PC12/45 SCL (QRH Rev.3)
PILATUS PC-12/45 · Checklist
Overview
This document is a short checklist for the Pilatus PC-12/45 aircraft, providing essential procedures for preflight inspection, engine starting, taxiing, takeoff, landing, and shutdown. It serves as a quick reference for pilots to ensure all critical steps are followed during flight operations.
- Refer to PC-12/45 POH Section 4 for complete information.
- Perform a thorough preflight inspection before starting the engine.
- Check engine instruments and flight controls before takeoff.
- Monitor cabin pressurization and engine parameters during flight.
- Ensure all lights and systems are set correctly before taxiing.
- Follow specific procedures for takeoff and landing phases.
- Perform shutdown procedures after landing.
- Use caution with ice protection systems as required.
Summary written by AI from the source document. Check the original before relying on it. See which parts of Sprinkle are written by AI.
Reference only, not for flight. Use the current approved manual for your aircraft. See terms, section 5.
Document
Source
Copy found at weebly.com. Sprinkle hosts a reference copy with an added summary, specifications and searchable full text.
Document details
- Type ·
- Checklist
- Year ·
- 2015
- File size ·
- 406 KB
- Copy found at ·
- weebly.com
- Language ·
- en
What is the PC12/45 SCL (QRH Rev.3)?
The PC12/45 SCL (QRH Rev.3) is a checklist for the PILATUS PC-12/45, dated 2015.
What year was the PC12/45 SCL (QRH Rev.3) published?
The PC12/45 SCL (QRH Rev.3) — the PILATUS PC-12/45 checklist on file — is dated 2015.
Common. More common than 99% of the aircraft models we track.
Most owners only have the POH. Here's the essential set for the PILATUS PC-12/45.
- Pilot's Operating Handbook / AFM
- Checklist
- Maintenance Manual
- Parts Catalog (IPC)
- Systems & Wiring
- Service Bulletins on file
- Type Certificate (TCDS)
PILATUS PC-12/45 for sale now
Free — save the PC-12 to your watchlist and track it in one place.
More PILATUS PC-12/45manuals & documents
Related documents
- Lear 55 ChecklistLEARJET 55 · Checklist
- Checklist for Diamond DA42 NG / -VIDiamond DA42 VI · Pilot's Operating Handbook
- Checklist für Diamond DA40-180 Diamond StarDiamond DA40 Diamond Star · Systems Description
- Checklist for Diamond DA42 TDI “Twin Star”Diamond DA42 VI · Checklist
- BE90 (C90A) Checklist V 1.4Beechcraft King Air 90 · Checklist
If you fly the PILATUS PC-12/45, you may also be researching these.
—In this document
Preflight Inspection
Check flight control lock, fuel quantity, parking brake, EIS system, and perform various tests before starting the engine.
Before Starting Engine
Ensure preflight inspection is complete, external lights are set, and seats are adjusted and locked.
Before Takeoff
Check engine and flight instruments, set trim, verify landing gear, and ensure CAWS panel shows no warnings.
Takeoff
Monitor engine instruments, rotate at VR, and maintain positive rate of climb.
After Landing
Set power control lever as required, retract landing gear, and ensure flaps are up.
Shutdown
Set power control lever to idle, turn off ECS and external lights, and perform final checks.
Summary written by AI from the source document. Check the original before relying on it. See which parts of Sprinkle are written by AI.
Safety notes
- Monitor ITT and torque limits during flight.
- Ensure cabin pressurization is maintained.
- Use caution with engine starting limits.
- Check for ice protection system requirements.
- Confirm all systems are operational before takeoff.
- Follow proper shutdown procedures to avoid damage.
Summary written by AI from the source document. Check the original before relying on it. See which parts of Sprinkle are written by AI.
Full document text
PC12/45 SCL (QRH Rev.3) SHORT CHECKLIST FOR COMPLETE INFORMATION REFER TO PC-12/45 POH SECTION 4 PREFLIGHT INSPECTION ENGINE STARTING Flight Control Lock removed and stowed Fuel quantity check Parking Brake Handle set/pedals push EIS system test External Power switch OFF TEST FIRE switch push (ENG FIRE and F DETECT BAT 1&2 switches OFF lights on) GEN 1&2 switches OFF TEST LAMP switch push (warning, caution, advisory AV Bus 1&2 switches OFF lights on). Overhead panel switches Non-Essential Bus AUTO LEDs lit STBY BUS switch ON Propeller area clear TEST LAMP switch push, check overhead panel Starter switch push for 2 seconds External lights OFF Oil pressure check rising Fuel pumps AUTO Ng stable between 13% and 20% IGNITION AUTO Condition lever GROUND IDLE DE-ICING OFF ITT Max 1,000°C limited to 5 sec INERT SEP OFF 800-870°C limited to 20 sec Cooling sys. OFF Ng stable above 50% Heating switch OFF Starter sequence completed PASS-WNG switches OFF Engine instruments check Circuit breakers check in Fuel Totalizer reset MSN 50-1 and UP GEN 1&2 switches ON - check CAWS - OFF MASK/Mic switch check set to MIC EXT PWR switch OFF (if external power used) EFIS CMPST switch NORM External Power Unit OFF then disconnect AHRS SLAVE INVERTER BAT or GEN check, change as required AHRS 1/AHRS 2 (if installed) SLAVE AV Bus 1&2 switches ON Landing Gear handle DN STBY BUS switch OFF ECS switch OFF Radios/avionics as required CABIN PRESS switch AUTO/GUARDED ECS switch AUTO Cabin Pressure controller set to cruise alt +500ft Temperature setting as required set rate knob to mid position Cooling or heating sys. as required Trim Interrupt switch NORM/GUARDED INERT SEP OPEN on unprepared surface Flap interrupt switch NORM/GUARDED Manual Override Lever OFF BEFORE TAXIING Power Control Lever idle detent AHRS 1/AHRS 2 check - no flags Condition Lever cut-off/feather Flaps 15° Flaps 0° A/P test button press, note lights Internal lights OFF Power Control Lever set 5 - 10 PSI Fuel Shut-off lever fully in TEST PUSHER switch push and hold Hydraulic hand pump handle stowed Power Control Lever set idle ECS Shut-off lever fully in CAWS panel check De-icing switches check, as required BEFORE STARTING ENGINE Pilot ventilation window closed and locked Preflight inspection complete External lights as required Seats adjusted and locked Parking Brake Handle release Seat belts fastened BAT 1&2 switches ON TAXIING Overhead panel voltmeter check 24 VDC Brakes check External power (if available): Connect then ON Flight instruments check EXT PWR switch ON PASS-WNG switches ON Overhead panel voltmeter check 28 VDC Landing gear 3 green lights Fuel contents check equal left/right Fuel pump LH ON, check audible, AUTO Fuel pump RH ON, check audible, AUTO OXYGEN lever ON Oxygen pressure gauge check 1850 PSI max PASS-OXY switch ON, check CAWS, set AUTO Oxygen masks check available, if required Pilot ventilation window closed and locked External lights as required PC-12/45 SCL (QRH Rev.1) REVISION 3: FEB 13, 2015 FOR FLIGHT SIMULATION PURPOSES ONLY. PILATUS LOGO AND CHECKLIST © PILATUS AIRCRAFT LTD BY AUTOGYRO 1 PC12/45 SCL (QRH Rev.3) SHORT CHECKLIST FOR COMPLETE INFORMATION REFER TO PC-12/45 POH SECTION 4 BEFORE TAKEOFF APPROACH Engine instruments check Ice Protection sys. as required Flight instruments check Altimiters set Trim set green lines and diamond Fuel quantity check Flaps 15° Landing Gear DN (below 180 KIAS) Flight controls free and correct Taxi/Landing lights as required Radios/avionics as required External lights as required CAWS panel check (no warning red lights) Flaps set conditions Probes switch ON Speed AOA centered Windshield heat as required Passengers brief/signs on External lights as required INERT SEP as required Transponder as required Runway identified FINAL HDG verified Landing Gear 3 green lights HDG Bug synchronised Flaps set as required Condition Lever FLIGHT IDLE Speed AOA centered INERT SEP as required Cabin Pressurization 0 Diff. Pressure Ice Protection sys. as required Autopilot disengaged Yaw Damper disengaged TAKEOFF EHSI check HDG LANDING ECS switch OFF Touch down main wheels first, do not flare with high pitch angle Power Control Lever set Power Control Lever IDLE or MAX reverse Engine instruments monitor, in limits Braking as required Rotate at VR, initial climb at VX or VY as req. After lift off + positive ROC: AFTER LANDING Brakes press to stop wheels Power Control Lever as required Landing Gear UP Condition Lever GROUND IDLE Yaw Damper ON Flaps UP Flaps 0° above 100 KIAS Trims set green range Taxi OFF External lights as required External lights as required Ice Protection sys. OFF or as required Yaw Damper as required Transponder STBY or check GND WX Radar as required WX Radar STBY CLIMB SHUTDOWN Ice Protection sys. as required Power Control Lever idle detent for 2 min Autopilot as required Parking brake set/pedals push Power Control Lever set as required ECS switch OFF ECS switch AUTO External lights OFF Cabin Pressurization monitor Ice Protection sys. OFF Engine instruments monitor Cooling and Heating sys. OFF Torque max 44.3 PSI PASS-WNG switches OFF ITT max 760°C, 720°C rec. STBY BUS switch ON Ng max 104% AV Bus 1&2 switches OFF Temperature setting as required GEN 1&2 switches OFF Condition lever cut off/feather CRUISE Oxygen shut-off lever OFF Altimeters set and cross-check Lighting switches OFF Cabin Pressurization monitor CAWS OIL QTY check Power Control Lever set, to cruise table (60 secs min after shutdown) refill if required Engine instruments monitor BAT 1&2 switches OFF Ice Protection sys. as required STBY BUS switch OFF Flight Control Lock installed DESCENT Wheel Chocks as required ATIS/Briefing received/performed Tie downs as required Ice Protection sys. as required Rudder/nose wheel centered Power Control Lever set to desired torque Propeller anchor installed Cabin Pressure controller set to LFE +500ft External covers installed PC-12/45 SCL (QRH Rev.1) REVISION 3: FEB 13, 2015
Show full textShow less
FOR FLIGHT SIMULATION PURPOSES ONLY. PILATUS LOGO AND CHECKLIST © PILATUS AIRCRAFT LTD BY AUTOGYRO 2










