Skip to content

MESSERSCHMITT BO105 Model Guide

Messerschmitt BO105 · Model Guide · 2026 · 47 KB

Model Guide for the Messerschmitt BO105

PDF, 47 KB, from Sprinkle’s own files.

What it covers

MESSERSCHMITT BO105 is listed in the library as a piston-engine model. No year, seat, spec or performance data was supplied. The only source is Alert Service Bulletin ASB BO105-90-103 (Rev. 4, June 21, 2010) on the starter-generator ground reference connection. It covers BO105 models A, C, S and D. This guide therefore covers what to check, not how the helicopter performs.

Key points

  • No performance, weight or seat figures are in the inputs. Get them from the helicopter's own manuals before buying.
  • ASB BO105-90-103 Rev. 4 covers models A, C, S and D. IFR-approved helicopters need a new ground reference line.
  • The bulletin estimates approx. 12 man-hours for the ground line retrofit and approx. 2 man-hours for the wire terminal check.
  • Ask to see the historical record entry confirming the bulletin was accomplished.

Main sections

Why the bulletin exists

On one helicopter a wire terminal broke at terminal E of the starter-generator. This cut the ground connection to the generator voltage regulator. The result was overvoltage in the electrical system, which damaged several items of electronic equipment.

What applies to which helicopter

IFR-approved up to S/N 0160: determine whether a retrofit is needed, at the next periodical inspection and within 6 months of receiving Rev. 4. IFR-approved from S/N 0161: retrofit in the same period. Non-IFR: inspect and measure resistance, which must read 0.5 ohms or less.

Who is not affected

Helicopters already modified under ASB-BO105-80-118, SB-BO105-80-119 or SB-BO105-90-104 are excluded. So are those with a voltage regulator with overvoltage protection already fitted, such as BO105 CBS-5 KLH and CB(S)-5, and some model D.

Safety notes

  • Uncorrected, a broken ground wire can cause overvoltage that damages avionics and other electronic equipment.
  • Terminal E nut torque is 25-26.5 Nm. The wire terminal must be centred and the wire installed without tension.
  • Without a standard grounding bar, a grounding bracket must be retrofitted as part of the work.

Questions this document answers

Which MESSERSCHMITT BO105 models does the bulletin cover?

The bulletin covers MESSERSCHMITT BO105 models A, C (C23, CB, CB-4), S (CS, CBS, CBS-4) and D (DS, DB, DB-4, DBS, DBS-4, DBS-5). Helicopters already modified under the listed earlier bulletins are excluded.

How is a non-IFR helicopter checked?

On a non-IFR MESSERSCHMITT BO105, inspect the starter-generator ground connection visually. Then measure resistance between the starter-generator and the voltage regulator. The reading must be 0.5 ohms or less.

What should a buyer ask for?

For a MESSERSCHMITT BO105, ask for the historical record entry confirming ASB BO105-90-103 was done. Also ask whether the helicopter is IFR-approved and whether it has a grounding bar as standard equipment.

The document’s text

Show the text read from the PDF

MESSERSCHMITT BO105 Model Guide MESSERSCHMITT BO105 is listed in the library as a piston-engine model. No year, seat, spec or performance data was supplied. The only source is Alert Service Bulletin ASB BO105-90-103 (Rev. 4, June 21, 2010) on the starter-generator ground reference connection. It covers BO105 models A, C, S and D. This guide therefore covers what to check, not how the helicopter performs. • No performance, weight or seat figures are in the inputs. Get them from the helicopter's own manuals before buying. • ASB BO105-90-103 Rev. 4 covers models A, C, S and D. IFR-approved helicopters need a new ground reference line. • The bulletin estimates approx. 12 man-hours for the ground line retrofit and approx. 2 man-hours for the wire terminal check. • Ask to see the historical record entry confirming the bulletin was accomplished. Why the bulletin exists On one helicopter a wire terminal broke at terminal E of the starter-generator. This cut the ground connection to the generator voltage regulator. The result was overvoltage in the electrical system, which damaged several items of electronic equipment. What applies to which helicopter IFR-approved up to S/N 0160: determine whether a retrofit is needed, at the next periodical inspection and within 6 months of receiving Rev. 4. IFR-approved from S/N 0161: retrofit in the same period. Non-IFR: inspect and measure resistance, which must read 0.5 ohms or less. Who is not affected Helicopters already modified under ASB-BO105-80-118, SB-BO105-80-119 or SB-BO105-90-104 are excluded. So are those with a voltage regulator with overvoltage protection already fitted, such as BO105 CBS-5 KLH and CB(S)-5, and some model D. Safety notes: • Uncorrected, a broken ground wire can cause overvoltage that damages avionics and other electronic equipment. • Terminal E nut torque is 25-26.5 Nm. The wire terminal must be centred and the wire installed without tension. • Without a standard grounding bar, a grounding bracket must be retrofitted as part of the work.

Read from the PDF by machine, so tables and diagrams come out rough. The PDF is the document.

More Messerschmitt BO105 documents

All 3 →

Also useful for the Messerschmitt BO105

From Sprinkle’s library of aircraft documents. PDFs open from Sprinkle’s own files. Read Nov 24, 2026.

Want this document taken down? Request removal