Mooney M20A — Checklist
1 checklist reference for the Mooney M20A.
Overview
1961 Mooney M20B Master · 1961
This document serves as a comprehensive checklist for the Mooney M20B aircraft, detailing essential procedures for preflight, engine start, takeoff, landing, and emergency situations. It is designed for pilots operating the Mooney M20B, providing step-by-step instructions to ensure safety and compliance with operational standards. The checklist includes critical checks for engine run-up, preflight inspections, and post-flight procedures, as well as emergency protocols for various scenarios. The document emphasizes the importance of thorough preparation and adherence to safety measures throughout the flight process.
- Engine run-up requires a maximum magneto drop of 125 RPM and a maximum difference of 50 RPM.
- Throttle should be set to 1700 RPM during engine run-up.
- Rotate at 65-75 MPH during takeoff for optimal performance.
- Climb speed should be maintained at 96 MPH (105 MPH for best rate).
- Emergency procedures include switching fuel tanks and preparing for power-off landings.
1 document