FOREWORD The fundamental mission of the Air Traffic Organization (ATO) is to ensure the safe provision of air traffic services in the National Airspace System (NAS). Thanks to its employees, the ATO operates the safest, most efficient air traffic system in the world.
As the ATO helps build the Next Generation Air Transportation System, the resulting cross - organizational changes to the NAS require an intensive, proactive, and systematic focus on assuring safety. The ATO uses the Safety Management System ( SMS) to achieve this. The SMS constitutes the operating principles that support the ATO in objectively examining the safety of its operations.
This document is the result of an ATO - wide effort and reflects current international best practices and intra - ag ency lessons learned. It marks an important next step toward a mature and integrated SMS in the FAA. Therefore, it is important that all ATO personnel work diligently to uphold and follow the procedures and guidance in this SMS Manual to manage safety ri sk and help promote a positive safety culture in the ATO and the FAA.
Timothy L. Arel Chief Operating Officer Air Traffic Organization Contents Section 1. Safety Management System Overview 1.1 About the Safety Management System Manual 1.2 Establishment and Continuous Support of the ATO SMS 1.3 SMS Policy Derivations 1.4 The Four Components of SMS 1.5 SMS Benefits 1.6 SMS Continuous Improvement 1.7 Policy Compliance with SMS 1.8 FAA Documents Related to SMS Requirements Section 2. Managing Safety Risk in a System of Systems 2.1 Introduction to Managing System Safety 2.2 Safety Assessment Using the Tenets of SRM and Safety Assurance 2.3 SRM: Proactive and Reactive Hazard and Risk Management 2.4 Safety Assurance: Identifying and Closing Safety Gaps 2.5 Identifying and Addressing System Vulnerabilities 2.6 The Human Element’s Effect on Safety 2.7 Closing Gaps Using SRM and Safety Assurance Principles and Processes 2.8 Safety Order of Precedence Section 3. The Safety Risk Management Process 3.1 Scope of the Safety Risk Management Process 3.2 When to Perform SRM 3.3 When SRM May Not Be Required 3.4 NAS Change Proposals 3.5 SRM Process Phases 3.6 DIAAT Phase 1: Describe System 3.7 DIAAT Phase 2: Identify Hazards 3.8 DIAAT Phase 3: Analyze Risk 3.9 DIAAT Phase 4: Assess Risk 3.10 DIAAT Phase 5: Treat Risk Section 4. Developing Safety Performance Targets and Monitoring Plans 4.1 Developing Safety Performance Targets 4.2 Developing the Monitoring Plan 4.3 Post-SRM Monitoring Section 5. Risk Acceptance and Safety Documentation Review 5.1 Risk Acceptance and Approval 5.2 Scope of NAS Changes 5.3 Approving Safety Requirements 5.4 Risk Acceptance 5.5 SRM Document Concurrence 5.6 SRM Document Approval 5.7 Revising an SRM Document Section 6. ATO Audit and Assessment Programs 6.1 Audit and Assessment Programs 6.2 Safety Data Reporting, Tracking, and Analysis Section 7. Safety Data and Information Repositories 7.1 Safety Data and Information Repositories Section 8. Definitions and Acronyms 8.1 Definitions 8.2 Acronyms Annex A. Safety Risk Management Application and Guidance 1. Guidance for Preparing for and Convening a Safety Risk Management Panel 2. Special SRM Considerations for Waiver Renewals and Approvals Section 1 Safety Management System Overview 1.1 About the S afety M anagement S ystem Manual The Air Traffic Organization (ATO) Safety Management System (SMS) is a formalized and proactive approach to system safety. It directly supports the mission of the Federal Aviation Administration (FAA) : “to provide the safest, most efficient aerospace system in the world.” The ATO SMS is an integrated collection of policies , processes, procedures, and programs used to manage safety risk in the provision of air traffic management and communication, navigation, and surveillance services.
Th e ATO SMS Manual informs ATO employees and contractors about the goal of the ATO SMS, describes the interrelationship among the four components of the SMS, and instructs readers on the process of identifying safety hazards and mitigating risk in the National Airspace System (NAS). More detailed guidance on the practical application of the SMS, and speci fically Safety Risk Management (SRM), is contained in the annex of this document. Th is SMS Manual and its complements, such as the Safety Risk Management Guidance for System Acquisitions (SRMGSA) , ATO Safety Guidance documents, and other FAA safety docume nts, are used to carry out the safety mission of the FAA and requirements of the SMS.
1.1.1 Changes to the SMS Manual Safety and Technical Training ( AJI ) reviews th is SMS Manual annually. Individuals who would like to propose a change to the document may submit comments via the ATO SMS Policy Management Portal .
1.2 Establishment and Continuous Support of the ATO SMS Safety , the principal consideration of all ATO activities, is defined as the state in which the risk of harm to persons or damage to property is acceptable. Managing and assuring the safety of operations using the SMS has long been a focus of air navigation service providers worldwide, with the International Civil Aviation Organization (ICAO) having provided the guiding principles and the mandate for member organizations to us e an SMS. The ATO’s SMS efforts support the FAA safety mission, which emphasizes continuous improvement of safety and the integration of safety management activities across FAA organizations, programs, and Lines of Business (LOBs) . Efforts to develop and implement complex, integrated Next Generation Air Transportation System systems to improve the safety and efficiency of air travel in the United States make clear the relevance of the SMS.
1.3 SMS Policy Derivations The A TO S MS is supported by numerous levels of policy and requirements, as depicted in Figure 1 . 1 . R elevant programs that predate the SMS are detailed in other F AA publications and processes. This SMS Manual only references those documents when necessary. Section 1 .8 lists many of the related documents.
1_SMSM_20 2 21 2 1 Originally published December 2022 Uncontrolled copy when downloaded Section 1 Safety Management System Overview ICAO Annex 19, ICAO Safety Management ICAO Document 9859, Safety Management Manual (SMM) Order 8000.369, Safety Management System FAA Order 8040.4, Safety Risk Management Policy Order 1100.161, Air Traffic Safety Oversight AOV Order 8000.365, Safety Oversight Circulars Order JO 1000.37, Air Traffic Organization Safety Management System Order JO 1030.1, Air Traffic Organization Safety Guidance ATO Safety Risk Management Guidance for System Acquisitions SMS Manual Figure 1.1 : SMS Policy and Requirements Hierarchy 1.3.1 ICAO SMS Policy The FAA derives its high - level SMS policy from ICAO policy. ICAO Annex 19, Safety Management , provides standards and reco mmended practices for safety management for member states and air traffic service providers. Additionally, ICAO Document 9859, Safety Management Manual (SMM) , p rovides guidance for the development and implementation of the SMS for air traffic service providers. ICAO Document 9859 also provides guidance for safety programs in accordance with the international standards and recommended practices contained in Annex 19.
1.3.2 FAA SMS Policy FAA Order 8000.369, Safety Management System , describes the essential aspects of an SMS and provides implementa tion guidance to FAA organizations. This document is designed to create a minimum SMS standard that each FAA LOB can follow to implement an SMS.
FAA Order 8040.4, Safety Risk Management Policy , establishes requirements for how to conduct SRM in the FAA. It formalizes SRM guidance for FAA LOBs and Staff Offices and describes specific steps when performing and documenting SRM that cross es FAA LOBs. The ATO must consider and, when necessary, use the provisions in this order when coordinating SRM with other FAA organizations. AJI function s as the ATO liaison to interface with outside organizations. Within the ATO, AJI adjudicate s discrepancies among Service Units.
1.3.3 Air Traffic Safety Oversight Service Order The Air Traffic Safety Oversight Service (AOV) pro vides independent safety oversight of the ATO. FAA Order 1100.161, Air Traffic Safety Oversight , provides high - level SMS requireme nts of the ATO and AOV. When AOV involvement is required, AJI function s as the liaison between AOV and other ATO Service Units and organizations. Additional guidance from AOV is submitted via Safety Oversight Circulars (SOCs) that provide information that may be used by 1_SMSM_20 2 21 2 2 Originally published December 2022 Uncontrolled copy when downloaded Section 1 Safety Management System Overview the ATO to develop and implement internal procedures. AOV publi shes all SOCs on the intranet .
1.3.4 ATO SMS Policy and Requirements FAA Order JO 1000.37, Air Traffic Organization Safety Management System , documents high - level SMS requirements, roles, and responsi bilities. FAA Order JO 1030.1, Air Traffic Organization Safety Guidanc e , establishes a method and process for providing the ATO with supplemental guidance material pertinent to the SMS. The SRMGSA provides SMS requirements and guidance pertinent to programs proceeding through the FAA Acquisition Management System (AMS) p rocess. The ATO has also established Quality Assurance and Quality Control orders that govern safety data collection and the establishment of safety - related corrective actions. Those orders are as follows: FAA Order JO 7210.632, Air Traffic Organization Occurrence Reporting FAA Order JO 7210.633, Air Traffic Organization (ATO) Quality Assurance (QA) FAA Order JO 7210.634, Air Traffic Organiz ation (ATO) Quality Control FAA Order JO 7200.20, Voluntary Safety Reporting Program s All ATO organizations and individuals unde r the purview of FAA Order JO 1000.37 must adhere to the provisions of the aforementioned documents and this SMS Manual. If discrepancies exist between this SMS Manual and FAA orders and guidance, including those that originate outside the ATO, notify the Safety Managem ent Group, AJI - 31, Manager via the ATO SMS mailbox .
1.4 The Four Components of SMS The re are four components of the SMS that combine to create a system at ic approach to managing and ensuring safety. These components are: Safety Policy: The documented organizational policy that defines management’s commitment, responsibility, and accountability for safety. Safety Policy identifies and assigns responsibilities to key safety personnel.
SRM: A process within t he SMS composed of describing the system; identifying the hazards; and analyzing, assessing, and treating risk. SRM includes processes to define strategies for monitoring the safety risk of the NAS .
Safety Assurance: A set of processes within the SMS that verify that an organization meets or exceeds its safety performance objectives and that function systematically to determine the effectiveness of safety risk controls through the collection, analysis , and assessment of information.
Safety Promotion: The communication and distribution of information to improve the safety culture and the development and implementation of programs and/or processes that support the integration and continuous improvement of the SMS within the ATO .
Safety Promotion allows the ATO to share and provide evidence of successes and lessons learned.
Figure 1. 2 represents the relationship of the four SMS components in an integrated model. The integration and interaction of the four components is essential to managing the SMS effectively and fostering a positive safety culture.
1 . The role of the AJI - 31 Group Manager is defined in FAA Order JO 1000.37.
1_SMSM_20 2 21 2 3 Originally published December 2022 Uncontrolled copy when downloaded Section 1 Safety Management System Overview Figure 1.2 : The Integrated Components of the SMS 1.4.1 Safety Culture and Promotion in the ATO Safety culture is defined as the way safety is perceived and valued in an organization. It represents the priority given to safety at all levels in the organization and reflects the real commitment to safety. The ATO uses its SMS to promote a positive safety culture through policies that align safety goals with organizational standards, training, voluntary reporting, and best practices.
A strong safety culture helps ensure that personnel are trained and compete nt to perform their duties and that continual updates on training are provided. Promoting strong safety values means that all ATO employees share lessons learned from investigations and experiences, both internally and from other organizations.
Safety Promotion programs and activities are vital to achieving positive safety outcomes throughout the ATO. The tenets of Safety Promotion are used to foster a positive safety cultur e in which ATO employees understand why safety is important and how they affect it, providing a sense of purpose to safety efforts. Each employee must consider the potential effect that their decisions may have on safety , and each employee is responsible for understanding the significance of their job as it relates to safety. SMS training identifies the importance of the SMS and how each employee and contractor fits into the mission of using the SMS to improve safety in the ATO. For more information on SMS training, refer to the ATO S MS Toolbox .
Open communication is critical to a positive safety culture. The ATO communicates safety objectives to all operational personnel to improve the way safety is perceived, valued, and prioritized. In an organization with a strong safety culture, individuals and groups take responsibility for safety by communicating safety concerns and striving to learn, adapt, and modify individual and organizational behavior based on lessons learned.
1_SMSM_20 2 21 2 4 Originally published December 2022 Uncontrolled copy when downloaded Section 1 Safety Management System Overview 1.4.1.1 Safety Programs and Initiatives The ATO maintains a positive safety culture us ing programs and initiatives such as: Recurrent Training: An initiative that uses c ollaboratively developed i nstruction designed to maintain and update previously learned skills while promoting a positive safety culture.
Top 5 Program : A program that identifies high - priority data - driven safety issues that are trending in th e NAS . The Top 5 is determined based on data obtained from the Aviation Risk Identification and Assessment ( ARIA ) autom ated system , Voluntary Safety Reporting Programs, stakeholder input, and other databases used to log and report unsafe occurrences.
Fatigue Risk Management: A group that provides operational fatigue risk expertise, guidance, and s upport to the ATO in developing fatigue reduction strategies and policy recommendations to mitigate and manage operational fatigue risks in the NAS.
Partnership for Safety: A joint effort between the ATO and the National Air Traffic Controllers Association that encourages employees to become actively engaged in identifying local hazards and developing safety solutions before incidents occur.
Voluntary Safety Reporting Programs o Air Traffic Safety Action Program (ATSAP): A confidential system for controllers and other employees to voluntarily identify and report safety and operational conce rns. For more information, refer to the ATSAP website .
o Confidential Information Share Pro gram (CISP) : A program for the sharing and analysis of information collected through the ATSAP and airlines' Aviation Safety Action Programs to provide a more complete representation of the NAS. For more information , visit the CISP website .
o Technical Operations Safety Action Program (T - SAP): A system for reporting safety - related events or issues pertaining to operations, equipment, personnel, or anything believed to affe ct safety in the NAS for technicians and other Technical Operations employees. For more information, refer to the T - SAP website .
Change Advisory Group: A group that p romotes open communication with ATO SMS stakeholders and affected organizations by providing an effective and efficient policy revision process and expediting the review and concurrence process for the ATO SMS Manual .
Runway Safety: A team that w ork s with all stakeholders to develop inn ovative programs and techniques to reduce the severity and likelihood of surface incidents .
Lessons Learned: An initiative that improve s ATO processes, address es deficiencies proactively, and empower s employees to play a direct role in the safety of the NAS by providing valuable safety information .
1_SMSM_20 2 21 2 5 Originally published December 2022 Uncontrolled copy when downloaded Section 1 Safety Management System Overview 1.5 SMS Benefits ATO processes and tools that support the SMS help: Provide a common framework to proactively and reactively identify and address safety hazards and risks associated with NAS equipment, operations, and procedures; Encourage intra - agency stakeholders to participate in solving the safety challenges of an increasingly complex NAS; Reduce isolated decision - making by using integrated safety management principles; Improve accountability for safety through defined managerial roles and responsibilities and SRM processes; Integrate Safety Assurance processes that enable the ATO to effectively measure safety performance; P rovide documentation of the ATO’s data - based efforts to improve NAS safety using a repeatable process; Promote a continuous cycle of assessing, correcting/mitigating, and monitoring the safety of air navigation services; Foster a positive safety culture th at can help improve system safety; and Measure the performance and support the improvement of the SMS.
1.6 SMS Continuous Improvement The SMS is the framework that the ATO uses to measure and help ensure the safety of its operations. In an evolving NAS, it i s necessary to continuously seek improvement in ATO processes and policies that support ATO safety efforts and, by extension, support the SMS.
The ATO and external organizations conduct audits and assessments to measure and determine compliance with the p olicies and procedures used to manage safety in the NAS. By assessing SMS maturity, the ATO is able to identify gaps in SMS performance, opportunities for improvement, and areas in which to focus new policy development.
1.6.1 Measuring NAS - W ide ATO Safety Performance Historically, the ATO has based the identification of risk on whether an operation was compliant or separation was maintained; however, this approach has not always identified all aspects of risk in the most eff ective manner. Similarly, compliant operations have, on occasion and under certain applications, introduced varying levels of risk into the NAS.
Moving forward, the ATO will rely more on risk - based safety data to identify and analyze safety issues and evaluate the effectiveness of safety risk mitigation . The ATO has adopted a risk - based approach to collecting and analyzing data, rather than gathering and evaluating data based solely upon existing complianc e standards. Understanding the level of risk associated with an operation is a holistic safety method that can proactively look beyond compliance.
Risk - based safety addresses shortcomings without the boundaries of traditional compliance - based analysis.
Due to the ATO ’s transition from compliance - based safety assurance to Risk - Based Safety Management , FAA Order JO 7210.633 replaced Risk Analysis Events and the Risk Analysis Process with ARIA . Through ARIA , an airborne module identifies and measures potential risk between aircraft encounters by utilizing radar and other surveillance data . Each encounter is given a score through a Barrier Analysis Review . By basing mitigation efforts on aggregated 1_SMSM_20 2 21 2 6 Originally published December 2022 Uncontrolled copy when downloaded Section 1 Safety Management System Overview data that identifies and validates risk in the system, the ATO is able to focus on a systemic view of the operation to identify risk before it leads to an event.
1.7 Policy Compliance with SMS As the ATO’s SMS matures, the tenets of the SMS components are integrated into new and existing ATO policy. For a directive to be considered compliant with the SMS, it must incorporate safety measures and SMS requirements to help manage safe ty.
1.8 FAA Documents Related to SMS Requirements The following documents (orders, directives, handbooks, and manuals) address N AS safety management and are core documents that support the ATO SMS. This list is not all - inclusive and only represents a small portion of ATO documents that pertain to safety management.
Some docume nts listed may have been updated since the publication of this SMS Manual.
1.8.1 Safety Reporting a. FAA Order 7050.1, Runway Safety Program b. FAA Order JO 7200.20, Voluntary Safety Reporting Programs c. FAA Order JO 7210.632, Air Traffic Organization Occurrence Reporting d. FAA Order JO 7210.633, Air Traffic Organization (ATO) Quality Assurance (QA) e. FAA Order JO 7210.634, Air Traffic Organization (ATO) Quality Control f. FAA Order JO 8020.16, Air Traffic Organization Aircraft Accident and Aircraft Incident Notification, Investigation, and Reporting 1.8.2 Facilities and Equipment Management a. FAA Order JO 1320.58, Instructions for Writing Notices, Maintenance Technical Han dbooks, and System Support Directives b. FAA Order 1800.66, Configuration Management Policy c. FAA Order JO 1900.47, Air Traffic Control Operational Contingency Plans d. FAA Order 6000.15, General Maintenance Handbook for NAS Facilities e. FAA Order 6000.30, National Airspace System Maintenance Policy f. FAA Order JO 6000.50, National Airspace System (NAS) Integrated Risk Management 1.8.3 Hardware and Software System D evelopment a. FAA AMS b. FAA Systems Engineering Manual 1.8.4 Safety Management and Risk Assessment a. SRMGSA b. AOV SOC 07 - 02, AOV Concurrence/Approval at Various Phases of Safety Risk Management Documentation and Mitigations for Initial High - Risk Hazards 1_SMSM_20 2 21 2 7 Originally published December 2022 Uncontrolled copy when downloaded Section 1 Safety Management System Overview c. AOV SOC 07 - 05A, Guidance on Safety Risk Modeling and Simulation of Hazards and Mitigations d. AOV SOC 13 - 13A, Corrective Action Plan Development and Acceptance in Response to Safety Compliance Issues e. FAA Order JO 1000.37, Air Traffic Organization Safety Management System f. FAA Order JO 2900.2, Air Traffic Organization Audits and Assessments g. FAA Order 1100.161, Air Traffic Safety Oversight h. FAA Order 8000.369, Safety Management System i. FAA Order 8040.4, Safety Risk Management Policy j. FAA Order 8040.6, Unmanned Aircraft Systems Safety Risk Management Policy 1_SMSM_20 2 21 2 8 Originally published December 2022 Uncontrolled copy when downloaded Section 2 Managing Safety Risk in a System of Systems 2.1 Introduction to Managing System Safety As A ir Traffic Organization (A TO ) operational procedures and N ational Airspace System (N AS ) equipment (i.e., hardware and software) evolve, their interaction and interdependency across organizations within the ATO and throughout the F ederal A viation A dministration (FAA) must be addressed. In a system as large and diverse as the NAS, the identification of a safety hazard and mitigation of its risk often falls within the pur view of multiple organizations.
The effects of safety hazards and associated risk management methods across multiple organizations, domains, and implementation timelines must be properly understood to achieve the highest practical level of safety. Safety risk deemed acceptable for an individual element of the NAS may lead to unintentional safety risk in another element if S afety Risk Management (SRM) is not conducted with a “system of systems” philosophy. As emerging NAS equipment, operations, and procedures are tested and implemented, the SRM process must account for their potential safety impact on exist ing/legacy tools and procedures and vice versa.
Sharing safety data and using an integrated safety management approach helps identify and resolve issues requiring the consideration of multiple disciplines.
The goal of an integrated approach to safety management is to eliminate gaps in safety analyses by assessing NAS equipment, operations, and procedures across three planes: vertical, horizontal, and temporal. The vertical plane is hierarchical, providing assessments from a specific project up to the NAS - level system of systems of which the project is a part. The horizontal plane spans organizations, programs, and systems. Finally, the temporal plane attempts to eliminate safety gaps across program and system impleme ntation timelines.
Figure 2.1 depicts several factors in each of the three planes that should be considered to ensure an integrated approach to safety management. Refer to the S afety Risk Management Gu idance for System Acquisitions for more information.
Integrated Safety Management Procedures Policy Training Capability Technology People Figure 2.1: Integrated Safety Factors 2.2 Safety Assessment Using the Tenets of S RM and Safety Assurance In acknowledging the complexity of the NAS and its various system interdependencies, the ATO uses the systematic processes and tenets of S RM and Safety Assurance to identify and address safety hazards and risks across the NAS.
The remainder of this section discusses the foundational concepts and practices used to identify and address safety issues and consider potential ramifications in an integrated way. It will 2_SMSM_20 2 21 2 9 Originally published December 20 2 2 Uncontrolled copy when downloaded Section 2 Managing Safety Risk in a System of Systems describe at a high level the underlying causes of safety hazards and the means by which the AT O manages and tracks safety risk.
The SRM process provides the framework to track a NAS change after it has been implemented using Safety Assurance functions to determine whether control s and/or safety requirements are performing as intended/designed. Refer to Figure 2.2 for a depiction of the relationship between SRM and Safety Assurance.
SRM Safety Assurance Describe System System Description System Operation Identify Data Information Management Hazards Acquisition Analyze Analysis Analysis Risk Meeting No Yes Operational/Safety Assess Risk Assessment Performance Targets?
Safety Treat Risk Requirements Problem Resolution Implemented Figure 2.2 : SRM / Safety Assurance Process Flow 2.3 SRM: Proactive and Reactive Hazard and Risk Management SRM is a formalized approach to integrated system safety. It both informs decision - makers about the potential hazards, safety risks, and ways to reduce risk associated with a particular proposal and identifies ways to mitigate existing safety issues in the NAS. The methodology is applied to all NAS equipment, operations, and procedures to identify s afety hazards and address risk.
2_SMSM_20 2 21 2 10 Originally published December 20 2 2 Uncontrolled copy when downloaded Section 2 Managing Safety Risk in a System of Systems It is necessary to make the approach to managing safety risk into a formalized, objective process. This helps ensure the effective management of a safety hazard ’s risk . SRM provides a means to: Identify potential hazards and analyze and as sess safety risk in ATO operations and NAS equipment ; Define safety requirements to reduce risk to an acceptable level ; Identify safety performance targets , the measurable goals used to verify the predicted residual risk of a hazard ; and Create a plan that an organization can use to determine if expected risk levels are met and maintained.
2.4 Safety Assurance: Identifying and Closing Safety Gaps SRM alone does not en sure the safety of the services the ATO provides; equally important are the efforts performed under the umbrella of Safety Assurance. Safety Assurance builds on SRM efforts by collecting and assessing data to monitor compliance, assess the performance of safety measures, and identify safety trends. It provides the means to determine whether NAS equipme nt, operations, and procedures — and changes to them — meet or e xceed acceptable safety levels. The Safety Assurance component of the S afety Management System (S MS ) encompasses all of the ATO processes and programs that survey the NAS. These processes and programs can lead to the discovery of previously unidentified existing safety issues and risk controls that are outdated or no longer effective.
Continuous improvement of the safety of the NAS can occur only when an organization is vigilant in monitoring the performance of its operations and corrective actions. Refer to Section 6 for more information about the ATO programs that fit within the Safety Assurance component of the SMS.
2.4.1 The Top 5 Program Th e Top 5 Program leverages the vast amount of safety data collected through mandatory and voluntary reporting programs and stakeholder feedback to identify trending safety issues and develop Corrective Action Plans (CAPs) to address and monitor the safety performance of those issues . The program uses SRM principles to guide its process. The Top 5 Steering Committee, composed of directors from ATO Service Units and repr esentatives from the Air Traffic Supervisor s ’ Committee and N ational A ir T raffic C ontrollers A ssociation , oversees the decision - making needs of the Top 5.
When identifying an item for the Top 5, observed safety trends are broken down into discrete issues by assessing details such as causal factors and system states. Subject matter experts from stakeholder organizations then participate on CAP Teams to perform an in - depth data review and identify mitigation s that may reduce the prevalence and/or criticality of the observed safety trend. The team also set s safety performance targets that must be met prior to closing the issue from the Top 5. Safety and Technical Training ( AJI ) works to ensure corrective actions are implemented and monitors each issue against its performance targets to determine when closure of each issue from the Top 5 can occur .
The review performed by each CAP Team is documented and kept in the Top 5 issue portfolio, which is updated and signed annually by the Director of Policy and Performance, AJI - 3, on behalf of the Top 5 Steering Committee. CAPs and monitoring strategies may be updated on a 2_SMSM_20 2 21 2 11 Originally published December 20 2 2 Uncontrolled copy when downloaded Section 2 Managing Safety Risk in a System of Systems yearly basis, an d these updates are captured in addend a to the issue portfolio . If any mitigations identified through the CAP are potential changes to the NAS, those changes must go through the SRM process. The Top 5 issue portfolio may be used as input to th e safety analysis but do es not serve as a substitute for an SRM document, if one is needed.
2.4.2 Audits and Assessments To continuously improve the safety of its NAS equipment, provisioned services, operations, and procedures, the ATO conducts audits and assessments to determine whether the NAS is performing as expected. ATO employees also use audit and assessment techniques to test, validate, and verify safety data obtained and produced by the vari ous entities and organizations in the NAS. Furthermore, ATO audits and assessments identify causes and correlations that can improve the unders tanding of safety performance.
Audits and assessments are defined as follows: An assessment is the process of me asuring or judging the value or level of something.
The objective of an assessment is to determine the organization’s ability to achieve its goals and accomplish its mission.
An audit is a review that verifies conformance to established criteria, processe s, and work practices. The objective of an audit is to determine an organization’s compliance with FAA directives and procedures.
Audits and assessments verify positive and negative safety trends . If a safety issue or hazard is identified through an audit or assessment, SRM is used to document the hazard and identify mitigations . In this sense, Safety Assurance and SRM complement each other by providing a continuous loop of hazard identification and risk management methods .
Audits and assessments may be scheduled or unscheduled formal reviews ; examinations ; or verifications of activities, controls, ATO operations, and ATO systems. The scope of safety audit and assessment activities can vary. An audit or assessment can either focus on a single procedure / piece of NAS equipment or broadly exam ine multiple elements of a system.
The ATO uses both audits and assessments at the facility, district, Service Area, and national levels. Using the above - described methodologies, the ATO assesses safety performance through: Proactive evaluation of facilities, equipment, documentation, and procedures (e.g., internal assessments); Proactive evaluation of Service Delivery Point performance, thus verifying the fulfillment of Service De livery Point safety responsibilities (e.g., periodic competency checks in the form of Quality Control, operational skills assessments, and system safety reviews); and Periodic evaluations to verify a system’s performance in control and management of safety risks (e.g., internal and external audits and assessments).
For additional information about the ATO’s audit and assessment program , refer to FAA O rder JO 2900.2, Air Traffic Organization Audits and Assessments .
2_SMSM_20 2 21 2 12 Originally published December 20 2 2 Uncontrolled copy when downloaded Section 2 Managing Safety Risk in a System of Systems 2.4.3 ATO Quality Assurance and Quality Control Requirements and guidance for Quality Assurance and Quality Control are contained in three ATO orders: FAA Order JO 7210.632, Air T raffic Organization Occurrence Reporting ; FAA Order JO 7210.633, Air Traffic Organization (ATO) Quality Assurance (QA) ; and FAA Order JO 7210.634 , Air Traffic Organization (ATO) Quality Control .
These orders provide specific direction for the reporting, investigatin g , and recording of air traffic incidents. Responsibilities for assessing trends and noncompliance are also provided, along with guidance for identifying and correcting performance deficiencies.
2.5 Identifyin g and Addressing System Vulnerabilities Before performing SRM , it is important to acknowledge the potential origins of safety hazards in the N AS. Daily operations in an ever - changing air traffic environment can present varying hazards and levels of safety risk . Given the complex interplay of human, material, and environmental factors in ATO operations, the complete elimination of all hazards and safety risk is unachievable. Even in organizations with excellent training programs and a strong safety culture, mechanical and electronic equipment will fail, software will function in an unintended manner, and human operators will make errors.
2.5.1 System Gaps and Hazard Defenses Developing a safe procedur e, hardware, or software system requires that the procedure/system contain multiple defenses, ensuring that no single event or sequence of events results in an incident or accident. Failures in the defensive layers of an operational system can create gaps in defenses, some known and others unknown. Gaps “open” and “close” as the operational situation, environment, or equipment serviceability state changes. A gap may sometimes be the result of a momentary oversight on the part of a controller or operator, typically described as an active failure . Other gaps may represent long - standing latent failures in the system. Latent conditions exist in the system before negative effects can occur. The consequences of a latent condition may lie dormant for extended periods of time. Figure 2.3 illustrates how an incident or accident can penetrate all of a system’s defensive layers.
Figure 2. 3 : Defenses in Depth 2_SMSM_20 2 21 2 13 Originally published December 20 2 2 Uncontrolled copy when downloaded Section 2 Managing Safety Risk in a System of Systems These gaps may occur due to: Undiscovered and long - standing shortcomings in the defenses, The temporary unavailability of some elements of the system due to maintenance action, Equipment failure, Human interaction, and Policy/ Decision - making.
2.5.2 Hazard Defenses Designers of NAS hardware and software must strive to design systems that will not impose hazardous conditions during abnormal performance. Using a key systems engineering concept, such systems are referred to as being fault tolerant. A fault - tolerant sy stem includes mechanisms that will preemptively recognize a fault or error so that corrective action can be taken before a sequence of events can lead to an accident. A subset of a fault - tolerant system is a system that is designed to be fail safe. A fai l - safe system is designed such that if it fails, it fails in a way that will cause no harm to other devices or will not present a danger to personnel.
Error tolerance , another systems engineering concept, is a system attribute in which, to the maximum exte nt possible, systems are designed and implemented in such a way that errors do not result in an incident or accident. An error - tolerant design is the human equivalent of a fault - tolerant design .
Design attributes of an error - tolerant system include: Errors are made apparent, Errors are trapped to prevent them from affecting the system, Errors are detected and warnings/alerts are provided, and Systems are able to recover from errors.
For an accident or incident to occur in a well - designed system, gaps must develop in all of the defensive layers of the system at a critical time when defenses should have been capable of detecting the earlier error or failure. Functions, equipment, proce dures, and airspace components of the NAS interact th r ough numerous complex relationships. Given the temporal nature of these relationships, the ATO must continuously monitor safety risk to maintain an acceptable level of safety performance and prevent ga ps.
2.6 The Human Element’s Effect on Safety Human error is estimated to be a causal factor in the majority of aviation accidents and is directly linked with system safety error and risk. For this reason, hardware and software system designers must eliminate as many errors as possible, minimize the effects of errors that cannot be eliminated, and reduce the negative effect of any remaining potential human errors.
Human performance variability is a limitation that necessitates a careful and complete study of th e potential effect of human error. Human capabilities and attributes differ in areas such as: Manner and ability of the senses (e.g., seeing, hearing, and touching), Cognitive functioning, Reaction time, Physical size and shape, and Physical strength.
2_SMSM_20 2 21 2 14 Originally published December 20 2 2 Uncontrolled copy when downloaded Section 2 Managing Safety Risk in a System of Systems Fat igue, illness, and other factors (e.g., stressors in the environment, noise, and task interruption ) also affect human performance. Optimally, the system is designed to resist, or to at least tolerate, human error.
When examining adverse events attributed to human error, it is often determined that elements of the human - to - system interface ( e.g., display design, controls, training, workload, or manuals and documentation) are flawed. The study of human reliability and the application of human performance kn owledge must influence system design for safety systems and be an integral part of risk management. Recognizing the critical role that humans and human error play in complex systems and applications has led to the development of the human - centered design approach.
This approach is central to the concept of managing human error that affects safety risk.
2.7 Closing Gaps Using SRM and Safety Assurance Principles and Processes Safety risk can be reduced proactively and reactively. Monitoring operational data, carefully analyzing the system, and reporting safety issues make it possible to proactively detect and prevent sequences of events where system deficiencies (i.e., faults and errors, either separately or in combination) could lead to an incident or accident before it actually occurs. The same approach also can be used to reactively analyze the chain of events that led to an accident or incident. With adequate information, safety professionals can take corrective action to strengthen the system’s defenses when devising new air traffic procedures, operations, and NAS equipment or when making changes to them. The following is an illustrative, but not comprehensive, list of t ypical defenses used in combination to close gaps in defenses: Equipment defense strategies : Redundancy: o Full redundancy, which provides the same level of functionality when operating on the alternate system o Partial redundancy, which results in some reduct ion in functionality (e.g., local copy of essential data from a centralized network database) Independent checking of design and assumptions System design that ensures that critical functionality is maintained in a degraded mode if individual elements fail Policy and procedures regarding maintenance to prevent a loss of some functionality in the active system or a loss of redundancy Automated aids or diagnostic processes designed to detect system failures or processing errors and to report those failures ap propriately Scheduled maintenance Implementation of robust system development assurance programs in system acquisitions Operating procedures : Adherence to standard phraseology and procedures Read - back of critical items in clearances and instructions 2_SMSM_20 2 21 2 15 Originally published December 20 2 2 Uncontrolled copy when downloaded Section 2 Managing Safety Risk in a System of Systems Checklists and habitual actions (e.g., requiring a controller to follow through the projected flight path of an aircraft, looking for conflicts, and receiving immediate coordination from the handing - off sector) Inclusion of a validity indicator in designat ors for Standard Instrument Departures and Standard Terminal Arrival Routes Training and reporting methods Organizational factors : Management commitment to safety A strong, positive safety culture Safety policy implementation with adequate funding provided for safety management activities Oversight to ensure that correct procedures are followed A zero - tolerance policy toward willful violations or shortcuts Control over the activities of contractors 2.8 Safety Order of Precedence The methods for reducing safety risk generally fall under one of the four categories that make up the Safety Order of Precedence. The Safety Order of Precedence categorizes safety risk mitigations in the following order of preference: Table 2.1: Safety Order of Precedence and Examples Priority Definition Example 1. Design for minimum risk - Design the system During airport planning, avoid (e.g., operation, procedure, human - to - system interface, or intersecting runways if possible.
NAS equipment) to eliminate risks. If the identified risk cannot be eliminated, reduce it to an acceptable level by sele cting alternatives.
2. Incorporate safety devices - If identified risks cannot be Install an Engineered Material s eliminated through alternative selection, reduce the risk by Arresting System , which uses using fixed, automatic, or other safety features or devices, crushable material placed at the end and make provisions for periodic function checks. of a runway to stop an aircraft that overruns the runway .
3. Provide warning - When alternatives and safety devices do Install a lighting system to alert not effectively eliminate or reduce risk s , use warning pilots/controllers of potential devices or procedures to detect the condition and produce unauthoriz ed crossings.
an adequate warning. The warning is designed to minimize Provide new runway or taxiway the likelihood of inappropriate human reaction and response markings.
and must be provided in time to avert the hazard’s effects.
4. Develop procedures and training - W hen it is impractical Develop new taxi and to eliminate risks through alternative selection, safety departure/arrival procedures for features, and warning devices, use procedures and training. intersecting runway operations.
However, management mus t concur when procedures and Train pilots and controllers on new training alone are applied to reduce risks of catastrophic or procedures for intersecting runways.
hazardous severity.
Note: Reliance solely on training is normally not a sufficient means to mitigate safety risk.
2_SMSM_20 2 21 2 16 Originally published December 20 2 2 Uncontrolled copy when downloaded Section 3 The Safety Risk Management Process 3.1 Scope of the S afety R isk M anagement Process The Air Traffic Organization (ATO) S afety Risk Management (S RM ) process is used to determine the safety risk of National Airspace System (NAS) changes or existing safety issues associated with the provision of air traffic management services. These services include the acquisition, operation, and maintenance of hardware and software; management of airspace and airport facilities; and development of operations and procedures. Security (e.g., physical, information, and cyber), environmental, or occupational safety and health issues that potentially affect the provision of air traffic management services should be considered during the SRM process . Conversely, if these issues do not have an effect on the safe provision of air traffic management services , these issues should not be considered .
It is important to note that the SRM process is not designed to and should not be used to account for programmatic considerations that are related to the environment, finance, budget, or labor/human resources. Addi tionally, safety hazards associated with the environment, occupational safety, or security that can or do affect the provision of air traffic management services must be reported to the appropriate authority.
This section provides a linear SRM process to follow, guidelines to identify safety hazards and mitigate their risks, and requirements for the development of consistent and thorough safety analyses. Using the steps in this section to perform SRM will not always result in an exhaustiv e study of air traffic procedures, operations, or NAS equipment (i.e., hardware and software). The appropriate level of detail used when conducting SRM depends on the complexity, size, and potential effect of the NAS change or existing safety issue . Figure 3.1 provides a high - level depiction of the key steps, decision points, and outputs of the SRM process.
Figure 3.1: SRM Process 3.2 When to Perform SRM S RM is most frequently performed in response to a N AS change. NAS changes may be proposed and initiated as part of implementation plans for new/modified air traffic procedures, operations, or NAS equipment, or in response to existing safety issues currently in the NAS.
For the A TO, a NAS change is a modi fication to any element of the NAS that pertains to , or could affect , the provision of air traffic management and /or communication, navigation, and surveillance services. Air traffic controllers and technicians, their training, and their certification are elements of the NAS and directly relate to the provision of air traffic services.
3_SMSM_202 21 2 17 Originally published December 202 2 Uncontrolled copy when downloaded Section 3 The Safety Risk Management Process In some cases, SRM is performed in response to a request to take action on an existing safety issue. Existing safety issues are existing contributing factors or findings that led to, or could lead to, an unsafe outcome . Requests for action to address such issues may be proposed and initiated as part of a S afety A ssurance function. This is usually a result of Q uality A ssurance, audits, or assessment s . If a request to take action on an existing safety issue is received, SRM must be performed.
Though not all NAS changes will require SRM, the decision and justification to forgo performing SRM is a safety decision. If there is uncertainty as to the appropriate path to tak e, contact a Safety and Technical Training (AJI) Safety Case Lead (SCL) for assistance. The following list presents NAS changes that will require SRM . It is important to note that this does not constitute a complete list or explanation of all NAS changes that require SRM .
Operational/procedural changes or waivers that are not defined in an existing order (e.g., flight trials, tests, demonstrations, and prototypes that are live in the NAS) Any waiver or change to an order, if the order implements a procedure that, when followed, could affect the provision of air traffic services Introduction of new types of navigation procedures into the NAS Changes to separation m inima (refer to the ATO Safety Guidance (ATO - SG) ATO - SG - 15 - 05, Safety and Technical Training Guidance on Separation Minima ) Addition, modification, closure, or removal of an airport, runway, or taxiway; airport building construction; and lighting changes Note: Many of the changes that fall into this category are proposed and sponsored by the Office of Airports (ARP) ; ARP Sa fety Management System ( S MS ) requirements are documented in Federal Aviation Administration (FAA) Order 5200.11, FAA Airports (ARP) Safety Management System . The ATO must remain vigilant to ensure the SRM process is conducted on construction projects to maintain continued compliance with air traffic procedures and operations.
New NAS systems used in Air Traffic Control (ATC) or pilot navigation (or new uses for such existing systems), regardless of their applicability to the FAA Acquisition Management System (A MS ) System Support Directives that introduce new requirements and/or change requirements for risk - assessed operational systems/equipment in the NAS, such as: o Communication, navigation, and surveillance systems o Weather products/services o Displays o Alerting and advisory systems o Service provider equipment (e.g., the Automatic Dependent Surveillance – Broadcast (ADS - B) system and FAA Telecommunications Infrastructure) o Local a daptations (e.g., resulting from a Program Trouble Report) o Decision support tools 1 . Do not use the SRM process to address editorial or administrative changes.
3_SMSM_202 21 2 18 Originally published December 202 2 Uncontrolled copy when downloaded Section 3 The Safety Risk Management Process System Support Directives that are built with different levels of rigor (e.g., development assurance levels) than what was required during initial acquisition - level SRM Changes to system certification and maintenance standards, requirements, and practices (e.g., technical handbooks) Before NAS equipment, procedures, systems, or services are removed, discontinued, deactivated, or decommissioned from the NAS Site adaptations, if the acceptable technical limits for such adaptations are not defined in the system - level SRM work approved prior to the In - Service Decision, or if such limits are to be exceeded ATC facility changes, including: o Tower siting or relocati on o Facility relocation o Cab replacement or redesign o Permanent consolidation or de - consolidation of facilities o Facility split o Temporary tower All charting specification changes prior to submission to the Inter a gency Air Committee for final signature (e.g., symbology, color changes in routes, and route identifiers) Airspace changes, including routes, airways, and sectors, and the addition or deletion of a position or sector Changes to policies, procedures, or NAS equipment for which training exists Removal of or modifications/waivers to existing national and/or local training requirements that could affect the NAS or NAS operations, except for the purposes of individual performance management Establishment of or modifications to Technical Training , AJI - 2, orders, architecture, and curricula If conditions of the assumptions change in any way during the SRM process, initial risk must be reassessed When an emergency modification is necessary 3.3 When SR M May Not Be Required Some NAS changes do not require SRM . The change proponent must use the criteria in this section and Section 3.2 to make this determination.
SRM does not need to be performed for NAS changes that are compliant with policies/processes that have undergone SRM and have been documented with approv al by the appropriate management official. If these policies or procedures are changed, or if any NAS change deviates from these policies or procedures, SRM must be performed to manage the safety risk. Note that editorial and administrati ve changes (i.e., any changes that do not affect the substantive elements of a procedure or system) do not require SRM.
2 . See Section 3.7.3.3 for more information on emergency modifications.
3_SMSM_202 21 2 19 Originally published December 202 2 Uncontrolled copy when downloaded Section 3 The Safety Risk Management Process F AA and/or ATO documents (e.g., policies, directives, manuals, Standard Operating Procedures (SOPs) , Letters of Agreement, and Letters o f Procedure) for developing and implementing many routine and repeatable NAS changes could be considered compliant with the ATO SMS, meaning that SRM was performed, documented, and approved. For example, routine procedures such as flight inspections are conducted in accordance with FAA Order 8200.1, United States Standard Flight Ins pection Manual . If there are no changes to those procedures, then SRM is not required. However, if there is a change to the frequency of flight inspections, SRM is required.
Modifications made to systems to meet initial operational specifications (e.g., Problem Trouble Reports) may not require additional SRM if the system specifications have previously undergone SRM . The modification and testing processes must also be compliant with the SMS.
3.3.1 Examples of NA S Changes Unlikely to Require SRM The following list presents NAS changes that will likely not require SRM. It is not a complete list or explanation of all NAS changes that do not require SRM .
Facility layout/redline/end - state drawings (e.g., Air Route Surveillance Radar (ARSR) , Air port Traffic Control Tower (ATCT) , Terminal Radar Approach Control Facility, or Air Route Traffic Control Center (ARTCC) ), as identified in the Configuration Control Board Charter, Appendix A System Support Directives that do not change requirements and have followed AMS development assurance processes Changes to directives for those directives with no safety functionality Installation or moving of equipment if defined installation siting processes are not violated Maintenance actions, as specified in maintenance technical handbooks Contact the Safety Engineering Team, AJI - 314, Manager via the ATO SMS mailbox for assistance determining if SRM is required.
3.4 NAS Change Proposals The configuration management requirements fr om the NAS Change Proposal (NCP) process may not specifically relate to safety effects. When a NAS change covered by a n N CP requires SRM, the appropriate documentation must be included in the material provided to the Configuration Control Board. In terms of SRM, a n N CP can be categorized as one of the following: Does not require SRM Requir es SRM (refer to Annex A ) For more information on N CPs , refer to FAA Order 1800.66 , Configuration Management Policy .
For information on SRM for techn o l ogy refreshment portfolios , see the Safety Risk Management Guidance for System Acquisitions ( SRMGSA ) .
3_SMSM_202 21 2 20 Originally published December 202 2 Uncontrolled copy when downloaded Section 3 The Safety Risk Management Process 3.5 SRM Process Phases SRM is co mposed of a five - phase process called the DIAAT, presented in F igure 3.2 . The DIAAT phases are described in detail in Section 3 .6 through Section 3 .10 .
Define scope and objectives DESCRIBE Define stakeholders Identify criteria and plan for SRM efforts (including modeling and simulations)
THE SYSTEM D
Define system or change (use, environment, intended function, future configuration, etc.)
Identify hazards IDENTIFY Use a structured approach Be comprehensive and do not dismiss hazards prematurely
HAZARDS I
Employ lessons learned and experience supplemented by checklists ANALYZE Identify controls Determine risk based upon the severity and likelihood of the outcome
RISK A
ASSESS Assign risk level for each hazard based on severity and likelihood
RISK A
Identify risk management strategies Develop safety performance targets TREAT RISK
T
Develop monitoring plan Figure 3.2: DIAAT Process 3.6 D IAAT Phase 1: Describe System Define scope and objectives DESCRIBE Define stakeholders Identify criteria and plan for SRM efforts (including modeling and simulations)
THE SYSTEM D
Define system or change (use, environment, intended function, future configuration, etc.)
3.6.1 Overview As discussed in Section 3.2 , NAS changes may be proposed and initiated as part of implementation plans for new or modified air traffic procedures, operations, or NAS equipment, or in response to existing safety issues in the NAS . As part of any pre - SRM panel activities and any follow - on SRM panel activities , it is important to develop a detailed description of the NAS change and/or current system and its affected elements.
Note: S RM for mitigations to existing hazards that were identified through safety audits or post - event safety risk analys e s should use the event or situation that led to the realization of the 3_SMSM_202 21 2 21 Originally published December 202 2 Uncontrolled copy when downloaded Section 3 The Safety Risk Management Process hazard’s effect(s) as the basis for the documented system description. Use this section as guidance, but refer to Section 3 .7.3 for further information.
3.6.2 Bounding S RM in an Integrated NAS Bounding refers to the process of limiting the analysis and assessment of a change or system to only the elements that affect or interact with each other to accomplish the central function of that change or system. In many cases, there may be a limited or incomplete understanding of the air traffic environment in which the N AS equipment, operation, or procedure will be employed, or the interconnected systems with which the changing system must be integrated for effective operation. Furthermore, the scope for other associated NAS equipment, operations, or proced ures may be unknown. Thus, it becomes difficult to ensure that there are no gaps across the boundaries of the change or system . As a result, the scope may be inadvertently set at an inappropriate level.
In light of these potent ial difficulties, the scope must be set such that gaps are eliminated. As systems become increasingly more complex, interactive, and interrelated, the analysis and assessment of potential safety risk must be integrated temporally, by domain, and across locations. Figure 3.3 provides a visual representation of this integration. Where time is concerned, it is important to consider whether potential safety risk mitigations implemented in the short term will be adequate years into the future when other systems are introduced in the NAS, or whether other follow - on mitigations will negate the effect of those implemented in the past.
Figure 3 .3: The Complex Integration Aspects of a Capability Figure 3.4 depicts the potential scope and level of S RM required based on the potential impact and scope of the NAS change. The lowest - tiered SRM focus es on identifying hazards associated with individual projects/programs and individual changes to the NAS that are often associated with new system acquisitions. The middle tier is the capability level. Examples of capabilities include Performance Ba sed Navigation, Surface Operations, or Data Communications. Here, system safety risk analyses and assessments become more complex, considering multiple combinations of dependent functions. The top tier represents high - level SRM activities associated with service levels and/or domains to reflect a strategic view of safety across the NAS. Safety manage ment at this level is more static in nature (i.e., essentially 3_SMSM_202 21 2 22 Originally published December 202 2 Uncontrolled copy when downloaded Section 3 The Safety Risk Management Process non - recurring system safety engineering). It employs high - level functional hazard analyses to identify NAS - level hazards and safety requirements that fl ow down vertically to the other - tiered l evels.
Figure 3.4: Three Tiers of Integrated Safety Management 3.6.3 Depth and Breadth of the NAS Change or Existing Safety Issue In general, SRM for more complex and far - reaching NAS changes or existing safety issues will require a greater scope and more detail. When evaluating a NAS change or existing safety issue , consider any potential effect s on organizations outside the A TO (e.g., Aviation Safety and A RP ). Consider the following facto rs: The depth of the NAS change or existing safety issue . The complexity and nature (i.e., operational or system acquisition) of the NAS change will dictate the type and number of analyses or assessments required.
The breadth of the NAS change or existing safety issue . The scope of SRM will require additional details when the NAS change affects more than one organization or L ine of Business (L OB ) .
3.6.4 Involving Other FAA LOBs When ATO SRM impacts F AA LOBs and/or organizations outside the ATO, the provisions and guidance in FAA Order 804 0.4, Safety Risk Management Policy , apply. Refer to Section 3. 7. 7 for information on coordinating and addressing safety issues. Refer to Section 5 .4.1 and Section 5 .4.2 for discussion on cross - LOB risk acceptance.
3.6.5 Setting the Scope of Individual SRM A nalyses and Assessments Guidelines to help determine the scope of individual SRM analys e s and assessment s include: Having a sufficient understanding of system boundaries, including interfaces with peer systems, larger systems of which the system is a component, and users and maintainers; 3_SMSM_202 21 2 23 Originally published December 202 2 Uncontrolled copy when downloaded Section 3 The Safety Risk Management Process Determining the system elements that interact or sub - system components that may be affected; and Limiting the system to those elements that affect or interact with each other to accomplish the mission or function.
When setting the scope of individual SRM analys e s and assessments : Define the relationships/interactions of the NAS change.
Identify temporal aspects of these relationships/interactions.
Collect safety documentation that has determined the building blocks of the NAS change.
Set the scope wide enough to determine the aggregated risk and address any gaps.
3.6.6 Describing the System / NAS Change System descriptions need to exhibit two essential characteristics: correctness and completeness. Correctness means that the description accurately reflects the system without ambiguity or error. Completeness means that nothing has been omitted and that everything stated is essential and appropriate .
The system description provides informa tion that serves as the basis for identifying all hazards and associated safety risks. The system/operation must be described and modeled in sufficient detail to proceed to the hazard identification stage of the DIAAT process . For example, modeling might entail creating a functional flow diagram to help depict the system and its interface with the users, other systems, or sub - systems.
As discussed, the system is always a component of some larger system. For example, even if the change encompasses all services provided within an entire ARTCC, that ARTC C can be considered a subset of a larger body of airspace, which in turn is a subset of the NAS.
Complex NAS changes may require a detailed system description that includes numerous charts, drawings, design descriptions, and/or narratives. Simple NAS changes may only require one or two paragraphs describing the system and NAS change. The description must be clear and complete before continuing the SRM process . Questions to consider include: What is the purpose of the NAS change?
What issue is necessitating the NAS change?
How will the change be used / function in the NAS?
What are th e boundaries and external interfaces of the NAS change or system?
In what environment will the system or NAS change operate?
How is the system or NAS change interconnected/interdependent with other systems?
How will the NAS change affect system users/maint ainers?
If the NAS change is a waiver/renewal, how could other waivers in effect interact with it?
The following are examples of information to consider when describing the system: Average annual approaches to each runway Fleet mix 3_SMSM_202 21 2 24 Originally published December 202 2 Uncontrolled copy when downloaded Section 3 The Safety Risk Management Process Number and type of airpo rt operations Number of aircraft controlled (ground, pattern, and transitions) Number of hours the airport operates and number of aircraft controlled under Visual Flight Rules (VFR) versus Instrument Flight Rules (IFR) Availability and reliability of both hardware and software Section 7 identifies sources of data to use in SRM .
Once the system elements are listed, a careful review of the NAS change description should be conducted. A bounded system limits the analysis and assessment to the components necessary to adequately determine the safety risk associated with the NAS change, system, and/or operation. When there is doubt about whether to include a specific element in the analysis, it is preferable to include that item, even though it might prove irrelevant during the hazard identification phase.
3.6.6.1 5M Model Method The 5M Model can be used to capture the information needed to describe the s ystem and aid in hazard identification. The 5M Model uses a Venn diagram to depict the interrelationships among its five elements, as seen in Figure 3.5 . To adequately bound and describe a system, it is important to understan d the relationships between the elements of the 5M Model.
The 5M Model illustrates five integrated elements that are present in any system: Mission: The clearly defined and detailed purpose of the proposed NAS change or system/operation (hu)Man/Person: The human operators, maintainers, and affected stakeholders Machine: The equipment used in the system, including hardware, firmware, software, human - to - system interfaces, system - to - system interfaces, and avionics Management: The pr ocedures and policies that govern the system’s behavior Media: The environment in which the system is operated and maintained 3_SMSM_202 21 2 25 Originally published December 202 2 Uncontrolled copy when downloaded Section 3 The Safety Risk Management Process (hu)Man/Person Operational Personnel Mission Maintenance Personnel Engineering Personnel Machine Management Computer Human Operational Procedures Interface Airspace Procedures Software/Hardware Maintenance Procedures Media or Environment National Airspace System Figure 3.5: 5M Model The 5M Model and similar techniques are used to deconstruct the proposed NAS change in order to distinguish elements that are part of or affected by the proposed NAS change. These elements later help to identify sources, causes, hazards, and current and p roposed risk mitigation strategies.
3.7 D I AAT Phase 2: Identify Hazards Identify hazards IDENTIFY Use a structured approach Be comprehensive and do not dismiss hazards prematurely
HAZARDS I
Employ lessons learned and experience supplemented by checklists 3.7.1 Overview During the hazard identification phase, identify and document hazards , their possible causes, and corresponding effects. Th is phase is re quired to determin e the appropriate means to address any safety risks associated with a N AS change or existing safety issue . A hazard is defined as a ny real or potential condition that can cause injury, illness, or death to people; damage to or loss of a system, equipment, or property; or damage to the environment. A hazard is a prerequisite to an accident or incident.
The following resources and methods can be used to identify hazards: The safety analysis that accompanies the proposed implementation of a new or modified operation, process, or piece of NAS equipment ; Air Traffic Safety Action Program and Technical Operations Safety Action Program reports ; Air Traffic Safety Oversight Service (AOV) compliance audits ; 3_SMSM_202 21 2 26 Originally published December 202 2 Uncontrolled copy when downloaded Section 3 The Safety Risk Management Process Aviation Risk I dentification and Assessment (ARIA) ; National Transportation Safety Board safety recommendations; ATO Audits and Assessments; Audits performed as part of facility - level Quality Control efforts or AJI Quality Assurance efforts ; and Reports of unsafe conditions in daily operations.
Refer to Section 6 for information about the various audit and reporting programs and tools.
3.7.2 Potential Sources of Hazards The hazard identification stage considers all possible causes of hazards. The use of previous hazard analyses when identifying hazards is impo rtant , as it provides consistency in S RM and can reduce the time needed to identify hazards. For example, approved SRM documents on similar NAS changes or earlier integrated assessments, including applicable cross - organizational safety assessments and Ind ependent Operational Assessments (IOAs) , may be useful. Refer to Section 6 for information on IOA s .
Depending on the nature and size of the system under consideration, the causes may include: NAS equipment failure/malfunction, Operating environment (including physical conditions, airspace, and air route design), Human operator failure/error, Human - machine interface problems, Operational procedures limitations/design, Maintenance procedures limitations/design, and/or External services.
3.7.3 Existing Hazards An existing hazard is any hazard that is currently in the NAS. Existing hazards often fall i nto the following categories .
3.7.3.1 Hazards Identified but Not in the Scope of an Ongoing NAS Change These hazards must typically be addressed through a separate, follow - on safety analysis performed by the organization deemed responsible. An AJI SCL can assis t in determining which organization should be notified about the existing hazard ( s ) identified.
3.7.3.2 Hazards Identified by Audits When an audit identifies a potential safety issue, the issue must be addressed. Refer to FAA Order JO 2900.2, Air Traffic Organization Audits and Assessments .
3.7.3.3 Emergency Modifications There may be unusual, unforeseen, or extraordinary issues or conditions that require the implementation of hardware or software solutions in a timeframe that does not allow proceeding 3 . FAA Order JO 7210.633, Air Traffic Organization Quality Assurance (QA) , removed Risk Analysis Events (RAEs) and Risk Analysis Process (RAP), the process for notification and interviews associated with RAE. Any references to RAE s or RAP in this SMS Manual are for research and historical purposes only.
4 . AJI SCLs are experts in SMS policy and guidance that pertain to the ATO. Refer to the SRMGSA for a description of their roles and responsibilities.
3_SMSM_202 21 2 27 Originally published December 202 2 Uncontrolled copy when downloaded Section 3 The Safety Risk Management Process through the formal SRM process. Emergency modifications are temporary f ixes installed to maintain continuity of air navigation, air traffic control , communications, or support services during unusual or emergency conditions. Such NAS changes may result from unforeseen natural occurrences, a lack of replacement parts, softwar e patches, or real - time situations that require immediate action. Refer to FAA Order 6032.1, National Airspace System (NAS) Modifi cation Progr am , for more information on emergency modifications.
A memorandum must be sent to the Director of Policy and Performance, AJI - 3, within two days of the implementation of the modification.
The memorandum must: State what system was modified, Provide a summary of the emergency modification, Identify why the modification was made, and Indicate when the safety risk assessment will be conducted.
The official who authorized the emergency modification must ensure that SRM is performed in accordance with th e ATO SMS Manual within 30 days of the implementation of the modification.
After SRM is completed, a follow - up memorandum must be sent to the AJI - 3 Director stati ng that it has been completed and uploaded to the Safety Management Tracking System ( SMTS ) .
The AJI - 3 Director must inform AOV and the ATO Chief Operating Officer (COO).
3.7.3.4 Existing High - Risk Hazards When the AJI - 3 Director validates an existing hazard as high risk, they must notify the ATO COO and AOV of the high risk and the interim actions needed to mitigate the risk. The ATO COO must approve the interim action and accept the associated risk or require the opera tion to be stopped. The responsible Service Unit must coordinate with the AJI - 3 Director to address the risk and any potential corrective actions.
Thirty calendar days after the notification is sent to the ATO COO and AOV, the re sponsible Service Unit must coordinate with the AJI - 3 Director to develop a permanent plan that will eliminate the hazard or reduce the risk to an acceptable level and provide that plan to AJI. The plan must include: A description of the hazard and system state, The severity and likelihood of the high risk, Data or empirical evidence that justifies the determination th at a high - risk hazard exists, Safety requirements or a dec ision to cease the operation, A schedule t o complete an SRM document in accord ance with this SMS Manual, and An approval signature by the Vice President of each responsible/affected Service Unit.
Cessation is viable if the prescribed means are inadequate to reduce the risk to an acceptable level. In some cases, though, cessation of the operation may not be the safest means to mitigate the risk. There could be unintended consequences that result in more potential harm or increase system safety risk.
5 . The AJI - 3 D irector provide s leadership and expertise to ensure that operational safety risk in the air traffic services that the ATO provides is identified and managed. They also ensure that safety risk is considered and proactively mitigated in the early development, design, and integration of solutions.
3_SMSM_202 21 2 28 Originally published December 202 2 Uncontrolled copy when downloaded Section 3 The Safety Risk Management Process The Service Unit must forward the plan with a memorandum via its Vice President to the Vice President of AJI for approval and copy the AJI - 3 Director , who will then forward the memorandum to AOV. AJI will notify AOV of any subsequent changes to the approved plan.
The hazard must be documented in an SRM document that is written in accordance with this SMS Manual and uploaded to SMTS within 30 calendar days of the implementation of the final safety requirements. The responsible Service Unit must adhere to the SRM documentation approval and risk acceptance requirements documented in this SMS Manual.
3.7.4 Elements of Hazard Identification When considering new NAS equipment and procedures or planned modifications to current NAS equipment and proced ures, define the data sources and measures necessary to identify hazards. The elements of a thorough system description contain the potential sources of hazards associated with the proposed NAS change. There are numerous ways to do this, but all require at least three elements: Operational expertise that relates specifically to the operation or equipment, Training or experience in various hazard analysis techniques, and A defined hazard analysis tool.
3.7.4.1 T ools and T echniques for Hazard Identification In many cases, to identify safety hazards, a Preliminary Hazard L ist (PHL) and the required Hazard Analysis Worksheet (HAW) will suffice. If an additional means to identify hazards and compare solutions is required , select the methodology that is most appropriate for the type of system being evaluated. The Service Center and/or an AJI S CL can provide additional guidance on which tool(s) to use for various types of NAS chang es.
When selecting hazard iden tification/analysis tools, it is important to consider: The necessary information and its availability; The timeliness of the necessary information; The amount of time required to conduct the analysis; and The tool that will provide the appropriate systema tic approach for: o Identifying the greatest number of relevant hazards, o Identifying the causes of the hazards, o Predicting the effects associated with the hazards, and o Assisting in identifying and recommending risk management strategies.
Table 3. 1 : Hazard Identification Tools and Techniques Analysis T ool/T echnique Summary Description The PHL / What - If Analysis methodology identifies hazards, hazardous situations, or specific accident events that could produce an undesirable consequence. One can use the PHL / What - If Analysis as a brainstorming method.
P H L / What - If Analysis The PHL / What - If Analysis may be a combination of hazards, causes, effects, and system states. The items listed in the PHL / What - If Analysis all have the potential to be placed into the HAW.
The Failure Mode and Effect Analysis determines the results or effects of Failure Mode and Effect Analysis sub - element failures on a system operation and classifies each potential failure according to its severity.
3_SMSM_202 21 2 29 Originally published December 202 2 Uncontrolled copy when downloaded Section 3 The Safety Risk Management Process Analysis T ool/T echnique Summary Description The Failure Modes, Effects, and Criticality Analysis is an essential function in design from concept through development. The Failure Modes, Effects, and Criticality Analysis is iterative to correspond with the Failure Modes, Effects, and nature of the design process itself. It identifies component and Criticality Analysis sub - system failure modes (including the effect of human error), evaluat es the results of the failure modes, determines rates and probability, and demonstrates compliance with safety requirements.
The Fault Hazard Analysis is a deductive method of analysis that can be used exclusively as a qualitative an alysis or, if desired, can expand to a quantitative one. The Fault Hazard Analysis requires a detailed Fault Hazard Analysis investigation of sub - systems to determine component hazard modes, causes of these hazards, and resultant effects on the sub - system and its operation.
A Fault Tree Analysis is a graphical design technique that can provide an alternative to block diagrams. It is a top - down, deductive approach Fault Tree Analysis structured in terms of events. It is used to model faults in terms of failures, anomalies, m alfunctions, and human errors.
The foundation of the performance of a Human Error Analysis is a Job Task Analysis, which describes each human task and subtask within a system in terms of the perceptual (information intake), cognitive (in formation processing and decision - making), and manual (motor) behaviors required of an operator, maintainer, or support person. The Job Task Analysis Job Task Analysis should also identify the skills and information required to complete tasks; equipment requirements; the t ask setting, time, and accuracy requirements; and the probable human errors and consequences relating to these areas. There are several tools and techniques for performing task analyses, depending on the level of analysis needed.
Operational Hazard The OHA is a qualitative severity assessment of the hazards associated Assessment (OHA) with the system. The OHA inclu des tabular worksheets and the PHL .
The Scenario Analysis tool identifies and corrects potentially hazardous Scenario Analysis situation s by postulating accident scenarios in cases where it is credible and physically logical to do so.
3.7.5 Develop ing a HAW When hazards are identified, t he HAW is required as part of the ATO SRM process. It is a tool used to provide an initial overview of the hazard’s presence in the overall flow of the operation and is used both for Operations and Second - Level Engineering. When developing the HAW, it is crucial to consider the hazards inherent to all aspects of an operation without regard to risk.
ATO safety professionals use the HAW in nearly all risk management applications, except in the most time - critical situations.
Using the HAW helps panels overcome the tendency to focus on safety risk in one aspect of an operation and overlook more serious issues elsewhere in the operation. Its broad scope guides the identification of issues that may require analysis and assessmen t with more detailed hazard identification tools. Refer to Annex A for a description of the expected contents of the HAW.
6 . All SRM documentation (with the exception of the PSP, Operational Safety Assessment (OSA), the Comparative Safety Assessment, and SSAR) requires the use of a HAW. Worksheets specific to these documents are contained in the SRMGSA.
3_SMSM_202 21 2 30 Originally published December 202 2 Uncontrolled copy when downloaded Section 3 The Safety Risk Management Process 3.7.6 Causes and System State Defined Identify and document potential safety issues, their possible causes, and the conditions under which the safety issues are revealed (i.e., the system state).
A cause is the origin of a hazard. Causes are events occurring independently or in combination that result in a hazard . Causes include, but are not limited to, human error, latent failure, active failure, design flaw, component failure, and software error.
A system state is t he expres sion of the various conditions, characterized by quantities or qualities, in which a system can exist. It is important to capture the system state tha t most exposes a hazard, while remaining within the confines of any operational conditions and assumptions defined in existing documentation . Assumption s are conclusions based on the presumed condition of a system or system state — not documented facts, desired outcomes, or mitigations . The system state can be described using a combination of, but not limited to, the following terms: Operational and Procedural: VFR versus IFR, simultaneous procedures versus visual approach procedures, etc.
Conditional: Instrument Meteorological Conditions (IMC) versus Visual Meteorological Conditions (VMC) , peak traffic versus low traffic, etc.
Physical: Electromagnetic environment effects, precipitation, primary power source versu s back - up power source, closed runways versus open runways, dry runways versus contaminated runways, environmental conditions, etc.
Risk analys e s and assessment s must consider all possibilities while allowing for all system states. During the SRM process , the SRM panel must consider the probability of the identified system state (s) when determining the likelihood of a hazard ’s effect(s) and use that determination consistently throughout the analysis. Any given hazard may have a different risk level in each possible system state.
3.7.7 Addressing Hazards that Cross FAA L OB s FAA Order 8040.4 provides risk management policy to follow when hazards, risks, and associated SRM affect multiple L O Bs . The ATO must consider and, when necessary, use the provisions in this order when coordinating SRM with other FAA organizations. AJI will function as the ATO liaison to interface with organizations outside of the ATO when the provision s of FAA Order 8040.4 are invoked.
3.7.8 Hazard Escalation and Reporting There may be cases in which the ATO and another FAA organization disagree on key issues surrounding a NAS change. The AJI - 3 Director and t he Safety Management Group, AJI - 31, Manager must be made aware of such NAS changes and must work to determine the appropriate course of action. The AJI - 3 Director will determine whether such hazards and issues need to be elevated to an FAA - level mediation process facilitated by the FAA S MS Committee.
For more information, refer to the FAA SMS Hazard Escalation Reporting Process .
3_SMSM_202 21 2 31 Originally published December 202 2 Uncontrolled copy when downloaded Section 3 The Safety Risk Management Process 3.8 DI A AT Phase 3: Analyze Risk ANALYZE Identify controls Determine the severity and likelihood of the hazard’s effect
RISK A
3.8.1 Overview An accident or incident rarely results from a single failure or event. Consequently, risk analysis is seldom a binary (e.g., on/off, open/closed, or broken/operational) process. Risk analyses can identify failures from primary, secondary, or e ven tertiary events.
During the risk analysis phase: Evaluate each hazard (identified during the “Identify Hazards” phase) and the system state (from the “Describe the System” and “Identify Hazards” phases) to determine the controls, Analyze how the operation would function should the hazard occur, and Determine the hazard’s associated severity and likelihood and provide supporting rationale.
3.8.2 Controls A control is any means currently reduc ing a hazard’s causes or effects. Policies, procedures, hardware, software, or other tools can only be considered controls if they are part of the operating N AS and have demonstrated effectiveness. Understanding controls affects the ability to determine credible effects. Certain control s may only be in place in certain operating environments or under certain system states. Do not document safety requirements as c ontrols ; safety requirements are planned or proposed ways to reduce ri sk . Refer to Section 3.10 .3 for information about documenting safety requirements.
Provide supporting data and /or a rationale that confirms the control’s use, applicability, and availability related to the hazard. For instance, if orders are identified as controls, cite the specific version, paragraph, and/or section number(s). Alternatively, if equipment is identi fied as a control, discuss how it reduces or manages the risk. Only document the controls associated with the N AS change under evaluation. When considering existing hazards identified through safety audits or post - event risk analys e s, consider any contro l (s) that either minimized the hazard’s effect or failed.
Table 3.2 provides broad examples of controls. This is not a comprehensive list of controls; each identified control should be directly applicable to the hazard being ad dressed.
3_SMSM_202 21 2 32 Originally published December 202 2 Uncontrolled copy when downloaded Section 3 The Safety Risk Management Process Table 3. 2 : Examples of Controls Controller Pilot Technical Operations Radar s urveillance Traffic Collision Avoidance Preventive m aintenance System (TCAS) - Ground and airb orne Failure warnings / Ground Proximity Warning maintenance Controller s canning System Alerts - Radar Visual scanning (out window) Redundant systems - Visual (out wind ow) Radar surveillance - Triple redundant radi o Conflict Alert, Minimum Safe Checklists Altitude Warning, Airport - Software redundancy Movement Area Safety Redundancies / back - up sys tems Diverse points of deliv ery System (AMASS) Pilo t intervention (evasive action ) Fall - back system s Procedures - Center radar proce ssing - Specific SOP reference Software /hardware des igns - Order r eference Triple redundant radio Controller intervention Management oversight Completed training 3.8.3 Determining a Credible Hazard Effect Effect refers to the real or credible harmful outcome that has occurred or can be expected to occur if the hazard occurs in the defined system state. A si ngle hazard can have multiple effects. Credible means that it is reasonable to expect that the assumed combination of conditions that define the system state will occur within the operational lifetime of a typical ATC system ( i .e . , 30 years) Credible effects should be determined with respect to controls.
Document all identified credible effects.
Often, there is confusion when distinguishing the possible effects of a hazard from the credible effects; possible is not necessarily the same as credible. The credibility of an effect is a nuanced and key consideration in the analysis. A thorough understanding of this concept can save time in determining the risk level of a specific hazard. When determining the credibility of the effect, it is important to: Recall and Understand the Defenses in Depth Model. It is well established that incidents and accidents cannot typically be attributed to a single failure , or even to a single individual. Rather, aviation safety issues are the end result of a number of failures ( causes or failures) . Based on this model (see Section 2. 5 .1 ) , it is critical to consider the defenses that already exist in the NAS when deciding the credibility of an effect.
Review History. Check the historical record. Have there been similar NAS changes?
What happened? How does the experience gained from the activities affect the credibility of the outcomes that have been identified for the NAS change?
Rely on Quantitative Data. Section 3.8 .4.3.3 and Section 3.8 .4.3.4 discuss the use of quantitative and qualitative data, respectively. Do the quantitative data support the credibility of the outcomes identified? If so, th e hazard severity determination can be based on statistical data, and the determinations of the SRM panel members will be more objective. Section 7 provides additional information about the aviation safety databases available for gathering data.
3_SMSM_202 21 2 33 Originally published December 202 2 Uncontrolled copy when downloaded Section 3 The Safety Risk Management Process Visualize the Occurrence of the Accident or Incident. Put the hazard in its proper context withi n the given system state and determine the sequence of events (causes) that could lead to the worst credible outcome. Given that the A TO strives to build error - tolerant systems (in accordance with the Defenses in Depth Model), consider how many controls ( redundancies, procedures, warning devices, equipment, etc.) would have to fail for an identified hazard to breach every defense to result in a catastrophic event.
Is it credible to expect that the necessary combination of extreme conditions will simultaneously occur within the operational lifetime of the system?
3.8.4 Defining Risk 3.8.4.1 How to Define and Determine Risk Risk is the composite of predicted severity and likelihood of the potential effect of a hazard.
While the worst credible eff ect may present the highest severity , the likelihood of th is effect is often very low. A less severe effect may occur more frequently and therefore present a higher overall risk than the more severe effect. The ways to reduce the risk for the two effects may be different, and both must be identified. Consider all credible effects and their associated risks in order to identify the highest risk for the safety hazard.
Attempt to obtain and document objective evidence (e.g., historical evidence of similar N AS changes, testing data, modeling , or simulation results) to support the assessed level of risk. If quantitative data are not available, document the research methods — including the data sources reviewed — in addition to qualitative risk assessments. Becau se different system states can affect both severity and likelihood in unique ways, determine whether the hazard will exist in several system states and analyze the risk accordingly.
3.8.4.2 Determin ing Severity Severity is the consequence or impact of a hazard’s effect or outcome in terms of degree of loss or harm. It is independent of likelihood and must be determined before likelihood is calculated. Determine the severity of each effect, considering the controls while doing so. For each effect, use the severity measure yielding the most conservative estimate (i.e., the highest credible severity) . Table 3.3 is the severity table used by the ATO to help determine the severity of a hazard when performing SRM. Provide a rationale for the chosen severity level in the HAW. When a NAS change crosses FAA LOBs, consult with the affected parties; the provisions of FAA Order 8040.4 apply.
3_SMSM_202 21 2 34 Originally published December 202 2 Uncontrolled copy when downloaded Section 3 The Safety Risk Management Process Table 3. 3 : Severity Table Hazard Severity Classification Note: Severities related to ground - based effects apply to movement areas only.
Minimal Minor Major Hazardous Catastrophic 5 4 3 2 1 CONDITIONS RESULTING IN ANY ONE OF THE F OLLOWING: A minimal Low Risk Analysis Medium RAE High RAE severity, Ground collision reduction in Event (RAE) severity, three four indicators fail Mid - air collision ATC services severity, two or fewer indicators fail CAT A RI indicators fail Controlled flight into Category CAT B RI terrain or obstacles ( CAT ) D CAT C RI R unway I ncursion (RI) ATC Proximity Services Event, Operational Deviation, or measure of compliance greater than or equal to 66 percent Minimal injury Non - serious injury to Non - serious injury to Incapacitation to UAS A collision with a to those on the three or fewer people more than three crew manned aircraft ground on the ground people on the ground Manned aircraft Fatality or fatal Loss of UAS Loss of UAS control A reduced ability of making an evasive injury to persons control and and manned aircraft the crew to cope with maneuver to avoid other than the UAS manned w ere involved adverse operating unmanned aircraft , crew aircraft were conditions to the and the proximity Circumstances not involved extent that there from unmanned requiring a manned would be a significant aircraft is less than aircraft to abort reduction in safety 500 feet takeoff ( i.e., rejected margin takeoff); however, Serious injury to the act of aborting Circumstances persons other than takeoff does not requiring a manned the UAS crew Unmanned degrade the aircraft aircraft to abort Aircraft Pro ximity of UAS to performance takeoff (i.e., rejected Systems manned aircraft capability takeoff); the act of (UASs) causing conditions aborting takeoff that would prevent degrades the aircraft continued safe flight performance and landing of the capability manned aircraft Manned aircraft making an evasive maneuver to avoid unmanned aircraft , and the proximity from unmanned aircraft remains equal to or greater than 500 feet 3_SMSM_202 21 2 35 Originally published December 202 2 Uncontrolled copy when downloaded Section 3 The Safety Risk Management Process Hazard Severity Classification Note: Severities related to ground - based effects apply to movement areas only.
Minimal Minor Major Hazardous Catastrophic 5 4 3 2 1 CONDITIONS RESULTING IN ANY ONE OF THE F OLLOWING: Minimal injury Physical discomfort Physical distress to Serious injury to Fatal injuries to 7 8 to persons on to passenger(s) (e.g., passengers (e.g., persons on board persons on board board extreme braking, abrupt evasive action, clear air turbulence severe turbulence causing unexpected causing unexpected movement of aircraft aircraft movements) resulting in injuries to Flying Minor injury to greater one or two Public than 10 percent of passengers out of persons on board their seats) Minor injury to less than or equal to 10 percent of persons on board Flight crew Increase in flight Large increase in Large reduction in Collision between inconvenience crew workload ATC workload safety margin aircraft and NAS obstacles or terrain Equipment Slight increase Significant increase Significant reduction (with Table in ATC in ATC workload in safety margin 3.4 ) workload Slight reduction in safety margin 3_SMSM_202 21 2 36 Originally published December 202 2 Uncontrolled copy when downloaded Section 3 The Safety Risk Management Process Hazard Severity Classification Note: Severities related to ground - based effects apply to movement areas only.
Minimal Minor Major Hazardous Catastrophic 5 4 3 2 1 CONDITIONS RESULTING IN ANY ONE OF THE F OLLOWING: 9 9 9 Pilot is aware Pilot deviation Pilot deviation where Pilot deviation where Ground collision of traffic where loss of loss of airborne loss of airborne Mid - air collision (identified by airborne separation separation falls within separation falls within TCAS traffic falls within the same the same parameters the same parameters Controlled flight into alert, issued by parameters of a low of a medium RAE of a high RAE terrain or obstacles 3 3 3 ATC, or RAE severity severity severity Hull loss to manned observed by Reduction of Reduction in safety Reduction in safety aircraft flight crew) in functional capability margin or functional margin and functional close enough Failure conditions of aircraft, but overall capability of the capability of the proximity to that would prevent safety not affected aircraft, requiring aircraft requiring crew require continued safe flight (e.g., normal crew to follow to follow emergency focused and landing procedures as per abnormal procedures procedures as per attention, but Airplane Flight as per Airplane Flight Airplane Flight no action is Manuals) Manuals Manuals required Circumstances Circumstances NMAC encounters Pilot deviation requiring a flight crew requiring a fligh t crew with separation less where loss of Flight Crew to abort takeoff ( i.e., to reject landing (i.e., than 100 feet airborne rejected takeoff); balked landing) at or separation falls however, the act of near the runway within the aborting takeoff does threshold same not degrade the parameters of Circumstances aircraft performance a Proximity requiring a flight crew capability Event or to abort takeoff (i.e., measure of N ear M id - A ir rejected takeoff); the compliance C ollision (NMAC) act of aborting takeoff greater than or encounters with degrades the aircraft equal to 66 separation greater performance percent than 500 feet capability Circumstances NMAC encounters requiring a with s eparation less flight crew to than 500 feet initiate a go - around Notes: 1. Refer to FAA Order 7050.1, Runway Safety Program .
2. Proximity Events and Operational Deviations are no longer used to measure losses of separation, but they are applicable when validating data using those metrics .
3. FAA Order JO 7210.633, Air Traffic Organization Quality Assurance (Q A ) , removed RAE s and the process for notification and interviews associated with RAE s . Any r eference to RAE s in this SMS Manual is for research and historical purposes only. RAE severity indicators are as follows: a. Proximity. Failure transition point of 50 percent or less of required separation.
b. Rate of Closure. Failure transition point greater than 205 knots or 2,000 feet per minute (consider both aspects and utilize the higher of the two if only one lies above the transiti on point).
3_SMSM_202 21 2 37 Originally published December 202 2 Uncontrolled copy when downloaded Section 3 The Safety Risk Management Process c. ATC Mitigation. ATC able to implement separation actions in a timely manner.
d. Pilot Mitigation. Pilot executed ATC mitigation in a timely manner.
4. An effect categorized as catastrophic is one that results in a t least one fatality or fatal injury.
5. Ground Collision. An airplane on the ground collides with an object or person.
6. Minor Injury. Any injury that is neither fatal nor serious.
7. Serious Injury. Any injury that: a. Requires hospitalization for more than 48 hours, commencing within seven days from the date the injury was received; b. Results in a fracture of any bone (except simple fractures of fingers, toes, or nose); c. Causes severe hemorrhages, nerve, muscle, or tendon damage; d. Involves any internal organ; or e. Involves second - or third - degree burns, or any burns affecting more than five percent of the body’s surface.
8. Fatal Injury. Any injury that results in death within 30 days of the accident.
9. Refer to FAA Order JO 8020.16, Air Traffic Organization Aircraft Accident and Aircraft Incident Notification, Investigation, and Reporting , for more informat ion about pilot deviations .
10. NMAC definitions are derived from FAA Order 8900.1, Flight Standards Information Management System, Volume 7, Investigation, which defines the following categories: critical, potential, and low potential. Refer to Section 8 for the complete definitions of these categories.
3.8.4.2.1 Determining Severity of NAS Equipment Hazard Effects S RM must be conducted throughout the AMS lifecycle in accordance with the S R M G S A and AMS policy on the FAA Acquisition System Toolset website . As such, the inherent functional severity of certain NAS equipment ha zard effects has been analyzed and assessed .
When performing SRM on NAS equipment that was previously evaluated , it is recommended to use the data, methodology, and results of the previous work as the starting point for the new risk analysis. If there are differences in functionality between the original system and the system undergoing analysis, the differences should be accounted for and documented in the new risk analysis.
In general, NAS equipment can fail such that one of two effects is expected: Loss of Function. The service is no longer provided.
Malfunction. The service is being provided inaccurately or with diminished integrity.
When identifying functional failures that lead to hazards, the loss of function and the malfunction of constituent parts must be con sidered. The severity of malfunctions and losses of function from infrastructure systems, such as telecommunications and power systems, is dependent upon the services they support.
3_SMSM_202 21 2 38 Originally published December 202 2 Uncontrolled copy when downloaded Section 3 The Safety Risk Management Process Examples of the systems that provide services include, but are not limit ed to, the following: Navigation (NAV) Instrument approach systems : Localizer, glide slope (e.g., visual glide slope indicators, such as Precision Approach Path Indicator and Visual Approach Slope Indicator), Ground - Based Augmentation System, markers, appr oach lights, Distance Measuring Equipment, Localizer - Type Directional Aid, and Runway Visual Range En Route guidance systems : Very - High Frequency Omnidirectional - Range Radio, Tactical Air Navigation, Distance Measuring Equipment, and Wide - Area Augmentation System Communication (COMM) Air - to - ground COMM : Headsets/microphones, speakers, voice switches, radio control equipment, and radios Ground - to - ground COMM : Headsets/microphones, speakers, and voice switches Surveillance Automatic Dependent Surveillance – Broadcast (ADS - B), Airport Movement Area Safety System (AMASS), Automated Radar Terminal System (ARTS), Airport Surface Detection Equipment (ASDE), Air Route Surveillance Radar (ARSR), Air Traffic Control Radar Beacon Sys tem (ATCRBS), Mode Select Beacon System (MODES), Wide Area Multilateration (WAM), and Standard Terminal Automation Replacement System (STARS) Weather Automated Surface Observing System (ASOS), Automated Weather Observing System (AWOS), Low - Level Wind Shear Alert System, Flight Service Automation System , Operations and Supportability Implementation System, Next Gen eration Weather Radar, Terminal Doppler Weather Radar, Weather and Radar Processor, and Weather Messag e Switching Center Replaceme nt 3.8.4.2.2 Using the NAS Equipment Worst Credible Severity Table When determining the severity of hazards related to NAS equipment, use the “NAS Equipment” row in Table 3.3 in conjunction with Table 3.4 . Table 3.4 , the NAS Equipment Worst Credible Severity Table, is the starting point for determining severity of NAS equipment. The severity of hazards that result from specific equipment changes may be lower or higher than the worst case presented in Table 3.4 due to the possible controls that limit exposure or the interactions and dependencies that exist with other systems. Losses in equipment functionality and equipment malfunctions may not necessarily be traceable to a loss in separation ; therefore, losses of separation should be addressed independently .
The severity levels in Table 3.4 are derived from the operational safety assessments and other documentation produced during initial safety assessments completed as part of the AMS processes that define severi ty based on the inherent functionality of systems. References to high or low traffic are relative indications during a period of time at any given facility.
3_SMSM_202 21 2 39 Originally published December 202 2 Uncontrolled copy when downloaded Section 3 The Safety Risk Management Process Table 3.4: NAS Equipment Worst Credible Severity Table Failure Environment / Worst Credible Service Functionality Effect Condition/Hazard System State Severity/Rating Insufficient IMC, CAT III, reaction time Hazardous critical phase of for pilot to flight (i.e., near or Large reduction execute immediately after in safety margin missed touchdown) approach IMC, CAT I/II Loss of function Minor Missed All, CAT III, Increased flight approach non - critical phase crew workload of flight Minimal Pilot has to VMC take over Flight crew manual control inconvenience Hazardously Instrument Minor Misleading NAV approach Day, VMC Information Increased flight guidance (HMI), missed crew workload approach Pilot Major penetrates Significant Night, VMC Obstacle reduction in Clearance safety margin Surface (OCS) Malfunction Catastrophic HMI exceeds monitor limits Collision and penetrates between aircraft OCS and obstacles IMC HMI exceeds Hazardous monitor limits Large reduction but does not in safety margin penetrate OCS Visual Glide Loss of function Night, VMC None No safety effect Slope Indicators (Precision Major Approach Path Pilot Indicator / Significant Malfunction Night, VMC penetrates Visual reduction in OCS Approach Slope safety margin NAV Indicator) Pilot Minor transitions to En route Loss of function IMC alternate Slight reduction guidance navigation in safety margin method 7 . Risk should be determined with regard to its operational impact on the provision of air traffic management and/or communication, navigation, and surveillance services.
3_SMSM_202 21 2 40 Originally published December 202 2 Uncontrolled copy when downloaded Section 3 The Safety Risk Management Process Failure Environment / Worst Credible Service Functionality Effect Condition/Hazard System State Severity/Rating Hazardous HMI exceeds Malfunction IMC minimum en Large reduction route altitude in safety margin Minor Runway visual Loss of function / Missed IMC Increased flight range malfunction approach crew workload Major Large increase in ATC workload High traffic Significant or Pilots slight reduction unable to in safety margin Loss of single communicate frequency with ATC on Minor that frequency Significant increase in ATC Low traffic workload Air - to - ground Slight reduction in safety margin COMM Hazardous High traffic Large reduction Pilots unable to in safety margin Simultaneous loss communicate of multiple with ATC on Major frequencies multiple Significant Low traffic frequencies reduction in safety margin Minor ATC Ground - to - transitions to Significant Loss of function All ground alternate increase in ATC communication workload Major Significant High traffic reduction in ATC loss of safety margin Loss of function situational awareness Minor Aircraft/vehicle Low traffic Slight reduction position in safety margin Surveillance Major ATC makes Significant Malfunction All decisions reduction in based on HMI safety margin Minor ATC loss of ability to Significant Aircraft data Loss of function All differentiate increase in ATC among aircraft workload 3_SMSM_202 21 2 41 Originally published December 202 2 Uncontrolled copy when downloaded Section 3 The Safety Risk Management Process Failure Environment / Worst Credible Service Functionality Effect Condition/Hazard System State Severity/Rating ATC makes decisions Major based on Significant Malfunction All incorrect reduction in aircraft safety margin identification information ATC not Major alerted when aircraft exceed Significant Loss of function All established reduction in safety safety margin Alerts parameters Minimal Malfunction All False alarms Slight increase in ATC workload Minor ATC transitions to Significant Interfacility data Loss of function All manual increase in ATC methods workload Adverse Minimal weather Loss of function All information Flight crew Adverse reported as inconvenience weather unavailable information (Adverse Major Adverse Weather weather Malfunction: Significant All weather not includes wind failure to detect reduction in reported shear, safety margin thunderstorms, icing, IMC, etc.)
Minimal Adverse Malfunction: All weather falsely Flight crew false detection reported inconvenience 3.8.4.3 Determining Likelihood 3.8.4.3.1 Likelihood versus Frequency Likelihood is defined as the estimated probability or frequency, in quantitative or qualitative terms, of a hazard’s effect or outcome. More specifically, the concept of likelihood can be separated into two components: likelihood/probability and frequency. Frequency is an expression of how often a given effect occurs; it is a known value determined (for example) by monitoring a hazard and its effects to identify initial, current, or residual risk (see Section 4.3.1 and Section 4.3.4 ). Conversely, likelihood is an expression of the probability of a hazard’s effects occurring (i.e., a rate of how often a given effect is expected to occur), which is used to estimate initial and predicted residual risk. Provide a rationale for likelihood estimations in the HAW.
3_SMSM_202 21 2 42 Originally published December 202 2 Uncontrolled copy when downloaded Section 3 The Safety Risk Management Process 3.8.4.3.2 What to Consider When Defining Likelihood Frequency and Modeling Frequency is sometimes used to help estimate likelihood, but historical data do not always represent future conditions. Historical frequency may be zero for a given procedure, but that does not mean that the future likelihood is also zero. For example, a facility may conduct a procedure that has unreported incidents that could lead to an undesirable outcome, such as a loss of separation or a collision. Likewise, a facility may not have encountered the scenario or system state that exposes the more severe outcome. Consider all potential effects that are derived from indicators of the operation in all credible scenarios. This practice is required to challenge the philosophy of, “It has not happened in the past, so it will not happen in the future.” When possible, use modeling t o examine the effects of hazards that are too rare to have significant historical statistical data available. If modeling is required and data are available, the risk analysis should be based on statistical or observational data (e.g., radar tracks). Where there are insufficient data to construct statistical risk assessments, input from SRM panel members and Subject Matter Experts (SMEs) can be used. This means that if the tru e rate of a particular type of operation is unknown, it can be estimated using expert judgment. It is important to note that complex proposed NAS changes, such as changes to separation standards, require quantitative data to support the associated risk an alysis.
Credible Effects and Controls Analyze the likelihood of all credible effects to: ( 1) Determine the highest potential risk and ( 2) Identify all system states that expose the risk. Remember that less severe effects may occur more frequently, produci ng a higher risk ; this is why it is important to determine the likelihood of all credible effects. Consider controls when determining likelihood because they may minimize the likelihood of an effect.
Crossing FAA LOBs When a NAS change crosses FAA LOBs, c onsult with the affected parties; the provisions of FAA Order 8040.4 apply.
3.8.4.3.3 Calculating Likelihood with Quantitative Data Once the credible effects and the estimated rates of occurrence have been determined, it is possible to calculate a likelihood rating. The Operations Network database is the official source of NAS air traffic operations data.
To estimate the likelihood, first determine the expected number of times the credible effect will occur (i.e., the number of times that the hazard will occur in the system state that will expose the risk). Then, divide that value by the number of ATO oper ations, flight hours, or operational hours in which the effect is exposed (i.e., the number of ATO operations, flight hours, or operational hours affected by the proposed NAS change or the existing hazard). Finally, compare the result of this calculation (presented below) to the ranges presented in Table 3.5 to determine the likelihood rating.
8 . For guidance on how to design and conduct modeling in support of safety risk analyses, refer to AOV S afety O versight C ircular 07 - 05 A , Guidance on Safety Risk Modeling and Simulation of Hazards and Mitigations .
3_SMSM_202 21 2 43 Originally published December 202 2 Uncontrolled copy when downloaded Section 3 The Safety Risk Management Process Identify which likelihood unit to use to analyze the effect’s maximum exposure rate (i.e., the number of ATO operations, flight hours, or operational hours). For example, for the following environments, the number of ATO operations will often be the most appropriate likelihood unit to use when analyzing the exposure of an effect: a Terminal Radar Approach Control (TRACON ) facility ; ARTCC with small, busy sectors; or an ATCT . However, when determining occurrences of an effect in the Oceanic domain or for an ARTCC with a larger sector, often the number of flight hours may be more appropriate. System acquisitions or modifications will use units of operational hours. Whether the NAS change applies to a single facility or to an entire NAS domain, it is important to use the relevant number of ATO operations in which the hazard may occur when calculating likelihood.
Table 3.5: Likelihood of the Effect Standards – ATO Operations and NAS Equipment Operations: Expected Occurrence Rate (per operation / flight hour / operational hour ) Quantitative (ATC / Flight Procedures / Systems Engineering) Frequent (Probability) ≥ 1 per 1 , 000 A Probable 1 per 1 , 000 > (Probability) ≥ 1 per 100,000 B Remote 1 per 100,000 > (Probability) ≥ 1 per 10,000,000 C Extremely Remote 1 per 10,000,000 > (Probability) ≥ 1 per 1,000,000,000 D Extremely Improbable 1 per 1,000,000,000 > (Probability) ≥ 1 per 10 E The values in Table 3.5 are derived from an analysis of historical ATC data mapped to the established engineering standard ( Advisory Circular 25.1309 - 1, System Design and Analysis ) and can be applied to both ATC and Flight Procedures. The ratios binding each expected occurrence rate range were determined through calculations made using ten years of aviation data. In each calculation, the numerator was the number of occurrences of a given severity level occurring during a ten - year period, as obtai ned from various relevant databases. The denominator was the number of ATO operations (or flight hours) in that ten - year period, as obtained through the Operations Network database or the National Transportation Safety Board database. The value was adjus ted to reflect a forecasted air traffic increase. A cut - off point of - 14 10 was established to define the boundaries of credible events for the purposes of calculating likelihood. Figure 3.6 depicts the likelihood continuum an d the expected occurrence rate ranges.
9 . It is important to note that the close correlation between flight hours and operations is entirely coincidental; average flight time is roughly two hours, and each flight has about two T ower and two TRACON operations. The two numbers are not interchangeab le.
3_SMSM_202 21 2 44 Originally published December 202 2 Uncontrolled copy when downloaded Section 3 The Safety Risk Management Process Figure 3.6: Likelihood Continuum 3.8.4.3.4 Determining Likelihood When No Data Are Available For some NAS changes, the necessary data are not available. There may not be a similar enough change/procedure/situation in the NAS to provide similar data from which to estimate a rate of occurrence. When unable to use modeling, S ME input can be u tilized by SRM panel members to provide a qualitative approach to determine likelihood. This approach is only recommended when all avenues of data collection have been exhausted or when the change proponent is attempting to implement a new oper ation for which no data exist. For a majority of changes to the NAS, data from a similar NAS change may be collected and analyzed to determine the number of expected occurrences of an effect.
Table 3.6 presents calendar - based approximations of NAS - wide effect occurrences. This table only applies if the proposed NAS change or existing hazard affects all ATO operations in a particular air traffic domain.
Table 3. 6 : Cale ndar - Based Likelihood of the Effect Definitions – Operations/Domain - Wide Operations: Expected Occurrence Rate (Calendar - based) (Domain - wide: NAS - wide, Terminal, or En Route) Frequent Equal to or more than once per week A Probable Less than once per week and equal to or more than once per three B months Remote Less than once per three months and equal to or more than once per C three years Extremely Remote Less than once per three years and equal to or more than once per 30 D years Extremely Improbable Less than once per 30 years E 3.9 DIA A T Phase 4: Assess Risk ASSESS Assign risk level for each hazard based on severity and likelihood
RISK A
3.9.1 Overview In this phase, identify each hazard’s associated initial risk and plot each hazard on a risk matrix.
When assessing and mitigating safety risk, first determine the risk level prior to the implementation of any safety requirements (see Section 3.10 .3 ) . Initial risk describes the 3_SMSM_202 21 2 45 Originally published December 202 2 Uncontrolled copy when downloaded Section 3 The Safety Risk Management Process composite of the severity and likelihood of a hazard ’s effect , considering only control s and documented assumptions for a given system state. It describes the risk before any of th e proposed mitigations are implemented.
When analyzing and assessing N AS equipment or existing hazard s, the initial risk may be equated to the current risk , which is defined as the composite of severity and frequency of a hazard’s effects in the present state.
3.9.2 Risk Levels and Definitions Record all hazards and their associated risk levels. Hazards are assigned one of three risk levels: high, medium, or low. The A TO and its employees are responsible for identifying and mitigating hazards with unacceptable risk (i.e., high risk). Likewise, the ATO should determine if hazards with acceptable risk (i.e., medium and low risk) can be further mitigated.
3.9.2.1 High Risk This is unacceptable risk, and the NAS change cannot be implemented unless the hazard’s associated risk is mitigated to medium or low. Existing high - risk hazards also must be reduced t o medium - or low - risk hazards . The predicted residual risk must be monitored and tracked in relation to the safety performance targets . The predicted residual risk must be confirmed with objective evidence suggesting an impact to the hazard’s causes or e ffects .
Hazards with catastrophic effects that are caused by single point failures, common cause failures, or undetectable latent events in combination with single point or common cause failures are considered high risk, even if the possibility of occurrence is extremely improbable.
When a system has a single point failure , there is a failure of one independent element of the system that causes or could cause the whole system to fail. The system does not have a back - up, redundancy, or alternative procedure to compensate for the failed component. An example of a single point failure is found in a system with redundant hardware, in which both pieces of hardware rely on the same battery for power. In this case, if the battery fails, the entire system will fail.
A common cause failure is a failure that occurs when a single fault result s in the corresponding failure of multiple system components or functions . An example of a common cause failure is found in a system wit h redundant computers running on the same software, which is susceptible to the same software bugs.
3.9.2.2 Medium Risk Although initial medium risk is acceptable, it is recommended and desirable that safety requirements be developed to reduce severity and/or likelihood. The risk must be monitored and tracked in relation to the safety performance targets . The predicted residual risk must be confirmed with objective evidence suggesting an impact to the hazard’s causes or effects .
Refer to Section 4.2 for information on monitoring.
A catastrophic severity and corresponding extremely improbable likelihood qualify a s medium risk, provided that the effect is not the result of a single point or common cause failure. If the cause is a single point or common cause failure, the hazard is categorized as high risk.
3_SMSM_202 21 2 46 Originally published December 202 2 Uncontrolled copy when downloaded Section 3 The Safety Risk Management Process 3.9.2.3 Low Risk This is acceptable risk without restriction or limitation. It is not mandatory to develop safety requirements for low-risk hazards; however, develop a monitoring plan with at least one safety performance target.
3.9.3 Plotting Risk for Each Hazard The risk matrix shown in Figure 3.7 is used to determine risk levels. Plotting the risk for each hazard on the matrix helps to prioritize treatment. The rows in the matrix reflect the likelihood categories, and the columns reflect the severity categories. Adhere to the following guidelines when plotting risk for each hazard: • Plot a hazard’s risk according to its associated severity and likelihood.
• To plot the risk for a hazard on the risk matrix, select the appropriate severity column (based on the severity definitions in Table 3.3 ) and move down to the appropriate likelihood row (based on the likelihood definitions used from either Table 3.5 or Table 3.6 ).
• Plot the hazard in the box where the severity and likelihood of the effect associated with the hazard intersect.
• If the plotted box is red, the risk associated with the hazard is high; if the box is yellow, the risk associated with the hazard is medium; and if the box is green, the risk associated with the hazard is low. As shown in the split cell in the bottom right corner of the matrix, hazards with a catastrophic severity and extremely improbable likelihood can be medium or high risk, depending on the cause, as explained in Section 3.9.2.1 .
Use this SMS Manual and the risk matrix in Figure 3.7 for all SRM panels in which the ATO accepts the risk. When an FAA LOB other than the ATO is required to accept the safety risk, FAA Order 8040.4, and the risk matrices therein, apply. FAA Order 8040.4 also applies with regard to acceptability of risk levels at the agency level when crossing LOBs.
3_SMSM_202212 31 Originally published December 2022 Uncontrolled copy when downloaded Section 3 The Safety Risk Management Process FAA Order 8040.4 , and the risk matrices therein, appl y . FAA Order 8040.4 also applies with regard to acceptability of risk levels at the agency level when crossing LOBs .
Severity Likelihood Minimal Minor Major Hazardous Catastrophic 5 4 3 2 1 Frequent Low Medium High High High A Probable Low Medium High High High B Remote Low Medium High High Medium C Extremely Low Low Medium High Remote Medium D High* Extremely Low Low Low Improbable Medium E Medium *Risk is high when there is a single point or common cause failure.
Figure 3.7: Risk Matrix 3.10 DIAA T Phase 5: Treat Risk Choose risk management strategies Develop safety performance targets TREAT RISK
T
Develop monitoring plan 3.10.1 Overview In this phase, identify appropriate means to mitigate or manage the safety risk. Treating risk involves: Identifying appropriate safety requirements, Defining safety performance targets or a sound alternate method to verify the predicted residual risk fo r each hazard, and Developing a monitoring plan that prescribes tasks and review cycles for comparing the current risk to the predicted residual risk.
3.10.2 Risk Management Strategies To address safety risk, identify and evaluate means that either manage the ris k or reduce it to an acceptable level. The four risk management strategies are risk control, risk avoidance, risk transfer, and risk assumption. Assess how the proposed risk management strategy affects the overall risk. Consider using a combination of a ctions to best manage or reduce the risk to an 3_SMSM_202 21 2 48 Originally published December 202 2 Uncontrolled copy when downloaded Section 3 The Safety Risk Management Process acceptable level. When determining the appropriate strategy, consider how the safety performance target (see Section 4.1 ) will be used to evaluate the safety performance of the chosen course of action.
3.10.2.1 Risk Control A risk control strategy involves the development of safety requirements , defined as planned or p roposed means to reduce a hazard’s causes or effects. Examples include policies or procedures, redundant systems and/or components, and alternate sources of production. R efer to Section 3.10 .3 for information on d ocumenting safety requirements.
An explanation of how a safety requirement reduced the hazard’s risk level — ultimately supported with objective evidence through testing, monitoring , or an other method — must be provided for each safety requirement. All safety requirements that are implemented and are determined to have successfully addressed the hazard or safety issue become part of the operating NAS. At that time, they will be considered controls that form the basis for future SRM efforts. Refer to Section 3.8 .2 for information on controls .
3.10.2.2 Risk Avoidance The risk avoidance strategy averts the potential occurrence and/or consequence of a hazard by either selecting a different approach or not implementing a specific proposal. This technique may be pursued when multiple alternatives or options are available, such as determining where to construct an ATCT . In some cases, a decision may be made to limit the NAS change to certain conditions or system states, thereby avoiding the risk associated with other conditions.
An example of this is allowing simultaneous operations on one runway t hat is overflown by three other runway flight paths. It may be discovered that the risk associated with the simultaneous operation can be mitigated to an acceptable level for two of the runways but not for the third. It may be decided that aircraft will not be allowed to operate on the third runway while simultaneously landing on the crossing runway, thereby avoiding risk.
A Comparative Safety Assessment (CSA) may be used when multiple systems or procedures are available. If one alternative cannot be mitigated to an acceptable level, then another system, method, or procedure may be chosen. When no alternatives are available, the risk avoidance strategy is more likely to be used as the basis for a “go” or “no - go” decision at the start of an operation or program. Risk must be avoided from the perspective of all affected stakeholders. Thus, an avoidance strategy is one that involves all of the stakeholders associated with the proposed NAS change.
3.10.2.3 Risk Transfer The risk transfer strategy shifts the owne rship of risk to another party; the recipient may be better equipped to mitigate the risk at the operational or organizational level. Organizations transfer risk primarily to assign responsibility to the organization or operation most capable of managing it. The recipient must accept the risk, and the transfer must then be documented (e.g., through a Letter of Agreement or Memorandum of Agreement).
Examples of risk transfer may include: The transfer of aircraft separation responsibility in applying visual separation from the air traffic controller to the pilot, 10 . Refer to Section 2.8 for information about the Safety Order of Precedence.
11 . See the SRMGSA for more information on CSAs.
3_SMSM_202 21 2 49 Originally published December 202 2 Uncontrolled copy when downloaded Section 3 The Safety Risk Management Process The development of new policies or procedures to change ownership of a NAS component to a more appropriate organization, The procurement of contracts for specialized tasks from more appropriate sources (e.g., contract maintenance), and The transfer of A TC systems from the acquisition organization to the organization that provides maintenance.
Transfer of risk cannot be the only method used to treat a high - risk hazard. Identify safety requirements to lower the safety risk to medium or low before it can be accepted in the NAS. All transferred risks must be monitored until the predicted residual risk is verified by the appropriate organization.
3.10.2.4 Risk Assumption The risk assumption strategy simply means accepting the risk. The risk acceptor assumes responsibility for the risk as it is. When a risk acceptor agrees to implement a NAS change, they agree to implement it based on the predicted residual risk being medium or low and assume responsibility for the risk. When this management strategy is used, the predicted residual risk is derived from the controls. Under this strategy, controls serve as the basis on which s afety performance targets or alternate methods to verify predicted residual risk are developed. It is recommended and desirable that safety requirements be developed to further mitigate risk or reduce likelihood or severity.
It is not permissible to use a risk assumption strategy to treat an initial or current high risk associated with a hazard. The predicted residual risk for initial high - risk hazards must be medium or low before it can be accepted into the NAS.
3.10.3 Documenting Safety Requirements All safe ty requirements identified by the SRM panel attendees and included in the HAW are considered to be recommendations for review and approval by the appropriate signatories .
After appropriate means of managing risk have been developed and documen ted , management officials may identify the effect of safety requirements on other organizations and coordinate with the affected organizations.
If any safety requirement affects the safe provision of a ir t raffic m anagement services, i t may be necessary for th e safety requirement to undergo the SRM process to determine its effect on the NAS .
Refer to Section 5 .3 for more information on safety requirements ’ approval and implementation decision - making and sig natures.
3.10.4 Determin ing Predicted Residual Risk Predicted residual risk is the risk that is estimated to exist after the safety requirements are implemented or after all avenues of risk mitigation have been explored. The predicted residual risk is based on the assumption that controls are in place and/or all safety requirements are implemented and are valid. If safety requirements are not documented in the HAW, predicted residual risk should be the same as the initial risk.
If the risk cannot be re duced to an acceptable level after attempting all possible risk reduction strategies, either revise the original objectives or abandon the proposed NAS change. If an acceptable proposal is not identified, the NAS change cannot be implemented. Similarly, if a 3_SMSM_202 21 2 50 Originally published December 202 2 Uncontrolled copy when downloaded Section 3 The Safety Risk Management Process NAS change was implemented without safety requirements and the predicted residual risk was not met, r efer to Section 4.3.2 for more information.
3_SMSM_202 21 2 51 Originally published December 202 2 Uncontrolled copy when downloaded Section 4 Developing Safety Performance Targets and Monitoring Plans 4.1 Develop ing Safety Performance Targets Safety performance targets are measurable goals used to verify the predicted residual risk of a hazard. A safety performance target is the preferred means to relate the performance of risk reduction efforts to the expected risk level. The safety performance target is included as p art of the monitoring plan (see Section 4.2 ).
Safety performance targets are used to assess safety performance with respect to control s and newly implemented safety requirements. Do not define the worst credible effect or ef fects producing the highest risk level as the safety performance target; instead, look at the less severe effects or indicators (e.g., the number of unauthorized vehicle deviations on taxiways per a specific number of airport operations over a period of ti me) . Safety performance targets should be related to the hazard or N ational A irspace S ystem (NAS) change.
When developing safety performance targets, the S afety R isk M anagement (SRM) panel attendees should apply the data used during the “ Analyze Risk ” phas e to determine the appropriate metrics to monitor. If there is no established data source to support a proposed safety performance target, then a means to begin collecting th e data should be identified and documented as a safety requirement . Data used during the SRM process also serve as th e basis for comparison against the post - implementation metrics.
Mapping a hazard to a specific safety performance target may not be possible in terms of establishing a causal relationship. In such cases, identify a sound alternate method to verify the pre dicted residual risk and determine whether control s and/or safety requirements a re appropriate and functioning as intended.
It is important to retain objective evidence that the safety requirements have been implemented.
Objective evidence is simply docum ented proof. The evidence must not be circumstantial; it must be obtained through observation, measurement, testing, or other mean s.
4.2 Developing the Monitoring Plan The monitoring plan should be comprehensive enough to verify the predicted residual risk. The monitoring plan includes either the safety performance targets or another sound method for verify ing the predicted residual risk. The SRM panel should c reate a plan for each hazard that defines: Monitoring activities; The frequency and duration of tracking monitoring results; and How to determine, measure, and analyze any adverse effects on adjoining systems.
4.2.1 Monitoring Activities The risk acceptor, or the monitoring Point of Contact (POC) identified by the risk acceptor, must verify that the control s and/or safety requirements were implemented and are functioning as designed. Specifically, this means that procedures must be str ingently followed and hardware or software must function within the established design limits.
Detail the methods by which the risk acceptor , or the monitoring POC identified by the risk acceptor, will gather the performance data and monitoring results . The organization that 1 . Acquisition programs should refer to the S afety R isk M anagement G uidance for System Acquisitions (SRMG SA ) for guidance on safety performance targets .
2 . Segmented or phased acquisition programs should refer to the SRMGSA for guidance on monitoring .
4_SMSM_202 21 2 52 Originally published December 202 2 Uncontrolled copy when downloaded Section 4 Developing Safety Performance Targets and Monitoring Plans accepted the risk is accountable for ensuring that the monitoring plan is being upheld (i.e., that the monitoring results are being compared to the defined safety performance targets ( or the results alone are being used) to determine whether predicted residual risk is being me t) . Refer to Sectio n 5 .4 for information about risk acceptance.
4.2.2 Frequency and Duration of Monitoring When considerin g the frequency and duration of tracking monitoring results, account for: The complexity of the NAS change, The hazard’s initial risk level, How often the hazard’s effect is expected to occur in the defined system state (i.e ., likelihood), Control s, The types of safety requirements that are being implemented (if any), and The amount of time needed to verify the predicted residual risk.
For example, when considering a hazard associated with the familiarity of a new procedure, a relatively short tracking pe riod would be required until a person or population could reasonably be expected to adapt to the new procedure and the predicted residual risk could be verified .
However, the monitoring plan for a hazard associated with new separation criteria may require several years of tracking to verify the predicted residual risk.
Refer to Annex A f or documentation requirements of a complete monitoring plan for an individual hazard.
4.3 Post - SRM Monitoring It is critical to obtain feedback on safety performance indicators through continuous monitoring.
Organizations responsible for performing Quality Control and/or Quality Assurance use audits and assessments to monitor the safety risk and performance of an implemented N AS change documented in the monitoring plan. The responsible organization determines whether an implemented NAS change is meeting the safety performance targets documented in the monitoring plan.
Results of post - implementation monitoring help determine whether a change can be made part of the operating NAS or must be readdressed through the S RM process.
4.3.1 Monitoring and Current Risk A hazard’s current risk is updated at each monitoring int erval (in accordance with stated monitoring frequency). Current risk provides an indicator of whether safety requirements are meeting the predicted residual risk. The risk acceptor is accountable for ensuring that the monitoring plan is being upheld and that monitoring reports, as dictated by the monitoring frequency, are being analyzed to determine whether the safety performance targets are being met .
4.3.2 Predicted Residual Risk Is Not Met Through monitoring current risk and the safety performance of a recently implemented NAS change, it may become clear that the predicted residual risk is not being met. If this occurs, notify the risk acceptor. The risk acceptor may choose to accept the current risk as the new 4_SMSM_202 21 2 53 Originally published December 202 2 Uncontrolled copy when downloaded Section 4 Developing Safety Performance Targets and Monitoring Plans predicted residual risk or to reconvene the SRM panel for additional safety requirement considerations. In either case, the SRM document must be revised with the new safety requirements (if identified) and new predicted residual risk, and approval and risk acceptance signatures must be reobtained (refer to Section 5.4.1 for information on risk acceptance authority).
There are several reasons why the predicted residual risk may not be met: The safety requirements or controls may not be properly mitigating the risk, The initial risk may have been analyzed inaccurately, Unintended consequences may have occurred, or New hazards may have been identified.
Refer to Section 5.7 for information on updating SRM documentation.
4.3.3 Predicted Residual Risk Is Met The successful completion of monitoring is a prerequisite to hazard and NAS change closeout.
This includes the achievement of safety performance targets and/or the predicted residual risk.
The monitoring procedures used to verify the predicted residual risk must also be documented, as they will be used to evaluate the safety performance of the change after it is added to the operating NAS. The established monitoring requirements must be followed, even after meeting the goals of the monitoring plan.
4.3.4 Residual Risk Residual risk is the level of risk that has been verified by completing a thorough monitoring plan with an achieved measurable safety performance target(s). It is the composite of the severity of a hazard’s effect and the frequency of the effect’s occurrence.
4.3.5 Monitoring and Tracking of Changes Added to the Operating NAS A change is considered part of the operating NAS only after monitoring through existing Safety Assurance processes is completed, the safety performance target is achieved and maintained, and/or the predicted residual risk is verified. The NAS change and all the associated safety requirements become part of the operating NAS, which will become the basis from which all future NAS changes will be measured. If a safety requirement is altered or removed from a NAS change that was made part of the operating NAS, SRM must be performed.
The documentation that was developed during the SRM process is critical to Safety Assurance functions, which often use SRM documents as inputs to assessments and evaluations.
4_SMSM_202 21 2 54 Originally published December 202 2 Uncontrolled copy when downloaded Section 5 Risk Acceptance and Safety Documentation Review 5.1 Risk Acceptance and Approval The review and approval of Safety Risk Management (SRM) documents and acceptance of any safety risk is designed to maintain and assure the quality of Air Traffic Organization (ATO) risk management activities. There are key variables that affect safety risk acceptance and SRM documentation review and signature requirements. They include the organization(s) affected by the proposed National Airspace System (NAS) change, the organization that developed the document, the risk(s) associated with the NAS change, and whether the NAS change is considered national or local in scope. There are several signature authorities associated with SRM documentation: concurrence, approval, risk acceptance, and safety requirement implementation. Refer to Section 5.2 for information regarding nationally and locally scoped changes.
For guidance on specific signature types, refer to Sections 5.3 through 5.6. Tables 5.1 through 5.4 summarize the SRM document signature requirements. The terms “affected facilities” and “affected Service Units ” refer to the facilities or organizations that are impacted by the safety risk associated with the NAS change or existing safety issue.
Note: Table 5.1 is not to be used for SRM documents with an unacceptable (high) predicted residual risk (see Table 5.4).
Table 5.1: Signatures for SRM Document Approval and Risk Acceptance (Use with Annex A, Section 1.4, Completing the SRM Documentation) (1) (2) (14) (15) Requires AOV Initial Required SRM Required Safety Risk Type of Approval/Acceptance? Predicted Document Approval Acceptance Change (3) Risk Level Signatures (4) Signatures (16) Support Managers or ATMs or Technical Low/Medium System Support Center No Operations Managers of (5) Managers of the affected the affected facilities facilities (6) Support Managers (6) or ATMs or Technical Low/Medium S ystem Support Center Local Operations Managers of (5) Managers, AJI - 3 Director the affected facilities (8) (9) Yes Headquarters Director (s) or Technical Op erations Vice President of the High (7) Service Area Director, affected Service Unit AJI - 3 Director (8) Yes/No Headquarters Group Headquarters Low/Medium M anager of the change Director(s) of the (5) proponent, AJI - 3 Director affected Service Unit(s) (8) National Headquarters Director(s) of the affected Service Vice President(s) of the High (7) Unit(s), affected Service Unit(s) AJI - 3 Director (8) 5_SMSM_202 21 2 55 Originally published December 202 2 Uncontrolled copy when downloaded Section 5 Risk Acceptance and Safety Documentation Review Requires AOV Initial Required SRM Required Safety Risk Type of Approval/Acceptance? Predicted Document Approval Acceptance Change (3) Risk Level Signatures (4) Signatures (16) Director of Mission Support Services Strategy , Headquarters Low/Medium Director of P rogram Director(s) of the (5) M anagement affected Service Unit(s) O rganization , AJI - 3 (1 3 ) Director (1 1 ) (1 2 ) Acquisitions Yes/No (10) Director of Mission Support Services Strategy , Vice President(s) of the Director of P rogram High (7) affected Service Unit(s) M anagement (1 3 ) O rganization , AJI - 3 Director (1 1 ) (1 2 ) Notes: (1) The change proponent must ensure that the SRM document is entered into the Safety Management Tracking System (SMTS) for tracking and monitoring the status of the NAS change / existing safety issue .
(2) Signature responsibility may only be delegated from a Director to a Deputy Director.
(3) The changes that require Air Traffic Safety Oversight Service (AOV) approval are listed in Federal Aviation Administration ( FAA ) Order 1100.161, Air Traffic Safety Oversight .
I f there is an initially identified high - risk hazard, AOV must approve the means to reduce safety risk and the Service Area Director of Operations or Technical Operations Service Area Director and the Director of Safety and Technical Training (AJI) Policy and Performance, AJI - 3 , (8) must sign the document.
(4) If the AJI - 3 Directo r ’s approval is required, then t he proponent of an air traffic change / existing safety issue must send a copy of the SRM document to the Director of Air Traffic Operations (Service Area) for informational purposes only before submitting the SRM document to the AJI - 3 Dire ctor .
(5) In cases where medium or low safety risk and/or controls go outside of the ATO, the mitigations must be approved by the designated management officials within the other L ine s of B usiness (LOBs) and accepted by AOV.
(6) If a facility does not have a Support Manager, the Assistant General Manager or General Manager of the affected facility shall designate an SRM document approver.
(7) The AJI - 3 Director must submit safety cases with mea ns to reduce safety risk of any initially identified high - risk safety hazards to AOV for approval.
(8) If the change or existing safety issue meets the criteria for AOV approval, the AJI - 3 Director must submit it to AOV accordingly .
(9) SRM documents that accompany air traffic waiver requests must also be signed by the Service Area Director of Air Traffic Operations.
(10) See the Safety Risk Management Guid ance for System Acquisitions (SRMGSA) for details on which safety deliverables must be approved by the AJI - 3 Director or by the Program Management Organization (AJM) .
5_SMSM_202 21 2 56 Originally published December 202 2 Uncontrolled copy when downloaded Section 5 Risk Acceptance and Safety Documentation Review (11) Some s afety documentation developed for acquisition programs must undergo a peer review before signature, as described in the SRMGSA . Refer to Section 8 of the SRMGSA for more information.
(12) The Director o f Mission Support Services (AJV) Strategy, AJV - S, or their designee must provide their approv al when the safety requirements are not already documented in an approved Program Requirements Document ( PRD ) .
(13) Risk a cceptance must be obtained for SRM documents in which risk is identified , except for the Operational Safety Assessment and the Comparative Safety Assessment.
(14) For approval and/or risk acceptance outside of the ATO, AOV may facili tate signatures on behalf of the ATO. However, the Service Unit change proponent should obtain signatures from the affected organization (user) participating on the SRM panel.
(15) Second - Level Engineering should start with Table 5 .2 for their signature requirements.
(16) F ederal Contract Towers (F CTs ) can concur with but cannot accept risk into the NAS.
The General Manager or Assistant General Manager accepts risk on the behalf of the FCT.
5_SMSM_202 21 2 57 Originally published December 202 2 Uncontrolled copy when downloaded Section 5 Risk Acceptance and Safety Documentation Review Table 5 . 2 : Signatures for Second - Level Engineering SRM Document Approval and Risk Acceptance (1) (2) (3) Previous SRM Proposed Facilitated by Document Modification to Required SRM AJI or Required Identifying Approved Document Requires AOV Hazard (s) Safety Risk Safety System - Level Approval Approval or Identified? Acceptance Implications of Requirements?
Acceptance? Signatures Signatures the Proposed ( 5 ) ( 6 ) ( 7 ) (4) Modification?
Yes No additional SRM required Headquarters Headquarters Group Manager of Director(s) of Yes the change the affected proponent Service Unit(s) No Headquarters Group Manager of No None the change No proponent No See signature requirements in Yes Table 5 .1 Headquarters Yes Group Manager of No the change None proponent , AJI - 3 Director See signature requirements in Yes Table 5 .1 Headquarters Yes Group Manager of No the change None proponent , AJI - 3 Director Yes Yes/No See signature requirements in Yes Table 5 .1 Headquarters No Group Manager of No the change None proponent , AJI - 3 Director Notes : (1) Th is table applies to national - level NAS changes only. For local changes, refer to T able 5 .1 .
(2) The change proponent must ensure that the SRM document is entered into SMTS for tracking and monitoring the status of the NAS change / existing safety issue .
(3) Signature responsibility may only be delegated from a Director to a Deputy Director.
(4) System Level Requirements refer to the requir ements listed in the Final PRD .
(5) The changes that require AOV approval are listed in FAA Order 1100.161 .
5_SMSM_202 21 2 58 Originally published December 202 2 Uncontrolled copy when downloaded Section 5 Risk Acceptance and Safety Documentation Review (6) In cases where medium or low safety risk and/or controls go outside of the ATO, the means to reduce safety risk must be approved by the designated management officials within the other LOBs and accepted by AOV.
(7) The AJI - 3 Director must submit the means to reduce safety risk of any initially identified high - risk safety hazards to AOV for approval.
Table 5.3: Signatures for SRM Document Approval (Use with Annex A, Section 1.4, Completing the SRM Documentation) (1) (2) (4) Required SRM Document Type of Change Approval Signatures Director of Air Traffic Operations (Service Area) ; Assistant General Manager or General Local (3) Manager ; or Technical Operations Manager or Assistant General Manager Headquarters Director(s) of National affected Service Unit(s), AJI - 3 Director Headquarters Director(s) of Acquisitions (5) affected Service Unit(s), AJI - 3 Director Notes: (1) The change proponent must ensure that the SRM document is entered into SMTS for tracking and monitoring the status of NAS changes.
(2) Signature responsibility may only be delegated from a Director to a Deputy Director.
(3) For local changes, the SRM document is signed one level above the A ir T raffic M anager (ATM) at the facility completing the SRM document.
(4) This table does not apply to S econd - L evel E ngineering.
(5) See the SRMGSA for details on which safety deliverables must be approved by the AJI - 3 Director or by AJM .
Table 5.4: Signatures for SRM Document Approval for Proposed NAS Changes Only (Use with Unacceptable (High) Predicted Residual Risk) (1) (2) (3) Required SRM Document Type of Change Approval Signatures ATMs or Technical Operations Local (4) Managers of the affected facilities Headquarters Director(s) of the National affected Service Unit(s), AJI - 3 Director Notes: (1) When the predicted residual risk is unacceptable (high), AOV approval is not required.
5_SMSM_202 21 2 59 Originally published December 202 2 Uncontrolled copy when downloaded Section 5 Risk Acceptance and Safety Documentation Review (2) Per ATO S afety M anagement S ystem (SMS) policy, a high predicted residual risk is unacceptable and the NAS change in question must not be implemented. The SMTS submitter is responsible for notating this in SMTS and closing out the project . (See the SMTS User Manual . ) (3) Signature responsibility may only be delegated from a Director to a Deputy Director.
(4) For local changes, the SRM document is signed one level above the ATM at the facility comple ting the SRM document.
5.2 Scope of NAS Changes N AS changes are considered either local or national. A national NAS change is one fo r which a n AJI S afety C ase L ead (SCL) facilitates or leads the S RM effort or that meets at least one of the following criteria: The NAS change has high visibility or a potential political, economic, or financial impact to the F AA, the NAS, or the flying public.
The NAS change is the result of financial or operational decisions made by FAA executive management, Cabinet - level executives, or Congress.
The NAS change includes means to reduce any safety risk identified as part of the Top 5 P rogram.
The NAS change modifies safety policy that must be incorporated into a directive.
The NAS change could or does present operational or technical conflicts to multiple affected Service Units or FAA LOBs .
The NAS change will be implemented on a national level, affecting multiple facilities.
Note: There may be cases in which an AJI SCL facilitates a local SRM panel and none of the aforementi oned criteria apply. These changes will be considered local.
A NAS change is considered to be local if : I t does not meet any of the preceding criteria and it affects three or fewer S ervice D elivery P oints within a single Service Area , or It is a change proposed by Technical Operations that involves a single piece of equipment that is restricted to one district.
In cases where a NAS change affects two adjacent Service Delivery Points in different Service Areas or a single Terminal Radar Approach Control / A ir R oute T raffic C ontrol C enter with more than two underlying Airport Traffic Control Towers, the change proponent has the authority to determine if the change will be considered local or national in scope.
Note: M any systems and facilities that provide service in the NAS are not procured, owned, or maintained by the FAA or another f ederal entity. The FAA has the authority and responsibility to assur e the safety of these services in accordance with Title 49 of the United States Code Section 44505, System s, procedures, facilities, and devices , and Title 14 of the Code of Federal Regulations Part 1 71 , NON - FEDERAL NAVIGATION FACILITIES . Although a system/service 1 . AJI will typically identify t hese types of changes.
5_SMSM_202 21 2 60 Originally published December 202 2 Uncontrolled copy when downloaded Section 5 Risk Acceptance and Safety Documentation Review may not be procured by the FAA, implementation into the NAS is considered a NAS c hange and requires appropriate SRM as if the FAA were acquiring the system/service.
5.2.1 Local Implementation of National NAS Changes When the local implementation of a nationally scoped S RM document cannot foll ow the national standard, local SRM is required for the local deviations. If formal waivers are required in such cases, local SRM does not eliminate the waiver requirement.
5.3 Approving Safety Requirements An organization’s saf ety requirement approval signature represents its commitment to implementing the safety requirement in accordance with the associated SRM document. For acquisition systems, if the approved PRD contains the safety requirements referenced in the SRM document , no P oint o f C ontact (POC) signature is required. If the requirements are not listed in the approved P RD, the SRM document must include a POC signature for each additional safety requirement.
5.3.1 Appropriate Signatories Safety requirement signature authority must be at the manager ial level with the ability to fund and ensure the implementation of the safety requirement. The appropriate signing official may be determined by the FAA organization. When multiple officials a re responsible for providing safety requirements signatures for an SRM document, they must share similar managerial status es or responsibilit ies .
When an organization outside of the F AA is responsible for a safety requirement, a signature on file is required. This requirement may be met through a memorandum or an SRM document .
The change proponent is responsible for following up on the status of the implementation of safety requirements identified in the SRM document .
5.3.2 Endorsing Implementation of S afety Requirements All safety requirements that the SRM panel attendees identify must be accounted for in the SRM document . The change proponent and appropriate safety requirement(s) POC(s) must collaborate to determine which safety requirements will be approved for implement ation and notate that decision in the SRM document. The risk acceptor is accountable for ensuring that all approved safety requirements are implement ed and all monitoring activities are recorded in SMTS.
5.3.2.1 Safety Requirements Planned for Implementation All safety requirements included in the H azard A nalysis W orksheet (HAW) of the signed SRM document must be implemented before or in conjunction with the NAS change, even when the risk is classified as medium or low. All organizations responsible for implementing a safety requirement must: 1. Sign the SRM document for the safety requirement approval, 2. Document the status of the safety requirement (e.g., implemen ted, not implemented, or in progress), and 3. Record objective evidence supporting the safety requirement’s implementation .
5_SMSM_202 21 2 61 Originally published December 202 2 Uncontrolled copy when downloaded Section 5 Risk Acceptance and Safety Documentation Review Only safety requirements that are to be implemented must have an accompanying signature.
5.3.2.2 Safety Requirements Not Planned for Implemen tation If a safety requirement is not going to be implemented, SRM panel attendees must be contacted to verify that the predicted residual risk, safety performance target (s) , and/or monitoring plan have not been affected. If changes are required, the SRM panel attendees must reconvene to update any impacted section of the SRM document, including the H AW , and the SRM document must be revised to include these chan g es and the rationale for not implementing the safety requirement. In addition, if any of the SRM panel members dissent with the removal of the safety requirement or the resulting changes to the predicted residual risk, safety performance target (s) , and/or monitoring plan, the dissention must be included in the SRM document.
5.3.3 Safety Recommendations Safety recommendations do not rise to the level of safety requirements . They are not used when determining predicted residual risk and do not require any endorsement but may be recorded within the SRM document .
5.4 Risk Acceptance Risk acceptance is confirmation by the appropriate management official that they understand the safety risk associated with the N AS change or existing safety issue and that they accept that safety risk into the NAS . Safety risk must be accepted before the implementation of a proposed NAS change and the execution of the monitoring plan. Risk acceptance is based on the predicted residual risk . Risk acceptance and other inputs (e.g., cost - benefit analysis) are necessary before a cha nge to the NAS can be implemented. When an individual or organization accepts a risk, it does not mean that the risk is eliminated; some level of risk will remain.
Risk acceptance requires: Signed confirmation from the appropriate management official that they understand and accept the predicted residual safety risk(s) associated with the hazard(s) identified in the SRM document ; Signatures for the safety requirements identified in the SRM document ; Approval of the safety performanc e target(s) or alternate method(s) identified to verify the predicted residual risk associated with each hazard, confirming that the safety performance target(s) or identified alternate method(s) can be used to measure the current risk; and A comprehensive monitoring plan that the risk acceptor agrees to follow to verify the predicted residual risk.
For nationally implemented NAS changes, risk can be accepted at the national level. However, if a facility is not able to comply with all of the safety requir ements or has additional hazards and/or causes that were not identified in the national SRM document , the facility must perform 2 . A PRD may be used in lieu of providing signatures for safety requirements; see the SRMGSA for more information.
3 . This reconvene can be conducted in person or via tele phone or video conference.
5_SMSM_202 21 2 62 Originally published December 202 2 Uncontrolled copy when downloaded Section 5 Risk Acceptance and Safety Documentation Review SRM (with local risk acceptance) prior to the implementation of th e NAS change. Refer to Section 5 .2.1 for information on local versus national implementation of safety requirements.
5.4.1 Authority to Accept Safety Risk The acceptance of the safety risk depends on the span of the program or NAS change and the associ ated risk. T he responsibility for risk acceptance ultimately lies with the organization(s) affected by the NAS change. Risk acceptance authority also depends on whether a NAS change is local or national in scope.
By signing the SRM docume nt, the risk acceptor is confirming the following are understood and accepted: T he identified safety risk(s); The safety requirements that will be implemented; The predicted residual risk(s) associated with the hazard(s) ; The safety performance target(s) identified to measure the predicted residual risk associated with each hazard, thus confirming that the safety performance target(s) may be used to measure the current risk level; and The information contained in the monitoring plan.
The risk acceptor is accountable for: Ensuring that all monitoring activities are being recorded in S MTS ; Ensuring that performance data needed for the monitoring activities are being collected and analyzed to verify that the safety performance target(s) are being met; Determining the need to reconvene SRM panel attendees or choosing to accept the current risk as the new predicted residual risk if performance data indicate that the predicted residu al risk is not met and/or if the risk management strategy is proven to be inadequate; and Reconven ing the SRM panel attendees if a safety requirement identified by the attendees cannot be implemented.
5.4.2 Risk Acceptance Outside of the A TO If the af fected party is outside of the ATO (e.g., navigation or weather services), each organization responsible for establishing requirements for contracted services accepts the risk into the NAS. L OBs/organizations outside of the ATO (e.g., Office of Airports, Office of NextGen, Office of Comme rcial Space Transportation, or Office of Aviation Safety) are also responsible for components of the NAS and have a role in accepting safety risk.
ATO vice presidents, directors, managers, and supervisors must work clos ely with their counterparts in LO Bs /organizations outside of the ATO to help ensure that the appropriate party or parties accept and manage any safety risk resulting from NAS changes. Again, it is not in compliance with ATO policy to implement a NAS change without having first accepted any associated safety risk. Refer to F AA Order 8040.4, Safety Risk Management Policy , for policy on cross - LOB risk acceptance.
4 . This reconven e can be conducted in person or via tele phone or video conference.
5_SMSM_202 21 2 63 Originally published December 202 2 Uncontrolled copy when downloaded Section 5 Risk Acceptance and Safety Documentation Review 5.5 SRM Do cument Concurrence Concurrence is used to represent a technical review of the SRM document and to confirm the rationale used throughout is consistent with the SRM process . The concurrence signature comes from an S RM expert who is well versed in the ATO S MS Manual and familiar with the terminology and processes therein. The concurrence signature is not a required signature; however, Service Areas, District Offices, or individual facilities may require a concurrence signature on their respective SRM documents.
5.6 SRM Document Approval Approval of a n SRM document w ith hazar ds requires and represents that: The SRM document was developed in accordance with policy and guidance ; Hazards were systematically identified using a structured approach ; Risk was appropriately analyzed and assessed ; If identified, safety requirements were deemed valid ; Safety performance targets or other methods to verify predicted residual risk were approved by the responsible Service Unit ; and A monitoring plan was prepared.
Approval of an SRM document w ithout haza rds requires and represents that: The SRM document was developed in accordance with policy and guidance , The N AS change did not introduce new hazards or increase safety risk, and The SRM document includes a detailed rationale to support the finding of no hazards .
In approving SRM documentation, the approval authority affirms that the aforementioned items have been performed and agrees that the underlying assumptions are reasonable and the findings are complete and accurate. SRM documentation approval does not constitute approval for implementation or acceptance of any risk associated with the NAS change or existing safety issue.
5.6.1 Service Unit SRM Documentation Approval or Concurrence Affected or stakeholder Service Units must assign an appropriate management official to provide approval or concurrence of the SRM document. The person selected must be available to provide input to the management official(s) who will accept the risk associated with the NAS change or existing safety issue.
If SRM documentation must be sent outside of the Service Unit for approval (to another Service Unit, another LOB, AJI, or AOV), the documentation must have an approval or concurrence signature before it leaves the Service Unit. All identified means to reduce safety risk requiring approval and acceptance by AOV must first be sent through AJI.
If SRM documentation requires the approval or concurrence of more than one Service Unit, discrepancies in the approval standards or processes may exist between the organizations. In these cases, the change proponent should request that AJI adjudicate the discrepancies.
If an AJI SCL managed the development of an SRM document (see Annex A), no other Service Unit concurrence is required; however, the risk acceptor must still review and sign the SRM 5_SMSM_202 21 2 64 Originally published December 202 2 Uncontrolled copy when downloaded Section 5 Risk Acceptance and Safety Documentation Review document before the NAS change can be implemented. If an AJI SCL develops the SRM document , the relevant/affected operational Service Unit(s) that accepted the associated risks of the NAS change or existing safety issue must follow the monitoring plan documented in the SRM document .
5.6.2 AJI Review and Approval AJI SCLs verify that the SRM process has been followed, that the safety documentation is complete, and that the safety documentation adheres to the SMS Manual principles and guidelines.
Any documentation forwarded to the AJI - 3 Director for approval must first go through an AJI peer review. For an AJI peer review, forward SRM documentation to the AJI SCL in draft form and without signatures. At this point, the AJI SCL will facilitate the remaining steps in the review process. When the SRM document is ready for signature, the AJI SCL will notify the change proponent, who will obtain the appropriate signatures. Finally, when the SRM document has all signatures except for that of the AJI - 3 Director , the AJI SCL w ill present the SRM document to the Safety Management Group , AJI - 31 , Manager . The AJI - 31 Group Manager will forward the SRM document to the AJI - 3 Director for signature. Other SRM document signature requirements that are documented in this SMS Manual remain.
When a NAS change or existing safety iss ue facilitated by AJI crosses FA A LOBs/organizations, an AJI SCL reviews the SRM document to verify that affected LOBs/organizations have reviewed and approved the documentation . In addition, the AJI - 3 Director must approve and sign the SRM document .
5.6.2.1 AJI Participation in System Acquisition SRM AJI SCLs will be involved with NAS change efforts from concept development through In - Service Management. An AJI SCL will be assigned to a portfolio or program to provide safety guidance and advice, as appropriate. The AJI SCL will be familiar with the portfolio or program , it s possible interfaces , its position within the Enterprise Architecture , its milestones , and its safety documentation requirements. The AJI SCL will stay with that portfolio or program throughout its lifecycle.
The AJI SCL will ensure that all required safety documentation meets the requirements of this SMS Ma nual and the SRMGSA and will request subject matter experts to review (i.e., peer review) certain documentation before it is presented to the AJI - 3 Director for approval.
The AJI - 3 Director reviews certain SRM documentation and the associated acquisition safety assessments, analyses, reports, and plans, providing approval or commen ts (see the SRMGSA for information regarding specific documentation reviews and approval requirements) .
5.6.3 AOV Approval and Acceptance 5.6.3.1 Items Requiring AOV Approval AOV approval is the formal act of approv ing of a NAS change submitted by a requesting organization. This action is required prior to the proposed NAS change be ing implemented.
This is not the same as approval of the SRM document itself. All NAS changes or existing safety issues submitted to AOV for approval first require approval and concurrence by AJI and any applicable Service Units. Refer to Section 5 .6.2 for information on AJI approval.
5_SMSM_202 21 2 65 Originally published December 202 2 Uncontrolled copy when downloaded Section 5 Risk Acceptance and Safety Documentation Review The following items require AOV approval before impleme ntation: Controls that are defined to mitigate or eliminate initial and current high - risk hazards.
(For specific guidance regarding the AOV high - risk hazard acceptance/approval process and modeling requirements, see FAA Order 8000.365, Safety Oversight Circulars (SOC) ; AOV Safety Oversight Circular ( SOC ) 07 - 02, AOV Concurrence/Approval at Various Phases of Safety Risk Management Documentation and Mitigations for Initial High - Risk Hazards ; and AOV SOC 07 - 05A, Guidance on Safety Risk Modeling and Simulation of Hazards and Mitigations . ) Changes or waivers to provisions of handbooks, orders, and documents that pertain to separation minima, including FAA Order JO 7110 .65, Air Traffic Control ( see the ATO Safety Guidance (ATO - SG ) on separation minima ) Waiver renewals pertaining to approved separation Changes to NAS equipment availability and any changes to the program Specific ATO - SG document s pertaining to the SMS, as explained in FAA Order JO 1030.1, Air Traffic Organization Safety Guidance 5.6.3.2 Items Requiring AOV Acceptan ce The following require acceptance by AOV: Mitigations to reduce high safety risk to medium or low and /or mitigations that span FAA LOBs Exclusions to SMS requirements granted by AJI Changes to the criteria in FAA Order 8200.1, United States Standard Flight Inspection Manual , including: o The flight inspector’s authority and responsibilities o F acility status classification and issuance of Notices to Air Missions o Records and reports o Extensions in the periodicity or interval of inspections o Changes in required checklist items for the inspection of specific system areas o Changes in established tolerances, or tolerances proposed for new equipment or new functionality o Changes in the procedures for evaluating the safety and flyability of instrument flight procedures Changes to the personnel certification requirements Changes to the certification criteria in FAA Order 6000.15, General Maintenance Handbook for National Airspace System (NAS) Facilities Changes to the personnel certification requirements in FAA Order JO 3000.57, Air Traffic Organization Technical Operations Training and Personnel Certification 5_SMSM_202 21 2 66 Originally published December 202 2 Uncontrolled copy when downloaded Section 5 Risk Acceptance and Safety Documentation Review 5.6.4 Coordinati on of SRM Documentation AJI will collaborate with AOV to obtain the necessary reviews, approval, and risk acceptance signatures for SRM documentation with all applicable organizations outside of the ATO for all NAS changes. The scope of potential changes includes products, services, systems, and procedures associated with federal and non - federal facilities. Service Unit change proponents may initiate these reviews and signatures through outside ATO organizations. However, the Service Unit change proponen t must inform the appropriate AJI SCL of such action.
5.7 Revising an SRM D ocument Through post - implementation monitoring, a need to modify the previously approved SRM document may arise (se e Section 4.3.2 ). This requires a revision of the SRM document and new SRM document approval and risk acceptance signatures.
Table 5 . 5 : Signature Requirements for SRM D ocument Revisions (1) New SRM D ocument Part of SRM Approval Signature and Type of Change Version Protocol D ocument Changed Risk Acceptance Required?
Whole number New hazard; change to predicted revisions HAW Yes residual risk (e.g., 1.0 to 2.0) Adding, c hanging, removing, or not HAW to include Whole number implementing new or existing Yes safety requirements revisions safety requirements Updating charts, maps, airport layout, and approach plates, as Decimal revisions System description No long as change does not affect (e.g., 1.0 to 1.1, 1.2) hazards or risk levels Adding rationale or data for risk Hazard and r isk a nalysis when risk is not changed Decimal revisions No analysis and/or means to reduce safety risk are not added or changed Clarification of safety requirements, including Standard Operating Procedures, Letters of Agreement, Safety requirements, letters to airmen, and monitoring plan, and implementation and monitoring Decim al revisions No appendices reports, as long as risk is not changed and means to reduce safety risk are not added or changed Notes: (1) If an SRM document revision does not necessitate a new approval/acceptance signature from AOV, a new signature from the AJI - 3 Director is not required.
The risk acceptor(s), in coordination with the change proponent, may need to update or change an SRM document as a project progresses and decisions are modified. Mo nitoring may indicate that the N AS change does not meet the predicted residual risk, that the risk management strateg y is less effective than expected, or that additional hazards exist. In this case, additional 5_SMSM_202 21 2 67 Originally published December 202 2 Uncontrolled copy when downloaded Section 5 Risk Acceptance and Safety Documentation Review safety requirements may be necessary. Any change that may affect the assumptions, hazards, causes, or estimated risk in an SRM document necessitates a revision, including new signatures. A change page (containing a description of e ach change to the SRM document and the number of each affected page) must be included with each SRM document .
Based on the results of ex ternal assessments (e.g., Inde pendent Operational Assessments , Flight Inspections, post - implementation safety assessments, AJI audits and assessments, and the NAS Technical Evaluation Program ) , the change proponent may need to reconvene the SRM panel attendees and update the SRM document as needed .
5_SMSM_202 21 2 68 Originally published December 202 2 Uncontrolled copy when downloaded Section 6 ATO Audit and Assessment Programs 6.1 Audit and Assessment Programs Safety and Technical Training (AJI) Safety Assurance programs evaluate compliance with Safety Management System (SMS) requirements and Federal Aviation Administration (FAA) and/or Air Traffic Organization (ATO) orders, standards, policies, and directives. Findings from these assessments could require that the change proponent reconvene the Safety Risk Management ( SRM ) panel attendees and update the SRM document as needed .
Audit and assessment programs evaluate: The effectiveness of each Service Unit’s performance and operations ; The effectiveness of Air Traffic Control (ATC) facilities’ and Technical Operations (AJW) Districts’ internal Quality Control efforts (e.g., operational skills assessment s , system service review s , certification, periodic maintenance, data integrity, modification, and availability) ; The effectiveness of Quality Control mitigation efforts in response to identified trends and risks ; Trends identified from safety data analysis ; The effectiveness of safe ty - related policies and procedures ; and Compliance with and maturity of the ATO’s SMS .
6.1.1 AT O Compliance Verification Evaluation Program FAA Order JO 7210.633, Air Traffic Organization (ATO) Quality Assurance (QA) , and FAA Order JO 7210.634, Air Traffic Organization (ATO) Quality Control , describe the current ATC facility evaluation and assessment programs that involve assessments and audits focu sing on compliance and safety. Air Traffic Service Area Directors , A ir T raffic M anagers (ATMs) , and AJW D istricts are responsible for conducting internal evaluations of their respective facilities.
The Quality Assurance Group , AJI - 12, retains oversight of the ATC evaluation process and performs program assessments.
6.1.2 Difference between ATC Facility Audits and Assessments The ATM conducts internal compliance verifications of their facility in accordance with FAA Order JO 7210.634 . AJI conducts audits based on identified or suspected safety issues and non compliance in accordance with FAA Order JO 1000.37, Air Traffic Organization Safety Management System . The office determines priorities by soliciting input from the Service Areas and other FAA Lines of Business ( LOBs ) and by analyzing objective criteria from sources such as occurrence reports and risk analysis results. In addition, AJI conducts no - notice spot inspections of ATC facilities and AJW activities, inc luding the Aviation System Standards group.
6.1.3 National Airspace System Technical Evaluation Program FAA Order 6000.15, General Maintenance Handbook for National Airspace System (NAS) Facilities ; FAA Order JO 6040.6, National Airspace System Technical Evaluation Program ; and FAA Order 8200.1, United States Standard Flight Inspection Manual , describe the equipment evaluation and auditing programs that are part of the National Airspace System (NAS) Technical Evaluation Program.
6 _SMSM_202 21 2 69 Originally published December 20 2 2 Uncontrolled copy when downloaded Section 6 ATO Audit and Assessment Programs The NAS Technical Evaluation Program provides AJI with asset management and safety decision - making information based on an independent review of: How well facilities and services meet their intended objectives: o Evaluators check key performance parameters and certification parameters at selected facilities.
o Evaluators review NAS Performance Analysis and NAS Performance Index data.
How well the maintenance pro gram is executed: o Evaluators review facility logs to verify certification, periodic maintenance accomplishments, and documentation of corrective and scheduled maintenance activities.
o Evaluators review the completion of required modifications.
o Evaluators re view facility documentation , such as Technical Performance Records , and required reference data.
How well customer needs are being met: o Evaluators solicit customer feedback through interviews and surveys.
o Evaluators review the outage coordination process.
Evaluators may also review specialist certification records and credentials. These reviews are either part of a special inspection or are random spot checks of documentation in a location that is geographically convenient to the routine evaluation.
6.1.4 I nde pe ndent Operational Assessments AJI supports the agency’s commitment to field - safe and operationally ready solutions by conducting Independent Operational Assessments ( IOAs ) on designated new or modified systems or capabilities before the In - Service Management phase. An IOA is a full system - or capability - level evaluation conducted in an operational environment. An IOA’s purpose is to confirm the readiness of a system from an operational and safety perspective. IOAs are independent of the Program Management Organization (AJM) implementing the solution. IOAs evaluate systems against pre - determined critical operational issues. Hazards identified by an IOA must still undergo all necessary phases of the SRM process by the change proponent.
The Vice President of AJI directs the commencement of an IOA after the acceptance of an IOA Readiness Declaration from the Vice President of AJM . To assess the system/capability, AJI collab orates with the organizations that will operate, maintain, or otherwise be operationally affected by the solution. AJI reports any new or previously identified hazards, as well as operational concerns, based on data observed an d collected during the IOA.
At the conclusion of an IOA, the team assesses the solution’s operational readiness based on the identified hazards and any observed operational concerns. The team reports and briefs the results of the IOA to affected stakehold ers, including the Vice President of AJI, AJM , the affected operating service(s), and any other affected organizations. The results are also provided to the In - Service Decision authority. The change proponent is responsible for the treatment and monitori ng phases of SRM for the hazards identified during the IOA.
6 _SMSM_202 21 2 70 Originally published December 20 2 2 Uncontrolled copy when downloaded Section 6 ATO Audit and Assessment Programs 6.1.5 Independent Assessments AJI performs independent assessments to evaluate operational procedures, order compliance, fielded systems, and safety benefits. An AJI independent assessment is independe nt of the Program Office or operating service responsible for the program or operation. They are post - implementation evaluations of NAS changes that assess actual performance.
During independent assessments, the teams verify that any previously documented hazards were rated accurately (based on observed data) and that no unacceptable safety risks exist. In addition, teams may identify operational issues and other findings.
Independent assessments may involve several facility or program assessments over a long period of time, one assessment that lasts for an extended period of time, or multiple brief assessments. The processes and procedures are tailored according to the duration of the assessment and the complexity of the operation or program being assessed. The assessment may be conducted at one or multiple sites, and data may be collected on site or remotely.
Results and/or recommendations are based on the assessment team’s analysis of data co llected during and, if applicable, before the assessment. The conclusions and recommendations are independent from external sources.
6.2 Safety Data Reporting, Tracking, and Analysis S MS s require the collection and analysis of data from different sources and various vantage points to determine if hazards exist. An important aspect of safety data analysis is developing the capability to sort and analyze a vast array of data and transform ing that data into information that permits the identification and mitigation of hazards, thus preventing f uture incidents and accidents.
6.2.1 Purpose of Safety Data Collection and Evaluation The tracking and analyzing of safety data to enhance the A TO ’s awareness of p otentially hazardous situations is a critical aspect of the SMS. AJI assists with the collection and analysis of agency - wide safety data and supports sharing the data to continually improve the safety of the N AS.
Safety data are used to: Identify risks, s ystemic trends, and vulnerabilities in the system; Determine the effects of a NAS change on the operation as a whole; Assess the performance of safety requirements in managing risk; Identify areas where safety could be improved; Contribute to accident and incident prevention; and Assess the effectiveness of training.
In most cases, if the analysis of safety data leads to the identification of issues or hazards, the resolution or corrective action constitutes a NAS change, which requires SRM. This is an example of the continuous, closed - loop process for managing safety risk.
6 _SMSM_202 21 2 71 Originally published December 20 2 2 Uncontrolled copy when downloaded Section 6 ATO Audit and Assessment Programs Safety Risk Management Safety Assurance No No Conduct post- Describe the Was predicted Assess risk level and devise Yes Hazards Implement the implementation Yes system and NAS residual risk safety requirements for identified? NAS change monitoring achieved? implementation, if necessary change activities Perform periodic Data audits and Sources assessments Were any hazards identified or risk introduced? Yes No 6.2.2 AJI’s Role in Safety Data Collection and Evaluation AJI obtains safety data through various sources within and outside the F AA. AJI measur es safety by tracking safety metrics to produce reports on NAS safety, which are shared with appropriate LOBs and/or external stakeholders.
6.2.3 Safety Data Collection and Reporting Processes The FAA collects and reports on safety data from various sources in the NAS. Section 7 lists many of the existing FAA and ATO orders, processes, and databases related to safety data collection and reporting.
FAA Order JO 7210.632, Air Traffic Organization Occurrence Reporting , provides specific direction regarding the recording, reporting, and investiga tion of air traffic incidents.
FAA Order JO 6040.15, National Airspace Performance Reporting System , and FAA Order 6000.30, National Airspace System Maintenance Policy , cover reporting on the serviceability of ATO facilities and systems, such as failures and degradations of communi cations, surveillance, and other systems and equipment that affect safety.
Maintenance guidelines, directives, checklists, configuration management, and the NAS Technical Evaluation Program all contribute to the periodic review and maintenanc e of equipmen t and procedures.
The Safety Recommendation Reporting System provides FAA aviation safety inspectors with a method to develop and submit safety recommendations directly to the Office of Accident Investigation and Prevention. (See FAA Order 8020.16, Air Traffic Organization Aircraft Accident and Aircraft Incident Notification, Investigation, and Reporting . ) The Risk Analysis Process quantifies the level of risk present in any air traffic incident.
It provides a method for consistent and coherent identification of risk elements and 1 . FAA Order JO 7210.633 removed R isk A nalysis E vent s (RAE s ) and the process for notification and interviews associated with RAE s . Any reference to RAE s in this SMS Manual are for research and historical purposes only.
6 _SMSM_202 21 2 72 Originally published December 20 2 2 Uncontrolled copy when downloaded Section 6 ATO Audit and Assessment Programs allows users to prioritize actions designed to reduce the effect of those elements. The process uses t he Risk Analysis Tool developed by EUROCONTROL to analyze each RAE. RAEs are assessed by a panel of air traffic and flight operations personnel (e.g., controllers and air - transport rated pilots). This panel is responsible for conducting the analysis of RAEs and coordinating the post - assessment reporting, mitigating, and tracking. The Risk Analysis Tool produces a numerical value of severity and repeatability on a risk matrix. The Risk Analysis Tool also captures any associat ed causal, systemic, and contributing factors.
Aviation Risk Identification and Assessment (ARIA) identif ies and asses s es latent risk in the NAS and help s prioritize event analysis. Barrier Analysis Review (BAR) is the assessment of safety data to determine systemic risk and includes an evaluation of safety barrier resiliency. The aggregate data produce d by this process assists in the identification of systemic trends and potential risk in the NAS. Referred ARI A Reports , potential operational risk identified during the Q uality A ssurance (QA) validation process, service area QA manager referral, N ational A ir T raffic C ontrollers A ssociation service area or national safety representative referral, AJI Headquarters manager referral, and random QA selections are all means by which safet y data may be referred for BAR.
Several non - punitive, voluntary reporting programs allow pilots and ATO person nel to report an incident or event without reprisal. These programs include the Aviation Safety Action Program (refer to the A ir Tra ffic Safety O v ersight Service S afety O versight C ircular 07 - 04, Aviation Safety Action Program (ASAP) for Credentialed ATO Personnel ), the Aviation Safety Reporting Program, the Technical Operations Safety Action Program, and the Air Traffic Safety Action Program. They are designed to foster consistent reporting and higher quality data.
Other mechanisms employed by the FAA for employees to report issues include the Unsatisfactory Condition Report program, the Aviation Safety Hotline, and the Adminis trator’s Hotline. Both hotlines can be reached by calling 1 - 800 - 255 - 1111.
6 _SMSM_202 21 2 73 Originally published December 20 2 2 Uncontrolled copy when downloaded Section 7 Safety Data and Information Repositories 7.1 Safety Data and Information Repositories Federal Aviation Administration (FAA) employees populate several aviation safety databases with information regarding National Airspace System (NAS) safety events and serviceability.
Many professionals use aviation safety data and information as input for the development of NAS safety enhancements. For assistance in collecting safety data , contact the Safety and Technical Training (AJI) Safety Analysis Group , AJI - 3 2 . Sources for gathering safety data and information include: National Transportation Safety Board (NTSB) recommendations ; FAA recommendations ; Air Traffic Safety Oversight Service compliance issues ; Requirements for new communication, navigation, surveillance, and automation services to enhance or expand airspace management ; Unsatisfactory Condition Reports ; Employee suggestions ; App lications for procedural changes ; Research and development ; Acquisition of new systems and equipment ; Industry advocacy ; Participation in international forums ; Table 7 .1 provides an overview of various safety databases and recording systems used by the FAA , and Table 7.2 outlines data types and applicable reporting requirements .
7 _SMSM_20 2 21 2 74 Originally published December 20 2 2 Uncontrolled copy when downloaded Section 7 Safety Data and Information Repositories Table 7 .1: Safety Databases and Reporting Systems System Name Overview Mandatory Reporting Data Accident/Incident Data The Accident/Incident Data System contains data records for all general aviation and System commercial air carrier incidents since 1978.
Formerly known as the National Airspace Incidents Monitoring System, the Air Traffic Quality Assurance database is a collection of databases specific to the following subjects: Near Mid - Air Collisions ( NMACs ) , pilot deviations, vehicle/pedestrian deviation s, and Area Navigation / Required Navigation Performance deviations. The NMAC database contains reports of in - flight incidents Air Traffic Quality where two aircraft have closed to an unsafe distance but avoided an actual collision.
Assurance database The pilot deviation database contains inc ident reports in which the actions of a pilot violated a Federal Aviation Regulation or a North American Aerospace Defense Command Air Defense Identification Zone tolerance. The vehicle/pedestrian deviation database contains incident reports of pedestrian s, vehicles, or other objects interfering with aircraft operations on runways or taxiways.
ARIA is an automated system that helps employ risk - based, data - driven Aviation Risk decision - making , facilitating better insight into potential risk in the NAS via the Identification and Barrier Analysis Review process , which assess es severity, likelihood, and barrier Assessment ( A R I A ) effectiveness in Referred ARIA Reports. Barrier analysis is also used to identify and System assess factors (mitigating, aggravating, or observed) for air traffic operations where at least one aircraft is receiving Air Traffic Control ( ATC ) services.
Aviation Safe ty ASIAS is a data warehouse and integrated database system. It enables users to Information Analysis and perform queries across multiple databases and display queries in useful formats. It Sharing (ASIAS) System includes accidents, incidents, and pil ot reports of NMACs .
The CVT replaces the Facility Safety Assessment System. Facilities conduct internal compliance verifications and enter the information in the tool. The Quality Compliance Verification Co ntrol groups in the Service Units conduct external compliance verifications and Tool (CVT) enter the information in the tool. Service delivery points also develop risk mitigation plans that communicate how specific risks will be mitigated for all checklist items con tained in the CVT determined to be noncompliant.
The CEDAR system provides an electronic means of assessing employee performance, managing resources, and capturing safety - related information and Comprehensive metrics. The tool provides a standard interface for the collection, retrieval, and Electronic Data Analysis reporting of data from multiple sources. It also automates the creation, and Reporting (CEDAR) management, and storage of facility activities, events, b riefing items, Quality Assurance Reviews, Technical Training discussions, and FAA forms.
The Facility Safety Assessment System is a national database that contains Facility Safety historical information related to the Facility Safety Assessment process. This Assessment System information includes evaluation checklists, reports, facility information, tracking information, and response data.
Integrated NAS Technical This national database contains reports, findings, and mitigation plans from NAS Evaluation Program Technical Evaluation Program audits and assessments. It is maintained by the NAS Application Quality Assurance and Performance Group in the Services Management Group .
The NTSB accident and incident database is the official repository of aviation NTSB A ccident and accident data and causal factors. In this database, personnel categorize events as I ncident D atabase accidents or incidents.
7 _SMSM_20 2 21 2 75 Originally published December 20 2 2 Uncontrolled copy when downloaded Section 7 Safety Data and Information Repositories System Name Overview Mandatory Reporting Data Facility Directives This database contains Letters of Agreement, Standard Operating Procedures, and Repository facility orders for all facilities nationwide.
The Operations Network is the official source of NAS air traffic operations and delay data. The data collected through the Operations Network are used to analyze the Operations Network performance of the FAA’s ATC facilities’ traffic count and delay information, airport tra ffic control tower and Terminal Radar Approach Control operations, etc.
PDARS calculates a range of performance measures, including traffic counts, travel times, travel distances, traffic flows, and in - trail separations. It turns these measurement data into information useful to FAA facilities through an architecture Performance Data that fea tures: Analysis and Reporting Automatic collection and analysis of radar tracks and flight plans, System (PDARS) Automatic generation and distribution of daily morning reports, Sharing of data and reports among facilities, and Support for exploratory and causal analysis.
FAA Order JO 7210.63 3, Air Traffic Organization (ATO) Quality Assurance (QA) , removed Risk Analysis Event s ( RAE s ) and the process for notification and interviews associated with RAE s . Any reference s to RAE s in this S afety M anagement S ystem Manual are for research and historical purposes only. RAE severity indicators are as follows: a. Proximity. Failure transition point of 50 percent of required separation or Risk Analysis Tool less.
b. Rate of Closure. Failure transition point greater than 205 knots or 2,000 feet per minute (consider both aspects and utilize the higher of the two if only one lies above the transition point).
c. ATC Mitigation. ATC able to implement separation actions in a timely manner.
d. Pilot Mitigation. Pilot executed ATC mitigation in a timely manner .
Voluntary Reporting ATSAP is a non - punitive, voluntary reporting program modeled after the Aviation Safety Action Program for employees delivering air traffic services. It allows for Air Traffic Safety Action employees to submit safety concerns and deficiencies so issues can be resolved Program (ATSAP) before a major error occurs. This voluntary reporting helps promote a strong safety culture within the ATO .
ASAP promotes voluntary reporting of safety issues and events that come to the attention of employees of certain certificate holders. It includes enforceme nt - related Aviation Safety Action incentives to encourage employees to voluntarily report safety issues, even though Program (ASAP) the issues may involve an alleged violation of Title 14 of the Code of Federal Regulations.
ASRS collects voluntarily submitted aviation safety incident/situation reports from Aviation Safety Reporting pilots, controllers, and other personnel. It identifies system deficiencies and issues Syste m (ASRS) messages to alert individuals in a position to correct the identified is sues.
The TechNet website provides a means for expediently distributing NAS operational information within the FAA. It contains information such as NAS delay information TechNet by service (e.g., automation, surve illance, navigation, and communication) and active equipment outages (i.e., full interruptions to service).
7 _SMSM_20 2 21 2 76 Originally published December 20 2 2 Uncontrolled copy when downloaded Section 7 Safety Data and Information Repositories System Name Overview T - SAP is a voluntary, non - punitive safety reporting program for ATO Technical Technical Operations Operations personnel. Employees at the point of service have a unique Safety Action Program understanding of safety and can better identify threats and risks to their particular operations. By studyin g the data gained from voluntary reports, safety issues can be (T - SAP) more efficiently identified and mitigated.
Table 7 .2: Data Types and Applicable Reporting Requirements Data Overview References FAA Order JO 8020.16, Air Traffic This order contains reporting requirements Organization Aircraft Accident and Aircraft incident or regarding safety issues, concerns, accident Accident Incident Notification, incidents, and accidents.
Investigation, and Reporting This order mandates that personnel collect Mandatory occurrence FAA Order J O 7210.632, Air Traffic and analyze data concerning air traffic reports Organization Occurrence Reporting incidents.
This order establishes procedures for Oceanic altitude and FAA Order JO 7210.632, Air Traffic processing reports and for collecting navigation errors Organization Occurrence Reporting system data for analysis.
FAA Order JO 8020.16, Air Traffic This order establishes procedures for Safety Aviation Safety Inspectors to report safety Organization Aircraft Accident and Aircraft recommendations recommendations directly to the Office of Incident Notification, Investigation, and Accident Investigation and Prevention. Reporting FAA Order JO 6030.41, Technical This order mandates that significant events Operations Notification of System and Significant system be reported and contrib utes to daily system events Service Interruptions and Other Significant performance and incident reporting.
Events This order mandates that outage reports FAA Order JO 6040.15, National Airspace System outages be filed and contributes to daily system Performance Reporting System (NAPRS) performance and incident reporting.
This order provides FAA employees with a Unsatisfactory FAA Order 1800.6, Unsatisfactory means of informing management of condition s Condition Report unsatisfactory conditions.
This order defines the policy and procedures for ATO Voluntary Safety Reports. It identifies the responsibilities of Vol untary Safety FAA Order JO 7200.20, Voluntary Safety individuals and organizations and the Reports Reporting Programs requirements, expectations, and polic ies under which the identified programs o perate.
7 _SMSM_20 2 21 2 77 Originally published December 20 2 2 Uncontrolled copy when downloaded Section 8 Definitions and Acronyms 8 .1 Definitions Acceptable Level of Safety Risk. Medium or low safety risk.
Accident. An unplanned event or series of events that results in death ; injury ; or damage to, or loss of, equipment or property.
Acti ve Failure. An error of omission or commission that is made in the course of a particular operation. An active failure can also be a known problem or a known mechanical deficiency or fault.
Acquisition Management System (AMS). A Federal Aviation Adminis tration ( FAA ) policy dealing with any aspect of lifecycle acquisition management and related disciplines. The AMS also serves as the FAA’s Capital Planning and Investment Control process.
Air Traffic Safety Oversight Service (AOV) Acceptance. The process whereby the regulating organization has delegated the authority to the service provider to make changes within the confines of approved standards and only requires the service provider to notify the regulator of those changes within 30 days. Changes made by the service provider in accordance with their delegated authority can be made without prior approval by the regulator.
Analysis. The process of identifying a question or issue to be addressed, examining the issue, investigating then interpreting the results , and possibly making a recommendation. Analysis typically involves using scientific or mathematical methods for evaluation.
AOV Approval. The formal act of approving a N ational Airspace System (N AS ) change submitted by a requesting organization. This action is required prior to the proposed NAS change being implemented.
Assessment. A process of measuring or judging the value or level of something.
Assumptions. Conclusions based on the presumed condition of a syste m or system state — not documented facts, desired outcomes, or mitigations.
Audit. A review of an organization’s safety programs or initiatives to verify completion of tasks and to determine the organization’s compliance with FAA directives and procedures.
Aviation Risk Identification and Assessment (ARIA) . An automated system that helps employ risk - based, data - driven decision - making , which facilitat es better insight into potential risk in the NAS .
Barrier Analysis Review (BAR) . The process used to assess severity, likelihood, and barrier effectiveness in Referred ARIA Reports. Barrier analysis is also used to identify and assess factors (mitigating, aggravating, or observed) for air traffic operations where at lea st one aircraft is receiving Air Traffic Control ( ATC ) services.
Baseline. The written processes, procedures, specifications, and other conditions of the system that were accepted as the starting point for oversight of safety in the NAS on March 14, 2005. The Air Traffic Organization ( ATO ) must maintain the NAS at a safety lev el that is at least equal to that state, in compliance with current policies, processes, and procedures that are documented in its orders, handbooks, and manuals. ( Note: “Acceptance of the baseline did not 8 _SMSM_20 2 21 2 78 Originally published December 20 2 2 Uncontrolled copy when downloaded Section 8 Definitions and Acronyms imply or state that the NAS was or was not inhere ntly safe as configured on that date, nor did it imply that the NAS had no existing high risks,” AOV S afety O versight C ircular 07 - 0 1, Acceptance of the Air Traffic Organization (ATO) Baseline . ) Bounding. A process of limiting the analysis and assessment of a change or system to only the elements that affect or interact with each other to accomplish the central function of that change or system .
Cause. The origin of a hazard.
Change Proponent. An individual, Program Office , facility, or organization within the FAA that has identified the need for Safety Risk Management ( SRM ) or has propos ed or is sponsoring a NAS change or means to address an identified existing safety issu e . The S RM p anel m embers are selected at the discretion of the c hange p roponent and/or SRM p anel f acilitator.
Common Cause Failure. A failure that occurs when a single fault results in the corresponding failure of multiple system components or functions.
Compliance Audit. An audit that evaluates conformance to established criteria, processes, and work practices. The obj ective of a compliance audit is to determine whether employees and processes have followed established policies and procedures.
Continuous Loop. S RM processes are repeated until the safety risk associated with each hazard is acceptable and has met its pre dicted residual risk.
Concurrence. The co ncurrence signature is used to represent a technical review of the SRM document and to confirm the rationale used throughout is consistent with the SRM process .
The concurrence signature comes from an SRM expert who is well versed in th is S afety M anagement S ystem (SMS) Manual and familiar with the terminology and processes therein.
Configuration Management. A process for establishing and maintaining the consistency of a product’s performance, function , and physical attributes with its requirements, design, and operational information throughout its life.
Confirmation. The act of using a written response from a non – SRM panel attendee to confirm the integrity of a specific item or assertion.
Consensus. The judgement arrived at by a majority of panel members .
Control. A ny means currently reduc ing a hazard’s causes or effects . (See “Mitigation.”) Credible. It is reasonable to expect that the assumed combination of conditions that define the system state will occur within the operational lifetime of a typical A TC system (i.e. , 30 years) .
Critical NAS System. A system that provides functions or services tha t, if lost, would prevent users of the NAS from exercising safe separation and control over aircraft.
Current Risk. The composite of severity and frequency of a hazard’s effects in the present state.
8 _SMSM_20 2 21 2 79 Originally published December 20 2 2 Uncontrolled copy when downloaded Section 8 Definitions and Acronyms Development Assurance. All the planned and systematic actions used to substantiate, at an adequate level of confidence, that errors in requirements, design, and implementation have been identified and corrected such that the system satisfies the applicable approval or certification basis.
Dissention. If any SRM panel member disagrees with the SRM panel’s official findings (i.e., group consensus cannot be reached ), that panel member should provide the nature and summary of the disagreement for inclusion in this part of the SRM document.
Effect. The real or credible harmful outcome that has occurred or can be expected to occur if the hazard occurs in the defined system state.
Equipment. A complete assembly — operating either independently or within a system/sub - system — that performs a specific function.
Error - Tolerant System. A system that is designed and implemented in such a way that, to the maximum extent possible, errors and equipment failures do not result in an incident or accident.
An error - tolerant design is the human equivalent of a fault - tolerant design .
Existing Safety Issue. Existing contributing factor s or finding s that led to, or could lead to, an unsafe outcome.
Facility. Generally, any installation of equipment designated to aid in the navigation, communication, or control of air traffic. Specifically, the term denotes the total electronic equipment, power generation, or distribution systems and any structure u sed to house, support, and/or protect these equipment and systems. A facility may include a number of systems, sub - systems, and equipment.
Fail Operational. A system designed such that if it sustains a fault, it still provides a subset of its specified behavior.
Fail Safe. A system designed such that if it fails, it fails in a way that will cause no harm to other devices or will not present a danger to personnel.
Fault Tolerance. The ability of a system to respond without interruption or loss of capabi lities in the event of an unexpected hardware or software failure.
Frequency. An expression of how often a given effect occurs.
Hazard. Any real or potential condition that can cause injury, illness, or death to people; damage to or loss of a system, equipment, or property; or damage to the environment. A hazard is a prerequisite to an accident or incident.
Hazard Analysis Worksheet (HA W). A tool used to provide an initial overview of the hazard ’ s presen ce in the overall flow of the operation.
Hazard Identification. The determination of the hazard scenarios and associated consequences (undesired events) as a result of introducing a new system into the NAS. This provides an intermediate product that expresses the hazards that will be used during risk analysis and assessment .
8 _SMSM_20 2 21 2 80 Originally published December 20 2 2 Uncontrolled copy when downloaded Section 8 Definitions and Acronyms High - Risk Hazard. A hazard with an unacceptable level of safety risk; the NAS change cannot be implemented unless the hazard’s associated risk is mitigated and reduced to medium or low.
Hull Loss. An aircraft that is destroyed / substantially damaged beyond economic repair, missing, or completely inaccessible.
Human - Centered. The structured proces s during concept and requirement definition, design, development, and implementation that identifies the user as the focal point of the effort for which procedures, equipment, facilities, and other components serve to support human capabilities and compens ate for human limitations; also called “user - centered.” Human Factors. A multidisciplinary effort to generate and compile information about human capabilities and limitations and apply that information to equipment, systems, facilities, procedures, jobs, environments, training, staffing, and personnel management for safe, c omfortable, and effective human performance. (See FAA Order 9550.8, Human Factors Policy .)
Incident. An occurrence other than an accident that affects or could affect the safety of operations.
Initial Risk. The composite of the severity and likelihood of a hazard ’ s effect , considering only controls and documented assumptions for a given system state. It describes the risk before a ny of the proposed mitigations are implemented.
Inquiry. The technique of asking questions and recording responses.
Inspection. The act of critically examining documents to determine the content and quality of a transaction, such as inspecting leases, co ntracts, meeting minutes, requirements, and organization policy.
Latent Failure. An error or failure with adverse consequences that may lie dormant within a system for a long time, becoming evident when combined with other factors.
Likelihood. The estimated probability or frequency, in quantitative or qualitative terms, of a hazard’s effect or outcome.
Maintenance. Any repair, adaptation, upgrade, or modification of NAS equipment or facilities.
This includes preventive maintenance.
M anagemen t Strategy. Actions designed to reduce or manage the risk associated with a NAS change or operation.
Mitigation. A ny means to reduce the risk of a hazard.
N ational Airspace System (N AS ) . A complex system that is composed of airspace, airports, aircraft, pilots, air navigation facil ities, and ATC facilities; communication, navigation, and surveillance services and supporting technologies and systems; operating rules, regulations, policies, and procedures; and people who implement, sustain, or operate the system components.
8 _SMSM_20 2 21 2 81 Originally published December 20 2 2 Uncontrolled copy when downloaded Section 8 Definitions and Acronyms NAS Change. A modification to any element of the NAS that pertains to, or could affect , the provision of air traffic management and /or communication, navigation, and surveillance services.
Near Mid - Air Collision Categories. FAA Order 8900.1, Flight Standards Information Management System , Volume 7, Chapter 4 , ide ntifies the following definitions of Critic al , Potential , and Low categories : 1) “A” – Critical. A situation in which collision avoidance was due to chance, rather than a pilot’s evasive act or action. Situations where large evasive maneuvers are necessary to avoid collision and/or situations where little or no time is available to recognize the threat and react appropriately. Encounters of less than 100 feet separation are considered to be critical ris k.
2) “B” – Potential. A situation which would probably have resulted in a collision if no action had been taken by the pilot; a situation in which a T raffic Alert and C ollision A voidance S ystem (TCAS) Resolution Advisory was received and followed; or where a Traffic Information Services ( TIS ) alert or the pilot sighting the traffic without electronic aid caused pilot evasive action. A “potential” risk is a situation in which a collision would probably occur eventually if no action is taken by either pilot. Situations of encounters of less than 500 feet separation may be considered potential risk.
3) “C” – Low Potential. A situation in which a collision is unlikely, however, one or both pilots was surprised by the proximity of the other; one in which the cours e of the aircraft bring them closer than required approved separation; a situation where whether or not the pilot took evasive action a collision probably would not occur; or a situation in which there is ample time to take action to avoid a collision. A TIS alert or TCAS traffic advisory may cause the pilot to t ake action after sighting the traffic either with or without the aid of an electronic alert system; situations of encounters of 500 feet or greater; slowly converging flightpaths may be considered low potential collision risks.
Objective Evidence. Documented proof; the evidence must not be circumstantial and must be obtained through observation, measurement, test ing , or other means.
Observation. The process of witnessing an organization’s process. It differs from a physical examination in that t he auditor only observes the process; no physical evidence is obtained.
Operational Assessments. An assessment to address the effectiveness and efficiency of an organization. The objective of an operational assessment is to determine the organization’s a bility to achieve its goals and accomplish its mission.
Opposing Opinion. An opinion submitted in writing if a Subject Matter Expert ( SME ) participating in an SRM panel disagrees with th at SRM panel’s official findings; opposing opinions are atta ched to the SRM document as part of the distribution.
Oversight. Regulatory supervision to validate the development of a defined system and verify compliance to a pre - defined set of standards.
Physical Examination. The act of gathering physical evidence. It is a substantive test involving the counting, inspecting, gathering, and inventorying of physical and tangible assets, such as cash, plants, and equipment .
8 _SMSM_20 2 21 2 82 Originally published December 20 2 2 Uncontrolled copy when downloaded Section 8 Definitions and Acronyms Preconditions. The system states or variables that must exist for a hazard or an accident to occ ur in an error - tolerant system.
Predicted Residual Risk. The risk that is estimated to exist after the safety requirements are implemented or after all avenues of risk miti gation have been explored.
Preliminary Hazard List (PHL) . A hazard identification tool used to list all potential hazards in the overall operation. Development of a PHL typically begins with a brainstorming session among the individuals participating in the SRM panel .
Process. A set of interrelated or interacting activities that transform inputs into outputs.
Program Assessment. A Safety Assessment ’ s review of an organization’s safety programs or initiatives. Programs and initiatives include, but are not limited to, Service Area Quality Assurance (QA) , Air Traffic Facility Quality Control, Runway Incursion Prevention Plans, Equipment Availability Programs, and Contractor QA programs for F ederal C ontract T owers (FCT) .
Qualitative Data. Subjective data expressed as a measure of quality; nominal data.
Quality Assurance (QA) . A program for the systematic monitoring and evaluation of the various aspects of a project, service, or facility to ensure that standards of qualit y are being met.
It is a process to assess and review the processes and systems that are used to provide outputs (whether services or products) and to identify risks and trends that can be used to improve these systems and processes.
Quality Control. A p rocess that assesses the output (whether a product or service) of a particular process or function and identifies any deficiencies or problems that need to be addressed.
Quantitative Data. Objective data expressed as a quantity, number, or amount, allowin g for a more rational analysis and substantiation of findings.
Recording. The process of documenting the identified hazards and the associated safety information.
Redundancy. A design attribute in a system that ensures duplication or repetition of elements to provide alternative functional channels in case of failure. Redundancy allows the service to be provided by more than one path to maximize the availability of the service.
Requirement. An essential attribute or characteristic of a system. A requirement is a condition or capability that must be met or passed by a system to satisfy a contract, standard, specification, or other formally imposed document or need.
Residual Risk. The level of risk that has been verified by completing a thorough monitoring plan with an achieved measurable safety performance target(s). Residual risk is the composite of the severity of a hazard’s effect and the frequency of the effect’s occurrence.
Risk. The composite of predicted severity and likelihood of the potential effect of a hazard.
8 _SMSM_20 2 21 2 83 Originally published December 20 2 2 Uncontrolled copy when downloaded Section 8 Definitions and Acronyms Risk Acceptance. The confirmation by the appropriate man agement official that they understand the safety risk associated with the NAS change or existing safety issue and that they accept that safety risk into the NAS. Risk acceptance requires that signatures have been obtained for the safety requirements identified in the SRM d ocument and that a comprehensive monitoring plan has been developed and will be followed to verify the pre dicted residual risk.
Risk Analysis Event (RAE) . A loss of approved separation between two aircraft in a radar environment that results in less than 66 percent of the applicable separation minima maintained.
FAA Order JO 7210.633 , Air Traffic Organization (ATO) Quality Assurance (QA) , removed RAE s and the process for notification and interviews associated with RAE s . Any reference to RAE s in this SMS Manual are for research and historical purposes only.
Risk Assumption Strategy. A risk management strategy used to accept the risk.
Risk Avoidance Strategy. A risk management strategy used to avert the potential occurrence and/or consequence of a hazard by either selecting a different approach or not implementing a specific propo sal.
Risk Control Strategy. A risk management strategy used to develop options and take actions to lower the risk.
Risk Mitigation. Refer to “Mitigation.” Risk Transfer Strategy. A risk management strategy used to shift the ownership of a risk to another party.
Safety. The state in which the risk of harm to persons or property damage is acceptable.
Safety Assurance. A set of processes within the SMS that verify that an organiza tion meets or exceeds its safety performance objectives and that function systematically to determine the effectiveness of safety risk controls through the collection, analysis, and assessment of information. Safety Assurance is one of the four components of the SMS.
Safety Culture. The way safety is perceived and valued in an organization. It represents the priority given to safety at all levels in the or ganization and reflects the real commitment to safety.
Safety Case Lead (SCL) . An expert in SMS policy and guidance that pertain to the ATO.
Safety Directive. A mandate from AOV to the ATO to take immediate corrective action to address a noncompliance issue that creates a significant unsafe condition.
S afety Management System (S MS ) . An integrated collection of policies , processes, procedures, and programs used to manage safety risk in the provision of air traffic management and communication, navigation , and surveillance services.
Safety Margin. The buffer between the actual minimum - level requirement and the limit of the hardware or sof tware system.
Safety Performance Indicators. Metrics identified to determine how risk mitigations are performing.
8 _SMSM_20 2 21 2 84 Originally published December 20 2 2 Uncontrolled copy when downloaded Section 8 Definitions and Acronyms Safety Performance Monitoring. The act of observing the safety performance of the NAS to ensure an acceptable level of safety risk.
Safety Performance Targets. Measurable goals used to verify the predicted residual risk of a hazard. They should quantifiably define the predicted residual risk.
Safety Policy. The documented organizational policy that defines management’s commitment, respon sibility, and accountability for safety. One of the four components of the SMS , Safety Policy identifies and assigns responsibilities to key safety personnel.
Safety Promotion. The communication and distribution of information to improve the safety cultu re and the development and implementation of programs and/or processes that support the integration and continuous improvement of the SMS within the ATO. One of the four components of the SMS, Safety Promotion allows the ATO to share and provide evidence of successes and lessons learned.
Safety Requirement. A planned or proposed means to reduce a hazard’s causes or effects.
Safety Requirement Approval. Certification that the safety requirements can and will be implemented.
S afety Ri sk Management (S RM ) . A process within the SMS composed of describing the system; identifying the hazards ; and analyzing, assessing, and treating risk . One of the four components of the SMS, SRM includes processes to define strategies for monit oring the safety risk of the NAS. SRM complements Safety Assurance.
S RM Document . A document that records the SRM panel attendees’ de terminations for NAS change s and existing safety issue s . It presents evidence support ing whether the NAS change and/or risk management strategies should be accept ed by ATO or FAA management officials from a safety risk perspective.
SRM Document Approval (for SRM Documents With Hazards ) . Indication that the SRM document was developed in accordance with policy and guidance ; hazards were systematically identified using a structured approach ; risk was appropriately analyzed and assessed; if identified, safety requirements were deemed valid; safety performance targets or other methods to verify predicted residual risk were approved by the responsible Service Unit; and a monitoring plan was prepared. SRM document approval does not c onstitute acceptance of the risk associated with the NAS change or existing safety issue or approval to implement the NAS change.
SRM Document Approval (for SRM Documents Without Hazards ). Indication that t he SRM document was developed in accordance with policy and guidance , the N AS change did not introduce new hazards or increase safety risk, and the SRM document includes a d etailed rationale to support the finding of no hazards .
S RM Panel. A meeting of a diverse group of SRM panel members , S M E s , observers, and facilitators from the various organizations affected by the NAS change or existing safety issue .
They objectively identify potential hazards and effects associated with the NAS change or e xisting safety issue and pr ovide findings and recommendations to decision - makers , which are captured in an SRM d ocument .
8 _SMSM_20 2 21 2 85 Originally published December 20 2 2 Uncontrolled copy when downloaded Section 8 Definitions and Acronyms SRM Panel Co - Facilitator. A person who shares responsibilities with the SRM panel faci litator in supporting the SRM panel.
SRM Panel Facilitator. A trained expert on the SRM process who moderates the deliberations of the SRM panel attendees from a neutral position. They invoke participation , mediate discussion, ensure any dissenting opinions are documented, keep the meeting organ ized and on topic, remain neutral throughout the process without advocating for a specific outcome, and may support the development of the SRM document.
S RM Panel Member . An SRM panel member is a n FAA employee or other representati ve (as specified in an FAA Memorandum of Agreement) who objectively performs the SRM process.
The SRM panel members are selected at the discretion of the change proponent and/or SRM panel facilitator.
SRM Panel Observer . An individual who is not part of the SRM panel meeting and does not participate in the deliberation process (only observe s the proceedings). They have an objective to obtain a better understanding of the SRM process — not the NAS change or existing safety issue being addressed . SRM p anel observers are permitted at the discretion of the change proponent.
Safety Risk Tracking. A closed - loop means of ensuring that the requirements and mitigations associated with each hazard that has associated medium or high risk are implemented. Safety risk tracking is the process of defining safety requir ements, verifying implementation, and readdressing the risk to make sure the hazard meets its risk level requirement before being accepted.
Severity. The consequence or impact of a hazard’s effect or outcome in terms of degree of loss or harm.
Single Point Failure. The failure of an item that would result in the failure of the system and is not compensated for by redundancy or an alternative operatio nal procedure.
SMS Continuous Improvement Plan. The plan that specifies the activities required for individual ATO Service Units to allocate sufficient resources toward the integration and maturation of the ATO SMS.
Source (of a Hazard ). Any real or pote ntial origin of system failure, including equipment, operating environment, human factors, human - machine interface, procedures, and external services.
Stakeholder. A group or individual that is affected by or is in some way accountable for the outcome of a safety undertaking; an interested party having a right, share, or claim in a product or service or in its success in possessing qualities that meet that party’s needs and/or expectations.
S ubject Matter Expert (SME) . A n FAA employee or third - party stakeholder who serves as a technical expert on the NAS change, procedure, hardware / software , or proposed solution 1 . Inclusive of F C T employees or other contractors who have been given explicit authority to represent (i.e., make decisions for / speak on behalf of) the FAA.
2 . This includes FAA bargaining unit representatives or Department of Defense (DoD) representatives. Note: DoD representatives participate as panel member s when DoD A T C procedures / airspace are impacted.
8 _SMSM_20 2 21 2 86 Originally published December 20 2 2 Uncontrolled copy when downloaded Section 8 Definitions and Acronyms undergoing SRM . SME s are not SRM panel member s and do not participate in the consensus - driven decisions regarding initial / predicted residual risk levels while analyzing or assessing safety risks to the NAS.
System. Integrated elements that are combined in an operational or support environment to accomplish a defined objective. These elements include people, hardware, software, firmware, information, procedures, facilities, services, and other support facets.
System State. An expression of the various conditions, characterized by quantities or qualities, in which a system can exist.
Tracking. The continued process of documentin g the results of monitoring activities and the change’s effect on the safety of the NAS.
Unacceptable Level of Safety Risk. A high - risk hazard or a combination of medium/low risks that collectively increase risk to a high level.
Worst Credible Effe ct. The most unfavorable, yet believable and possible, c ondition given the system state .
8 .2 Acronyms ADS - B Automatic Dependent Surveillance – Broadcast AJG Management Services AJI Safety and Technical Training AJM Program Management Organization AJV Mission Support Services AJW Technical Operations AMASS Airport Movement Area Safety System AMS Acquisition Management System AOV Air Traffic Safety Oversight Service ARIA Aviation Risk Identification and Assessment ARP Office of Airports ARSR Air Route Surveillance Radar ARTCC Air Route Traffic Control Center ARTS Automated Radar Terminal System ASAP Aviation Safety Action Program ASDE Airport Surface Detection Equipment ASIAS Aviation Saf ety Information Analysis and Sharing ASR Airport Surveillance Radar ASRS Aviation Safety Reporting System ATC Air Traffic Control ATCRBS Air Traffic Control Radar Beacon System ATCT Airport Traffic Control Tower ATM Air Traffic Manager / Air Traffic Management ATO Air Traffic Organization ATO - SG Air Traffic Organization Safety Guidance ATSAP Air Traffic Safety Action Program BAR Barrier Analysis Review 8 _SMSM_20 2 21 2 87 Originally published December 20 2 2 Uncontrolled copy when downloaded Section 8 Definitions and Acronyms CAP Corrective Action Plan CAT Category CEDAR Comprehensive Electronic Data Analysis and Reporting CISP Confidential Information Share Program COMM Communications COO Chief Operating Officer CSA Comparative Safety Assessment CVT Compliance Verification Tool DoD Department of Defense FAA Federal Aviation Administration FCT Federal Contract Tower HAW Hazard Analysis Worksheet HMI Hazardously Misleading Information ICAO International Civil Aviation Organization IFR Instrument Flight Rules IMC Instrument Meteorological Conditions IOA Independent Operational Assessment LOB Line of Busi ness MODES Mode Select Beacon System NAS National Airspace System NATCA National Air Traffic Controllers Association NAV Navigation NCP NAS Change Proposal NMAC Near Mid - Air Collision NTSB National Transportation Safety Board OCS Obstacle Clearance Surface OHA Operational Hazard Assessment OSA Operational Safety Assessment PDARS Performance Data Analysis and Reporting System PHL Preliminary Hazard List POC Point of Contact PRD Program Requirements Document QA Quality Assurance RAE Risk Analysis Event RAP Risk Analysis Process RI Runway Incursion SCL Safety Case Lead SME Subject Matter Expert SMS Safety Management System 8 _SMSM_20 2 21 2 88 Originally published December 20 2 2 Uncontrolled copy when downloaded Section 8 Definitions and Acronyms SMTS Safety Management Tracking System SOC Safety Oversight Circular SRM Safety Risk Management SRMGSA Safety Risk Management Guidance for System Acquisitions STARS Standard Terminal Automation Replacement System T - SAP Technical Operations Safety Action Program TCAS Traffic Alert and Collision Avoidance System TIS Traffic Information Services TRACON Terminal Radar Approach Control VFR Visual Flight Rules VMC Visual Meteorological Conditions WAM Wide Area Multilateration 8 _SMSM_20 2 21 2 89 Originally published December 20 2 2 Uncontrolled copy when downloaded
Annex A
Safety Risk Management Application and Guidance
Annex A Safety Risk Management Application and Guidance Contents 1. 2 SRM Planning and Initial Decision - Making ................................ ................................ ... 1 1. 2 .2 Determine the Need for an SRM Panel ................................ ................................ . 1 1. 3 .2.2 Monitoring Plan ................................ ................................ ................................ . 8 1. 4 .1.5 Rationale for a Safety Finding Without Hazards (If No Hazards Are Identified) . 12 1. 4 .1.10 Appendices ................................ ................................ ................................ ... 13 2. 2 .1 Initiate the Request for a New Waiver or Waiver Renewal ................................ ... 14 2. 2 .4 Waiver Renewals ................................ ................................ ................................ . 14 2. 2 .5 Waiver Approval ................................ ................................ ................................ .. 15 Annex_SMSM_202 21 2 i Originally published December 202 2 Uncontrolled copy when downloaded Annex A Safety Risk Management Application and Guidance No SRM panel or documentation required No Yes Sec. 3.3 Is the change in Potential Introduces Convene an SRM accordance with a new hazards or to affect safe panel NAS Change increases procedure/policy that Sec. 3.2; No provisioning of ATM or Sec. 3.2 Annex A, safety risk? underwent SRM and was CNS services?
Sec. 1 Sec. 3.7 approved?
Sec. 3.2 Sec. 3.3 Yes Yes No No Determine Establish predicted Assign risk controls Existing Safety Convene an level based Develop safety residual risk, safety High - Risk Can risk and hazard SRM panel Issue on severity Hazard? No requirements be further reduced? performance targets, Yes Sec. 3.2; Annex effects Sec. 3.9.2.1 Sec. 3.2 and likelihood Sec. 3.10 Sec. 3.10.3 and monitoring activities A, Sec. 1 Sec. 3.8.2, Sec. 3.9 Sec. 3.10.4, 4.1, 4.2 3.8.3 Yes Yes No (A)* Revise objective/scope Can high risk Safety Risk Management Process or abandon project be mitigated? No Post - Implementation Safety Assurance Sec. 3.10 Sec. 3.10.4 Monitor in Predicted accordance with residual risk/safety Change considered part of the monitoring plan performance targets met?
operational NAS; periodically assess Yes Sec. 4.3.2, 4.3.3 Sec. 4.3 safety performance of procedures, operations, NAS equipment Sec. 4.3.5 No (B)* Obtain applicable Accept current risk as the concurrence and new predicted residual risk approval signatures & revise SRM document Sec. 5.5, 5.6 Sec. 4.3.2, 5.7 Write SRM Write SRM document Obtain AOV Obtain applicable If applicable, obtain document with without hazards Initial approval and risk approval for necessary safety hazards and create high risk hazard? and create SMTS Yes acceptance signatures requirement signature(s) SMTS entry risk mitigations Sec. 3.9.2.1 entry Sec. 5.4, 5.6 Sec. 5.3 Annex A, Sec. 5.6.3 Annex A, Documentation Process Sec. 1.5 Sec. 1.5 No *See Section 4.3.2 for more information on how to proceed if predicted residual risk is not met.
Figure A .1: Overview of the S afety R isk M anagement Process Annex_SMSM_202 21 2 ii Originally published December 202 2 Uncontrolled copy when downloaded Annex A Safety Risk Management Application and Guidance 1. Guidance for Preparing for and Convening a Safety Risk Management Panel 1.1 Overview This section provides practical guidance for applying the Safety Risk Management (SRM) process , which is depicted in Figure A.1 . This sect ion outlines information regarding how to: Determine whether an SRM panel is required, Prepare for and convene an SRM panel, and Produce the resulting SRM documentation .
1.2 SRM Planning and Initial Decision - Making The scope of a n SRM effort is based on the type, complexity, and effect of the National Airspace System (NAS) change or existing safety issue. The following steps are essential to performing any initial decision - making as well as planning and preparing for SRM of all NAS changes and existing safety issues: Define the NAS change or existing safety issue and the s cope of the operational system and/or environment affected.
De termine the need for an SRM panel .
Identify an SRM panel facilitator and appropriate SRM panel attendees.
To support th ese activit ies, each of which are detailed below , the change proponent for the SRM effort should consult their Service Center Quality Control Group ; the Safety and Technical Training (AJI) Safety Engineering Team , AJI - 314, Manager (who can be contacted through the Air Traffic Organization (ATO) Safety Management System (SMS) mailbox ) ; or a local safety Point of Contact (POC) when initiating the process.
1.2.1 Define the NAS Change / Existing Safety Issue The change proponent must properly define the purpose and scope of the NAS change or existing safety issue using inp ut from technical experts . The change proponent should consider the impact of the NAS change on relevant NAS equipment, operations, and procedures. This includes : The NAS change or existing safety issue, The system state(s) in which the change will be operational / in which the existing safety issue exists , Assumptions (not controls), and The components of the 5M Model.
1.2.2 Determin e the Need for an SRM Panel After defining the scope of the NAS change, the change proponent should determine if the NAS change pertains to or has the potential to affect safe provision of air traffic management or communication, navigation, and surveillance services using input from the technical experts . If it does not , then no further analysis is required (i.e., an SRM panel , SRM document, and Safety Management Tracking System (SMTS) entry are not required). Conversely, if there is potential for the NAS change to affect the safety of the NAS, then an SRM pa nel and S MTS entry are required . The SRM panel only det ermines the safety of the NAS change — not its suitability, validity, or necessity. Panel deliberations must not be used to define what the NAS change Annex_SMSM_202 21 2 1 Originally published December 202 2 Uncontrolled copy when downloaded Annex A Safety Risk Management Application and Guidance should be or to change the purpose or intent of the NAS change defined by the organization(s) sponsoring t he NAS change.
Likewise, when using SRM to address an existing safety issue, convening a n SRM panel is warranted. When addressing existing safety issues, i t is still necessary to identify hazards and causes associated with the issue, but it is not necessary to assess the validity or current risk level if it has already been i dentified and confirmed by a safety audit or post - event safety risk analysis.
1.2.3 Identify SRM Panel Attendees The change proponent works closely with the SRM panel facilitator/co - facilitator to identify the SRM panel attendees necessary to perform SRM. The size and composition of the SRM panel will vary based on the type and complexity of the proposed NAS change or existing safety issue, and it should be limited to an appropriately sized yet diverse team of stakeholders and Subject Matter Experts (SMEs). A stakeholder is considered to be an entity that could be affected by the proposed NAS change or existing safety issue from a safety risk perspective (i.e., an entity responsible for any of the following tasks: implementing the NAS change when approved, ac cepting the residual risk, implementing safety requirements, or affirming controls).
The change proponent, with the SRM panel facilitator, should obtain information on the knowledge, experiences, and positi ons of each attendee . The following list, though not all - inclusive, provides types of experts to consider for participation on an SRM panel: Employees directly responsible for developing the NAS change or managing the existing saf ety issue, Employees with current knowledge of and experience with the system or NAS change, Hardware/ Software engineering and/or automation experts (to provide knowledge on equipment performance), Human factors specialists, Systems specialists, System operators, Employees skilled in collecting and analyzing hazard and error data and using specialized tools and techniques (e.g., operations research, data, and human factors), Quality Control / Quality Assurance employees (to help ensure that the safety pe rformance target is measurable and auditable or to help develop an alternate means to verify predicted residual risk), Air traffic procedures specialists, Information and cyber - security specialists, Third - party stakeholders (e.g., pilots, pilot organizatio ns, and industry representatives) , Air traffic controllers, Maintenance technicians, Traffic management specialists, and Bargaining unit representatives.
Annex_SMSM_202 21 2 2 Originally published December 202 2 Uncontrolled copy when downloaded Annex A Safety Risk Management Application and Guidance Although not required, the 5M Model is useful for identifying potential SRM panel members and SMEs . N ote that it may be necessary to elevate a request for participation to an appropriate management level to ensure participation by all affected stakeholders.
Any SRM panel meeting attendee should fulfill one of the roles specified in the follow ing subsections .
1.2.3.1 Change Proponent A change proponent is an individual, Program Office , facility, or organization with in the F ederal Aviation Administration (F AA ) that has identified the need for SRM or has proposed or is sponsoring a NAS change or means to address an existing safety issue.
Among other responsibilities, the change proponent works with the SRM panel facilitator to define the purpose and scope of the NAS change or existing safety issue , c apture the safety findings from the SRM panel meeting in an SRM document , and ensure that the SRM document is recorded in SMTS . The change proponent may record the information directly, design ate a responsible individual, or work with the SRM panel facilitator or organization responsible for accepting safety risk to enter the SRM document into SMTS.
Unless circumstances warrant doing so, the change proponent should not function as an SRM pane l member at their SRM panel.
1.2.3.2 SRM Panel Facilitator An SRM panel facilitator is a trained expert on the SRM process who moderates the deliberations of the SRM panel attendees from a neutral position.
The change proponent selects or requests an SRM panel facilitator. After, the change proponent and the facilitator ( and co - facilitator if one is identified) will have an initial meeting to prepare for the SRM panel. During this time, the facilitator will provide a briefing to the change proponent on the SRM process and work with the change proponent to develop the scope of the SRM panel. The SRM panel facilitator should also become well - versed in the subject matter (e.g., by requesting briefings and collecting all available and relevant safety information), as necessary, before the SRM panel convene s.
This c oordination and preparation between the change proponent and facilitator/co - facilitator result s in the development of a briefing package to provide to SRM panel attendees before the panel meeting . The briefing package should include all relevant information about the NAS change or existing safety issue , the SRM panel meeting invitation, an agenda, briefing materials, and directions to the meeting venue.
An effective SRM panel facilitator ensures the SRM process is followed in an unbiased manner and works to achieve consensus, a judgement by a majority of panel mem bers . They invoke participation , mediate discussion , ensure differences of opinions are documented , keep the meeting organized and on topic, and remain neutral throughout the process without advocating for a specific outcome. The facilitator (or their designee) may assist the change proponent in writ ing the SRM document , which describ es the safety findings of the SRM panel meeting.
Facilitator duties and responsibilities must be discussed with the change proponent and communicated to the SRM panel attendees .
Annex_SMSM_202 21 2 3 Originally published December 202 2 Uncontrolled copy when downloaded Annex A Safety Risk Management Application and Guidance 1.2.3.2.1 SRM Panel Co - Facilitator An SRM panel co - facilitator is a person who shares responsibilities with the SRM panel facilitator in supporting the SRM panel .
A n SRM panel co - facilitator , if one is assigned, assist s the facilitator . A co - facilitator is especially helpful when the panel size exceeds 12 attendees and/or the subject matter is complex. Like the facilitator, the co - facilitator (or their designee) may assist the change pro ponent in writ ing the SRM document describing the safety fin dings of the SRM panel meeting. Co - facilitator duties and responsibilities must be discussed with the change proponent and communicated to the SRM panel attendees .
1.2.3.2.2 Facilitation by AJI Safety Case Leads An AJI Safety Case Lead (SCL) is an expert in SMS policy and guidance that pertain to the ATO. They may facilitate SRM efforts for existing safety issues and NAS changes that meet any of the following criteria: It has a high (potentially political, economic, or financial) impact on the FAA , the NAS, or the flying public.
It is the result of financial or operational decisions made by FAA executive management, cabinet - level executives, or Congress.
The NAS change is a propos ed means of addressing any safety issues identified as part of the Top 5 Program.
The NAS change modifies safety policy that must be incorporated in a directive.
It can or does present operational or technical conflicts to multi ple affected Service Units or FAA Lines of Business (LOBs).
1.2.3.3 SRM Panel Member An SRM panel member is a n FAA employee or other representative (as specified in an FAA Memorandum of Agreement) who objectively performs the SRM process.
An SRM panel member represents the program, facility, organization, or constituency potentially affected by the safety risk, the safety requirements associated with the proposed NAS change and/or the existing safety issue. Among other responsibilities, SRM panel members eva luate safety risk associated with the NAS change or existing safety issue objectively, thoroughly, and fairly ; do not debate the validity of the NAS change; and review and comment on SRM document s .
1.2.3.4 S M E An SME is an FAA employee or third - party stakeholder who serves as a technical expert on the NAS change, procedure, hardware / software, or proposed solution undergoing SRM.
SMEs share data, detailed information, and experience about the subject being discussed during the SRM panel meeting ; partake in technical dialogue with SRM panel members; and review and comment on the aspects of SRM docu ments for which their expert ise is applicable .
1 . Inclusive of federal contract tower employees or other contractors who have been given explicit authority to represent (i.e., make decisions for / speak on behalf of) the FAA.
2 . This includes FAA bargaining unit representatives or Department of Defense (DoD) representatives. Note: DoD representatives participate as panel member s when DoD Air Traffic Control procedures / airspace are impacted.
Annex_SMSM_202 21 2 4 Originally published December 202 2 Uncontrolled copy when downloaded Annex A Safety Risk Management Application and Guidance They are not panel member s and do not participate in the consensus - driven decisions regarding initial / predicted residual risk levels while analyzing or assessing safety risk s to the NAS .
Note: In other areas of the ATO SMS Manual, th e term “ subject matter expert ” is used generically. Each SRM panel attendee is expected to have technical knowledge in a subject area that would suggest their participation in the panel meeting is appropriate.
1.2.4 SRM Panel Observer An SRM panel observer is an individual who is not part of the SRM panel meeting and does not participate in the deliberation process (only observes the proceedings ) .
An observer has an objective to obtain a better understanding of the SRM process — not the NAS change or existing safety issue being addressed . They are not active member s of the SRM panel meeting ; do not provide input during the deliberations ; and , like all other attendees, may not use electronic recording devices during the panel meeting. The presence of p anel observers is permitted at the disc retion of the change proponent.
1.2.4.1 Air Traffic Safety Oversight Service Attendance The SRM panel facilitator or change proponent must evaluate the NAS change or existing safety issue to determine whether it will require approval or acceptance from the Air Traffic Safety Oversight Service (AOV) and consider their attendance at the SRM panel . Contact the Safe ty Management Group, AJI - 31, Manager for guidance, if necessary. If AOV approval or acceptance is required, then the SRM panel facilitator or change proponent must coordinate with AJI to ensure compliance with AOV requirements.
1.2.4.2 Guidance for Bargaining Unit Participation When selecting SRM panel attendees, adhere to the Collective Bargaining Agreement between the FAA and affected bargaining unit representatives. When a NAS change or existing safety issue crosses Service Area boundaries and LOBs, the change proponent will ensure the Management Services (AJG) Technical Labor Group, AJG - L1, is notified.
Ensure that all facilities, including their respective bargaining units, are given notification of the upcoming SRM panel. Labor organizations, such as the National Air Traffic Controllers Association and Professional Aviat ion Safety Specialists , represent several different bargaining units (engineers, controllers, attorneys, etc.). In some cases, multiple bargaining units may need to attend the panel to ensure that the appropriate expertise is available. Multiple bargaini ng unit members, when represented by the same labor union, may be SRM panel members, but the labor organization representative will identify a lead representative that speaks for the labor organization during the SRM panel.
For assistance finding a labor union representative , contact AJG - L1 for more information.
1.2.4.3 Participation on SRM Panels Outside of a Service Unit or the ATO ATO employees are often requested to participat e as stakeholders or SMEs on SRM panels sponsored by organizations outside of their Service Unit or the ATO. It is important to support these requests, whether they originate within or outside of the ATO. Participation as an SME or stakeholder does not n ecessarily mean that the organization represented by an SRM panel member is responsible for developing or implementing safety requirements, accepting risk, or approving the SRM document .
Annex_SMSM_202 21 2 5 Originally published December 202 2 Uncontrolled copy when downloaded Annex A Safety Risk Management Application and Guidance When requesting the participation of an ATO Service Unit, the requestor should contact the appropriate Program Office or Service Unit for coordination.
1.3 Convening the SRM Panel Following the identification and invitation of SRM panel attendees , the S RM pane l convene s .
On the first day of t he SRM panel meeting, the SRM panel facilitator or a designee must present an SRM panel orientation that includes: The agenda for the meeting , A summary of the goals and objectives for the SRM panel, A brief review of the SRM process, SRM panel ground rules, The method(s) by which the SRM panel will identify hazards (if known), and A draft or summary of the “Current System” and “ Description of Change ” sections of the SRM document, if available, provided by the change proponent (see Sections 1.4.1.3 and 1.4.1.4 of Annex A).
1.3.1 SRM Panel Meeting Logistics The SRM panel facilitator may perform or delegate the function of time keeper in order to manage start times and breaks. The facilitator may also delegate the recording of meeting notes, the writing of the SRM document, and the provision of audio/visual support.
The SRM panel should be conducted using in-person meetings, if possible; however, stakeholders can participate in SRM panel meetings via other methods, such as web meetings or teleconferences. In the event that the invited stakeholders cannot participate in an SRM panel, consult with the change proponent and, if feasible, continue the SRM panel as scheduled. The findings should then be forwarded to the absent stakeholders to gather additional input, comments, or concerns.
1.3.2 SRM P anel Deliberations During the SRM panel, the SRM panel facilitator will lead attendees in objectively examining, identifying, and mitigating potential safety hazards and effects associated with the NAS change or existing safety issue. If hazards are identified, the SRM panel facilitator will guide the attendees through the five-step DIAAT process using the Hazard Analysis Worksheet (HAW) and monitoring plan (see Sections 1.3.2.1 and 1.3.2.2 of Annex A).
SRM panel members should strive for unanimous agreement on risk determinations; however, there may be instances in which not all SRM panel members agree with the panel’s consensus.
In those cases, record the difference of opinions from the SRM panel members in the SRM document. Dissenting SRM panel members should provide, in writing, their own rationale and data for why their risk determination differs from that of the other SRM panel members. The written dissention must be included in the SRM document.
The SRM panel facilitator must mediate and assist SRM panel members in working through differences of opinion. The facilitator should be able to recognize, acknowledge, and use differences of opinion to help the SRM panel members consider different points of view.
Annex_SMSM_202 21 2 6 Originally published December 202 2 Uncontrolled copy when downloaded Annex A Safety Risk Management Application and Guidance 1.3.2.1 HAW Use the HAW to organize the SRM panel’s deliberations into 16 key categories. It is at the panel’s discretion to decide which items belong in the HAW. It provides a snapshot of the SRM panel conclusions and will be included in the SRM document for each hazard identified.
Table A . 1: HAW Hazard Description: 1. 2. 3. 4.
Hazard ID Hazard Description Cause System State Alpha - numeric Any real or potential condition The origin of a hazard An expression of the various identifier that can cause injury, illness, conditions, characterized by (under 10 or death to people; damage to quantities or qualities, in which characters) or loss of a system, a system can exist equipment, or property; or damage to the environment Controls: 5. 6.
Controls Control Justification Any means currently reducing a hazard’s A justification for each control, indicating its effect on the causes or effects identified hazard's causes or effects Initial Risk: 7. 8. 9. 10. 11. 12.
Severity Lik elihood Effect Severity Likelihood Initial Risk Rationale Rationale The real or The Explanation of The estimated Explanation of The composite of credible consequences how severity probability or how likelihood the severity and harmful or impact of a was determined frequency, in was determined likelihood of a outcome that hazard’s effect quantitative or hazard, has occurred or outcome in qualitative considering only or can be terms of degree terms, of a controls and expected if the of loss or harm hazard’s effect documented hazard occurs or outc ome assumptions for a in a defined given system state system state Safety Requirements: 13a . 13b . 14a. 14b.
Organizatio n Safety Requirement Planned for Responsible for POC Description Implementation? Implementing Safety Requirement A planned or proposed means to Denotes whether the The organization’s name / POC’s name and reduce a hazard’s causes or safety requirement is routing code telephone number effects planned for implementation ( yes/no ) 3 . All SR M documentation (with the exception of the Program Safety Plan, Operational Safety Assessment , Com parative Safety Assessment, and System Safety Assessment Report ) require s the use of a HAW. Worksheets specific to the se documents are contained in the S afety R isk M anagement G uidance for S ystem A cquisitions .
Annex_SMSM_202 21 2 7 Originally published December 202 2 Uncontrolled copy when downloaded Annex A Safety Risk Management Application and Guidance Predicted Residual Risk: 15a. 15b .
Predicted Residual Pre dicted Residual Risk Rationale Risk The risk that is If necessary, any additional explanation needed to help the reader understand how estimated to exist after the predicted residual risk was determined the safety requirements are implemented or after all avenues of risk mitigation have been explored Safety Performance Target: 16.
Safety Performance Target The measurable goals that will be used to verify the predicted residual risk of a hazard 1.3.2.2 Monitoring Plan Use a monitoring plan table to organize the SRM panel’s plan for monitoring the safety performance target and verifying the predicted residual risk for each hazard identified.
Information from the monitoring plan will be needed for the SRM document and entry into SMTS.
Table A .2 : Monitoring Plan Safety Performance Provide a safety performance target ( as documented in the HAW ) that can be 1.
Target used to verify the predicted residual risk for the hazard Provide the hazard ID ( s ) from the HAW that is associated with this s afety 2. Hazard ID(s) p erformance t arget Include the initial risk from the HAW 3. Initial Risk I nclude the means that will be implemented to reduce the hazard’s causes or 4. Safety Requirements effects f rom the HAW Organization Responsible for Include information on the responsible organization / POC documented in the 5.
HAW Implementing Safety Requirements Predicted Residual 6. Include the p redicted r esidual r isk from the HAW Risk Enter the name and contact information of the person who will be responsible Monitoring POC(s) 7.
for conducting the monitoring of this safety performance target Describe the tasks that will be led by the monitoring POC to collect and analyze 8. Monitoring Activities data to verify the predicted residual risk 9. Monitoring Start Date Enter the date when the monitoring activities should begin 10. Reporting Frequency Specify how often the monitoring activities will be reported 11. Reporting Duration Specify the total length of time for the monitoring effort 1.3.3 Factors that Jeopardize SRM Panel Results Failure to adequately describe the system and scope the NAS change or existing safety issue can negatively affect the fidelity of the SRM process . Change proponents, SRM panel Annex_SMSM_202 21 2 8 Originally published December 202 2 Uncontrolled copy when downloaded Annex A Safety Risk Management Application and Guidance facilitators, and SRM panel members should adhere to the following guidelines to help ensure that SRM panel deliberations are relevant to the NAS change or existing safety issue : Sufficiently define the scope.
Involve relevant stakeholders.
Identify drivers and constraints.
Define product boundaries and external interfaces.
Baseline the scope before writing requirements.
1.4 Completing the SRM Document ation A n SRM document record s the SRM panel attendees’ determinations for NAS change s and existing safety issues. The SRM d ocument presents evidence supporting whether the NAS change and/or risk management strategies should be accept ed by ATO or FAA management officials from a safety risk perspective . There are two types of SRM documents: safety findings with hazards and safety findings without hazards .
Safety Finding With Hazards: When an SRM panel determines that a NAS change or existing safety issue could introduce hazards or increase safety risk, the panel must complete each phase of the DIAAT process. Typically, this results in new means to reduce risk (i.e., safety requirements) being devised and proposed for implementation.
Safety risk an d overall safety performance must be monitored after implementation of the NAS change and/or safety requirements to address the identified hazards. This information should be contained in an SRM document with hazards.
Safety Finding Without Hazards: When an SRM panel determines that no hazards will be introduced or that safety risk will not increase with the implementation of the NAS change being assessed, an SRM document without hazards is used. The SRM document should include a description of the syste m and NAS change and a rationale explaining why the change does not introduce hazards or increase safety risk.
1.4.1 Writing the SRM Document The change proponent, the SRM panel facilitator, or a designated individual should begin drafting the SRM document im mediately after the SRM panel meeting . The draft SRM document should be presented to the SRM panel to verify that the SRM panel members’ discussions have been correctly recorded and consensus has been achieved. In the event that an SRM panel member does not concur with a determination made during the risk analysis or risk assessment phases of the process , they are encouraged to submit a dissent in writing.
Such dissent s are included in the SRM document for evaluatio n by the risk acceptance official.
The change proponent, the SRM panel facilitator, a designated individual , or the organization responsible for accepting safety risk must enter the SRM document into SMTS .
4 . The purpose of SRM is not to record all modifications to elements of the NAS but rather to assess the risk potentially caused by proposed changes to or existing safety issues in the NAS . SRM documentation should strictly consider and document safety concerns and safety findings. Certain modifications may not necessarily be considered NAS changes under the purview of this SMS Manual. The change proponent must consider potential safety ramifications when making any modification to the NAS (see Section 3.2 ). Modifications that do not relate to safety will not require SRM and do not need to be documented. Contact a n AJI SCL for assistance, if necessary.
5 . When addressing existing safet y issues, the approach for safety findings with hazards is the most appropriate.
6 . Refer to the S afety R isk M anagement G uidance for S ystem A cquisitions for guidance on writing SRM documents for acquisitions .
Annex_SMSM_202 21 2 9 Originally published December 202 2 Uncontrolled copy when downloaded Annex A Safety Risk Management Application and Guidance The following list reflects the applicable sections and criteria for SRM documents: Executive Summary SRM Document Signatures Current System Description of Change / Existing Safety Issue Rationale for a Safety Finding Without Hazards (if no hazards are ide ntified) Hazard Identification and Risk Determination (if hazards are identified) Monitoring Plan (if hazards are i dentified) Dissention ( when applicable ) SRM Panel Attendees Appendices For additional guidance about writing either type of document, consider using the SRM document templates available in SMTS and on t he ATO SMS Toolbox .
1.4.1.1 Executive Summary Use the Executive Summary to provide only the substantive information necessary for decision - makers to understand the current system ; NAS change / existing safety issue ; and, if applicable, the associated safety risk and proposed ways to address the hazards and safety risk. Provide detailed information and supporting narrative on these items in the body of the SRM document.
Include the following administrative information regarding the SRM document : Title. Include a clear, concise name of the document with which the document’s subject can be easily understood .
Change Proponent Organization . Provide the organization that is initiating the NAS change or that has taken responsibility for addressing the existing safety issue . Include the organization ’s name and FAA routing code.
Document Type. Indicate the document type , such as O perations , Second - Level Engineering , etc.
For SRM documents with hazards, use the tables below to summarize the hazards identified and proposed means of mitigation/monitoring: Table A . 3 : Hazard Summary Predicted Hazard ID Hazard Description Initial Risk Residual Risk Table A.4 : Safety Requirements Associated Organization POC Safety Requirement Hazard ID(s) Responsible Signature Annex_SMSM_202 21 2 10 Originally published December 202 2 Uncontrolled copy when downloaded Annex A Safety Risk Management Application and Guidance Table A.5 : Monitoring Plan Summary Associated Safety Performance Target Hazard ID If no hazard s are identified, do not include the above tables. Instead, provide a brief rationale for a safety finding without hazards.
1.4.1.2 SRM Document Signatures L ist ed below are the signatures required on the SRM document signature page . For each signatory, include the printed name, s ignature ( handwritten or electronic), organization, and date. Signatures should be obtained and must be listed in th e following order: concurre nce (whe n appropriate) ; approver ; risk accept o r ; and the Director of Policy and Performance, AJI - 3 , when necessary.
1. Concurrence. Include a concurrence signature from an SRM expert who is well - versed in th is SMS Manual and familiar with the terminology and processes therein . This signature is used to represent a technical review of the SRM document and to confirm the rationale used throughout is consistent with the SRM process .
2. Approval. Include an approval signature from an official representing the organization responsible for implementing the NAS change ( and from the AJI - 3 Director , if required ) .
An approver provides a technical and administrative quality control review of the SRM document , its findings, and the identified results.
Note: The official responsible for the approval signature cannot have been a n SRM panel member.
3. Risk Acceptance. Include a risk acceptance signature from an appropriate official representing the organization that will be using the safety - assessed NAS equipment, policy, or procedure. This signature indicates confirmation by the official that they understand the safety risk associated with the NAS change or existing safety issue and that they accept that safety risk into the NAS. Risk acceptance requires that signatures have been obtained for the safety requirements identified in the SRM document and that a comprehensive monitoring plan has been developed and will be followed to verify the predicted residual risk .
The safety requirements signatures from the responsible o rganization (s) and associated POC(s) are contained within the Executive Summary.
1.4.1.3 Current System Provide a detailed description of the hardware/software system, operation, or procedur e that constitutes the NAS change or the environment in which the existing safety issue has manifested . Include the following information , when applicable: A brief background on what triggered the need for a NAS change or the evaluation of an existing safety issue. If there is an associated S RM document , compliance issue, or Top 5 issue that necessitated this NAS change, briefly summarize it here , and include the associated reference or documentation as attachments.
The current hardware or software system or existing pr ocedures/operations and the corresponding (operational) system states.
Annex_SMSM_202 21 2 11 Originally published December 202 2 Uncontrolled copy when downloaded Annex A Safety Risk Management Application and Guidance The current procedure and its operational environment and, when applicable, a discussion about elements of this issue that make it particularly unique or challenging.
Equipment or proc edures needed to accommodate the implementation of the NAS change.
F uture configuration, system, or procedural changes that might affect the proposed change /procedure or existing safety issue.
1.4.1.4 Description of Change / Existing Safety Issue Provide a descrip tion of the proposed NAS change or the existing safety issue being addressed.
Include the following information, when applicable: A des cription of the proposed NAS change/procedure or existing safety issue and any critical safety parameters that are involved (e.g., prohibited/restricted airspace, noise abatement area, and operational limitation s ).
When applicable, discuss the types of verifications that will be performed throughout the development process to review whether the finalized proposed NAS change will be safe, operational, and effective once implemented. Evaluation can consist of simulator modeling, live testing, or a combina tion thereof.
A depiction of the proposed NAS change/procedure or existing safety issue (if visual illustration is beneficial).
Assumptions that make evaluating the NAS change or existing safety issue more manageable or that better scope the ch ange or issue undergoing SRM .
A summary of the relevant results of any related or preceding safety analyses (i.e., an acquisition program or operational change). Include any references and/or associated documentation mentioned in Section 1.4. 1.10 of Annex A .
The trac eability between the proposed change and the NAS Enterprise Architecture.
1.4.1.5 Rationale for a Safety Finding Without Hazards (If No Hazards Are Identified) There may be cases in which, through performing elements of the SRM process (i.e., describing the system / NAS change and identifying hazards), the SRM panel does not identify hazards associated with the implementation of the NAS change , or the SRM panel determine s that the NAS change d oes not increase the current risk level. In such cases, include a detailed rationale that explains how the SRM panel came to that conclusion. When the provisions of this section apply, the SRM document is nearly complete . Follow the guidance for Dissention ( when applicable), SRM Panel Attendees, and Appendices , and prepare the SRM document for signatures .
1.4.1.6 Hazard Identification and Risk Determination (If Hazards Are Identified) Provide a detailed explanation of each hazard identified. Provide the completed HAW for each hazard (see Section 1.3. 2. 1 of Annex A for instructions on creating a HAW) and the information necessary to support the risk overview in the Executive Summary.
1.4.1.7 Monitoring Plan (If Hazards Are Identified) Complete a monitoring plan for each hazard identified (see Section 1.3. 2. 2 of Annex A for instructions on creating a monitoring plan). Provide the completed monitoring pl an table for each hazard and the information necessary to support the monitoring overview in the Executive Summary.
Annex_SMSM_202 21 2 12 Originally published December 202 2 Uncontrolled copy when downloaded Annex A Safety Risk Management Application and Guidance 1.4.1.8 Dissention (When Applicable) The SRM panel process strives for agreement by all panel members with official findings, such as risk rating s . If any SRM panel member disagrees with the SRM panel’s official findings , that panel member should provide the nature and summary of the disagreement for inclusion in this part of the SRM document. SRM panel member discussions and disagreements that take place while working toward consensus are not dissentions if the SRM panel member ultimately agrees with or can live with the panel’s official findings, but such proceedings should be detailed in the body of the SRM document.
If an SME disagrees with the SRM panel’s official findings, and submits, in writing, an oppo sing opinion, this opposing opinion is not included in the dissention section of the SRM document. However, the opinion should be attached to the SRM document as part of the distribution.
1.4.1.9 SRM Panel Attendees Include a table with each SRM panel attendees ’ name and relevant information including their position, facility, and FAA routing code. Clarify each attendees’ role (i.e., facilitation team member, change proponent, SRM panel member, SME, or SRM panel observer ) .
1.4.1.10 Appendices Use appendices to include the following , as appropriate : Supporting documentation , such as simulations, modeling, and other technical analyses ; Relevant references ; and Acronyms, terms , and definitions .
1.4.2 SMTS SMTS is the official repository f or all completed ATO SRM documents . T he change proponent is responsible for ensuring that the SRM document is entered into SMTS before the initiation of monitoring activities, the full implementation of the NAS change, or the achievement of an FAA Acquisition Management System decision point . The change proponent may record the information directly, designate a responsible individual, or work with the SRM panel facilitator or organizati on responsible for accepting safety risk to enter the SRM document into SMTS. See the S afety R isk M anagement G uidance for S ystem A cquisitions for a more detailed description of mandatory entry requirements for acquisition programs.
1.4.2.1 Implementation Dates in SMTS Once the SRM document has been completed and all required signatures have been obtained, the change proponent is responsible for providing a monitoring start date (i.e., the date after all safety requirements are implemented). This date must be ente red into SMTS to trigger the automated email notification process for the monitoring plan.
2. Special SRM Considerations for Waiver Renewals and Approvals 2.1 Overview The section provides guidance for SRM considerations specific to waiver renewals and approvals.
7 . A complete d SRM document includes all required signatures (both ink and digital signatures are accepted).
Annex_SMSM_202 21 2 13 Originally published December 202 2 Uncontrolled copy when downloaded Annex A Safety Risk Management Application and Guidance 2.2 Documentation, Review, and Approval Process for Waivers to Separation Minima A waiver to separation minima can result in aircraft being allowed closer than approved separation from terrain, obstacles on the surface of the earth, airspace, or other aircra ft. The current ATO S afety Guidance (ATO - S G ) on separation minima lists the requirements in FAA Order JO 7110.65, Air Traffic Control , that pertain to separation minima. The ATO - S G also details which NAS changes related to separation minima requi rements need approval from AOV.
Any new waiver request or waiver renewal request that pertains to separation minima requires a new SRM docu ment or an SRM document on file that is developed in accordance with th e ATO SMS Manual. The SRM document should include a quantitative analysis (e.g., scientific study, Flight Standards Service report, detailed modeling, or Monte Carlo simulation) to sup port the information provided .
2.2.1 Initiate the Request for a New Waiver or Waiver Renewal Waivers must be kept to a minimum as they contribute to a nonstandard NAS. B efore developing or renewing a waiver, coordinate with the appropriate Service Area and Service Unit to obtain their commitment to the effort . The Service Unit will coordinat e with AJI to determine whether additional information is warranted to support the request and SRM document .
2.2.2 Waiver Development Guidance: Identify Appropriate Haza rds Most paragraphs in FAA and ATO orders mitigate a potential safety hazard. Attempt to identify the hazard that the relevant order intends to mitigate to determine the appropriate hazard(s) to address in the SRM document . If the waiver request is intended to reduce safety risk , then ensure there is sufficient justification in the SRM document , and show the waived procedures as a means to reduce risk in the HAW .
2.2.3 Relationship b etween the Waiver Request and the SRM D ocument A ll of the following waiver requirements should be covered in the SRM document : The “Affected Directive” and “Operations Authorized” sections of the waiver should match the “ Description of Change” section of the SRM document .
The “Special Provisions, Conditions, and Limitations” section of the waiver should flow out of the HAW section of the SRM document, specifically from the controls , system states, and/or the safety requirements.
Remember to include any new safety requirements in the SRM document .
2.2.4 Waiver Renewals Waivers must be renewed every two years. When submitting a waiver renewal request, read the current SRM document to determine whether any updates are necessary. Keep in mind that an SRM document must be updated to reflect the current oper ational environment. All required means to reduce risk ( including the publication of information and any refresher training requirements, as delineated in the original SRM document ) must be in place.
For each waiver renewal request: Determine whether the level of safety risk that was introduced with the initial waiver remains acceptable, Annex_SMSM_202 21 2 14 Originally published December 202 2 Uncontrolled copy when downloaded Annex A Safety Risk Management Application and Guidance Use the safety performance monitoring results per the monitoring plan to allow the responsible organization to determine whether the waiver is working as intended, an d Determine whether the provisions of the waiver have matured sufficiently that they should be made available to all others in the NAS through inclusion in FAA Order JO 7110.65 .
Before submitting a waiver renewal request, ensure the monitoring information pertaining to the existing waiver is up to date in SMTS . All proposed modifications to any provision of the current waiver will require a new waiver to be developed with a new SRM document .
2.2.5 Waiver Approval All new waivers and waiver renewal requests will be approved by AJI. AJI will coordinate the approved waiver with AOV, if necessary. Ensure that new waivers and information pertaining to waiver renewals are entered in SMTS.
Annex_SMSM_202 21 2 15 Originally published December 202 2 Uncontrolled copy when downloaded