CESSNA 180K — Normal Procedures
1 normal procedures reference for the CESSNA 180K.
This document provides installation instructions for the TrickAir Model 3000 main landing gear skis specifically designed for various Cessna 180 models, including the 180K. It outlines the necessary equipment, procedures, and safety considerations for properly installing the skis. The instructions emphasize the importance of following the guidelines to ensure correct alignment and performance of the skis. The document is intended for use by qualified aircraft technicians and includes references to FAA regulations and maintenance manuals. It also covers post-installation procedures and weight and balance considerations after the skis are fitted.
- The installation must be performed on a level surface, preferably concrete or asphalt.
- Verify the aircraft's weight and balance before installation.
- Ensure ski ground clearance is between 0.50 to 0.75 inches after installation.
- Use a torque wrench to tighten all bolts according to the aircraft maintenance manual.
- Document the installation with FAA Form 337 and logbook entries.
How many Normal Procedures documents does Sprinkle have for the CESSNA 180K?
Sprinkle has 1 Normal Procedures document on file for the CESSNA 180K.
What year is the CESSNA 180K Normal Procedures?
The CESSNA 180K Normal Procedures on file is dated 2011.
How many pages is the CESSNA 180K Normal Procedures?
The CESSNA 180K Normal Procedures runs 20 pages.
Where does Sprinkle's CESSNA 180K Normal Procedures come from?
This CESSNA 180K Normal Procedures was originally published by trickair.com and is hosted on Sprinkle with full text and specs.