virtual Runway Intersection Point (VRIP) c. Cutoff Points (CP) developed with the use of enhanced TARGETS.

REFERENCE − No Change FAA Order JO 7110.65, Para 3 − 9 − 9, Non-intersecting Converging Runway Operations.

Add (d) Specify procedures to be used when conditions dictate intersecting runway separation standards must be applied.

REFERENCE − Add FAA Order JO 7110.65, Para 3 − 9 − 8, Intersecting Runway/Intersecting Flight Path Operations.

FAA Order JO 7110.65, Para 3 − 10 − 4, Intersecting Runway/Intersecting Flight Path Operations.

Add 2. A facility may be permitted to conduct independent non-intersecting CRO without the use of mitigations for runway pairs in subparagraph c1 above when: Add ( a) A safety analysis and/or simulation modeling is conducted for the non-intersecting CRO runway pair and the arrival/departure configuration meets the FAA target level of safety. For example, SCIA (see paragraph 10 − 4 − 12) or Dependent Converging Instrument Approaches (DCIA) (see FAA Order JO 7110.110) implementation may serve as an alternative to developing mitigations under subparagraph c1 above.

Add (b) Runway configurations and operational constraints for which these provisions are applied must be specified in a facility directive.

Add NOTE − The above provisions will only be considered after review of a facility Safety Risk Management Document (SRMD).

Add 3. All non-intersecting CRO procedures under subparagraph c above must be approved by the Director, Strategic Operations, Headquarters, AJT − 1.

BG − 20 Briefing Guide 7/9/26 JO 7210.3EE CHG 3 d. The procedures must be evaluated on an annual d. The ATM must review facility go-around/ basis to determine their effectiveness . missed approach and/or non-intersecting CRO procedures on an annual basis and revise as necessary .

e. A facility may be permitted to conduct Delete independent non-intersecting Converging Runway Operations (CRO) without use of the mitigations as defined in subparagraph c, when the following conditions are met: 1. A documented independent safety analysis Delete indicating that a specific non-intersecting CRO configuration meets FAA safety criteria.

2. Runway configurations for which these Delete provisions are applied must be specified in a facility directive.

NOTE − Delete The above provisions will only be considered after review of a facility Safety Risk Management Document (SRMD).

1. PARAGRAPH NUMBER AND TITLE: 11 − 2 − 6. FAA CONTRACT TOWER (FCT) AIR TRAFFIC CONTROLLER ELIGIBILITY 2. BACKGROUND: In addition to the Enhanced Collegiate Training Initiative (E − CTI), the FAA has recently approved a new Federal Contract Tower (FCT) hiring pathway for graduates of FAA-approved institutions called the Control Tower Operator Partnership program (CTO − P). This initiative is designed to prepare individuals for employment at FCTs as developmental controllers by providing foundational curriculum and simulation training that mirrors FAA academy standards for Initial Qualification Training (IQT). Upon successful completion from an FAA-approved CTO − P institution, students will be eligible for hiring by FCT companies and trained for their first facility rating in accordance with applicable CFRs and FAA orders.

3. CHANGE: OLD NEW 11 − 2 − 6. FAA CONTRACT TOWER (FCT) 11 − 2 − 6. FAA CONTRACT TOWER (FCT) AIR TRAFFIC CONTROLLER AIR TRAFFIC CONTROLLER ELIGIBILITY ELIGIBILITY Title through a No Change b. Persons not holding a previous CTO certificate b. Persons not holding a previous CTO certificate or AOV credential with a tower rating must have a or AOV credential with a tower rating must have a valid e nhanced Air Traffic Collegiate Training valid E nhanced Air Traffic Collegiate Training Initiative ( AT − CTI) endorsement letter. Initiative ( E − CTI) tower endorsement letter or graduated from an FAA-approved Control Tower Operator Partnership (CTO − P) school .

Briefing Guide BG − 21 JO 7210.3EE CHG 3 7/9/26 1. PARAGRAPH NUMBER AND TITLE: 11 − 3 − 3. CIC DESIGNATION AT FCT-OPERATED FACILITIES 2. BACKGROUND: This is a new paragraph that parses out controller-in-charge CIC designation requirements at FAA Contract Tower (FCT) operated facilities, which differ from CIC designation requirements at FAA operated facilities.

3. CHANGE: OLD NEW Add 11 − 3 − 3. CIC DESIGNATION AT FCT-OPERATED FACILITIES Add CIC designation at FCT-operated facilities differs from CIC designation at FAA-operated facilities due to administrative differences. For FCTs, candidates for CIC must: Add a. Have been prior certified FAA/DoD/military controllers, or have FCT CIC experience, with assessment by the ATM that the candidate’s experience is suitable for CIC designation.

Candidates hired via Enhanced Air Traffic Collegiate Training Initiative or Control Tower Operator Partnership (CTO − P) must have been certified for 6 months in the facility where CIC duties will be performed. The Service Area Director of Air Traffic Operations may issue a facility waiver for the 6-month requirement where a more immediate assignment is needed.

Waivers to facilities will be for 2 years.

Add b. Be operationally current.

Add c. Be selected by the ATM.

1. PARAGRAPH NUMBER AND TITLE: 14 − 3 − 6. REGULATORY NOTAMs FOR PRESIDENTIAL TFR, SPECIAL SECURITY INSTRUCTIONS, OR EMERGENCY AIR TRAFFIC RULES 2. BACKGROUND: This paragraph currently appears in FAA Order 7930.2, Notice to Airmen (NOTAM), Appendix D (paragraph D − 2), but is being moved to FAA Order JO 7210.3, Facility Operation and Administration, to align with similar operational instructions in Chapter 14 of this order.

3. CHANGE: OLD NEW Add 14 − 3 − 6. REGULATORY NOTAMs FOR PRESIDENTIAL TFR, SPECIAL SECURITY INSTRUCTIONS, OR EMERGENCY AIR TRAFFIC RULES Add a. Upon receipt of these messages, the watch supervisor, controller-in-charge (CIC), or desig - nated lead specialist (DLS) at the designated FSS must ensure that the applicable NOTAM is received at each of the remaining facilities.

BG − 22 Briefing Guide

section 91.141), Special Security Instructions

7/9/26 JO 7210.3EE CHG 3 Add b. The watch supervisor, CIC, or DLS of the designated FSS must be responsible for: Add 1. Logging the Presidential TFR (14 CFR section 91.141), Special Security Instructions flight restriction (14 CFR section 99.7), or Emergency Air Traffic Rules (14 CFR section 91.139) regulatory NOTAM in the facility log.

Add 2. Notifying the specialists on duty that a Presidential TFR, Special Security Instructions, or Emergency Air Traffic Rules regulatory NOTAM has been issued, if applicable.

Add 3. Posting the applicable Presidential TFR, Special Security Instructions, or Emergency Air Traffic Rules regulatory NOTAM in the facility status information area.

Add 4. As part of the FSS watch checklist, the watch supervisor, CIC, or DLS must check to ensure that every applicable Presidential TFR, Special Security Instructions flight restriction, or Emergency Air Traffic Rules regulatory NOTAM has been received in the facility.

NOTE − Add The purpose of this procedure is to ensure that all flight service specialists are aware of applicable regulatory NOTAMs for Presidential TFRs, Special Security Instructions flight restrictions, or Emergency Air Traffic Rules so that pilots are briefed appropriately.

1. PARAGRAPH NUMBER AND TITLE: 18 − 4 − 7. SPACE LAUNCH OR REENTRY VEHICLE MISHAPS 2. BACKGROUND: With the increase of space transport operations in the NAS, efforts to enhance guidance to various orders are being made to raise situational awareness and prepare facilities for the integration of space activities. A collaborative effort of NAS stakeholders sought a change to the subject order to assist facilities in ensuring that they monitor ATO Space Operations (AJR − 1800) hotlines and provide valuable data in the event of mishaps.

3. CHANGE: OLD NEW 18 − 4 − 7. SPACE LAUNCH OR REENTRY 18 − 4 − 7. SPACE LAUNCH OR REENTRY VEHICLE MISHAPS MISHAPS Title through b No Change Add c. The facility must ensure participation in hotlines hosted by ATO Space Operations (AJR − 1800) for tactical space operations with potential impact to their airspace. The roles and responsibilities must be defined in a facility directive.

Briefing Guide BG − 23 JO 7210.3EE CHG 3 7/9/26 REFERENCE − Add FAA Order JO 7210.3, Para 4 − 3 − 6, Space LOAs.

FAA Order JO 7400.2, Para 31–3–1, Responsibilities, Subpara b.

Add d. Facility reporting for mishaps should include playback data (CDR, FALCON, NVR, etc.) covering the affected area/airspace during the period when debris was reported falling.

REFERENCE − Add FAA Order JO 7110.65, Para 10–5–2 Debris-Generating Space Launch or Reentry Vehicle Mishaps.

FAA Order JO 7210.632 Air Traffic Organization Occurrence Reporting, Appendix A.

1. PARAGRAPH NUMBER AND TITLE: 18 − 5 − 4. RESPONSIBILITIES 2. BACKGROUND: Review of paragraph 18 − 5 − 4, followed by discussion with representatives from the David J. Hurley Air Traffic Control System Command Center, revealed the opportunity to provide an organization update.

3. CHANGE: OLD NEW 18 − 5 − 4. RESPONSIBILITIES 18 − 5 − 4. RESPONSIBILITIES Title through d4 No Change e. Terminal facilities listed in 18 − 5 − 1 must: e. Terminal facilities listed in TBL 18 − 5 − 1 must: e1 through e3 No Change 4. Submit suggestions for improvement to the 4. Forward suggestions for NTML Terminal Operations area office, when applicable . improvement to the District TMO . The TMO will consult with the ATCSCC.

1. PARAGRAPH NUMBER AND TITLE: Appendix 6. Commercial Space LOA Sample Templates 2. BACKGROUND: In Spring of 2024, Air Traffic Safety Oversight Service (AOV) conducted an audit to determine compliance with policy and procedural requirements for integrating space launch/reentry vehicle operations in the NAS. An observation of noncompliance with letter of agreement (LOA) guidance and a recent update to FAA Order JO 1000.45, Application of the Acceptable Level of Risk to Space Missions in the NAS, prompted a review of FAA Order JO 7210.3, Facility Operation and Administration, Appendix 6, Commercial Space LOA Sample Templates, resulting in proposed updates to procedures to address gaps and provide clarity to facilities drafting LOAs.

3. CHANGE: OLD NEW Appendix 6. Commercial Space LOA Sample Appendix 6. Space LOA Sample Templates Templates BG − 24 Briefing Guide 7/9/26 JO 7210.3EE CHG 3 OLD [Name(s) of affected Air Traffic Control Facilities (Controlling Facility listed first)], ATO Space Operations, [Operator] Letter of Agreement Effective: Subject: Coordination of [Operator] Launch/Reentry Operations from [name and location of Launch and (if applicable) Reentry site] 1. Purpose: State the purpose of the Letters of Agreement (LOA), type of operation (launch, launch with reentry), and location of operation (name and location of launch and (if applicable) Reentry site). If LOA is for a one − time operation, state that.

Sample text: This Letters of Agreement (LOA) provides procedures for the integration and appropriate coordination of [licensed/permitted] [ Vehicle Type: horizontal/vertical] [launch/launch with reentry/hover − test] operations into the National Airspace System (NAS) from [name and location of launch and (if applicable) Reentry site].

2. Cancellation: Include any previous LOA canceled by this one [Subject and Effective Date of LOA being cancel l ed].

State agreement to review LOA annually.

Sample text: This LOA will remain in effect until cancel l ed by any signatory entity and will be reviewed annually throughout the life of the [license/permit] or when modifications are made to the [license/permit].

3. Scope: List the pertinent ATC facilities, Operator, and any additional stakeholders, including ATO Space Operations, Federal Ranges, and military facilities as applicable. State distribution of the LOA. The distribution should include, at a minimum, all signatories and the Office of Commercial Space Transportation (AST).

Sample Text: This LOA is pertinent to [ATC facilities], [additional stakeholders], and [Operator]. It is to be distributed to all signatories and stakeholders].

4. Responsibilities: State the responsibilities of the Operator, Controlling Facility, and as needed, any other stakeholders and/or affected facilities.

a. Operator must fulfill requirements provided in the Sample Text for this section.

b. Controlling Facility must fulfill requirements provided in the Sample Text for this section , and , 1. Fill out the Points of Contact Table (Attachment B).

2. Fill out the Actions Timetable (Attachment C) c. (As needed) Other stakeholders and affected facilities must: 1. Ensure appropriate personnel are aware of the provisions of this agreement.

Sample text for Operator : a. [Operator] must: 1. Ensure all Operator [and their designees] personnel operating within the scope of this agreement are knowledgeable of, understand, and comply with the provisions of this agreement.

2. Establish, make available, and be prepared to execute approved contingency plan(s).

a) Unless an established contingency plan has been approved by all necessary parties, [Operator] must coordinate requirements and get approval from [Controlling Facility] for contingency plan(s) at least [XX] calendar days prior to each operation.

Briefing Guide BG − 25 JO 7210.3EE CHG 3 7/9/26 3. Follow the procedures in Section 5 and the Action Timetable (Attachment C) with regards to communications and notifications.

4. Notify the parties in the Points of Contact Table (Attachment B) immediately if scheduled operations are cancel l ed.

5. (As needed) Develop separate agreements with foreign Air Navigation Service Providers when airspace coordination outside of the U.S. Flight Information Region is needed for the operation.

Sample text for Controlling Facility : b. [Controlling Facility] must: 1. Ensure all personnel responsible for providing air traffic service within the scope of this agreement are knowledgeable of, understand, and comply with the provisions of this agreement. This includes notification to other affected facilities.

2. Ensure appropriate [Controlling Facility] personnel are aware of and prepared to execute approved contingency plan(s).

3. Communicate with necessary facilities and ascertain their readiness to execute approved contingency plan(s).

4. Except when real time notifications of actual start of activity and end of activity times are provided to the facility via ATO Space Operations coordination, take appropriate actions to restrict airspace use during the effective times of the aircraft hazard area(s).

5. Take additional measures for public safety deemed necessary by 14 CFR parts 400 − 460.

Sample text as needed : c. (As needed) [Other stakeholders and affected facilities] must: 1. Ensure appropriate personnel are aware of the provisions of this agreement.

2. Ensure appropriate personnel are aware of and prepared to execute approved contingency plan(s).

d. Deviations from responsibilities and/or procedures established in this LOA must be coordinated prior to each operation, and responsibilities must be clearly defined in each case.

5. Procedures: Specify timeline and details for activities to take place prior to, during, and upon completion of operation.

Specify frequency of proposed operations and any limitations when considering dates and times of operations.

Include any restrictions on days of week and/or times of day operations that may or may not occur. Restrictions may include times when military operations require use of certain airspace. Specify procedure(s) for handling anomalies and emergencies. Information conveyed should include the location of event (latitude and longitude, represented as degree − minute − second) (when available), vehicle state, projected time the hazard will no longer be present, and any other pertinent details.

Sample text : a. [Operator] must: 1. Provide a Launch/Reentry Forecast Package to the parties specified in the Points of Contact Table (Attachment B), except Central Altitude Reservation Facility (CARF), at least once every [XX] months. These forecasts will include a best estimate of all anticipated launches for the upcoming [XX] months.

2. Provide [Controlling Facility] a pre − planning package a minimum of [XX] calendar days prior to the planned operation. At a minimum, the package should include: a) The launch/reentry window.

b) The best estimate of the geographic definition of the hazard area(s) (latitude and longitude, represented as degree − minute − second) (when available) for the primary date and any back − up date(s).

c) (As needed) Any support aircraft’s type and call sign.

3. (As needed) Submit Altitude Reservation (ALTRV) request(s) to CARF (and email a copy of the request to the [Controlling Facility]) a minimum of [XX] days prior to the planned operation.

BG − 26 Briefing Guide 7/9/26 JO 7210.3EE CHG 3 4. Verify the issuance of the appropriate NOTAMs.

5. No less than [XX] minutes in advance of a planned operation, notification will be given by [Operator] to [Controlling Facility] of intent for the [launch/hover − test] to take place.

6. During the operation, a [Operator] representative must participate on an FAA Hotline teleconference with [Controlling Facility] and ATO Space Operations (see Actions Timetable, Attachment C, for phone number).

Communication on the FAA Hotline teleconference must be established no less than [XX] minutes prior to planned operation.

a) The [Operator] representative must be able to provide real − time verbal indications of the status of the operation, its progress along the launch/reentry trajectory, and occurrence of significant events.

b) Participation by representative(s) from [other stakeholders and affected facilities] is advised.

7. Notify [Controlling Facility] upon completion of the operation.

8. (As needed) Contact CARF and request that the appropriate ALTRVs be cancel l ed.

9. In the event of an anomaly, a [Operator] representative must immediately notify [Controlling Facility], via FAA Hotline teleconference, of the occurrence of the anomaly. Information communicated should include, at a minimum: a) The last known state of the vehicle.

b) The location of the off − nominal event (latitude and longitude, represented as degree − minute − second) (when available).

c) The predicted location(s) impacted (latitude and longitude, represented as degree − minute − second) (when available).

d) Projected time the hazard(s) will no longer be present (when known).

e) Other information that will provide estimated positions of hazards.

10. In the event of an emergency, [Operator] must immediately contact [Controlling Facility], via FAA Hotline teleconference and email all the parties listed in the Points of Contact Table (Attachment B). Information conveyed should include, at a minimum: a) The last known state of the vehicle.

b) The location of the event (latitude and longitude, represented as degree − minute − second) (when available).

c) The predicted location(s) impacted (latitude and longitude, represented as degree − minute − second) (when available).

d) Projected time the hazard(s) will no longer be present (when known).

e) Other information that will provide estimated positions of hazards.

b. [Controlling Facility]: 1. Upon notification of a completed operation, [Controlling Facility] must cancel appropriate airspace restrictions and/or NOTAMs.

2. In the event when [Controlling Facility] becomes aware of a condition that would make the launch/reentry unsafe, [Controlling Facility] must immediately contact, via FAA Hotline, [Operator] and all other parties listed in the Points of Contact Table (Attachment B).

6. Attachments a. Signatures b. Points of Contact Table c. Actions Timetable d. Only include graphics that are applicable to this scenario:  Launch/Reentry Site Description/Map  Aircraft Hazard Area Description/Map Briefing Guide BG − 27 JO 7210.3EE CHG 3 7/9/26  Temporary Flight Restriction Description/Map  Air Traffic Control Assigned Airspace Description/Map e. Commercial Launch/Reentry Site LOA BG − 28 Briefing Guide 7/9/26 JO 7210.3EE CHG 3 Attachment A: Signatures ______________________ ______________________ [Controlling Facility] [Operator] ______________________ [ATO Space Operations] ______________________ [as appropriate, other stakeholders, including Federal Ranges and military facilities] Briefing Guide BG − 29 JO 7210.3EE CHG 3 7/9/26 Attachment B: Points of Contact Table The following table should be completed by the [Controlling Facility] and the information should be verified prior to every operation.

Office Phone # Email Responsibility [Operator] [Controlling Facility] Supervisor in Charge [Controlling Facility] Traffic Management Unit ATO Space Operations Central Altitude Reservation Function (CARF) National Traffic Management Office (NTMO) Attachment C: Actions Timetable The following table should be completed by [Controlling Facility]. In coordination with the [Controlling Facility], [Operator] must ensure that the following actions are completed at the defined intervals.

Date Time Event Remarks Completed Operator should provide best T – [XX] months Submit estimate of all known Suggestion: Launch/reentry launch/reentry dates for upcoming T – 6 months Forecast Package six months.

T – [XX] Coordinate Operator should coordinate with calendar days launch/reentry ATO Space Operations and as Suggestion: corridor/hazard appropriate, other affected T – 30 – 60 area(s) facilities.

calendar days T – [XX] Operator should provide a calendar days Submit Pre − Planning description of the Aircraft Hazard Suggestion: Package Area(s), along with date(s) and T – 10 calendar time(s) for launch/reentry.

days BG − 30 Briefing Guide 7/9/26 JO 7210.3EE CHG 3 Date Time Event Remarks Completed Operator is responsible for coordinating all necessary ALTRV T – [XX] requests. Requests should be File an Altitude calendar days submitted via email to Reservation (ALTRV) ___________@FAA.gov A copy of Suggestion: request with CARF (as the request should also be emailed T – 5 − 14 needed) to [Controlling Facility].

calendar days Contact: Operator should contact [Controlling Facility] for issuance of TFR(s) and NOTAM(s) (as Verify issuance of needed).

appropriate airspace T – [XX] hours notices (NOTAMs and Per 14 CFR § 91.143, TFRs need to TFRs) be issued at least ___ hours in advance of the scheduled operation.

T – [XX] hours and repeat again Operator contacts [Controlling at Facility] via [telephone/email] and Provide operational T – [XX] hours provides operational status report, status report which includes confirmation of Suggestion: T – intent and specifics of operation.

24 hours and 3 hours [FAA Hotline telephone #] The operation will be delayed or terminated if the Operator does T – [XX] minutes not establish communications via Suggestion: Establish Hotline FAA Hotline teleconference.

connection T – 60 − 30 Operator must have a minutes representative on the FAA Hotline teleconference until the operation is complete.

Operator provides operational status report. This report includes T – [XX] minutes confirmation that the operation Provide operational will take place as scheduled.

Suggestion: T – status report 30 minutes As necessary, Operator should continue to communicate any significant operational changes.

Briefing Guide BG − 31 JO 7210.3EE CHG 3 7/9/26 Date Time Event Remarks Completed T – [XX] minutes Operator must receive clearance or and repeat at T – Receive final clearance confirmation of continued [XX] minutes or confirmation of approved mission status from Suggestion: T – continued approved [Controlling Facility] to proceed 10 minutes and T mission status with operation.

– 5 minutes Maintain real − time Operator must provide real − time communication via During operation verbal indications on the status of FAA Hotline the vehicle.

teleconference Notify ATC and CARF ATC must be notified when (if applicable) of operation is complete. TFR(s), completion or ALTRV(s), and any other cancellation of necessary notices should be operation cancelled as soon as practicable.

Post − operation or mission A debrief should occur ideally cancellation within __ hours, but no later than Schedule __ hours of the completion of the post − operation debrief operation. A debrief should be conducted even if no off − nominal activity occurred.

BG − 32 Briefing Guide 7/9/26 JO 7210.3EE CHG 3 8/7/25 JO 7210.3EE CHG 1 Instructions for Letter of Agreement Template: Launch and Reentry Site Letter of Agreement Effective: Subject: Operations at [Name and location of Launch and Reentry Site] 1. Purpose: State the purpose of the Letters of Agreement (LOA), type(s) of anticipated operation ( if launch: [horizontal/vertical]) [launch/reentry], frequency of proposed operation(s) (if known), and name and location of Launch and Reentry Site.

Sample text: This LOA establishes a framework for the coordination and planning of procedures for [licensed/permitted] ( if launch: [horizontal/vertical]) [launch/reentry] operations into the National Airspace System from [name and location of Launch and Reentry Site].

2. Cancellation: Include any previous LOA canceled by this one [Subject and Effective Date of LOA being cancel l ed]. State agreement to review LOA annually.

Sample text: This LOA will remain in effect until cancel l ed by any signatory entity and will be reviewed annually throughout the life of the license or when modifications are made to the license.

3. Scope: List the affected ATC facilities; Launch/Reentry Site Operator; and any additional stakeholders, including ATO Space Operations, Federal Ranges, and military facilities, as applicable.

State that this LOA does not guarantee the approval of operations from the Launch and Reentry Site. Once a Vehicle Operator has been identified and its operations approved, responsibilities and procedures will be outlined in a separate letter of agreement with each Vehicle Operator.

State that this LOA does not confer any proprietary, property, or exclusive right in the use of airspace or outer space referenced in Code of Federal Regulation (CFR) 420.41.

State distribution of the LOA. The distribution should include, at a minimum, all signatories.

Sample text: This LOA is pertinent to [ATC facilities and stakeholders; including ATO Space Operations] and [Launch/Reentry Site Operator]. It does not guarantee the approval of operations from the Launch/Reentry Site.

Once a Vehicle Operator has been identified and its operations approved, responsibilities and procedures will be outlined in a separate LOA with each Vehicle Operator.

This LOA does not confer any proprietary, property, or exclusive right in the use of airspace or outer space referenced in Code of Federal Regulation (CFR) 420.41.

This LOA is to be distributed to the signatories, additional stakeholders, and the Office of Commercial Space Transportation (AST).

4. Responsibilities: State the responsibilities of the Site Operator, Controlling Facility, and as needed, any other stakeholders and/or affected facilities. All parties named within this letter of agreement will work collaboratively to develop the following: a. Procedures for notification and scheduling of operations, to include procedures for the issuance of Notices to Airmen, Altitude Reservations and Special Activity Airspace access.

b. Plans for communication between the operator and the FAA as necessary, before, during, and after a scheduled operation.

Briefing Guide BG − 33 JO 7210.3EE CHG 3 7/9/26 Air Traffic Control Facilities (Controlling Facility listed first)], ATO Space Operations, [Launch and Reentry Site Operator] c. Plans and procedures for cancellations, contingencies, and emergencies.

d. Plans and procedures for any other measures deemed necessary by the FAA to ensure public health and safety.

Sample text: a. [Launch/Reentry Site Operator] is responsible for the management, operation, and maintenance of the Launch/Reentry Site. This includes the coordination with users of its facility and the responsibility for ensuring all necessary information regarding operations is provided to the appropriate ATC facilities.

b. The FAA is responsible for the safe, orderly, and expeditious flow of known air traffic under its control. It is also responsible for the dissemination of pertinent information to the aviation community.

c. All parties named in this LOA will work collaboratively to develop procedures and other such measures deemed necessary to protect public health and safety.

5. Attachments State the responsibilities of the Site Operator, Controlling Facility, and as needed, any other stakeholders and/or affected facilities. All parties named within this letter of agreement will work collaboratively to develop the following: A. Signatures B. Points of Contact Table C. Graphics/Maps  Physical Site Description/Map  Airspace Description/Map(s) BG − 34 Briefing Guide 7/9/26 JO 7210.3EE CHG 3 [Name(s) of affected Air Traffic Control Facilities (Controlling Facility listed first)], ATO Space Operations, [Launch and Reentry Site Operator] Attachment A: Signatures ______________________ ______________________ [Controlling Facility] [Launch/Reentry Site Operator] ______________________ [ATO Space Operations] ______________________ [As appropriate, other stakeholders, including Federal Ranges and military facilities.]

Briefing Guide BG − 35 JO 7210.3EE CHG 3 7/9/26 [Name(s) of affected Air Traffic Control Facilities (Controlling Facility listed first)], ATO Space Operations, [Launch and Reentry Site Operator] Attachment B: Points of Contact Table The following table should be completed by the [Controlling Facility] and the information should be verified prior to every operation.

Office Phone # Email Responsibility [Controlling Facility] Airspace and Procedures Office [Controlling Facility] Traffic Management Unit ATO Space Operations [Launch and Reentry Site Operator] Add BG − 36 Briefing Guide 7/9/26 JO 7210.3EE CHG 3 NEW Instructions for Letter of Agreement Template: Launch and Reentry Operator [Name(s) of affected Air Traffic Control Facilities (Controlling Facility listed first)], ATO Space Operations, [Operator] Letter of Agreement Effective: Subject: Coordination of [Operator] Launch/Reentry Operations from [name and location of Launch and (if applicable) Reentry site] 1. Purpose: State the purpose of the Letters of Agreement (LOA), type of operation (launch, launch with reentry), and location of operation (name and location of launch and (if applicable) Reentry site). If LOA is for a one-time operation, state that.

Sample text: This Letters of Agreement (LOA) provides procedures for the integration and appropriate coordination of [licensed/permitted] [ Vehicle Type: horizontal/vertical] [launch/launch with reentry/hover-test] operations into the National Airspace System (NAS) from [name and location of launch and (if applicable) Reentry site].

2. Cancellation: Include any previous LOA canceled by this one [Subject and Effective Date of LOA being canceled].

State agreement to review LOA annually.

Sample text: This LOA will remain in effect until canceled by any signatory entity and will be reviewed annually throughout the life of the [license/permit] or when modifications are made to the [license/permit].

3. Scope: List the pertinent ATC facilities, Operator, and any additional stakeholders, including ATO Space Operations, Federal Ranges, and military facilities as applicable. State distribution of the LOA. The distribution should include, at a minimum, all signatories and the Office of Commercial Space Transportation (AST).

Sample Text: This LOA is pertinent to [ATC facilities], [additional stakeholders], and [Operator]. It is to be distributed to all signatories and stakeholders].

4. Responsibilities: State the responsibilities of the Operator, Controlling Facility, and as needed, any other stakeholders and/or affected facilities.

a. Operator must fulfill requirements provided in the Sample Text for this section.

b. Controlling Facility must fulfill requirements provided in the Sample Text for this section and 1. Fill out the Points of Contact Table (Attachment B).

2. Fill out the Actions Timetable (Attachment C) .

c. (As needed) Other stakeholders and affected facilities must: 1. Ensure appropriate personnel are aware of the provisions of this agreement.

Sample text for Operator : a. [Operator] must: 1. Ensure all Operator [and their designees] personnel operating within the scope of this agreement are knowledgeable of, understand, and comply with the provisions of this agreement.

2. Establish, make available, and be prepared to execute approved contingency plan(s).

a) Unless an established contingency plan has been approved by all necessary parties, [Operator] must coordinate requirements and get approval from [Controlling Facility] for contingency plan(s) at least [XX] calendar days prior to each operation.

Briefing Guide BG − 37 JO 7210.3EE CHG 3 7/9/26 3. Follow the procedures in Section 5 and the Action Timetable (Attachment C) with regards to communications and notifications.

4. Notify the parties in the Points of Contact Table (Attachment B) immediately if scheduled operations are canceled.

5. (As needed) Develop separate agreements with foreign Air Navigation Service Providers when airspace coordination outside of the U.S. Flight Information Region is needed for the operation.

Sample text for Controlling Facility : b. [Controlling Facility] must: 1. Ensure all personnel responsible for providing air traffic service within the scope of this agreement are knowledgeable of, understand, and comply with the provisions of this agreement. This includes notification to other affected facilities.

2. Ensure appropriate [Controlling Facility] personnel are aware of and prepared to execute approved contingency plan(s).

3. Communicate with necessary facilities and ascertain their readiness to execute approved contingency plan(s).

4. Except when real time notifications of actual start of activity and end of activity times are provided to the facility via ATO Space Operations coordination, take appropriate actions to restrict airspace use during the effective times of the aircraft hazard area(s).

5. Take additional measures for public safety deemed necessary by 14 CFR parts 400 − 460.

Sample text as needed : c. (As needed) [Other stakeholders and affected facilities] must: 1. Ensure appropriate personnel are aware of the provisions of this agreement.

2. Ensure appropriate personnel are aware of and prepared to execute approved contingency plan(s).

d. Deviations from responsibilities and/or procedures established in this LOA must be coordinated prior to each operation, and responsibilities must be clearly defined in each case.

5. Procedures: Specify timeline and details for activities to take place prior to, during, and upon completion of operation.

Specify frequency of proposed operations and any limitations when considering dates and times of operations.

Include any restrictions on days of week and/or times of day operations that may or may not occur. Restrictions may include times when military operations require use of certain airspace. Specify procedure(s) for handling anomalies and emergencies. Information conveyed should include the location of event (latitude and longitude, represented as degree − minute − second) (when available), vehicle state, projected time the hazard will no longer be present, and any other pertinent details.

Sample text : a. [Operator] must: 1. Provide a Launch/Reentry Forecast Package to the parties specified in the Points of Contact Table (Attachment B), except Central Altitude Reservation Function (CARF), at least once every [XX] months. These forecasts will include a best estimate of all anticipated launches for the upcoming [XX] months.

2. Provide [Controlling Facility] a pre-planning package a minimum of [XX] calendar days prior to the planned operation. At a minimum, the package should include: a) The launch/reentry window.

b) The best estimate of the geographic definition of the hazard area(s) (latitude and longitude, represented as degree − minute − second) (when available) for the primary date and any back-up date(s).

c) (As needed) Any support aircraft’s type and call sign.

3. (As needed) Submit Altitude Reservation (ALTRV) request(s) to CARF (and email a copy of the request to the [Controlling Facility]) a minimum of [XX] days prior to the planned operation.

BG − 38 Briefing Guide 7/9/26 JO 7210.3EE CHG 3 4. Verify the issuance of the appropriate NOTAMs.

5. No less than [XX] minutes in advance of a planned operation, notification will be given by [Operator] to [Controlling Facility] of intent for the [launch/hover-test] to take place.

6. During the operation, a [Operator] representative must participate on an FAA Hotline teleconference with [Controlling Facility] and ATO Space Operations (see Actions Timetable, Attachment C, for phone number).

Communication on the FAA Hotline teleconference must be established no less than [XX] minutes prior to planned operation.

a) The [Operator] representative must be able to provide real-time verbal indications of the status of the operation, its progress along the launch/reentry trajectory, and occurrence of significant events.

b) Participation by representative(s) from [other stakeholders and affected facilities] is advised.

7. Notify [Controlling Facility] upon completion of the operation.

8. (As needed) Contact CARF and request that the appropriate ALTRVs be canceled.

9. In the event of an anomaly, a [Operator] representative must immediately notify [Controlling Facility], via FAA Hotline teleconference, of the occurrence of the anomaly. Information communicated should include, at a minimum: a) The last known state of the vehicle.

b) The location of the off-nominal event (latitude and longitude, represented as degree − minute − second) (when available).

c) The predicted location(s) impacted (latitude and longitude, represented as degree − minute − second) (when available).

d) Projected time the hazard(s) will no longer be present (when known).

e) Other information that will provide estimated positions of hazards.

10. In the event of an emergency, [Operator] must immediately contact [Controlling Facility], via FAA Hotline teleconference and email all the parties listed in the Points of Contact Table (Attachment B). Information conveyed should include, at a minimum: a) The last known state of the vehicle.

b) The location of the event (latitude and longitude, represented as degree − minute − second) (when available).

c) The predicted location(s) impacted (latitude and longitude, represented as degree − minute − second) (when available).

d) Projected time the hazard(s) will no longer be present (when known).

e) Other information that will provide estimated positions of hazards.

b. [Controlling Facility]: 1. Upon notification of a completed operation, [Controlling Facility] must cancel appropriate airspace restrictions and/or NOTAMs.

2. In the event when [Controlling Facility] becomes aware of a condition that would make the launch/reentry unsafe, [Controlling Facility] must immediately contact, via FAA Hotline, [Operator] and all other parties listed in the Points of Contact Table (Attachment B).

6. Attachments a. Signatures b. Points of Contact Table c. Actions Timetable d. Only include graphics that are applicable to this scenario:  Launch/Reentry Site Description/Map  Aircraft Hazard Area Description/Map Briefing Guide BG − 39 JO 7210.3EE CHG 3 7/9/26  Temporary Flight Restriction Description/Map  Air Traffic Control Assigned Airspace Description/Map e. Commercial Launch/Reentry Site LOA BG − 40 Briefing Guide 7/9/26 JO 7210.3EE CHG 3 Attachment A: Signatures ______________________ ______________________ [Controlling Facility] [Operator] ______________________ [ATO Space Operations] ______________________ [as appropriate, other stakeholders, including Federal Ranges and military facilities] Briefing Guide BG − 41 JO 7210.3EE CHG 3 7/9/26 Attachment B: Points of Contact Table The following table should be completed by the [Controlling Facility] and the information should be verified prior to every operation.

Office Phone # Email Responsibility [Operator] [Controlling Facility] Supervisor in Charge [Controlling Facility] Traffic Management Unit ATO Space Operations Central Altitude Reservation Function (CARF) National Traffic Management Office (NTMO) Attachment C: Actions Timetable The following table should be completed by [Controlling Facility]. In coordination with the [Controlling Facility], [Operator] must ensure that the following actions are completed at the defined intervals.

Date Time Event Remarks Completed T – [XX] months Operator should provide best estimate Submit Launch/reentry of all known launch/reentry dates for Suggestion: Forecast Package T – 6 months upcoming six months.

T – [XX] calendar days Coordinate Operator should coordinate with ATO launch/reentry Space Operations and as appropriate, Suggestion: corridor/hazard area(s) other affected facilities.

T – 30 – 60 calendar days T – [XX] calendar Operator should provide a description days Submit Pre-Planning of the Aircraft Hazard Area(s), along Suggestion: Package with date(s) and time(s) for T – 10 calendar launch/reentry.

days BG − 42 Briefing Guide 7/9/26 JO 7210.3EE CHG 3 Date Time Event Remarks Completed Operator is responsible for coordinating all necessary ALTRV T – [XX] calendar requests. Requests should be File an Altitude days submitted via email to Reservation (ALTRV) ___________@FAA.gov A copy of the Suggestion: request with CARF (as request should also be emailed to T – 5 − 14 calendar needed) [Controlling Facility].

days Contact: Operator should contact [Controlling Facility] for issuance of TFR(s) and Verify issuance of NOTAM(s) (as needed).

appropriate airspace T – [XX] hours notices (NOTAMs and Per 14 CFR § 91.143, TFRs need to be TFRs) issued at least ___ hours in advance of the scheduled operation.

T – [XX] hours Operator contacts [Controlling and repeat again at Facility] via [telephone/email] and Provide operational provides operational status report, T – [XX] hours status report which includes confirmation of intent Suggestion: T – 24 and specifics of operation.

hours and 3 hours [FAA Hotline telephone #] The operation will be delayed or terminated if the Operator does not T – [XX] minutes Establish Hotline establish communications via FAA Suggestion: connection Hotline teleconference.

T – 60 − 30 minutes Operator must have a representative on the FAA Hotline teleconference until the operation is complete.

Operator provides operational status report. This report includes T – [XX] minutes confirmation that the operation will Provide operational take place as scheduled.

Suggestion: T – 30 status report minutes As necessary, Operator should continue to communicate any significant operational changes.

Briefing Guide BG − 43 JO 7210.3EE CHG 3 7/9/26 Date Time Event Remarks Completed T – [XX] minutes and repeat at T – Receive final clearance or Operator must receive clearance or [XX] minutes confirmation of confirmation of continued approved Suggestion: T – 10 continued approved mission status from [Controlling minutes and T – 5 mission status Facility] to proceed with operation.

minutes Maintain real-time Operator must provide real-time During operation communication via FAA verbal indications on the status of the Hotline teleconference vehicle.

Notify ATC and CARF ATC must be notified when operation (if applicable) of is complete. TFR(s), ALTRV(s), and completion or any other necessary notices should be cancellation of operation canceled as soon as practicable.

Post-operation or mission A debrief should occur ideally within cancellation __ hours, but no later than __ hours of Schedule post-operation the completion of the operation. A debrief debrief should be conducted even if no off − nominal activity occurred.

BG − 44 Briefing Guide 7/9/26 JO 7210.3EE CHG 3 8/7/25 JO 7210.3EE CHG 1 Instructions for Letter of Agreement Template: Launch and Reentry Site Letter of Agreement Effective: Subject: Operations at [Name and location of Launch and Reentry Site] 1. Purpose: State the purpose of the Letters of Agreement (LOA), type(s) of anticipated operation ( if launch: [horizontal/vertical]) [launch/reentry], frequency of proposed operation(s) (if known), and name and location of Launch and Reentry Site.

Sample text: This LOA establishes a framework for the coordination and planning of procedures for [licensed/permitted] ( if launch: [horizontal/vertical]) [launch/reentry] operations into the National Airspace System from [name and location of Launch and Reentry Site].

2. Cancellation: Include any previous LOA canceled by this one [Subject and Effective Date of LOA being canceled]. State agreement to review LOA annually.

Sample text: This LOA will remain in effect until canceled by any signatory entity and will be reviewed annually throughout the life of the license or when modifications are made to the license.

3. Scope: List the affected ATC facilities; Launch/Reentry Site Operator; and any additional stakeholders, including ATO Space Operations, Federal Ranges, and military facilities, as applicable.

State that this LOA does not guarantee the approval of operations from the Launch and Reentry Site. Once a Vehicle Operator has been identified and its operations approved, responsibilities and procedures will be outlined in a separate letter of agreement with each Vehicle Operator.

State that this LOA does not confer any proprietary, property, or exclusive right in the use of airspace or outer space referenced in Code of Federal Regulation (CFR) 420.41.

State distribution of the LOA. The distribution should include, at a minimum, all signatories.

Sample text: This LOA is pertinent to [ATC facilities and stakeholders; including ATO Space Operations] and [Launch/Reentry Site Operator]. It does not guarantee the approval of operations from the Launch/Reentry Site.

Once a Vehicle Operator has been identified and its operations approved, responsibilities and procedures will be outlined in a separate LOA with each Vehicle Operator.

This LOA does not confer any proprietary, property, or exclusive right in the use of airspace or outer space referenced in Code of Federal Regulation (CFR) 420.41.

This LOA is to be distributed to the signatories, additional stakeholders, and the Office of Commercial Space Transportation (AST).

4. Responsibilities: State the responsibilities of the Site Operator, Controlling Facility, and as needed, any other stakeholders and/or affected facilities. All parties named within this letter of agreement will work collaboratively to develop the following: a. Procedures for notification and scheduling of operations, to include procedures for the issuance of Notices to Airmen, Altitude Reservations and Special Activity Airspace access.

b. Plans for communication between the operator and the FAA as necessary, before, during, and after a scheduled operation.

Briefing Guide BG − 45 JO 7210.3EE CHG 3 7/9/26 [Name(s) of affected Air Traffic Control Facilities (Controlling Facility listed first)], ATO Space Operations, [Launch and Reentry Site Operator] c. Plans and procedures for cancellations, contingencies, and emergencies.

d. Plans and procedures for any other measures deemed necessary by the FAA to ensure public health and safety.

Sample text: a. [Launch/Reentry Site Operator] is responsible for the management, operation, and maintenance of the Launch/Reentry Site. This includes the coordination with users of its facility and the responsibility for ensuring all necessary information regarding operations is provided to the appropriate ATC facilities.

b. The FAA is responsible for the safe, orderly, and expeditious flow of known air traffic under its control. It is also responsible for the dissemination of pertinent information to the aviation community.

c. All parties named in this LOA will work collaboratively to develop procedures and other such measures deemed necessary to protect public health and safety.

5. Attachments State the responsibilities of the Site Operator, Controlling Facility, and as needed, any other stakeholders and/or affected facilities. All parties named within this letter of agreement will work collaboratively to develop the following: A. Signatures B. Points of Contact Table C. Graphics/Maps  Physical Site Description/Map  Airspace Description/Map(s) BG − 46 Briefing Guide 7/9/26 JO 7210.3EE CHG 3 [Name(s) of affected Air Traffic Control Facilities (Controlling Facility listed first)], ATO Space Operations, [Launch and Reentry Site Operator] Attachment A: Signatures ______________________ ______________________ [Controlling Facility] [Launch/Reentry Site Operator] ______________________ [ATO Space Operations] ______________________ [As appropriate, other stakeholders, including Federal Ranges and military facilities.]

Briefing Guide BG − 47 JO 7210.3EE CHG 3 7/9/26 [Name(s) of affected Air Traffic Control Facilities (Controlling Facility listed first)], ATO Space Operations, [Launch and Reentry Site Operator] Attachment B: Points of Contact Table The following table should be completed by the [Controlling Facility] and the information should be verified prior to every operation.

Office Phone # Email Responsibility [Controlling Facility] Airspace and Procedures Office [Controlling Facility] Traffic Management Unit ATO Space Operations [Launch and Reentry Site Opera - tor] BG − 48 Briefing Guide 7/9/26 JO 7210.3EE CHG 3 Instructions for Letter of Agreement Template: Federal Range Letter of Agreement Effective: Subject: Operations at [Name of Federal Range] 1. Purpose: State the purpose of the Letters of Agreement (LOA), name of Federal range. Facilities and stakeholders included in LOA.

Sample text: This LOA establishes a framework for the coordination and planning of procedures for launch and reentry operations into the National Airspace System (NAS) from [name of Federal Range]. The following describes responsibilities and requirements for [list included facilities and stakeholders].

2. Cancellation: Include any previous LOA canceled by this one [Subject and Effective Date of LOA being canceled]. State agreement to review LOA annually.

Sample text: This agreement cancels the [Subject and effective date of LOA being canceled].

This LOA will remain in effect until canceled by any signatory entity and will be reviewed annually or when modifications are required.

3. Scope: List the affected ATC facilities; Federal Range site Operator; and any additional stakeholders, including ATO Space Operations, and military facilities, as applicable. State distribution of the LOA. The distribution should include, at a minimum, all signatories.

Sample text: This LOA is pertinent to [ATC facilities and stakeholders, including ATO Space Operations] and [Federal range]. It does not guarantee the approval of operations from the [Federal range] This LOA does not confer any proprietary, property, or exclusive right in the use of airspace or outer space referenced in Code of Federal Regulation (CFR) 420.41.

This LOA is to be distributed to the signatories, additional stakeholders, and the Office of Commercial Space Transportation (AST).

4. Responsibilities: State the responsibilities of the [Federal range], Controlling Facility, and as needed, any other stakeholders and/or affected facilities. All parties named within this letter of agreement will work collaboratively to develop the following: a. Procedures for notification and scheduling of operations, to include procedures for the issuance of Notices to Airmen, Altitude Reservations and Special Activity Airspace access.

b. Plans for communication between the [Federal range] and the FAA as necessary, before, during, and after a scheduled operation.

[Name(s) of affected Air Traffic Control Facilities (Controlling Facility listed first)], ATO Space Operations, [Launch and Reentry Site Operator] c. Plans and procedures for cancellations, contingencies, and emergencies.

d. Plans and procedures for any other measures deemed necessary by the FAA to ensure public health and safety.

Sample text: Briefing Guide BG − 49 JO 7210.3EE CHG 3 7/9/26 a. [Federal range] is responsible for the management, operation, and maintenance of all facilities and equipment at [Federal range]. This responsibility includes the coordination with users of its facility and the responsibility for ensuring all necessary information regarding operations is provided to the appropriate ATC facilities.

b. The FAA is responsible for the safe, orderly, and expeditious flow of known air traffic under its control.

It is also responsible for the dissemination of pertinent information to the aviation community.

c. All parties named in this LOA will work collaboratively to develop procedures and other such measures deemed necessary to protect public health and safety.

5. Restrictions to Operations List any constraint to operations from Federal range.

Sample text: a. None; Or a. No launch or recovery operations between sunset and sunrise.

b. Launch vehicles limited to a max launch weight of 11,000,000 pounds.

6. Attachments Must include at a minimum A. and B. but not limited to.

A. Signatures B. Points of Contact Table (examples of additional attachments)  Physical Site Description/Map  Airspace Description/Map(s)  Launch/Reentry Site Description/Map  Aircraft Hazard Area Description/Map  Temporary Flight Restriction Description/Map  Air Traffic Control Assigned Airspace Description/Map  Action Timetable BG − 50 Briefing Guide 7/9/26 JO 7210.3EE CHG 3 [Name(s) of affected Air Traffic Control Facilities (Controlling Facility listed first)], ATO Space Operations, [Launch and Reentry Site Operator] Attachment A: Signatures ______________________ [Controlling Facility] ______________________ [Federal Range] ______________________ [ATO Space Operations] ______________________ [ As appropriate, other stakeholders and military facilities.]

Briefing Guide BG − 51 JO 7210.3EE CHG 3 7/9/26 [Name(s) of affected Air Traffic Control Facilities (Controlling Facility listed first)], ATO Space Operations, [Launch and Reentry Site Operator] Attachment B: Points of Contact Table example Office Phone # Email Responsibility [Operator] [Controlling Facility] Supervisor in Charge [Controlling Facility] Traffic Management Unit ATO Space Operations Central Altitude Reservation Function (CARF) National Traffic Management Office (NTMO) BG − 52 Briefing Guide

Source & rights

Source: faa.gov. Public-domain U.S. Government work (17 USC §105) — freely reproducible.

Permanent URL — we don’t break links.

Report a problem or request removal

Document details

Doc number
Publisher
FAA
Pages
192
File size
1.5 MB
Chapters
31