Skip to main content

Mooney M20R Ovation — Service Bulletins

1 service bulletins reference for the Mooney M20R Ovation.

Overview
Airworthiness Directive Schedule Aeroplanes Mooney M20 Series · 2023

This document is an Airworthiness Directive (AD) schedule for the Mooney M20 series aircraft, including the M20R model. Issued on February 23, 2023, it outlines mandatory inspections, modifications, and replacements required to maintain airworthiness. The document is intended for owners and operators of Mooney M20 aircraft, providing detailed compliance requirements to ensure safety and reliability. Each directive includes specific applicability, compliance timelines, and references to relevant service bulletins. The ADs cover various components, including fuel systems, landing gear, and control systems, emphasizing the importance of regular maintenance and adherence to safety standards.

  • The document is an Airworthiness Directive schedule for Mooney M20 series aircraft, including the M20R model.
  • Mandatory inspections and modifications are outlined for various components to ensure airworthiness.
  • Specific compliance timelines are provided, often requiring actions within 25 to 100 hours TIS.
  • References to relevant service bulletins are included for detailed instructions on compliance.
  • The document emphasizes the importance of regular maintenance and adherence to safety standards.
1 document