Piper PA-23 Aztec — Wiring Diagram
2 wiring diagram references for the Piper PA-23 Aztec.
Overview
HEATER INSTALLATION INSTRUCTIONS FOR MODEL CD25K KIT, P/N CD940-25K12 AND CD940-25K24, MODEL CD35K KIT, P/N CD940-35K12 AND CD940-35K24, MODEL CD45K KIT, P/N CD940-45K12 AND CD940-45K24 · 2001
This document provides detailed installation instructions for combustion heater kits designed for Piper PA-23 Apache and Aztec aircraft. It outlines the necessary steps for removing existing heaters and installing new C&D Associates combustion heaters, including wiring connections and safety precautions. The instructions are intended for aircraft maintenance personnel and ensure compliance with FAA regulations. Key information includes wiring diagrams, installation procedures, and notes on airworthiness limitations and operational checks.
- The document is for Piper PA-23 Apache and Aztec models.
- Installation of the new heater requires specific wiring connections to terminal strips.
- Weight change: Old heater (18 lbs) replaced by new heater (25 lbs).
- Compliance with FAA-approved Airworthiness Limitations is required.
- Electrical connections must be verified with volt and ohm meters.
2 documents