MU-2 Service Bulletin No. 243
Service Bulletins for the Mitsubishi Mu 2B
PDF, 222 KB, from Sprinkle’s own files.
What it covers
This document is a service bulletin for the Mitsubishi MU-2B aircraft, specifically addressing the inspection of the main landing gear oleo attach fittings. It outlines the purpose, compliance requirements, and detailed instructions for conducting a one-time visual inspection to ensure airworthiness.
Key points
- Mandatory inspection of main landing gear oleo attach fittings.
- Applicable to MU-2B-30/-35/-36 models, S/N 502 through 696 except 652 and 661.
- Inspection must be completed within 100 flight hours or 6 months.
- No special tools are required for the inspection.
- Approximately 5 man hours needed for compliance.
- If cracks are found, fittings must be replaced.
- Recurring inspections are required for continued airworthiness.
- Logbook entry is required after completion.
Main sections
Purpose
Conduct a one-time visual inspection of the main landing gear oleo attach fittings to ensure that no visible crack exists in lugs of the fittings.
Compliance
Mandatory compliance within 100 flight hours or 6 months after receipt of this Service Bulletin.
Instructions
Detailed steps for preparation, inspection, lubrication, restoration, and logbook entry.
Inspection
Visually inspect the lugs of the oleo attach fittings for visible cracks using a mirror and flashlight.
Lubrication
Lubricate the pin assemblies with grease 'GP' (MIL-PRF-23827).
Completion
Complete the compliance card and mail it back to Mitsubishi Heavy Industries America, Inc.
Safety notes
- Inspection is mandatory to ensure continued airworthiness.
- If cracks are found, replace the fitting immediately.
- If the visual inspection is inconclusive, conduct a non-destructive inspection.
The document’s text
Show the text read from the PDF
M U - 2 S E R V I C E B U L L E T I N MITSUBISHI HEAVY INDUSTRIES, LTD. NAGOYA AEROSPACE SYSTEMS WORKS 10, OYE-CHO, MINATO-KU, NAGOYA, JAPAN Page 1 of 3 No. 243 DATE: June 30, 2015 Subject: Main Landing Gear Oleo Attach Fitting – Inspection of Effectivity: MU-2B-30/-35/-36: S/N 502 through 696 except 652 and 661 Purpose: Conduct a one-time visual inspection of the main landing gear oleo attach fittings to ensure that no visible crack exists in lugs of the fittings. Background: Cracks were found in the fittings of the main landing gear oleo strut on several long body airplanes. Since the fitting is very important structure for safe landing, a one-time inspection is required to ensure continued airworthiness. Compliance: Mandatory Approval: JCAB Approved Time of Compliance: Within 100 flight hours or 6 months, after receipt of this Service Bulletin, whichever occurs first Responsible Agency of Compliance: MU-2 Owners/Operators Disposition of Removed Parts: Scrap Spare Parts Affected: None Required Man Hours: Approximately 5 man hours Special Tools Required: None Weight and Balance Change: None Flight Manual Revision: None -- 1 of 3 -- MU-2 Service Bulletin No. 243 DATE: June 30, 2015 Page 2 of 3 INSTRUCTIONS Refer to the applicable MU-2 Maintenance Manual, Illustrated Parts Catalog and Structural Repair Manual to comply with this Service Bulletin. 1. PREPARATION (1) Turn on electrical power to the airplane and open main landing gear forward doors using the ground open switch in accordance with the applicable maintenance manual for easier access to the fittings. If it is necessary to remove more parts for access, those parts may be removed. (2) Pull the circuit breakers “LG CONT” and “LG DOOR MOTOR”. (3) Electrically ground the aircraft. (4) Clean the fitting lug surface to be inspected with a solvent damped cloth to remove any dirt / dust / grease contaminants and make sure that the surface is exposed. 2. INSPECTION (1) Visually inspect the lugs of the oleo attach fittings on both sides for visible cracks. (Figure 1 & 2) Use a mirror and flashlight to check the entire surface of lugs of the fitting. If any cracks are found in the lug, replace with a new fitting in accordance with the applicable Maintenance Manual and discard the discrepant fitting. NOTE If the visual inspection is inconclusive, conduct a non-destructive inspection in accordance with the applicable maintenance manual. 3. LUBRICATION (1) Lubricate the pin assemblies with grease “GP” (MIL-PRF-23827). 4. RESTORATION (1) Close main landing gear forward doors. NOTE For continued airworthiness after completion of this SB, the Maintenance Requirement Manual requires recurring visual and non-destructive inspection of the fittings, and also, the Maintenance Manual requires lubrication for the pin assemblies. 5. LOGBOOK ENTRY Upon completion of this Service Bulletin, make an appropriate maintenance entry in the logbook similar to “Service Bulletin No. 243 complied with on (date) by (name), number/stamp.” 6. COMPLETION Complete the enclosed compliance card and mail back to Mitsubishi Heavy Industries America, Inc. in care of Turbine Aircraft Services, Inc. Turbine Aircraft Services, Inc. 4550 Jimmy Doolittle Drive, Addison, Texas 75001 Attention: Manager, Publications Phone: (972) 248-3108 X 209 Fax: (972) 248-3321 -- 2 of 3 -- MU-2 Service Bulletin No. 243 DATE: June 30, 2015 Page 3 of 3 Figure 1: LOCATION OF FITTING LUG INSPECTION (Typically shown for L/H side) Figure 2: MOST LIKELY LOCATION OF CRACKS ON FITTING (Typically shown for L/H side) FWD Drag Strut Leg Oleo Strut Oleo Attach Fitting Frame (STA5605) Pin Assy Most likely location of cracks FWD UPR OUTB/D (L/H) -- 3 of 3 --
Read from the PDF by machine, so tables and diagrams come out rough. The PDF is the document.
More Mitsubishi Mu 2B documents
All 8 →- Mitsubishi MU-2B Service Letter
This document is a service letter issued by Mitsubishi Heavy Industries regarding the MU-2B series aircraft. It informs owners and operators about the Honeywell Operating Information Letter (OIL) OI331-11R23 and the recommended installation of an Auto-Ignition System to enhance safety during icing conditions.
- Mitsubishi MU-2B Service Publication
This document is a service bulletin issued by Mitsubishi Heavy Industries regarding the MU-2B series aircraft. It outlines the need for visual inspections of the main landing gear leg fittings due to reported failures and provides guidance on upcoming ultrasonic inspection procedures.
- Mitsubishi Service Publications Transmittal
This document is a service bulletin issued by Mitsubishi Heavy Industries regarding the MU-2B series aircraft. It focuses on preventing hypoxia situations during flight, emphasizing the importance of following specific procedures to ensure pilot safety.
- Mitsubishi MU-2B Service Letter
This document is a service letter issued by Mitsubishi Heavy Industries regarding the MU-2B series aircraft. It addresses the importance of inspecting flight control cables to prevent potential failures and outlines recommendations for maintenance and inspection procedures.
- Service Bulletin No. 107/57-005
This service bulletin outlines the inspection and replacement procedures for the wing spacer plates of the Mitsubishi MU-2B aircraft. It aims to ensure the airworthiness of the wing structures by addressing potential fatigue cracks found in the spacer plates.
- MITSUBISHI MU 2B Model Guide
MITSUBISHI MU 2B belongs to the Mitsubishi MU-2 family, which registry data lists as a turboprop type. Family maxima run up to 14 passengers and 4,700 kg MTOW. No variant-specific specs were supplied, so this guide covers airworthiness items from Mitsubishi service publications. The type certificate holder is Mitsubishi Heavy Industries, Ltd. in Japan.
- Mu-2b-60 Pilot'S Operating Manual
The Mitsubishi MU-2B-60 Pilot's Operating Manual is a comprehensive document that provides essential information for operating the MU-2B-60 aircraft. It includes details on safety, performance, and operational procedures, specifically for serial numbers ranging from 700SA to 799SA and 1501SA to 1569SA.
Pilot's Operating Handbook · 1978PDF · 29 KB of Mu-2b-60 Pilot'S Operating Manual, opens in a new tabRequest removal of Mu-2b-60 Pilot'S Operating Manual
Mitsubishi MU-2 for sale now
View all 14 for sale →Aircraft that this service bulletins covers, listed on the sites Sprinkle reads. Asking prices, not sales. Mitsubishi MU-2 asking prices by year built.
Also useful for the Mitsubishi Mu 2B
From Sprinkle’s library of aircraft documents. PDFs open from Sprinkle’s own files. Read Sep 22, 2026.
Want this document taken down? Request removal


