Gulfstream Aerospace G350 — Service Bulletins
1 service bulletins reference for the Gulfstream Aerospace G350.
Overview
Federal Register/Vol. 77, No. 242/Monday, December 17, 2012 · 2012
This document is a service bulletin for the Gulfstream G350 aircraft, detailing mandatory actions and revisions required for compliance with an Airworthiness Directive (AD). It outlines procedures for performing a System Performance Operational Test (SPOST) on the Flight Safety Electronic Control Unit (FSECU) and necessary updates to the Aircraft Flight Manual (AFM).
- SPOST must be performed within 3 days after the AD's effective date.
- Specific bulletins and revisions must be used for G350 and G450 models.
- Normal Procedures and Limitations sections of the AFM must be revised after SPOST.
- Repairs are required if the FSECU fails the SPOST.
- Special flight permits are not allowed under this AD.
- Alternative Methods of Compliance (AMOCs) can be requested.
- Contact information for FAA and Gulfstream is provided for further assistance.
1 document
Gulfstream Aerospace G350 — Service Bulletins FAQ
How many Service Bulletins documents does Sprinkle have for the Gulfstream Aerospace G350?
Sprinkle has 1 Service Bulletins document on file for the Gulfstream Aerospace G350.
What year is the Gulfstream Aerospace G350 Service Bulletins?
The Gulfstream Aerospace G350 Service Bulletins on file is dated 2012.
Where does Sprinkle's Gulfstream Aerospace G350 Service Bulletins come from?
This Gulfstream Aerospace G350 Service Bulletins was originally published by govinfo.gov and is hosted on Sprinkle with full text and specs.