Skip to main content

R22 SERVICE BULLETIN SB-120C

Robinson R22 · Service Bulletins

Free account — keep the POHs & checklists you reference in one place.

Overview

This Service Bulletin SB-120C is directed towards owners, operators, and maintenance personnel of the Robinson R22 helicopter series. It addresses critical inspection and replacement procedures for the tail rotor blade, specifically for part number A029-2 with serial numbers 11279 and prior. The bulletin outlines compliance timelines for inspections and replacements based on the operational history and environmental conditions of the affected blades. The document emphasizes the importance of these procedures to prevent potential failures due to corrosion, particularly for helicopters operating in saltwater environments. It also includes compliance procedures and approximate costs associated with the inspections and replacements, ensuring that operators are informed of the necessary actions to maintain safety and airworthiness.

  • Affected tail rotor blades are P/N A029-2 with S/Ns 11279 and prior.
  • Initial inspection must be completed within 10 flight hours or by January 15, 2023.
  • Replacement deadlines vary based on operational history, with some as late as February 2025.
  • Visual inspections for corrosion must be performed before the first flight of each day.
  • Labor costs for compliance are approximately 0.2 hours for inspections and 3.5 hours for replacements.

Document

Source

Originally published by robinsonstrapistorprod.blob.core.windows.net. Sprinkle hosts a reference copy with an added summary, specifications and searchable full text.

Report a problem or request removal

Document details

Type
Service Bulletins
Year
2022
Pages
5
File size
368 KB
Publisher
robinsonstrapistorprod.blob.core.windows.net
How rare is it?
231Robinson R22 registered worldwide · 191 active

Common. Rarer than 1% of the aircraft models we track.

Documentation completeness
5/7

Most owners only have the POH. Here's the essential set for the Robinson R22.

More Robinson R22manuals & documents

See all 23
Similar aircraft

If you fly the Robinson R22, you may also be researching these.

In this document

Time of Compliance

The bulletin specifies two parts for compliance: Part A involves an inspection that must be completed within the next 10 flight hours or by January 15, 2023, whichever comes first. Recurring inspections are required before the first flight of each day thereafter. Part B outlines replacement timelines based on the operating history of the affected tail rotor blades, with specific deadlines for different conditions, such as operation from sea-going vessels or in severe corrosion zones.

Compliance Procedure

For Part A, if the helicopter is equipped with the affected tail rotor blades, operators must insert the enclosed Special Tail Rotor Tip Preflight Inspection sheet into the Pilot’s Operating Handbook. For Part B, the affected blades must be replaced according to the R22 Maintenance Manual, and new blade serial numbers must be recorded in the aircraft maintenance records.

Approximate Cost

The bulletin provides cost estimates for compliance. Part A requires no parts but involves 0.2 labor-hours. For Part B, there is no charge for helicopters or parts under warranty, while blades beyond warranty can be replaced at a discounted price of $1020, provided certain conditions are met. Labor for Part B is estimated at 3.5 labor-hours.

Safety notes

  • A debonded tail rotor tip can cause severe vibration and possible failure of the tail rotor gearbox housing.
  • Helicopters operating near saltwater are particularly susceptible to corrosion.

Full document text

Page 1 of 4 R22 SERVICE BULLETIN SB-120C (supersedes R22 Service Bulletin SB-120B) DATE: 22 December 2022 REV C: 28 January 2025 TO: R22-series Owners, Operators, and Maintenance Personnel SUBJECT: Tail Rotor Blade Inspection and Replacement EFFECTIVITY: P/N A029-2 tail rotor blade S/Ns 11279 and prior (A029-2 REV U and prior). Affected blades were factory-installed on R22 Helicopter S/Ns 4873 and prior. Affected blades were also shipped as spares prior to October 2022. TIME OF COMPLIANCE: Part A Inspection: Within next 10 flight hours or by 15 January 2023, whichever occurs first. Recurring inspections are required before the first flight of each day thereafter. Part B Replacement: • For affected tail rotor blades with a geographically unknown operating history: No later than 31 July 2024. • For affected tail rotor blades operating from a sea-going vessel: No later than 31 July 2024 with more than 1 year cumulative operating time, and No later than 02 February 2025 with less than 1 year cumulative operating time. • For affected tail rotor blades operating in a severe-corrosion zone depicted in U.S. FAA Advisory Circular (AC) 43-4B, Corrosion Control for Aircraft, Figures 4-15 thru 4-20, as applicable: No later than 31 July 2024 with more than 3 years cumulative operating time, and No later than 02 February 2025 with less than 3 years cumulative operating time. (OVER) R22 SB-120C Page 2 of 4 TIME OF COMPLIANCE (CONT’D): Part B Replacement (Cont’d): • For affected tail rotor blades with a geographically known operating history not described above: No later than 02 February 2025, or No later than 02 July 2025 under the following conditions: 1. Continue to comply with the [attached] Special Tail Rotor Tip Preflight Inspection insert in the Pilot’s Operating Handbook. 2. Within preceding 15 days, ensure compliance with 10X visual inspection described in the AMOC dated 23 January 2025 to AD 2024-04-02. Note that this inspection is not considered preventive maintenance and may only be performed by personnel authorized by 14 CFR 43.7. BACKGROUND: RHC has received additional reports of tail rotor blade tips coming loose due to corrosion at the bond. Helicopters operating near saltwater are particularly susceptible to corrosion, especially if stored outdoors. A debonded tip can cause severe vibration and possible failure of the tail rotor gearbox housing. A029-2 revision V blades have tip caps with an alternate alloy to reduce the likelihood of corrosion. Revision C of this bulletin aligns the requirements of this bulletin with AMOC approved in FAA letter 772-25-00024 dated 23 January 2025 to U.S. FAA Airworthiness Directive 2024-04-02. COMPLIANCE PROCEDURE: PART A: If helicopter is equipped with affected tail rotor blades, insert enclosed Special Tail Rotor Tip Preflight Inspection (page 3 of this bulletin) before the title page of the Pilot’s Operating Handbook. NOTE: Copies of Special Tail Rotor Tip Preflight Inspection sheet should also be made available to mechanics. Sheet may be removed from Pilot’s Operating Handbook following replacement of affected tail rotor blades. PART B: Replace each affected tail rotor blade per R22 Maintenance Manual (MM) § 28-20 and install tail rotor assembly per MM § 28-10. Enter new blade serial numbers in aircraft maintenance records. NOTE: MT179-4 shaft is required to accomplish tail rotor static balance. Available from RHC Customer Service if not already on hand. (Also, refer to R22 SL-96 Tail Rotor Static Balance Equivalent Tool.) APPROXIMATE COST: Part A: Parts: None required (Special Tail Rotor Tip Preflight Inspection sheet included as part of Bulletin). Labor: 0.2 labor-hour. Part B: Parts: No charge for helicopters or parts under warranty; each legible data plate removed from an affected blade and returned to RHC will be exchanged for a new blade. Blades beyond warranty period will be discounted to $1020 provided: a. Blade is in airworthy condition. RHC must receive legible data plate and either photographic evidence of blade condition or actual blade. b. Blade has not exceeded its 12 year calendar life. c. Blade is not within 100 hours of its life limit. Discount only applies to blades replaced by July 2025. Cost does not include transportation. Normal Service Center discounts do not apply (see Dealer/Service Center Memo dated May 28, 1997). Labor: 3.5 labor-hours. R22 SB-120C Page 3 of 4 THE DESIGN ENGINEERING ASPECTS OF THIS BULLETIN HAVE BEEN SHOWN TO COMPLY WITH APPLICABLE FEDERAL AVIATION REGULATIONS AND ARE FAA APPROVED. This page intentionally blank. R22 SB-120C Page 4 of 4 (This page to be printed on yellow paper.) Cut or fold along this line R22 SB-120C SPECIAL TAIL ROTOR TIP PREFLIGHT INSPECTION To be inserted before the title page of the Pilot’s Operating Handbook for all helicopters with affected tail rotor blades per R22 SB-120C. Brief all pilots and maintenance personnel regarding these inspection requirements. Date: 22 December 2022 Refer to Figure below. To be performed before the first flight of each day. May be performed by pilot or mechanic. Conduct visual inspection of tail rotor tip area. If bubbled paint or other evidence of corrosion is observed at or adjacent to tip cap bond line or if any portion of tip cap bond line is exposed, do not fly helicopter. Comply with latest revision of R22 SL-93 prior to further flight. This page may be removed from the Pilot’s Operating Handbook following replacement of affected tail rotor blades.

Type certificate, explained

What's in the Robinson R22 TCDS

A Type Certificate Data Sheet (TCDS) is the FAA's record of what an aircraft type was approved as. It is the source of truth for weights, seating, fuel and the rules the design was certified against. Expand any line to see what it means.

TCDS H10WERev 10· Issued 1997
Read the full TCDS

374 Robinson R22 parts for sale

See all →

Parts listed for sale by vetted eBay sellers — confirmed on eBay at checkout.