SCHEDULE OF AIRWORTHINESS DIRECTIVES
Piper PA-18 Super Cub · Airworthiness Directives
Overview
This document is an Airworthiness Directive (AD) issued by the Civil Aviation Safety Authority of Australia concerning the Piper PA-18 and PA-19 Super Cub series aeroplanes. It outlines specific requirements to ensure the safety and airworthiness of these aircraft models. The directive focuses on the re-routing of fuel primer and hydraulic lines to prevent potential hazards, specifically the risk of fire due to contact with the exhaust muffler. Compliance with this directive is mandatory for all applicable models, and it specifies a timeframe for compliance based on the aircraft's time in service. The document serves as a critical safety measure for operators and maintenance personnel of the Piper Super Cub series.
- Re-route fuel primer line and hydraulic line to avoid contact with the exhaust muffler.
- Secure lines to the firewall using clamps as per Piper SL No. 213.
- Compliance is required within 25 hours of time in service after 31 March 1985.
- This directive is applicable to all models of the Piper PA-18 and PA-19 Super Cub series.
- Failure to comply may increase the risk of in-flight fire.
Summary written by AI from the source document. Check the original before relying on it. See which parts of Sprinkle are written by AI.
Reference only, not for flight. Use the current approved manual for your aircraft. See terms, section 5.
Document
Source
Copy found at services.casa.gov.au. Sprinkle hosts a reference copy with an added summary, specifications and searchable full text.
Document details
- Type ·
- Airworthiness Directives
- Year ·
- 1985
- Pages ·
- 1
- File size ·
- 11 KB
- Copy found at ·
- services.casa.gov.au
What is the SCHEDULE OF AIRWORTHINESS DIRECTIVES?
The SCHEDULE OF AIRWORTHINESS DIRECTIVES is a airworthiness directives for the Piper PA-18 Super Cub, dated 1985.
How many pages is the SCHEDULE OF AIRWORTHINESS DIRECTIVES?
The copy of the SCHEDULE OF AIRWORTHINESS DIRECTIVES on file runs 1 pages.
What year was the SCHEDULE OF AIRWORTHINESS DIRECTIVES published?
The SCHEDULE OF AIRWORTHINESS DIRECTIVES — the Piper PA-18 Super Cub airworthiness directives on file — is dated 1985.
Common. One of the most common aircraft types we track.
Full essential library on file for the Piper PA-18 Super Cub.
Piper PA-18 Super Cub for sale now
Free — save the 18 to your watchlist and track it in one place.
More Piper PA-18 Super Cubmanuals & documents
See all 29 →- Piper PA-18 Super Cub Model GuideModel Guide
- Airworthiness Directive Schedule Aeroplanes Piper PA-18 Series (Super Cub)Airworthiness Directives
- AAIB Bulletin: G-CUBX AAIB-30327Other Documents
- Final Report: Ground Assessment of Electronic Conspicuity DevicesOther Documents
- Flight Test Instrumentation System for Small UASOther Documents
- PIPER PA-18/PA-12 PRODUCT & MODIFICATION GUIDEFlight Manual
- Type Acceptance ReportOther Documents
- Piper PA-18 Super CubSystems Description
- ICA Maintenance Manual for 2200 Floats on PA-18 Piper, Super Cub modelMaintenance Manual
- Model 8400 brake booster assemblies and modification of Scott Aviation Model B-711 Brake Master CylindersSupplemental Type Certificate
- SERVICE BULLETIN No. 0003Service Bulletins
- AAIB Bulletin No: 8/2003Other Documents
Related documents
- SCHEDULE OF AIRWORTHINESS DIRECTIVESPiper PA-18 Super Cub · Airworthiness Directives
- Airworthiness Directive Schedule Aeroplanes Piper PA-18 Series (Super Cub)Piper PA-18 Super Cub · Airworthiness Directives
- AIRWORTHINESS DIRECTIVEPiper PA-20 Pacer · Airworthiness Directives
- Airworthiness Directive Schedule Aeroplanes Piper PA-20 Series (Pacer)Piper PA-20 Pacer · Airworthiness Directives
- AIRWORTHINESS DIRECTIVE AD/PA-34/51 Amdt 1Piper PA-34 Seneca · Airworthiness Directives
If you fly the Piper PA-18 Super Cub, you may also be researching these.
—In this document
Applicability
The directive applies to all models of the Piper PA-18 and PA-19 Super Cub series aeroplanes.
Requirement
Operators are required to re-route the fuel primer line and, if necessary, the wheel brake hydraulic line to prevent contact with the exhaust muffler. This includes securing the lines to the firewall using clamps, as detailed in Piper Service Letter No. 213.
Compliance
Compliance with the directive must be achieved within 25 hours of time in service after 31 March 1985.
Background
The directive has been amended to combine the requirements of Piper Service Letter No. 213 and FAA AD 53-24-4, emphasizing the importance of re-routing the lines to mitigate the risk of in-flight fire.
Summary written by AI from the source document. Check the original before relying on it. See which parts of Sprinkle are written by AI.
Safety notes
- Ensure fuel primer and hydraulic lines do not pass behind the muffler to prevent fire hazards.
Summary written by AI from the source document. Check the original before relying on it. See which parts of Sprinkle are written by AI.
Full document text
COMMONWEALTH OF AUSTRALIA (Civil Aviation Regulations 1998), PART 39 - 105 CIVIL AVIATION SAFETY AUTHORITY SCHEDULE OF AIRWORTHINESS DIRECTIVES Piper PA-18 and 19 (Super Cub) Series Aeroplanes AD/PA-18/12 Amdt 1 Fuel Primer and Hydraulic Lines - Re-Routing 4/85 DM Applicability: All models. Requirement: 1. To prevent contact with the exhaust muffler, re-route fuel primer line, and wheel brake hydraulic line if necessary, to ensure that they do not pass behind the muffler. 2. Using clamps, secure the lines to the firewall - refer to Piper SL No. 213 for fuel primer line clamping instructions. Note: FAA AD 53-24-4 refers. Compliance: Within 25 hours time in service after 31 March 1985. Background: This Directive has been amended to combine the intent of Piper SL No. 213 and FAA AD 53-24-4 into a single requirement. Re-routing, as applicable, of the fuel primer line and wheel brake hydraulic line is necessary to preclude the possibility of an in- flight fire.










