PIPISTREL TAURUS ELECTRO G2 Model Guide
Model Guide for the Pipistrel Taurus Electro G2
PDF, 47 KB, from Sprinkle’s own files.
What it covers
PIPISTREL TAURUS ELECTRO G2 is covered here only by one Pipistrel service bulletin, SB-130-00-80-006, on airbrake bellcrank inspection. The inputs give no performance, weight or price data for this model. This guide therefore focuses on what a buyer should check in the airbrake system.
Key points
- The bulletin lists Taurus Electro G2 serials 179 T ET, 183 T ET and 184 T ET as affected.
- Cause: an in-service bellcrank failure led to un-commanded airbrake deployment.
- Compliance is due within the next 10 flight hours of the 22 September 2026 issue.
- Inspection takes about 2 hours and replacement about 3 hours; mass and balance impact is negligible.
Main sections
What the bulletin requires
Remove both wings and look through the inspection hole aft of the main spar. Use a flashlight and mirror, or a borescope. Check the weld seams on each airbrake bellcrank (P/N 1181065) around the full tube circumference. The procedure typically needs 2 people.
If a defect is found
A missing or incomplete weld seam means the aircraft cannot be dispatched until the bellcranks are replaced. Contact Pipistrel Support with photos. Replacement uses new bellcranks and self-locking nuts, tightened to 9 Nm with torque stripe. Then do the airbrake inspection, adjustment and closing moment check.
Cost and paperwork
Labour and spare parts coverage are marked for aircraft both under warranty and past warranty. Pipistrel reimburses labour if an Authorized Distributor or Approved Service Facility does the work. A Warranty Support Request is needed. Compliance must be logged and reported to Pipistrel.
Safety notes
- A bellcrank failure caused un-commanded airbrake deployment in service. Do not fly an affected aircraft past the compliance window.
- If any weld seam finding is found, the aircraft cannot be dispatched until the bellcranks are replaced.
- Examine the entire circumference of the tubes and all edges. If in doubt, contact Pipistrel Support with photos.
Questions this document answers
Does the bulletin apply to the PIPISTREL TAURUS ELECTRO G2?
Yes. For PIPISTREL TAURUS ELECTRO G2 it lists serials 179 T ET, 183 T ET and 184 T ET. It also covers the Rotax 503, Taurus 503 and Taurus Electro 135.
How soon must the PIPISTREL TAURUS ELECTRO G2 inspection be done?
The bulletin requires compliance within the next 10 flight hours. It was issued and took effect on 22 September 2026.
What should a buyer ask the seller about the PIPISTREL TAURUS ELECTRO G2?
Ask for proof that SB-130-00-80-006 was done, with the logbook entry and the compliance report to Pipistrel. Ask whether any findings led to bellcrank replacement.
The document’s text
Show the text read from the PDF
PIPISTREL TAURUS ELECTRO G2 Model Guide PIPISTREL TAURUS ELECTRO G2 is covered here only by one Pipistrel service bulletin, SB-130-00-80-006, on airbrake bellcrank inspection. The inputs give no performance, weight or price data for this model. This guide therefore focuses on what a buyer should check in the airbrake system. • The bulletin lists Taurus Electro G2 serials 179 T ET, 183 T ET and 184 T ET as affected. • Cause: an in-service bellcrank failure led to un-commanded airbrake deployment. • Compliance is due within the next 10 flight hours of the 22 September 2026 issue. • Inspection takes about 2 hours and replacement about 3 hours; mass and balance impact is negligible. What the bulletin requires Remove both wings and look through the inspection hole aft of the main spar. Use a flashlight and mirror, or a borescope. Check the weld seams on each airbrake bellcrank (P/N 1181065) around the full tube circumference. The procedure typically needs 2 people. If a defect is found A missing or incomplete weld seam means the aircraft cannot be dispatched until the bellcranks are replaced. Contact Pipistrel Support with photos. Replacement uses new bellcranks and self-locking nuts, tightened to 9 Nm with torque stripe. Then do the airbrake inspection, adjustment and closing moment check. Cost and paperwork Labour and spare parts coverage are marked for aircraft both under warranty and past warranty. Pipistrel reimburses labour if an Authorized Distributor or Approved Service Facility does the work. A Warranty Support Request is needed. Compliance must be logged and reported to Pipistrel. Safety notes: • A bellcrank failure caused un-commanded airbrake deployment in service. Do not fly an affected aircraft past the compliance window. • If any weld seam finding is found, the aircraft cannot be dispatched until the bellcranks are replaced. • Examine the entire circumference of the tubes and all edges. If in doubt, contact Pipistrel Support with photos.
Read from the PDF by machine, so tables and diagrams come out rough. The PDF is the document.
More Pipistrel Taurus Electro G2 documents
All 2 →- SERVICE BULLETIN Airbrakes Bellcrank Inspection
This service bulletin from Pipistrel provides mandatory inspection and potential replacement procedures for the airbrake bellcrank on specific Taurus aircraft models. It addresses a reported failure that could lead to un-commanded airbrake deployment, outlining compliance requirements and necessary actions for maintenance personnel.
Also useful for the Pipistrel Taurus Electro G2
From Sprinkle’s library of aircraft documents. PDFs open from Sprinkle’s own files. Read Nov 25, 2026.
Want this document taken down? Request removal