Skip to main content

LEONARDO AW109SP GRANDNEW — Maintenance Manual

1 maintenance manual reference for the LEONARDO AW109SP GRANDNEW.

Overview
DueList Report · 2024

This document is a Due List Report for the Leonardo AW109SP Grand New helicopter, specifically for serial number 22294. It outlines maintenance tasks, inspections, and service requirements based on the aircraft's operating hours and regulatory compliance.

  • The report is for AW109SP GRAND NEW, Serial: 22294, RegNo: VH-LCF.
  • Current aircraft hours are 1446.5 as of 23-Jan-2024.
  • Next due inspection is a 50-hour/60-day check by 23-Mar-2024.
  • Mandatory inspections include checks on main rotor elastomeric bearings.
  • The report includes various service tasks with specific due dates.
  • Maintenance tasks are categorized by ATA chapters.
  • The operator is Walker Air Services Pty Limited.
  • The report is projected until 05-Mar-2025.
1 document
LEONARDO AW109SP GRANDNEW — Maintenance Manual FAQ
How many Maintenance Manual documents does Sprinkle have for the LEONARDO AW109SP GRANDNEW?

Sprinkle has 1 Maintenance Manual document on file for the LEONARDO AW109SP GRANDNEW.

What year is the LEONARDO AW109SP GRANDNEW Maintenance Manual?

The LEONARDO AW109SP GRANDNEW Maintenance Manual on file is dated 2024.

Where does Sprinkle's LEONARDO AW109SP GRANDNEW Maintenance Manual come from?

This LEONARDO AW109SP GRANDNEW Maintenance Manual was originally published by smsaircraft.com and is hosted on Sprinkle with full text and specs.