Skip to main content

CESSNA 172C — Checklist

1 checklist reference for the CESSNA 172C.

Overview
172 Preflight Checklist · 2015

This document is a checklist for the Cessna 172, providing pilots with a structured guide for preflight, startup, before takeoff, cruise, before landing, after landing, approach, and emergency descent procedures. It is designed to ensure that all critical checks and procedures are followed to maintain safety and operational efficiency. The checklist includes specific actions to be taken at each stage of flight, along with important speed and power settings. This document serves as a quick reference for pilots to verify that all necessary steps are completed before and during flight operations.

  • Oil level must be between 6 to 8 quarts before startup.
  • Throttle should be set to 1000 RPM before takeoff and during startup.
  • V speeds include VR (55 KIAS), VY (78 KIAS), and VX (64 KIAS).
  • Perform magneto checks with a maximum drop of 125 RPM and a maximum difference of 50 RPM.
  • In an emergency descent, set the transponder to 7700 and ensure the mixture is rich.
1 document

CESSNA 172C for sale now