Skip to main content

SECTION 49U: ULS ENGINE CONTROLS

VANS RV-12IS · Maintenance Manual

Free account — keep the POHs & checklists you reference in one place.

Overview

This document provides maintenance instructions for the Vans RV-12iS aircraft, focusing on the installation and assembly of various components, including the tunnel cover assembly and throttle cable connections. It includes detailed steps, figures, and notes to ensure proper installation and functionality.

  • Includes detailed assembly instructions for the tunnel cover and throttle cable.
  • Provides figures for visual guidance on installation steps.
  • Emphasizes the importance of proper routing of throttle and choke cables.
  • Cautions against using lubricant on firewall penetration grommet.
  • Instructions for synchronizing carburetors are referenced.
  • Details on securing components with specific hardware are included.
  • Notes on painting components for UV protection.
  • Installation steps are provided for both left and right carburetors.

Document

Source

Originally published by vansaircraft.com. Sprinkle hosts a reference copy with an added summary, specifications and searchable full text.

Report a problem or request removal

Document details

Type
·
Maintenance Manual
Year
·
2018
File size
·
1.7 MB
Publisher
·
vansaircraft.com
Language
·
en
About this document
What is the SECTION 49U: ULS ENGINE CONTROLS?

The SECTION 49U: ULS ENGINE CONTROLS is a maintenance manual for the VANS RV-12IS, dated 2018.

Where does the SECTION 49U: ULS ENGINE CONTROLS come from?

This copy of the SECTION 49U: ULS ENGINE CONTROLS was originally published by vansaircraft.com and is hosted on Sprinkle as a free, searchable reference copy.

What year was the SECTION 49U: ULS ENGINE CONTROLS published?

The SECTION 49U: ULS ENGINE CONTROLS — the VANS RV-12IS maintenance manual on file — is dated 2018.

Documentation completeness
6/7

Most owners only have the POH. Here's the essential set for the VANS RV-12IS.

More VANS RV-12ISmanuals & documents

See all 19 →

In this document

Tunnel Cover Assembly Installation

Instructions for dimpling, riveting, and installing the tunnel cover assembly, including specific hardware requirements.

Throttle Cable Installation

Step-by-step guide for routing and securing throttle cables, including modifications to grommets and connections to the throttle lever.

Fuel Shutoff Cable Installation

Details on routing and securing the fuel shutoff cable, ensuring no kinks or bends.

Throttle Friction Assembly

Instructions for installing the throttle friction assembly and related hardware.

Carburetor Synchronization

Notes on synchronizing carburetors and the necessary steps to complete prior to this process.

General Installation Notes

Cautions and notes regarding installation practices, including the use of specific tools and techniques.

Safety notes

  • Do not use lubricant on the firewall penetration grommet.
  • Ensure full range of motion of the fuel shut-off valve is achieved.
  • Check for interference during the installation of throttle and choke cables.
  • Avoid excess force when installing screws to prevent cross-threading.
  • Ensure proper threading when installing the throttle return spring retainer.

Full document text

PARTICIPANTS: DATE OF COMPLETION: PAGE: REVISION: DATE: VAN'S AIRCRAFT, INC. 49U-01 RV-12iS 0 05/01/18 F-01293 CUP HOLDER F-01245-L TUNNEL AFT SIDE COVER F-01230-1 TUNNEL BRACE F-01244-R TUNNEL FWD SIDE COVER CT-01203 DUAL CHOKE CABLE ASSEMBLY CT-01201 38 IN. THROTTLE CABLE ASSEMBLY F-01246 TUNNEL COVER F-12101 FLAP COVER SECTION 49U: ULS ENGINE CONTROLS F-01244-L TUNNEL FWD SIDE COVER CT-01202 42 IN. THROTTLE CABLE ASSEMBLY F-12135U THROTTLE LEVER GUIDE F-01297 THROTTLE LEVER CT-01205 T-HANDLE CT-01204 FUEL CABLE ASSY FIGURE 1: F-01246 NUTPLATE INSTALLATION Step 1: Dimple #40 the nutplate rivet holes in the side flanges of the F-01246 as shown in Figure 1, then rivet the nutplates along the side flanges of the F-01246 as shown. Step 2: Machine countersink the remaining #40 holes in the F-01246 as shown in Figure 1. VAN'S AIRCRAFT, INC. PAGE: REVISION: DATE: 05/01/18 0 RV-12iS 49U-02 MACH CSK ALL #40 HOLES EXCEPT AS NOTED FLUSH OPPOSITE SIDE MACH CSK FLUSH OPPOSITE SIDE 16X K1000-08D 2X AN426AD3-4 F-01246 FIGURE 2: F-01246 PARTS AND HARDWARE 4X AD426AD3-4 MS21055-06 2X AN426AD3-3.5 5X K1000-06 2X AN426AD3-3.5 F-12101 F-01293 AN526C632R6 K1000-06 2X AN426AD3-3.5 4X 4X K1000-08D 2X AN426AD3-4 F-01244-L F-01244-R FIGURE 3: TUNNEL FWD SIDE COVER PERPARATION FIGURE 4: INSTALLING THE CUP HOLDER Step 4: Dimple #40 the nutplate rivet holes in the F-01244-L and F-01244-R as shown in Figure 3, then rivet the nutplates in place. AN470AD3-3 F-01246A Step 3: Rivet the F-01246A Throttle Cable Bracket and nutplates to the F-01246 as shown in Figure 2. For the remainder of this section, this assembly will be called the Tunnel Cover Assembly. Step 5: Dimple #40 the nutplate rivet holes in the F-12101 as shown in Figure 4. Dimple #40 the nutplates, then install the nutplates on the F-12101 with the rivets shown. Step 6: Rivet together the sides of the F-12101 with the rivets shown in Figure 4. Step 7: Sand and paint the F-01293. Painting the F-01293 before installation will provide the plastic protection from UV damage and scratches & scuffs. Step 8: Install the F-01293 using the hardware shown in Figure 4. 49U-03 RV-12iS 0 05/01/18 FIGURE 2: THROTTLE LEVER & TUNNEL BRACE Step 1: Modify the grommet called out in Figure 1 to be used for firewall penetration. Using a socket and a vise, squeeze the grommet until the socket shears through the grommet (this will be accompanied by a distinct crunching sound). Step 2: Insert the HW-00008 and HW-00009 clamps into the F-01230-1, then install the F-01230-1 using the hardware called out in the detail view in Figure 2. Place the the main brake lines into the HW-00008 as shown in Figure 2. Step 3: Install the throttle lever using the hardware called out in Figure 2. Tighten the nut enough to remove any slop or play but still allow the throttle lever to pivot with light friction. PAGE: REVISION: DATE: VAN'S AIRCRAFT, INC. HW-00009 HW-00008 BOLT-00005 (SECTION 32iS/U) WASHER-00014 WASHER-00014 F-01298-L THROTTLE LEVER F-01230-1 AN4-7 NAS1149F0463P AN310-4 2X NAS1149F0463P MS24665-132 MAIN BRAKE LINES VISE 3/8 1/4 DRIVE SOCKET AN931-4-12 FIGURE 1: MODIFYING THE FIREWALL GROMMET COVER JAWS WITH SCRAP ALUMINUM SHEET IF FACE IS HEAVILY KNURLED 14X AN526C832R6 VAN'S AIRCRAFT, INC. PAGE: REVISION: DATE: 05/01/18 0 RV-12iS 49U-04 LP4-3 TUNNEL COVER ASSEMBLY FIGURE 1: INSTALLING THE TUNNEL COVER ASSEMBLY NOTE: Use a short flush head rivet set on the upper side and a tall flush head rivet set on the lower side to squeeze the rivets installing the Tunnel Cover Assembly. Step 1: Rivet the Tunnel Cover Assembly to the fuselage using fasteners called out in Figure 1. NOTE: Guide the throttle cables above the choke cables when passing through the firewall. Guide the longer throttle and choke cables to the right hand side of the aircraft. CAUTION: Do not use lubricant on the firewall penetration grommet. Step 2: Install the modified grommet in the firewall passthrough hole, then thread one end of the CT-01201 and the CT-01202 through the grommet as shown in Figure 2. Step 3: Attach the CT-01201 and CT-01202 conduits to the F-01246A using the hardware provided with the cables as shown in Figure 2. Ensure the CT-01201 conduit is located in the left side hole of the F-01246A, and the CT-01202 is located in the right-side hole. Adjust the nuts so the F-01246A will be approximately centered on the threaded portion of the conduits, then tighten. Step 4: Loosely connect the CT-01201 and CT-01202 leads to the throttle lever using the hardware shown in the detail view in Figure 2. Ensure the flange of the bushing is against the CT-01202 lead and that the CT-01201 lead passes through the slot in the VA-219-1. Adjust the throttle cable leads so that the end of the leads extends beyond the shank of the VA-219-1 Double Control Cable Bolt as shown in the detail view in Figure 2. Tighten hardware to 8-10 in-pounds. Step 5: Route the CT-01203 through the hole in the AV-60000-U Power Module* through the washer and nut called out in Figure 2, through the center HW-00009, and through the modified grommet. Orient the handle of the CT-01203 so that the longer of the two cables is on the right side, then secure the CT-01203 to the AV-60000-U* by tightening the nut and washer. Step 6: Route the CT-01201, CT-01202, and CT-01203 cables from the firewall to the WD-1221 as shown in Figure 3 and secure them with the hardware called out. Do not connect the cable leads to the engine at this time. This will be done as part of the throttle and choke rigging later in this section. NOTE: This page refers to components provided in the avionics kit, denoted by ()*. FIGURE 3: THROTTLE AND CHOKE CABLE ROUTING CT-01202 CT-01201 CT-01203 MS21919DG14 MS21919DG7 AN525-10R7 MS21042-3 WD-1221 FIGURE 2: THROTTLE AND CHOKE CABLE INSTALLATION CT-01202 CT-01201 F-01246A CT-01203 7/16 NUT 7/16 LOCKWASHER (SUPPLIED WITH CABLE) AV-60000-U* CT-1202 LEAD CT-01201 LEAD 7/16 [11.1 mm] OPTIONAL: SOLDER OR HEAT SHRINK VA-219-1

Show full text

BUSH-F-BS.189X.250X.263 3X NAS1149F0363P MS21042-3 MODIFIED GROMMET AN426AD3-3.5 49U-05 RV-12iS 0 05/01/18 PAGE: REVISION: DATE: VAN'S AIRCRAFT, INC. FIGURE 2: INSTALLING THE FUEL SHUTOFF CABLE Step 1: Route the CT-01204 through the hole in the Tunnel Cover Assembly, through the washer and nut called out in the detail view in Figure 2, through the center lightening hole in two of the F-01212 ribs, and through the rest of the fuselage into the tailcone as shown in Figure 2. Secure the CT-01204 to the Tunnel Cover Assembly by installing the nut and washer shown in the detail view of Figure 2. Step 2: Thread the CT-01204 through the hole in the F-12108B and secure the conduit using the nuts and lockwashers as shown in the detail view of Figure 2. Adjust the nuts so the F-12108B will be approximately centered on the threaded portion of the conduit, then tighten. Step 3: Secure the CT-01204 conduit to both ES-00301 using tie wraps as shown in the detail view in Figure 2. Ensure there are no abrupt bends or kinks along the full length of CT-01204. Step 4: Slide the CT-00100 Wire Swivel into the fuel shut-off valve arm as shown in the detail view in Figure 2. Loosen the set screws. Step 5: Install the washer, then insert the CT-01204 lead into the hole in the CT-00100 as shown in the detail view in Figure 2. Do not tighten the set screws in the CT-00100. Step 6: With the fuel shut-off valve fully open (aligned with the valve body) and the CT-01204 handle extended as shown in Figure 1, tighten the lower set screw in the CT-00100. Step 7: Tighten the upper set screw in the CT-00100. Actuate the fuel shut-off cable handle through the full range of motion. Ensure that the full range of motion of the fuel shut-off valve is achieved. Check for any interference throughout the full range of motion of the fuel shut-off valve lever, CT-00100, and fuel shut-off cable lead. FUEL SHUT-OFF VALVE 1/4 [6.4 mm] FIGURE 1: RIGGING THE FUEL SHUTOFF CABLE CT-01204 3/8-24 NUT (INCLUDED WITH CABLE) SPLIT WASHER (INCLUDED WITH CABLE) ROUTE CABLE THROUGH UPPER HOLE (TYP) TUNNEL COVER ASSEMBLY 2X M6 NUT 2X M6 WASHER (INCLUDED WITH CABLE) CT-00100 F-12108B NAS1149F0432P ES-00301 (SECTION 21iS/U AND 24iS/U) PLASTIC TIE WRAP 8" F-01212 TUNNEL COVER ASSEMBLY CT-01204 VAN'S AIRCRAFT, INC. PAGE: REVISION: DATE: 05/01/18 0 RV-12iS 49U-06 16X AN526C832R6 AN526C632R4 FIGURE 1: INSTALLING THE TUNNEL COVERS (F-01244-L SHOWN, REPEAT FOR F-01244-R) F-12101 FIGURE 2: INSTALLING THE FLAP COVER F-01245L F-01244-L Step 1: Install the F-01244-L, F-01245-L, and F-01244-R using the hardware called out in Figure 1. Step 2: Install the F-12101 using the hardware called out in Figure 2. FIGURE 3: THROTTLE FRICTION ASSEMBLY & TUNNEL COVER CT-01206 F-01245-R NAS1149F0432P BUSHING-AL.259X.375X.688 NAS1149F0432P SPRING-00007 NAS1149F0432P BOLT-00005 Step 3: Install the Throttle Friction Assembly hardware onto the BOLT-00005 as shown in the detail view in Figure 3. Step 4: Install the F-01245-R using the hardware called out in Figure 3. Step 5: Install the CT-01206 1/4-20 Knob as shown in Figure 3. 24X AN526C832R6 13X AN526C832R6 49U-07 RV-12iS PAGE: DATE:08/09/20 REVISION: 2 VAN'S AIRCRAFT, INC. NOTE: Instruction for synchronizing the carburetors is found in the RV-12iS Maintenance Manual. Complete all sections of the RV-12iS Assembly Instructions and the ground test portions of the RV-12iS Production Acceptance Procedures prior to synchronizing the carburetors. The remaining steps on this page and 49U-08 provide throttle cable installation for the right carburetor. Cable installation on the left carburetor is a mirror of the right and should be done at the same time. Step 1: Place marks on the Throttle Arm, Throttle Shaft, and Idle Stop to orient the parts relative to each other, remove and discard the Throttle Arm Spring supplied with the carburetor, then remove the Throttle Arm and Idle Stop from the Shaft. See Figure 1 below and Figure 2 on page 49U-08. FIGURE 1: THROTTLE CABLE TO CARBURETOR CONNECTION CT-01202 CONDUIT ROTAX STEP WASHER ROTAX FLAT WASHER MS21045-3 VA-219-2 THROTTLE ARM CABLE BRACKET CT-01202 LEAD THROTTLE CABLE LOCKING HARDWARE M6 NUT (SUPPLIED WITH CABLE) M6 LOCKWASHER (SUPPLIED WITH CABLE) CT-00101 (SUPPLIED WITH CABLE) ROTAX NUT ROTAX SPRING WASHER IDLE STOP THROTTLE SHAFT IDLE SPEED ADJUSTMENT SCREW NAS1149F0363P FIGURE 2: NEW THROTTLE SPRING INSTALLATION VAN'S AIRCRAFT, INC. PAGE: REVISION: DATE:09/24/20 2 RV-12iS 49U-08 FIGURE 3: SETTING THE IDLE POSITION 3/16 [4.8 mm] FIGURE 1: VA-00276 INSTALLATION VA-00276 THROTTLE SHAFT CABLE SUPPORT THROTTLE SHAFT IDLE STOP SPRING-00002-R-1 (LEFT SIDE SPRING-00002-L-1) VA-00276 CABLE SUPPORT NOTE: Refer to Rotax Illustrated Parts Catalog Section 73-00-00 for hardware and the Rotax Maintenance Manual (Heavy Maintenance) for torque specs. Step 1: Remove the two M4 screws in the Cable Support. Slide the VA-00276 Throttle Return Spring Retainer onto the Throttle Shaft as shown in Figure 1. NOTE: The manufacturing process causes VA-00276 to have a slight bend and creates the potential for the M4 screws to be cross threaded during installation. Do not apply excess force while installing the screws. If the screws cannot be installed easily, flatten VA-00276 and loosely install the screws to ensure proper threading. Step 2: Reinstall the two M4 screws removed in Step 1. See Figure 2. NOTE: Instructions below apply to installing SPRING-00002-R-1 and SPRING-00002-L-1. SPRING-00002-L-1 is marked with blue ink on one edge. Step 3: Slide the SPRING-00002-R-1 (SPRING-00002-L-1 on Left Carburetor) Throttle Spring onto the throttle shaft. Position the the inboard leg against the VA-00276 as shown Figure 2. Step 4: Reinstall the Idle Stop as shown in Figure 2 with the outboard arm of the SPRING-00002-R-1 against the bent lower arm of the stop plate. The SPRING-00002-R-1 should be coiled approximately 14 turn past the relaxed position when properly installed. Step 5: Reinstall the throttle arm with the nut and washer that was removed in Step 1 on page 49U-07 Figure 1. Step 6: Install the conduit of the CT-01202 (the longer of the two throttle cables) to the cable bracket using the hardware shown in Figure 1 on page 49U-07. Adjust the nuts so that the cable bracket will be approximately centered on the threaded portion of the conduit, then tighten. Step 7: Insert the CT-01202 lead through the CT-00101 Stop Nut and into the hole in the shank of the VA-219-2 Control Cable Bolt. Loosely attach the throttle cable locking hardware called out in Figure 1 on page 49U-07. Move the throttle lever forward from the aft end of the slot as shown in Figure 3. Fully tighten the throttle friction adjustment. Step 8: Actuate the throttle arm so that the Idle Stop is lightly contacting the idle speed adjustment screw. While holding tension on the CT-01202 lead, tighten the throttle cable locking hardware to 8-10 in-pounds. See Figure 1 on page 49U-07. Move the CT-00101 against the end of the cable housing and tighten the set screw. The final position will be adjusted during the carburetor balance procedure. Step 9: Loosen the throttle friction adjustment. 49U-09 RV-12iS PAGE: DATE:08/09/20 REVISION: 1 VAN'S AIRCRAFT, INC. NOTE: See Section 5.28 for detailed information on cable trimming. Step 1: Trim the CT-01201 and CT-01202 leads to the dimension given in Figure 1. Step 2: Install the F-12135U using the hardware as called out in Figure 2. Do not over tighten the screws. Step 3: Actuate the Throttle Lever through its full range of travel. Ensure that the full range of motion of both throttle arms is achieved (idle stop screw-to-full open stop). Check for any interference throughout the full tange of motion of the throttle arm, throttle arm hardware, and throttle cable leads. Ensure that the idle speed adjustment screw on both carburetors are resting on the idle stop and that there is no clearance between the two when the throttle lever is in the idle position. NOTE: Optional alternate throttle grip is available to install. Order KIT 12iS THROTTLE GRIP from Van's Aircraft. Step 4: Install the CT-01205 using the hardware shown in Figure 2. AN3-21A MS21083-N3 F-12135U FIGURE 2: THROTTLE GUIDE & T-HANDLE 4X MS24693-26B 2X CT-01205 WASHER 5702-75-60 CT-01202 LEAD 1.0 [25.4 mm] (CHECK FOR INTERFERENCE BETWEEN THE END OF THE WIRE AND OTHER COMPONENTS) OPTIONAL: SOLDER OR HEAT SHRINK THROTTLE ARM FIGURE 1: TRIMMING THE THROTTLE CABLES THROTTLE CABLE LOCKING HARDWARE VAN'S AIRCRAFT, INC. PAGE: REVISION: DATE:08/09/20 1 RV-12iS 49U-10 Step 1: Move the CT-01203 handle all the way forward to the off position as shown in Figure 1. FIGURE 1: CHOKE HANDLE POSITION FIGURE 2: CHOKE CABLE LEAD-TO-CARB CONNECTION Step 2: Slide the CT-00100 Wire Swivel into the choke lever as shown in Figure 2. Loosen the outer set screw. Step 3: Insert the CT-01203 lead into the cable mount tube, then through the hole in the CT-00100 as shown in Figure 2, Detail A-A. Guide the conduit of the choke cable into the cable mount tube as shown in Figure 2. Step 4: With the choke lever resting against the lower stop, secure the CT-01203 lead by tightening the CT-00100 set screws. Step 5: Trim the CT-01203 lead to the dimension given in Figure 2, Detail A-A. Step 6: Curl the end of the CT-01203 lead outboard as shown in Figure 2 and reclock the carburetor fuel supply fitting as necessary to avoid interference. Actuate the CT-01203 handle through the full range of motion. Ensure that the full range of motion (lower stop-to-upper stop) of the choke lever is achieved. Check for any interference throughout the full range of motion of the choke lever, CT-00100, and CT-01203 lead. END OF SECTION A A DETAIL A-A CT-01203 CABLE MOUNT TUBE CHOKE LEVER CT-01203 LEAD CT-00100 HOLE 1.0 [25.4 mm] (CHECK FOR INTERFERENCE BETWEEN THE END OF THE WIRE AND OTHER COMPONENTS) UPPER STOP OPTIONAL: SOLDER OR HEAT SHRINK CABLE MOUNT TUBE CT-00100 CHOKE SPRING ATTACH POINT (SPRING MUST BE INSTALLED) NOTE: See Section 5.28 for detailed information on cable trimming. The steps on this page provide choke cable installation for the right carburetor. Cable installation on the left carburetor is a mirror of the right and should be done at the same time. LOWER STOP OUTER SET SCREW CARBURETOR FUEL SUPPLY FITTING CT-01203 VAN'S AIRCRAFT, INC. PAGE: REVISION: DATE: 05/01/18 0 RV-12iS 49U-10 THIS PAGE INTENTIONALLY LEFT BLANK