Establishing Submission Cutoff Dates for Civil Instrument Flight Procedures

8260.26H · FAA

Public domain · FAAOrders & Notices

Overview

The Establishing Submission Cutoff Dates for Civil Instrument Flight Procedures (8260.26H) is a public-domain FAA order, republished here as a free chaptered HTML edition with a linked table of contents and the official PDF.

Publisher
FAA
Document
8260.26H
Pages
22
Chapters
6

Key points

  • Order 8260.26H establishes submission cutoff dates for Civil Instrument Flight Procedures (IFPs) to ensure accuracy and reliability before public release.
  • The effective date for IFPs will not be assigned until all necessary actions, including flight inspection or validation, have been completed.
  • The order provides guidelines for the development and modification of IFPs, emphasizing coordination among various FAA divisions.
  • Submission deadlines for different types of procedures, such as Standard Instrument Approach Procedures (SIAPs) and Obstacle Departure Procedures (ODPs), are specified, with varying lead times required.
  • This order cancels the previous Order 8260.26G and includes updated information and schedules for data submission and publication.
Frequently asked questions
What is the purpose of Order 8260.26H?

The purpose of Order 8260.26H is to provide policy for data submission to support the promulgation and effective date assignment for both regulatory and non-regulatory public-use IFPs.

What happens if a facility is not commissioned as scheduled?

If a facility is not commissioned as scheduled, the IFP can still be published, but a NOTAM must be issued on the effective date to specify that the procedure is not authorized.

How long before the effective date must IFPs be submitted?

Submission deadlines vary; for example, SIAPs that affect en route charting must be submitted no later than 58 days prior to the desired effective date.

Who is the primary audience for this order?

The primary audience for this order is the Air Traffic Organization (ATO) and all service providers responsible for developing IFPs.

What does this order cancel?

Order 8260.26H cancels the previous Order 8260.26G, which was titled 'Establishing and Scheduling Civil Public-Use Standard Instrument Procedure Effective Dates.'

Chapter 1. General Information ................................................................................. 1-1

11/24/2020 Order 8260.26H

Table of Contents

Chapter 1. General Information ................................................................................. 1-1 1-1-1. Purpose of This Order ........................................................................................... 1-1 1-1-2. Audience ............................................................................................................... 1-1 1-1-3. What This Order Cancels ..................................................................................... 1-1 1-1-4. Where You Can Find This Order ......................................................................... 1-1 1-1-5. Explanation of Changes ........................................................................................ 1-1 1-1-6. Scope .................................................................................................................... 1-1 Chapter 2. Product and Process Guidelines ............................................................ 2-1 2-1-1. Procedures ............................................................................................................ 2-1 2-1-2. Non-Federal Facilities .......................................................................................... 2-2 2-1-3. Deviations ............................................................................................................. 2-2 2-1-4. Schedule ................................................................................................................ 2-2 Chapter 3. Responsibilities ....................................................................................... 3-1 3-1-1. Technical Operations Service Area ...................................................................... 3-1 3-1-2. Regional Airport Divisions ................................................................................... 3-1 3-1-3. Service Area Operations Support Group, Flight Procedures Team ...................... 3-2 3-1-4. Mission Support Services, Aeronautical Information Services ............................ 3-2 3-1-5. Flight Program Operations, Aircraft Operations .................................................. 3-3 Appendix A. Administrative Information ................................................................. A-1 1. Distribution .......................................................................................................... A-1 2. Background .......................................................................................................... A-1 3. Information Update .............................................................................................. A-1 Appendix B. Data Submission Cutoff Dates .......................................................... B-1 i

Chapter 1. General Information

11/24/2020 Order 8260.26H Chapter 1. General Information 1-1-1. Purpose of This Order. This order provides policy for data submission to support the promulgation and effective date assignment for both regulatory and non-regulatory public-use IFPs. It provides guidance regarding designation of associated controlled airspace for instrument procedures, including those based on area navigation (RNAV). It further ensures that the FAA will not assign an effective date for a procedure until the underlying infrastructure is in place to support the procedure and all necessary actions, including flight inspection or flight validation, have been completed. This order contains guidance that is pertinent to Title 14, Code of Federal Regulations (14 CFR) parts 71 and 97 ; as well as 49 U.S. Code § 44721 , Aeronautical charts and related products and services.

Note: An exception is made and an effective date may be assigned in advance of flight inspection for those Standard Instrument Approach Procedures (SIAPs) and Obstacle Departure Procedures (ODPs) promulgated with “Concurrent Dates” or “Hard Dates” as specified in Order 8260.19 , Flight Procedures and Airspace, Section 8-3.

1-1-2. Audience. The primary audience for this order is the Air Traffic Organization (ATO) and all service providers who have the responsibility to develop IFPs. The secondary audience includes Flight Standards Service, the Office of Airports, and all other ATO Service Units with IFP responsibilities.

1-1-3. What This Order Cancels. Order 8260.26G , Establishing and Scheduling Civil Public- Use Standard Instrument Procedure Effective Dates, dated April 24, 2020.

1-1-4. Where You Can Find This Order. You can find this order on FAA’s website .

1-1-5. Explanation of Changes.

a. Appendix B. Replaced/updated all tables with current/correct information. Specifically corrected the error with dates identified in Table 5, and added tables for the years 2025-2030.

b. Directive Feedback Form. Replaced/updated with current contact/email information.

1-1-6. Scope. This order affects FAA operating divisions; the ATO Service Units to include the Eastern, Central, and Western Service Center Operations Support Groups (OSGs), the Aeronautical Information Management Office, and Aeronautical Information Services; and other ATO service units to include Technical Operations and Flight Program Operations (Flight Inspection); and Office of Airports. It provides guidance relating to flight inspection of new/relocated NAVAIDs and new/amended IFPs, and components of the National Airspace System (NAS), data submission lead-times, and policy for processing and publishing IFPs.

1-1

Chapter 2. Product and Process Guidelines

11/24/2020 Order 8260.26H Chapter 2. Product and Process Guidelines 2-1-1. Procedures.

a. Development/Modification of Instrument Flight Procedures. The development and/or modification of IFPs must be a closely coordinated process. Order 8260.43 , Flight Procedures Management Program, as well as this order, provide guidance to ensure the coordinated, timely publication of proposed procedures. The IFP Validation Team and the IFP Prioritization Team are the established coordination mediums to assist in this effort.

b. Commissioning/Decommissioning Dates. The effective date for commissioning, decommissioning, or altering a component of the NAS having a direct bearing on the instrument flight rules (IFR) capability of the facility or system, must coincide with one of the pre-established, international Aeronautical Information, Regulation, and Control (AIRAC) charting dates (see Appendix B). Establishment of a procedure effective date must be coordinated with Aeronautical Information Services through the applicable Service Area OSG Flight Procedures Team (FPT) and Flight Program Operations (Flight Inspection) considering the data submission lead times in Appendix B. Commissioning notices and all information related to proposed commissioning dates of NAVAIDs must also be coordinated between Aeronautical Information Services and Flight Program Operations (Flight Inspection). For advance notification requirements to Aeronautical Information Services, refer to Order 7900.2 , Submitting Aeronautical Data to Aeronautical Information Services in Support of the National Airspace System (NAS).

c. Procedure Charts. Publish government produced procedure charts on pre-established international AIRAC charting dates as follows; refer to Appendix B for publication dates and data submission cutoff-dates: (1) Terminal Procedures Publication (TPP) . Publish a set of TPP volumes every 56 days.

The TPPs contain civil SIAPs, Take-off Minimums and ODPs, Alternate Minimums, Standard Instrument Departures (SIDs), Standard Terminal Arrival Routes (STARs), Charted Visual Flight Procedures (CVFPs), and selected military procedures that are effective on the date of the publication.

(2) Change Notice (CN) . Publish a CN on the intermediate 28th day (except for Alaska).

The CN contains only textual ODPs, SIAPs that do not affect en route products, radar minimums, and IFR alternate minimums; therefore, a CN effective date may only be used for these products.

(3) Original SIAPs . An original SIAP may be assigned a CN effective date provided the procedure does not require any en route charting changes and the airport information is published in the Airport/Facility Directory (AFD).

(4) En Route Changes . For the purposes of this order, en route changes are defined as those changes that require any modification of an IFR En route Chart, graphic ODP, SID, STAR, or the Digital En Route Supplement (DERS); e.g., adding a new fix that requires depiction on an en route chart, changing the location of a currently charted en route fix, adding ODP, SID or STAR charting to a fix, etc. Amending a Form 8260-2 , Radio Fix and Holding Data Record, that 2-1 11/24/2020 Order 8260.26H does not affect the aforementioned chart and digital products; e.g., adding a currently charted en route fix to an instrument approach procedure chart or adding a new fix that is only charted on a SIAP is not considered an en route chart change.

d. SIAPs. SIAPs are promulgated via a bi-weekly Transmittal Letter (TL), which is prepared and distributed by Aeronautical Information Services and must be submitted with a “Routine,” “Concurrent,” or “Hard” required effective date as specified in Order 8260.19 , Section 8-3. Those SIAPs that do not affect en route charting must be submitted no later than 38 days prior to the desired effective date. Those SIAPs that do affect en route charting must be submitted no later than 58 days prior to the desired effective date.

e. ODPs. ODPs may be published either textually or graphically as specified in Order 8260.46 , Departure Procedure (DP) Program, Chapter 2. Textual ODPs that do not affect en route charting [see paragraph 2-1-1.c(4)] must be submitted no later than 38 days prior to the desired effective date. For Graphic ODPs, see paragraph 2-1-1.f.

f. Other Terminal Procedures. Graphic ODPs, SIDs, STARs, and CVFPs are controlled by en route charting submission and must be submitted no later than 58 days prior to the desired effective date.

g. Air Traffic Service (ATS) Routes requiring Rulemaking Action. Submit those procedures requiring rulemaking action and all associated data, including flight inspection to Aeronautical Information Services no later than 90 days prior to the desired effective date.

2-1-2. Non-Federal Facilities. The procedure for commissioning facilities and establishing SIAPs should be identical for non-Federal facilities approved in accordance with 14 CFR part 171 , including those established under the Airport Improvement Program (AIP). The applicable Technical Operations Service Area or Service Center has primary responsibility for monitoring the installation progress for non-Federal facilities, including facilities installed under the AIP.

The Service Area OSG FPT, through the IFP Validation Team, must ensure that all Technical Operations Service Area requirements are satisfied prior to commissioning and establishing a SIAP on a non-Federal facility.

2-1-3. Deviations. Make every attempt successfully coordinating the development of a complete and accurate IFP prior to the selection of a publication date. Deviations from charting submission suspense dates must be minimal, coordinated with all applicable parties, and agreed to by Management of Aeronautical Information Services. These requests must be in accordance with ISO 9001:2008 Quality Management System (QMS) Level C: Operations and include those documents needed to ensure the effective planning, operation and control of Aeronautical Information Management (AIM), and Aeronautical Information Services processes. Other deviations to this order; e.g., infrastructure not fully in place, flight inspection schedule-delays, etc., require approval of the Flight Technologies and Procedures Division.

2-1-4. Schedule. Appendix B contains a listing of the submission and publication schedules for aeronautical products. When the specified “cutoff date” falls on a holiday, products must arrive at Aeronautical Information Services no later than the last workday preceding the holiday. The Aeronautical Information Services Airspace and Procedures Team is responsible for ensuring 2-2 11/24/2020 Order 8260.26H that temporary changes to the scheduled submission dates are promulgated to all concerned agencies. Flight Technologies and Procedures Division must coordinate all permanent changes to the schedules with Aeronautical Information Services.

2-3

Chapter 3. Responsibilities

11/24/2020 Order 8260.26H Chapter 3. Responsibilities 3-1-1. Technical Operations Service Area or Subordinate Service Center must: a. Establish a schedule of proposed commissioning dates through the IFP Validation Team and IFP Prioritization Team for new and/or restoration dates for relocated or modified NAVAIDs in the NAS. Give full consideration to equipment delivery dates, site availability, procedure development time, installation schedules, seasonal weather factors, survey data requirements, flight inspection scheduling, and contractor's performance requirements. Proposed commissioning dates must be selected to coincide with an international AIRAC 56-day cycle and must be coordinated with Aeronautical Information Services and Flight Program Operations (Flight Inspection). Additionally, concurrence must be obtained from the applicable Mission Support Service (MSS) Area OSG to include the FPT, and the Regional Airports Division.

b. Distribute proposed commissioning dates, including non-Federal navigation facilities (14 CFR Part 171 ) and AIP projects, to Flight Program Operations (Flight Inspection) and all interested offices. Keep them advised of any anticipated delays that might be encountered in the installation of individual system components that will impact published procedures.

c. Direct the appropriate Operational Control Center (OCC) to contact Flight Program Operations (Flight Inspection) to coordinate a flight inspection with sufficient lead time to ensure that a satisfactory flight inspection of the facility and the associated IFP(s) is completed prior to the submission cutoff date specified in Appendix B. Note that procedure lead times vary depending on whether the associated IFP(s) affect en route charts and whether rulemaking is required (see paragraph 3-1-5).

d. After notification of a successful flight inspection, notify the Service Area OSG FPT, and the Flight Technologies and Procedures Division that the facility is ready for commissioning.

e. Issue a commissioning or facility restoral NOTAM at 0901Z on the effective date agreed upon.

f. Provide site survey data on new, relocated, or modified facilities to Aeronautical Information Services and the applicable Service Area OSG FPT not later than 160 days prior to the desired procedure effective date. Additionally, provide current AC 150/5300-18 , General Guidance and Specifications for Submission of Aeronautical Surveys to NGS; Field Data Collection and Geographic Information System (GIS) Standards, compliant airport survey data through the Airports Data and Information Portal (ADIP) for sharing of this data with airports (see Order 7900.2 ).

3-1-2. Regional Airport Divisions must : a. When requested on a case-by-case basis, provide the ATO Terminal, En Route, Technical Operations, and Mission Support Service Units, the Eastern, Central, and Western Service Areas, and the applicable Service Area OSG FPT the following: (1) A copy of the airport drawing/Airport Layout Plan (ALP) accompanying an AIP request, 3-1 11/24/2020 Order 8260.26H (2) A drawing accompanying the Notification of Change of Airport Status for Non-AIP Proposals, or the latest Airport Master Record. These drawings will be used by charting agencies to determine runway length, width, and alignment, as well as taxiway configuration, terminal complex, control tower, and hangar layout.

b. This data must be submitted prior to final flight inspection so that charting agencies might properly depict the airport configuration. When available, provide the necessary data from the ADIP.

3-1-3. Service Area Operations Support Group, Flight Procedures Team must: a. Coordinate the development of IFPs under the IFP Validation Team process as noted in Order 8260.43 .

b. Obtain sufficient airport data and details to enable Aeronautical Information Services to complete procedure development and determination of controlled airspace requirements.

c. Take the necessary action to establish SIAPs, ODPs, ATS routes, SIDs, and STARs to be effective on the proposed facility commissioning date.

d. Coordinate with the OSG Airspace Team to complete the necessary rulemaking process to ensure that controlled airspace is available for the protection of planned procedures and ATS routes, and will be effective on the planned facility commissioning date or proposed IFP effective date. See Order JO 7400.2 , Procedures for Handling Airspace Matters, Chapter 18, Section 2, and Order 8260.19 , Section 4-1 and Section 5-2).

3-1-4. Mission Support Services, Aeronautical Information Services must: a. Review the status of IFPs through the Service Area OSG FPT to determine those procedures that can be published in the appropriate TPP or CN. The effective date of a procedure is the same date as the publication date.

b. Coordinate Airport/Facility Magnetic Variation (MagVar) change requests with the appropriate Aeronautical Information Services Office for all affected airports and facilities.

Publish magnetic variation change data in the NFDD effective coincidental with TL procedure effective dates.

c. Forward requests for airspace action to the applicable Air Traffic Service Area OSG FPT for coordination with the OSG Airspace Team for appropriate action to ensure the airspace is designated on or before the proposed commissioning date of the facility/effective date of the procedure(s).

d. Forward IFPs to Flight Program Operations (Flight Inspection) at least 50 calendar days prior to the applicable data submission cutoff date specified in Appendix B.

e. Ensure SIAP and ODP packages are forwarded to the Product Support Group, TL Team, no later than the specified submission cutoff dates noted in Appendix B.

3-2 11/24/2020 Order 8260.26H f. Assign the actual effective dates to SIAPs and ODPs IFPs and assemble them into a TL for distribution at least 34 days prior to the required effective date. Distribute the TL as follows: (1) Via a Large File Transfer to the appropriate offices.

(2) Via overnight mail service, or other appropriate means, to the Federal Register for publication through FAA General Council and the Federal Register Liaison Office.

g. Publish IFPs in the U.S. Government TPP or CN on the effective date stipulated in the TL (regulatory IFPs) or NFDD (non-regulatory IFPs) and in adherence with associated supporting data (e.g., fixes, holding patterns, NAVAIDs, runways) published via NFDD.

h. Publish the original/revised facility and fix data in the NFDD not later than 34 days prior to the IFP effective date for those IFPs that do not impact en route charts.

i. Publish the original/revised facility and fix data in the NFDD not later than 51 days prior to the IFP effective date for those IFPs that affect en route charts.

3-1-5. Flight Program Operations, Aircraft Operations must: a. Complete a satisfactory flight inspection of the facility(s) and associated IFPs within 50 calendar days of notification. Note that procedure lead times vary depending on whether the associated IFP(s) affect en route charts and whether rulemaking is required.

b. Notify the Aeronautical Information Services Procedures Publications Group of the results of the flight inspection including any final changes to the procedure that are required.

3-3

Appendix A. Administrative Information

11/24/2020 Order 8260.26H Appendix A. Administrative Information 1. Distribution. This order is distributed electronically only.

2. Background.

a. Prior to the original order, when a facility was not commissioned as scheduled, a SIAP could be published but required a Flight Data Center (FDC) NOTAM on the effective date specifying that the procedure is not authorized. In some cases, the NOTAM remained in effect for extended periods before the facility was eventually commissioned, or a determination was made that the facility would never be commissioned. Consequently, the procedure, although published, was never authorized and subsequently canceled. This directive was originally developed in response to NTSB recommendation A-71-19 to ensure that instrument approach procedure charts, especially those associated with new NAVAID commissioning(s), will not be released to the public until it is known that the supporting infrastructure is in place, the NAVAID(s) perform satisfactorily, and that all procedural data are correct and have been confirmed by flight inspection.

b. This order provides procedure specialists, flight inspection personnel, charting agents, and aircrews a shorter response time to publish and use procedures after flight inspection.

However, it must be remembered that the en route charting cycle is tied to airspace actions and is not as dynamic as the charting cycle for terminal data. En route data, including airways, NAVAIDs, airspace, fixes, graphic departure procedures, STARs, and digital aeronautical information must be effective on a pre-established 56-day international AIRAC cycle date. These data are also used to develop the DERS, which is used to update selected NAS data elements.

Information in the DERS is also used to program Air Route Traffic Control Center (ARTCC) computers, and is a source for the development of avionics databases. The lead-time for these products is not compatible with the 38-day suspense allowed for terminal procedures under this order. Adherence to this order will ensure improved service to the user and more complete and accurate instrument flight procedure charts.

c. This order was expanded in 1999 to include instrument procedures that are not dependent on ground-based NAVAIDs. It was also expanded to include any procedure submitted as “Proposed” under Order 8260.19 , which did not impact en route charting. Submission schedules were revised to include cutoff dates for IFP types other than SIAPs. Additionally, guidance for controlled airspace designation was provided.

d. In 2014, the order was revised to eliminate “Proposed” procedures in consonance with Order 8260.19 . Data submission cutoff lead times were coordinated with all stakeholders and revised accordingly. Responsibility for assigning IFP effective dates and preparation and dissemination of the TL was transferred to the Aeronautical Information Services, Product Support Group.

3. Information Update. For your convenience, FAA Form 1320-19, Directives Feedback Information, is included at the end of this order to note any deficiencies found, clarification needed, or suggested improvements regarding the contents of this directive.

A-1

Appendix B. Data Submission Cutoff Dates

11/24/2020 Order 8260.26H Appendix B. Data Submission Cutoff Dates (1) Table 1. 2020 (Leap Year) Data Submission Cutoff Dates (1) Data must be received by Aeronautical Information Services no later than the specified date to ensure publication on the desired AIRAC date. When the deadline date falls on a holiday, provide data NLT the preceding workday.

(2) Cutoff for airways and routes requiring a FINAL RULE under part 71 . Aeronautical Information Services must notify Airspace Policy and Regulations Group when flight inspection is satisfactory.

This lead-time is required to publish FINAL RULES in the Federal Register by the En Route cutoff date.

(3) Cutoff for En Route airspace, including fix/waypoints, non-rulemaking ATS routes, STARs, SIDs, Preferred IFR Routes (PFRs), Military Training Routes (MTRs), Special Activity Airspaces (SAAs), ARTCC boundaries.

(4) Cutoff for SIAPs and textual ODPs only.

(5) Last TL for each 28 AIRAC cycle.

B-1 11/24/2020 Order 8260.26H (1) Table 2. 2021 Data Submission Cutoff Dates (1) Data must be received by Aeronautical Information Services no later than the specified date to ensure publication on the desired AIRAC date. When the deadline date falls on a holiday, provide data NLT the preceding workday.

(2) Cutoff for airways and routes requiring a FINAL RULE under part 71 . Aeronautical Information Services must notify Airspace Policy and Regulations Group when flight inspection is satisfactory.

This lead-time is required to publish FINAL RULES in the Federal Register by the En Route cutoff date.

(3) Cutoff for En Route airspace, including fix/waypoints, non-rulemaking ATS routes, STARs, SIDs, PFRs, MTRs, SAAs, ARTCC boundaries.

(4) Cutoff for SIAPs and textual ODPs only.

(5) Last TL for each 28 AIRAC cycle.

B-2 11/24/2020 Order 8260.26H (1) Table 3. 2022 Data Submission Cutoff Dates (1) Data must be received by Aeronautical Information Services no later than the specified date to ensure publication on the desired AIRAC date. When the deadline date falls on a holiday, provide data NLT the preceding workday.

(2) Cutoff for airways and routes requiring a FINAL RULE under part 71 . Aeronautical Information Services must notify Airspace Policy and Regulations Group when flight inspection is satisfactory.

This lead-time is required to publish FINAL RULES in the Federal Register by the En Route cutoff date.

(3) Cutoff for En Route airspace, including fix/waypoints, non-rulemaking ATS routes, STARs, SIDs, PFRs, MTRs, SAAs, ARTCC boundaries.

(4) Cutoff for SIAPs and textual ODPs only.

(5) Last TL for each 28 AIRAC cycle.

B-3 11/24/2020 Order 8260.26H (1) Table 4. 2023 Data Submission Cutoff Dates (1) Data must be received by Aeronautical Information Services no later than the specified date to ensure publication on the desired AIRAC date. When the deadline date falls on a holiday, provide data NLT the preceding workday.

(2) Cutoff for airways and routes requiring a FINAL RULE under part 71 . Aeronautical Information Services must notify Airspace Policy and Regulations Group when flight inspection is satisfactory.

This lead-time is required to publish FINAL RULES in the Federal Register by the En Route cutoff date.

(3) Cutoff for En Route airspace, including fix/waypoints, non-rulemaking ATS routes, STARs, SIDs, PFRs, MTRs, SAAs, ARTCC boundaries.

(4) Cutoff for SIAPs and textual ODPs only.

(5) Last TL for each 28 AIRAC cycle.

B-4 11/24/2020 Order 8260.26H (1) Table 5. 2024 (Leap Year) Data Submission Cutoff Dates (1) Data must be received by Aeronautical Information Services no later than the specified date to ensure publication on the desired AIRAC date. When the deadline date falls on a holiday, provide data NLT the preceding workday.

(2) Cutoff for airways and routes requiring a FINAL RULE under part 71 . Aeronautical Information Services must notify Airspace Policy and Regulations Group when flight inspection is satisfactory.

This lead-time is required to publish FINAL RULES in the Federal Register by the En Route cutoff date.

(3) Cutoff for En Route airspace, including fix/waypoints, non-rulemaking ATS routes, STARs, SIDs, PFRs, MTRs, SAAs, ARTCC boundaries.

(4) Cutoff for SIAPs and textual ODPs only.

(5) Last TL for each 28 AIRAC cycle.

B-5 11/24/2020 Order 8260.26H (1) Table 6. 2025 Data Submission Cutoff Dates (1) Data must be received by Aeronautical Information Services no later than the specified date to ensure publication on the desired AIRAC date. When the deadline date falls on a holiday, provide data NLT the preceding workday.

(2) Cutoff for airways and routes requiring a FINAL RULE under part 71 . Aeronautical Information Services must notify Airspace Policy and Regulations Group when flight inspection is satisfactory.

This lead-time is required to publish FINAL RULES in the Federal Register by the En Route cutoff date.

(3) Cutoff for En Route airspace, including fix/waypoints, non-rulemaking ATS routes, STARs, SIDs, PFRs, MTRs, SAAs, ARTCC boundaries.

(4) Cutoff for SIAPs and textual ODPs only.

(5) Last TL for each 28 AIRAC cycle.

B-6 11/24/2020 Order 8260.26H (1) Table 7. 2026 Data Submission Cutoff Dates (1) Data must be received by Aeronautical Information Services no later than the specified date to ensure publication on the desired AIRAC date. When the deadline date falls on a holiday, provide data NLT the preceding workday.

(2) Cutoff for airways and routes requiring a FINAL RULE under part 71 . Aeronautical Information Services must notify Airspace Policy and Regulations Group when flight inspection is satisfactory.

This lead-time is required to publish FINAL RULES in the Federal Register by the En Route cutoff date.

(3) Cutoff for En Route airspace, including fix/waypoints, non-rulemaking ATS routes, STARs, SIDs, PFRs, MTRs, SAAs, ARTCC boundaries.

(4) Cutoff for SIAPs and textual ODPs only.

(5) Last TL for each 28 AIRAC cycle.

B-7 11/24/2020 Order 8260.26H (1) Table 8. 2027 Data Submission Cutoff Dates (1) Data must be received by Aeronautical Information Services no later than the specified date to ensure publication on the desired AIRAC date. When the deadline date falls on a holiday, provide data NLT the preceding workday.

(2) Cutoff for airways and routes requiring a FINAL RULE under part 71 . Aeronautical Information Services must notify Airspace Policy and Regulations Group when flight inspection is satisfactory.

This lead-time is required to publish FINAL RULES in the Federal Register by the En Route cutoff date.

(3) Cutoff for En Route airspace, including fix/waypoints, non-rulemaking ATS routes, STARs, SIDs, PFRs, MTRs, SAAs, ARTCC boundaries.

(4) Cutoff for SIAPs and textual ODPs only.

(5) Last TL for each 28 AIRAC cycle.

B-8 11/24/2020 Order 8260.26H (1) Table 9. 2028 (Leap Year) Data Submission Cutoff Dates (1) Data must be received by Aeronautical Information Services no later than the specified date to ensure publication on the desired AIRAC date. When the deadline date falls on a holiday, provide data NLT the preceding workday.

(2) Cutoff for airways and routes requiring a FINAL RULE under part 71 . Aeronautical Information Services must notify Airspace Policy and Regulations Group when flight inspection is satisfactory.

This lead-time is required to publish FINAL RULES in the Federal Register by the En Route cutoff date.

(3) Cutoff for En Route airspace, including fix/waypoints, non-rulemaking ATS routes, STARs, SIDs, PFRs, MTRs, SAAs, ARTCC boundaries.

(4) Cutoff for SIAPs and textual ODPs only.

(5) Last TL for each 28 AIRAC cycle.

B-9 11/24/2020 Order 8260.26H (1) Table 10. 2029 Data Submission Cutoff Dates (1) Data must be received by Aeronautical Information Services no later than the specified date to ensure publication on the desired AIRAC date. When the deadline date falls on a holiday, provide data NLT the preceding workday.

(2) Cutoff for airways and routes requiring a FINAL RULE under part 71 . Aeronautical Information Services must notify Airspace Policy and Regulations Group when flight inspection is satisfactory.

This lead-time is required to publish FINAL RULES in the Federal Register by the En Route cutoff date.

(3) Cutoff for En Route airspace, including fix/waypoints, non-rulemaking ATS routes, STARs, SIDs, PFRs, MTRs, SAAs, ARTCC boundaries.

(4) Cutoff for SIAPs and textual ODPs only.

(5) Last TL for each 28 AIRAC cycle.

B-10 11/24/2020 Order 8260.26H (1) Table 11. 2030 Data Submission Cutoff Dates (1) Data must be received by Aeronautical Information Services no later than the specified date to ensure publication on the desired AIRAC date. When the deadline date falls on a holiday, provide data NLT the preceding workday.

(2) Cutoff for airways and routes requiring a FINAL RULE under part 71 . Aeronautical Information Services must notify Airspace Policy and Regulations Group when flight inspection is satisfactory.

This lead-time is required to publish FINAL RULES in the Federal Register by the En Route cutoff date.

(3) Cutoff for En Route airspace, including fix/waypoints, non-rulemaking ATS routes, STARs, SIDs, PFRs, MTRs, SAAs, ARTCC boundaries.

(4) Cutoff for SIAPs and textual ODPs only.

(5) Last TL for each 28 AIRAC cycle.

B-11 Directive Feedback Information Please submit any written comments or recommendation for improving this directive, or suggest new items or subjects to be added to it. Also, if you find an error, please tell us about it.

Subject: To: Flight Technologies and Procedures Division, AFS-400 Coordination Mailbox ( 9-AWA-AFS400-COORD@faa.gov ) (Please check all appropriate line items) An error (procedural or typographical) has been noted in paragraph on page .

Recommend paragraph on page be changed as follows: (attach separate sheet if necessary) In a future change to this order, please cover the following subject: (briefly describe what you want added) Other comments: I would like to discuss the above. Please contact me.

Submitted by: Date: Telephone Number: Routing Symbol: FAA Form 1320-19 (10-98)

Source & rights

Source: faa.gov. Public-domain U.S. Government work (17 USC §105) — freely reproducible.

Permanent URL — we don’t break links.

Report a problem or request removal

Document details

Doc number
8260.26H
Publisher
FAA
Pages
22
File size
876 KB
Chapters
6