Skip to main content

Airworthiness Directive Schedule Aeroplanes Cessna 188 Series

Cessna 188 AGwagon · Service Bulletins

Free account — keep the POHs & checklists you reference in one place.

Overview

This document is an Airworthiness Directive (AD) schedule specifically for the Cessna 188 series aircraft, including models A188, A188A, A188B, and T188C. Issued on August 27, 2020, it outlines mandatory modifications, inspections, and compliance requirements to ensure the safety and airworthiness of these aircraft. The document serves as a reference for maintenance personnel and operators, detailing the necessary actions to be taken on various components and systems of the aircraft. Each directive includes specific compliance timelines and requirements, ensuring that all aircraft in the Cessna 188 series adhere to the latest safety standards set by the FAA.

  • All Cessna 188 series aircraft must comply with modifications and inspections as outlined in the AD schedule.
  • Specific modifications must be completed before the issuance of the Certificate of Airworthiness (C of A).
  • Regular inspections of critical components like the elevator trim tab and throttle linkage are mandatory.
  • Compliance timelines vary, with some actions required before further flight or within specified hours of Time in Service (TIS).
  • The document includes directives that have been cancelled, indicating ongoing updates to safety requirements.

Document

Source

Originally published by www.aviation.govt.nz. Sprinkle hosts a reference copy with an added summary, specifications and searchable full text.

Report a problem or request removal

Document details

Type
Service Bulletins
Year
2020
Pages
12
File size
206 KB
Publisher
www.aviation.govt.nz
How rare is it?
1Cessna 188 AGwagon registered worldwide · 0 active

Common. Rarer than 24% of the aircraft models we track.

Documentation completeness
5/7

Most owners only have the POH. Here's the essential set for the Cessna 188 AGwagon.

More Cessna 188 AGwagonmanuals & documents

See all 21
Similar aircraft

If you fly the Cessna 188 AGwagon, you may also be researching these.

In this document

Fuel Line Change - Modification

This directive requires all Cessna 188 series aircraft to embody Rex Aviation (NZ) Ltd Modification 204 regarding fuel line changes before the issuance of the Certificate of Airworthiness (C of A).

Battery Installation - Modification

All Cessna 188 series aircraft must comply with Rex Aviation (NZ) Ltd Modification 205 for battery installation prior to the issuance of the C of A.

Control System - Modification

Applicable to Cessna 188 series aircraft with serial numbers 1880002 through 1880175, this modification must be completed within the next 50 hours of Time in Service (TIS) as per Cessna Service Letter 67-1.

Elevator Trim Tab - Inspection

An inspection of the elevator trim tab horn for security and cracks is required before each flight until modification Rex-AD-92 is embodied, and thereafter at intervals not exceeding 100 hours TIS.

Throttle Linkage - Modification

All Cessna 188 series aircraft must fit a spring between the air to fuel lever and fuel metering lever, ensuring engine speed is approximately 2300 RPM on the ground with throttle control disconnected, before further flight.

Safety notes

  • Failure to comply with these directives may result in unsafe operating conditions and potential loss of airworthiness.
  • Regular inspections are crucial to prevent failures that could lead to accidents.

Full document text

Issued 27 August 2020 Page 1 of 12 CAA of NZ Airworthiness Directive Schedule Aeroplanes Cessna 188 Series 27 August 2020 Notes 1. This AD schedule is applicable to Cessna A188, A188A, A188B and T188C series aircraft manufactured under FAA Type Certificate No. A9CE. 2. The Federal Aviation Administration (FAA) is the National Airworthiness Authority (NAA) responsible for the issue of State of Design Airworthiness Directives (ADs) for these aircraft. State of Design ADs can be obtained directly from the FAA website at: Dynamic Regulatory System (faa.gov) 3. The date above indicates the amendment date of this schedule. 4. New or amended ADs are shown with an asterisk * Contents DCA/CESS188/101 Fuel Line Change - Modification .................................................................................. 3 DCA/CESS188/102 Battery Installation - Modification ................................................................................. 3 DCA/CESS188/103 Control System - Modification...................................................................................... 3 DCA/CESS188/104 Hopper Outlet Forward Fairing - Modification .............................................................. 3 DCA/CESS188/105A Cancelled .................................................................................................................... 3 DCA/CESS188/106 Cancelled .................................................................................................................... 3 DCA/CESS188/107 Cancelled .................................................................................................................... 3 DCA/CESS188/108 Cancelled .................................................................................................................... 3 DCA/CESS188/109 Cancelled .................................................................................................................... 3 DCA/CESS188/110 Rudder Pedal - Modification ........................................................................................ 4 DCA/CESS188/111A Mainplane Spars - Modification ................................................................................... 4 DCA/CESS188/112 Cancelled .................................................................................................................... 4 DCA/CESS188/113 Rudder Stop - Modification .......................................................................................... 4 * DCA/CESS188/114B Cancelled – Purpose Fulfilled ...................................................................................... 4 DCA/CESS188/115 Cancelled: Once only inspection ................................................................................. 4 DCA/CESS188/116 Cancelled .................................................................................................................... 4 DCA/CESS188/117 Cancelled .................................................................................................................... 4 DCA/CESS188/118 Cancelled .................................................................................................................... 4 DCA/CESS188/119 Throttle Linkage - Modification .................................................................................... 5 DCA/CESS188/120 Cancelled: DCA/GEN/5 refers ..................................................................................... 5 DCA/CESS188/121 Cancelled .................................................................................................................... 5 DCA/CESS188/122 Alternator Earth Lead - Inspection ............................................................................... 5 DCA/CESS188/123 Elevator Trim Tab - Inspection .................................................................................... 5 DCA/CESS188/124 Elevator Trim Tab - Modification .................................................................................. 5 DCA/CESS188/125 Installation of Inertia Reel Harness - Modification ....................................................... 6 DCA/CESS188/126 Engine Controls - Modification..................................................................................... 6 DCA/CESS188/127A Main Wheel Axles - Inspection .................................................................................... 6 DCA/CESS188/128 Aileron Control Cables - Inspection ............................................................................. 6 DCA/CESS188/129 Aileron Control Cables - Inspection ............................................................................. 7 DCA/CESS188/130 Aileron Control Cables - Renewal ............................................................................... 7 DCA/CESS188/131 Wing Spar - Inspection ................................................................................................ 7 DCA/CESS188/132 Induction Air Duct - Replacement ................................................................................ 7 DCA/CESS188/133 Throttle/Mixture Control Cable Attachment - Inspection .............................................. 7 DCA/CESS188/134A Fuel Cell Capacity Placard - Modification .................................................................... 8 Issued 27 August 2020 Page 2 of 12 CAA of NZ DCA/CESS188/135 Flap Operating Lever - Repositioning .......................................................................... 8 DCA/CESS188/136 Induction Airbox Seal - Inspection ............................................................................... 8 DCA/CESS188/137 Fuel Cap - Modification................................................................................................ 8 DCA/CESS188/138 Electrical System - Modification ................................................................................... 8

Show full text

DCA/CESS188/139 Alternator Installation - Modification and Inspection .................................................... 9 DCA/CESS188/140 MLG Legs - Modification.............................................................................................. 9 DCA/CESS188/141 Bladder Type Fuel Cells - Inspection And Modification ............................................. 10 DCA/CESS188/142A Cancelled – DCA/CESS188/146 refers ..................................................................... 10 DCA/CESS188/143 Fuel, Oil or Hydraulic Hose - Removal ...................................................................... 10 DCA/CESS188/144 Preflight Fuel System Check - Flight Manual Revision .............................................. 11 DCA/CESS188/145 Cancelled – N/A to Cessna 188 Aircraft .................................................................... 11 DCA/CESS188/146 Seat Adjustment Mechanism – Inspection and Replacement.................................... 12 Aeroplanes Cessna 188 Series Issued 27 August 2020 Page 3 of 12 CAA of NZ DCA/CESS188/101 Fuel Line Change - Modification Applicability: Model 188 Series All S/N’s Requirement: Embody Rex Aviation (NZ) Ltd Modification 204 Compliance: Before issue of C of A DCA/CESS188/102 Battery Installation - Modification Applicability: Model 188 Series All S/N’s Requirement: Embody Rex Aviation (NZ) Ltd Modification 205 Compliance: Before issue of C of A DCA/CESS188/103 Control System - Modification Applicability: Model 188 Series S/N 1880002 through 1880175 as detailed in Cessna SL 67-1 Requirement: Comply with Cessna SL 67-1 Compliance: Within the next 50 hours TIS Effective Date: 30 June 1967 DCA/CESS188/104 Hopper Outlet Forward Fairing - Modification Applicability: Model 188 Series All S/N’s Requirement: Embody Rex Aviation (NZ) Ltd Modification 220 Compliance: By 1 August 1967 DCA/CESS188/105A Cancelled Note: This AD was originally issued as a result of MLG spring leg failures to ski and agricultural aircraft operating in NZ. The AD has been cancelled following an investigation into its effectiveness at preventing failure of the MLG spring legs. Cessna has advised that the magnetic particle inspection is unlikely to be effective in detecting cracks before they reach the critical length. Also, repetitive paint removal from the legs to perform the inspection, may be harmful to the surface of the leg. To ensure the continuing airworthiness of the spring legs, maintenance is important to provide and maintain a good paint surface to protect the legs from corrosion or stone damage. DCA/CESS188/106 Cancelled DCA/CESS188/107 Cancelled DCA/CESS188/108 Cancelled DCA/CESS188/109 Cancelled Aeroplanes Cessna 188 Series Issued 27 August 2020 Page 4 of 12 CAA of NZ DCA/CESS188/110 Rudder Pedal - Modification Applicability: Model 188 Series S/N 1880001 through 1880317 as detailed in Cessna SL 67-47 Requirement: Comply with Cessna SL 67-47 (FAA AD 68-07-07 refers) Compliance: By 31 December 1967 DCA/CESS188/111A Mainplane Spars - Modification Applicability: 1. Front spar model A188 S/N 188001 through 1880572 2. Rear spars model A188 S/N 1880001 through 1880338 Requirement: Modify front spars in accordance with Rex Aviation (NZ) Ltd Technical Memo TM 34 and rear spars in accordance with Rex Aviation (NZ) Ltd Technical Memo TM 50. Where mod RA-491 has already been embodied, a doubler, Cessna P/N 16200581, may be fitted as an approved alternative to Rex Technical Memo TM 50. Compliance: By 1 December 1971 DCA/CESS188/112 Cancelled DCA/CESS188/113 Rudder Stop - Modification Applicability: Model 188 Series S/N 1880001 through 1880317 excluding those detailed in Cessna SL 67-53 Requirement: Comply with Cessna SL 67-53 Compliance: By 31 July 1968 * DCA/CESS188/114B Cancelled – Purpose Fulfilled Note: This AD was based on CASA AD/CESSNA188/7. This unique Australian AD, initially issued in 1968 and later amended in 1979, required inspection of the aileron hinge assemblies at the aileron spar and associated rib attachments in accordance with Rex Aviation Technical Memo TM21. The AD was only applicable to aircraft that had not been modified by the fitment of later P/N inboard, centre and outboard hinges, including the fitment of a shim at the centre hinge (i.e. Mod RA-B-965). The AD required compliance at every 100 hours TIS. Since 1980 no defects have been reported, indicating aircraft have been modified. The AD was cancelled by CASA on 18 June 2008. Effective Date: 27 August 2020 DCA/CESS188/115 Cancelled: Once only inspection DCA/CESS188/116 Cancelled DCA/CESS188/117 Cancelled DCA/CESS188/118 Cancelled Aeroplanes Cessna 188 Series Issued 27 August 2020 Page 5 of 12 CAA of NZ DCA/CESS188/119 Throttle Linkage - Modification Applicability: Model 188 Series All S/N’s Requirement: 1. Fit spring, Continental P/N 628371 between air to fuel lever P/N 625228 and fuel metering lever P/N 539989. 2. Check engine speed is approximately 2300 rpm on ground with throttle control disconnected. Compliance: Before further flight Effective Date: 30 June 1969 DCA/CESS188/120 Cancelled: DCA/GEN/5 refers DCA/CESS188/121 Cancelled DCA/CESS188/122 Alternator Earth Lead - Inspection Applicability: Model 188 Series All S/N’s Requirement: Cases have been reported where the earth lead from the alternator has broken and the negative current from the alternator arced across the adjacent metal bridges fuel pump return line, causing a puncture of the fuel line and a resultant fire on the ground. Inspect to ensure that the alternator lead is in a good condition and securely attached. Compliance: Within the next 10 hours TIS thereafter at intervals not exceeding 100 hours TIS Effective Date: 31 August 1970 DCA/CESS188/123 Elevator Trim Tab - Inspection Applicability: Model 188 Series All S/N’s Requirement: Inspect elevator trim tab horn P/N 0734603-1AGW for security and tab top and bottom skin for cracks in the vicinity of horn attachment Compliance: Before each flight until mod Rex-AD-92 is embodied, thereafter at intervals not exceeding 100 hours TIS Effective Date: 31 August 1970 DCA/CESS188/124 Elevator Trim Tab - Modification Applicability: Model 188 Series All S/N’s Requirement: Embody Rex-AK-92 modification Compliance: By 30 September 1970 Aeroplanes Cessna 188 Series Issued 27 August 2020 Page 6 of 12 CAA of NZ DCA/CESS188/125 Installation of Inertia Reel Harness - Modification Applicability: Model 188 Series All S/N’s Requirement: To allow greater freedom of pilot movement during all operating conditions, an approved inertia reel harness must be installed. Compliance: By 31 January 1971 DCA/CESS188/126 Engine Controls - Modification Applicability: 1. Model 188 Series S/N 18800832 and below 2. Model 188 Series S/N 18800833 and up Requirement: 1. On aircraft S/N 18800832 and below, embody Rex Aviation (NZ) Ltd modification REX-AK-65 issue 2. This revises the engine controls and repositions the auxiliary fuel pump switch more conveniently. 2. On aircraft S/N 18800833 and up, reposition the auxiliary fuel pump switch in accordance with relevant instructions in modification REX-AK-65 issue 2. Note that on these aircraft the engine controls modification is accomplished at manufacture Compliance: 1. By 1 February 1971. 2. Before issue of C of A. DCA/CESS188/127A Main Wheel Axles - Inspection Applicability: Model 188 Series All S/N’s with axles that have over 1000 hours TIS Requirement: Inspect all main wheel axles, irrespective of part numbers, for cracks in radius between axle and mounting flange Compliance: At intervals not exceeding 100 hours TIS Effective Date: 19 May 1976 DCA/CESS188/128 Aileron Control Cables - Inspection Applicability: Model 188 Series S/N 1880001 through 18800707 except those modified in accordance with Cessna Service Letter SE 72-1 Requirement: Inspect those portions of the aileron control cables that move in the area of the fairleads near BL20 for fraying or broken strands. Defective cables are to be replaced. Compliance: Within the next 25 hours TIS and thereafter at intervals not exceeding 100 hours TIS. (FAA AD 73-16-02 refers) Effective Date: 30 September 1973 Aeroplanes Cessna 188 Series Issued 27 August 2020 Page 7 of 12 CAA of NZ DCA/CESS188/129 Aileron Control Cables - Inspection Applicability: Model 188 Series S/N 1880001 through 18800707 including those modified in accordance with Cessna service letter SE 72-1 Requirement: Identify those portions of the aileron control cables that pass around the pulleys and either disconnect both ends of each aileron cable, or remove the cables to conduct the following inspection. Rotate the cable so that the cable tends to untwist and simultaneously simulate the curvature of the cable over the pulley and check for fraying or broken outer and inner cable strands. Defective cables are to be renewed. Compliance: Within the next 25 hours TIS and thereafter at intervals not exceeding 100 hours TIS. (FAA AD 73-16-02 refers) Effective Date: 30 September 1973 DCA/CESS188/130 Aileron Control Cables - Renewal Applicability: Model 188 Series S/N 1880001 through 18800707 including those modified in accordance with Cessna service letter SE 72-1 Requirement: Renew all aileron cables. Compliance: At 500 hours TIS and thereafter at intervals not exceeding 500 hours TIS. (FAA AD 73-16-02 refers) Effective Date: 30 September 1973 DCA/CESS188/131 Wing Spar - Inspection Applicability: Model 188 Series S/N 1880001 through 18800832 as detailed in SL Requirement: Comply with Cessna SESL SE 74-4 Compliance: Within the next 100 hours TIS and thereafter at intervals not to exceed 100 hours TIS Effective Date: 15 May 1974 DCA/CESS188/132 Induction Air Duct - Replacement Applicability: Model 188 Series S/N 18800833 through 18801824 Requirement: Comply with Cessna SESL SE 74-23 and SE 75-5 (FAA AD 74-23-07 and 75-09-06 refers) Compliance: By 30 July 1975 Effective Date: 2 June 1975 DCA/CESS188/133 Throttle/Mixture Control Cable Attachment - Inspection Applicability: Model 188 Series S/N 18800833 through 18801629, 18801643 and 18801644 Requirement: Comply with Cessna SESL SE 74-20 Compliance: Unless already accomplished, within the next 100 hours TIS and thereafter at intervals not exceeding 100 hours TIS Effective Date: 2 June 1975 Aeroplanes Cessna 188 Series Issued 27 August 2020 Page 8 of 12 CAA of NZ DCA/CESS188/134A Fuel Cell Capacity Placard - Modification Applicability: Model 188 Series S/N 18801347 through 18802027 as identified in S.L. and all other 188 series aircraft in which original fuel cells have been replaced with cells manufactured in June 1973 or later Note also applies to aircraft incorporating suffix T in S/N Requirement: Comply with Cessna SESL SE 75-7 (FAA AD 75-16-01 refers) Compliance: Within the next 100 hours TIS Effective Date: 15 October 1975 DCA/CESS188/135 Flap Operating Lever - Repositioning Applicability: Model 188 Series S/N 1880833 and up with mod RAL 334 or other similar seat installation Requirement: Install Rex Aviation modification RAL 423 Compliance: By 31 August 1976 DCA/CESS188/136 Induction Airbox Seal - Inspection Applicability: Model 188 Series S/N 18800001 through 18802348 Model A188 Series S/N 18800001 through 18800707 Requirement: Comply with Cessna SESL SE 76-18 (FAA AD 77-04-05 refers) Compliance: Within the next 50 hours TIS Effective Date: 31 March 1977 DCA/CESS188/137 Fuel Cap - Modification Applicability: Model 188 Series S/N 188-0446 through 188-0572 and S/N 18800573 through 18803296 with wing tanks Requirement: Fit vented fuel cap per Cessna SEB 92-27 (FAA AD 79-10-14R1 refers) Compliance: Within the next 100 hours TIS unless already accomplished Effective Date: 23 March 1979 DCA/CESS188/138 Electrical System - Modification Applicability: Model 188 Series S/N 188-0001 through 188-0572 and 18800573 through 18803046 Requirement: To prevent inflight electrical system failure, smoke in cockpit and/or fire in wire bundle, behind instrument panel, accomplished the following: Disconnect at ammeter or electrical system bus, as applicable, wire which connects bus to cigar lighter receptacle (wire is connected to either the bus side, or equipment side of a circuit breaker, or to the ammeter) then either: 1. Reconnect wire to bus using an existing or newly installed circuit protection device properly rated for wire gauge used, or 2. disconnect wire from lighter receptacle and remove it from aircraft, or 3. insulate disconnected end of wire and secure it to bundle in which it is routed. FAA AD 79-08-03 refers) Note: FAA AC 43.13-1A contains guidance information on wire gauge/circuit protection device ratings. Compliance: Within next 100 hours TIS Effective Date: 29 June 1979 Cessna 188 Series Issued 27 August 2020 Page 9 of 12 CAA of NZ DCA/CESS188/139 Alternator Installation - Modification and Inspection Applicability: Model 188 Series S/N 18800050 through 18803240 Requirement: 1. Install either additional ground strap per Cessna SESIL SE 79-59 or embody Cessna service kit SK-210-84 per SESIL SE 79-5. 2. Visually inspect alternator installation for, and if necessary provide, at least ½ inch clearance between alternator and adjacent flammable fluid carrying lines power plant controls and electrical wiring. 3. Visually inspect existing alternator to airframe ground for proper installation (SE 79-59 view A-A refers), evidence of looseness at the terminal and adequate length to allow for relative motion between alternator and airframe. Also, confirm that ground straps between engine and airframe mount are installed and provide continuity between engine and mount. Correct any unsatisfactory conditions found per FAA AC 43.13-1A (FAA AD 79-25-07 refers) Compliance: Within the next 50 hours TIS unless already accomplished Effective Date: 8 February 1980 DCA/CESS188/140 MLG Legs - Modification Applicability: Model 188, A188 and T188 Series with mudguards installed per Rex Aviation (NZ) Ltd mod RAL 359 Requirement: To preclude possible leg failure due to corrosion-pit initiated fatigue cracking, accomplish the following: 1. remove spring legs and mudguard assemblies 2. thoroughly clean area between extreme edges of mudguard attachment brackets on legs and (a) visually inspect leg surfaces for corrosion pitting, (b) using magnetic particle method inspect area for cracks. Remove from service before further flight any leg found cracked. Polish out corrosion pitting and reprotect before returning uncracked legs to service. Compliance: Within the next 50 hours TIS and thereafter at intervals not exceeding 400 hours TIS Effective Date: 8 June 1984 Cessna 188 Series Issued 27 August 2020 Page 10 of 12 CAA of NZ DCA/CESS188/141 Bladder Type Fuel Cells - Inspection And Modification Applicability: Models 188, A188 and T188 Series S/N 1880446 through 18803856 (wing tanks only) S/N 18800967T through 18803966T with bladder fuel cells S/N T18803307T through T18803966T with bladder fuel cells Requirement: To preclude possible power loss or engine stoppage due to water contamination of fuel system, accomplish the following: 1. Inspect fuel tank filler areas and caps for proper sealing per Cessna SIL SE 82-34. Check fuel cap seal by actuating locking tab and noting that force is maintained between cap seal and adaptor when tab is in over-centre locked position, or accomplish leak test per Cessna SIL SE 82-34. 2. Inspect fuel cell for wrinkles per Cessna SIL SE 84-4. If wrinkles found, modify and rework fuel cell per Cessna SIL SE 84-9 within next 100 hours TIS. 3. Install quick drains in fuel tank sumps and reservoirs where applicable, per Cessna SILs SE 79-45 and SE 84-8. (FAA AD 84-10-01R1 refers) Compliance: 1 and 2 inspections - within next 50 hours TIS and thereafter at intervals not exceeding 12 months. 3. Modification - within next 100 hours TIS. Effective Date: 27 July 1984 DCA/CESS188/142A Cancelled – DCA/CESS188/146 refers Effective Date: 30 June 2011 DCA/CESS188/143 Fuel, Oil or Hydraulic Hose - Removal Applicability: All model 188 series, all S/Ns. Requirement: To prevent fuel, oil or hydraulic systems failure caused by a collapsed hose, check the aircraft maintenance records for any fuel, oil or hydraulic hose, Cessna P/N S51- 10, replaced between March 1995 and 14 March 1997. If any fuel, oil or hydraulic hose, Cessna P/N S51-10, has been replaced between March 1995 and 14 March 1997, accomplish the following:- Before further flight physically check for a diagonal or spiral external reinforcement wrap per Cessna SB SEB96-15. Replace any P/N S51-10 hose that has a diagonal or spiral pattern external reinforcement wrap with a P/N S51-10 hose that has a criss- cross pattern external wrap per SB SEB96-15. (FAA AD 97-01-13 refers) Compliance: Within next 60 hours TIS or 60 days, whichever is the sooner. Effective Date: 14 March 1997 Cessna 188 Series Issued 27 August 2020 Page 11 of 12 CAA of NZ DCA/CESS188/144 Preflight Fuel System Check - Flight Manual Revision Applicability: Model A188 (S/N 653, 188-0001 through 188-0572), A188A (S/N 18800573 through 18800832), A188B (S/N 678T, 18800833 and on) and T188C (S/N T18803307T, T18803308T, T18803325T and on) equipped with fuel reservoir(s). Requirement: To preclude possible power loss or engine stoppage due to fuel contamination, accomplish the following:- Insert the following paragraphs into the aircraft flight manual. Alternatively, a manufacturer’s flight manual revision with the same wording is acceptable. (FAA AD 86-19-11 refers) PILOT OPERATING PROCEDURES - PREFLIGHT FUEL SYSTEM CHECK Fuel sampling: Fuel strainer, wing tank and reservoir quick drains. 1. Place a suitable container under the fuel strainer drain outlet prior to operating the strainer drain control for at least 4 seconds. Check strainer drain closed. 2. Inspect the fluid drained from the fuel strainer and each wing tank quick drain for evidence of fuel contamination in the form of water, rust, sludge, ice or any other substance not compatible with fuel. Also check for proper fuel grade before the first flight of each day and after each refueling. If any contamination is detected, comply with 4 below. 3. Repeat Steps 1 and 2 on each wing tank quick drain. 4. If the aircraft has been exposed to rain, sleet or snow, or if the wing fuel tanks or fuel strainer drains produce water, the fuel reservoir(s) must be checked for the presence of water by operating the fuel reservoir quick drains. The aircraft fuel system must be purged to the extent necessary to insure that there is no water, ice or other fuel contamination. NOTE 1: The fuel reservoir(s) are located under the fuselage between the firewall and forward door post on all airplane models. Consult the pilots Aircraft Flight Manual, Operating Handbook or Owners Manual in order to determine if one or two reservoir(s) are installed. NOTE 2: A check for the presence of water using the fuel reservoir quick drains prior to the first flight of each day is considered good operating practice. DCA/CESS188/144 refers Compliance: By 1 February 2000 Effective Date: 19 November 1999 DCA/CESS188/145 Cancelled – N/A to Cessna 188 Aircraft Effective Date: 25 November 2010 Cessna 188 Series Issued 27 August 2020 Page 12 of 12 CAA of NZ DCA/CESS188/146 Seat Adjustment Mechanism – Inspection and Replacement Applicability: Model 188, 188A, A188, A188A, 188B, A188B and T188C aircraft, all S/N. Note: This AD supersedes DCA/CESS188/142A to introduce additional inspection requirements, to improve the clarity of the required inspections, and provide improved figures/graphics. The FAA continue to receive reports of inadvertent seat movement. These reports included an incident of a seat separating from the seat track due to wear of the seat roller housing tangs. Requirement: To prevent seat slippage or disengagement of the seat roller housing from the seat rail which could result in the pilot/copilot being unable to reach all the controls and loss of aircraft control, accomplish the following: Accomplish the inspections and corrective actions in FAA AD 2011-10-09 on the seat rails; seat rollers, washers, and axle bolts or bushings; seat roller housings and the tangs; and the lock pin springs. (FAA AD 2011-10-09 refers) Compliance: Within the next 100 hours TIS after the last inspection accomplished per DCA/CESS188/142A (FAA AD 87-20-03 R2 refers) or by 30 June 2012 whichever occurs sooner, and thereafter at intervals not to exceed 100 hours TIS or every 12 months whichever occurs sooner. Effective Date: 30 June 2011