Orion Abort Flight Test

DFRC-E-DAA-TN2272 · NASA (NTRS) · 2010

Public domain · NASA (NTRS)Technical Reports

Overview

The purpose of NASA's Constellation project is to create the new generation of spacecraft for human flight to the International Space Station in low-earth orbit, the lunar surface, as well as for use in future deep-space exploration. One portion of the Constellation program was the development of…

Publisher
NASA (NTRS)
Document
DFRC-E-DAA-TN2272
Year
2010
Pages
31

Document

Orion Abort Flight Test

Peggy Hayes

NASA Dryden

FTO Flight Dynamics Lead

Recent Abort Flight Test Events

• Pad Abort 1 flight test occurred on 6 May 2010 from White Sands

Missile Range in New Mexico

Project Orion: Flight Test Office

Abort Flight Test

 Orion’s Launch Abort System (LAS) provides an emergency escape system for the crew  Abort Flight Test Objectives:  Provide adequate testing to demonstrate proper performance and function of the LAS throughout the required flight envelope  Validate key abort models  LAS performance and functionality  Parachute system performance and functionality  Separation aerodynamics  Separation mechanism performance  Pathfinder for Orion system integration and ground operations procedures

Orion Spacecraft Overview

Crew Module • Provides safe habitat for crew • Allows reentry and landing as a stand alone module • ISS “lifeboat” capability Launch Abort System • Safely removes the crew from launch vehicle in an emergency • Protects crew module from atmospheric loads and heating • Jettisons after successful pad operations and first stage flight Service Module • Supports crew module from launch through separation • Accommodates unpressurized cargo or mission science equipment Spacecraft Adapter • Provides connection to launch vehicle • Protects Service Module components

Components of Program Constellation

Earth Orion - Departure Crew Stage Exploration Vehicle Ares V - Heavy Lift Launch Lunar Vehicle Lander

Project Orion: Flight Test Office

Ares I - Crew Launch Vehicle

Launch Abort System (LAS) and

Crew Module (CM)

Nose Cone

Project Orion: Flight Test Office

Abort Motor Test Firing

Project Orion: Flight Test Office

Jettison Motor Firing

ORION

LAUNCH ABORT SYSTEM JETTISON MOTOR :;;

DEMONS ~ RA W O~ ~

.. .. - ... ; ... .' q1 I111' ~ ) f~ ~ V: it tO~8 . .

Project Orion: Flight Test Office

Attitude Control Motor Firing

Project Orion: Flight Test Office

Pad Abort 1 (PA-1)Trajectory Cartoon

Event 1. AM/ACM ignition 2. AM burnout 3. Begin re-orientation 4. End re-orientation 5. LAS Jettison 6. FBC jettison 7. Drogue mortar fire 8. Pilot mortar fire 9. LAS touchdown 10. Reach 33 ft/sec descent rate

Project Orion: Flight Test Office

11. CM touchdown PA-1 test at White Sands was designed to fly a due North trajectory,

At KSC, the pad abort trajectory ‘dog-legs’ towards the ocean

Launch Abort Vehicle (LAV) Controller Info

• For PA-1, LAV controller was developed by Orbital-Dulles – PID controller, had heritage from Pegasus – On-board gain scheduling based on mass properties changes – Roll-yaw coupling (p-beta) which used a yaw command to dampen roll rates – Timer-based guidance • 0-2 seconds; open-loop pitch-over to get downrange; commanded pitch & yaw • 2-10 seconds; downrange guidance; commanded alpha & beta • 10-21 seconds; reorientation guidance; commanded alpha & beta • All commands turned into attitude rate commands in FSW before they were passed to the ACM controller

Project Orion: Flight Test Office

Mobile Operations Facility (MOF) Overview

Telemetry, video, timing distribution, and processing equipment racks (7) LM Command, Control, and Monitoring System racks - not shown (3.5) Video Monitors (4) Chute Installation Chute Installation

Project Orion: Flight Test Office

Workstation displays (21) DFI Installation Acoustic Blankets Chutes Intercom panels (18) Acoustic Blanket Installation Acoustic Blanket Installation

WSMR Tracking Optics

CM

Dee Site has wide

LAS Bill Site has wide

FOV camera FOV camera and 2 mounts total

FBC

Project Orion: Flight Test Office

Footage from various video sites

• PA-1 Compilation video

Project Orion: Flight Test Office

Personal Experiences / Lessons Learned

• Launch Fever, noun: An unwillingness to miss an important deadline

despite known problems.

– High speed film camera in crew module

– SIGI-2 issues

– ACM controller issues

– Coyote

• Managing emotions associated with the launch

– Went through various failure scenarios

• Tip-over risk

• High vibration associated with the initial pull-away

• Risk of loss of controller authority with jet interaction

• Risk of parachute failure

Project Orion: Flight Test Office

– Stress near T-0

• Coping techniques

• Estimating probability of mission success

Lessons Learned (continued)

• Project pace & travel (4 years)

• Number of different organizations involved – always complicated

– Flight Test Office was the responsible flight test organization

– On some level, you needed to be Al Haig-like

• Lessons Learned take awhile to process, then recognize & identify

– Project collected Lessons Learned just after launch

– Lessons Learned in wind placard story

Project Orion: Flight Test Office

Lessons Learned – wind placards story

• Surprised at how ‘basic’ things became issues that grew quickly out

of control (the ‘how-did-we-get-here?’ phenomenon)*

– Wind placards were an example of this

• Early on, LM Mission Analysis group identified an issue with the

winds modeling in GRAM-99 with the WSMR RRA (wasn’t

consistent with weather balloon data, RRA data from the 1980’s)

• FTO agreed to go with the WSMR RRA from GRAM-2007 put into

GRAM-99, our concern was that the weather balloon data hadn’t

been blessed by the Air Force organization (AFCCC) that certifies

RRAs

• Using this RRA caused the LM Mission Analysis group to develop

placards that were very restrictive, and it became a lot of work to get

these placards expanded to reasonable operational levels

Project Orion: Flight Test Office

• Control room operations were down to a minimal staff (due to MOF

size), support personnel were available, but communication was

sometimes spotty

* Still working to define all the lessons learned here

Lessons Learned (continued)

Altitude Above WGS-84 Reference Ellipsoid (tt) 4000 4500 5000 5500 6000 6500 7000 7500 8000 8500 9000 9500 10000 10500 11000 1· 10 10 .0 10.7 13.0 13.4 15 .0 16 .7 17 .3 17 .5 19.8 21.2 22.6 23 .4 23 .0 23 .0 23.0 11-20 10 .1 11.0 12.8 13.9 15 .2 15.8 16 .8 19.0 20.5 22.1 24.4 24.9 25.5 25.5 25 .5 21-30 10 .7 11.7 13.6 13.7 14.4 15.5 16 .7 17 .3 19.1 20.4 21.1 22.0 22.7 22.7 22 .7 31-40 10 .3 12.5 13.9 14.5 15 .1 15 .7 17 .1 17 .6 19.0 18.5 18.5 19.7 17.6 17 .6 17 .6 41- 50 11.4 12.4 13.5 13 .9 16 .8 16 .6 17.8 17 .4 17.0 17 .6 18.6 18.4 18 .4 18 .4 15 .'

51-60 13.0 13 .3 14.3 14.6 16.2 16 .4 16 .1 16.6 17 .1 17.2 17.2 17.2 17.2 11.1 15.'

Iii 61 -70 11.7 12.1 12.8 13 .2 14.5 15.1 15.2 14.9 15.3 14.7 14.5 15.3 16.4 16 .4 16.4 QI 71-80 11.4 11.7 12.8 12.9 12.8 14.6 14.8 14.0 14.2 14 .7 15.7 15.7 17.0 17.0 17.0 ..

QI "- 81-90 10 .7 11.3 12.5 12.4 13.0 13.6 14.2 13.6 13.6 14.8 16.5 17.0 17.9 17.9 17.9 QO 91-100 10.1 11.9 11.3 12.3 13.0 12.6 13.0 13.9 14 .4 13.9 14.8 15 .7 15 .7 15.7 QI 11.2

C j

"'C 101-110 11.0 10.4 11.9 12.0 13 .3 12 .7 13.1 13.5 14.4 12.6 14.8 12.9 12.8 12.8 12.8

-

,2 aI 111-120 8.8 10.2 10.2 11.0 11.5 12 .1 13.3 12 .0 11.1 12.1 11.4 11.5 12.2 12.2 12 .2 .s::.

.... III 121-130 9.8 10.7 9.6 9.8 10 .3 10 .0 13.0 11.9 10.4 11.0 14.1 11.8 11.8 11 .8 8.'

t:: C ,_ 131 - 140 0 CLI 8.3 8.3 8.' 9.6 10.3 12 .6 8.9 9.5 10 .2 9.9 13 .0 10.3 9.1 9.1 9.1 "'C > Z 141- 150 C 7.3 8.7 8.5 8.9 9.9 12 .1 11.6 11.5 12 .4 12.6 12 .2 10.5 9.3 9.3 9.3 C 151-160 8.2 9.6 11.0 10.9 11.0 11.2 U .2 11.7 12.5 12.4 13.3 13.6 12.2 12.2 12 .2 b 0 ~ U 161-170 8.7 10.5 10.9 12.4 12.0 12 .4 U .6 12 .7 13.4 12 .8 13.5 13.9 14.3 14.3 14 .3 E - C 171- 180 11.0 12.4 12. 7 13.0 14 .5 14 .5 14.5 14.6 14.6 15.1 15.9 16.0 16 .0 16 .0 ra 9.'

,2 U "- 181- 190 10 .4 11.7 13.8 14.2 15.2 15.6 15.1 16 .4 16.2 16.6 17 .1 16.6 16 .6 16 .6 15.'

'9j 1:) 191-200 11.8 13.7 15.8 15.3 15 .7 18 .6 18 .3 17 .6 18.8 18.2 18.7 19.8 1 8. 5 18 .5 18 .5

- QI

QI 201-210 15.8 16.9 17.8 19 .2 19.3 20.4 20.8 22.4 21.8 23 .2 23 .7 23 .7 23.7 12.6 14.8 "- '0 211-220 13 .8 15.9 17 .5 18.1 19.2 21.2 21.9 22.9 24.1 25 .0 25 .1 26.0 25.9 25 .9 25 .9 "- 0

i 0

221-230 14.4 16.4 18.8 20.5 21.3 24 .3 25 .0 25 .8 27.7 29.3 30.7 33 .2 33.4 33 .4 33.4 III U CLI QI .... 231-240 17 .6 20.1 21.2 23 .1 25 .3 26.4 28.7 29.6 31.5 33.4 35.9 36.1 36 .1 36 .1 0 15.'

C CLI 241-250 15.8 19.5 20.9 23 .1 24.8 26.9 27.8 29.0 31.3 32.9 34 .' 37 .2 38.4 38.4 3 8. 4 U ~ 251-260 16.3 18.3 22.5 24.4 27.5 30 .1 32.2 34 .7 36.1 37 .9 39.5 39 .5 QI 21.3 26.3 39.5 .s::.

-

....

261-270 14.4 16.0 19.7 19.8 21.5 24.2 26.3 26.6 30 .0 31.4 33 .0 35.9 37.5 37.5 37 .5

Project Orion: Flight Test Office

:l ~ 271-280 12.1 14.2 15.6 19.0 20.7 21.9 23 .9 24.7 26.3 29.4 31.8 32 .1 34 .6 34.6 34.6 ....

E 281-290 10 .7 12.5 14.1 15.6 17.5 19.9 20.9 22.0 23 .5 27.4 27.8 29.8 32.4 32 .4 32 .4 :l 291-300 9.3 10.9 11.8 13.6 17 .3 18.2 20.4 23.1 23.4 24.6 26.2 26.2 26.2 E 15 .' 22.'

~ 301-310 9.7 10.0 11.8 14.6 14.0 15.6 17 .2 19.0 20.2 21.4 22 .8 23 .0 26.2 26.2 26.2 ~ 311-320 9.7 9.2 11.8 12.4 14.2 16 .2 17 .4 17 .4 19.1 20.1 22.2 24.3 25 .5 25.5 25 .5

- 321-330 8.9 10.7 10.7 11.7 14.3 15.2 16 .6 19.1 19.3 20.9 21.5 24.5 25.5 25.5 25 .5

331-340 8.' 9.6 11.1 13.2 13.8 15.6 17 .5 17 .2 19.6 22.1 24.0 24.2 27.5 27.5 27.5 341-350 8.7 10.5 12.0 12.6 14.2 15.2 16 .3 19.3 19.5 21.3 23.6 23.0 25.9 25 .9 25 .9 351-360 8.5 9.6 11.7 14.0 14.8 16 .1 16 .4 17 .4 19.8 2 0.4 22.0 24.7 26.6 26.6 26.6

Proposed wind placard table, not the actual table used for launch

Weather go/no-go call plan progression

• Plan A: GNC & Dryden meteorologist would make the call

• Plan B: at their request, involved LM Mission Analysis personnel in

weather center; GNC & Dryden MET still make the call

• Plan C: Senior Ops helps GNC in control room when complex

placards are developed; GNC, Dryden MET, Sr. Ops, FTA lead

make the call once we see data from weather center

• Plan D: As placard issue becomes more complex & controversial,

the decision gets pushed up to the Mission Management Team

(MMT is Orion PM & his support staff)

– Used 5 weather balloons on day of launch

– Had 924 MHz profiler next to launch site

– Flying in the windiest part of the year for White Sands (March - May)

Project Orion: Flight Test Office

– 4 day launch window (Thursday – Sunday); can’t go the following week

due to another higher priority program’s launch

– Day before the launch, briefing MMT on weather-101

Lessons Learned (continued)

• After all that, balloon data showed that we were go for flight, but from the

Ops recovery team and then from flight data, we learned

that we were flying in 3-sigma GRAM winds that day

Project Orion: Flight Test Office

Lessons Learned (continued)

• Wind Placards

– Don’t involve people in the process who don’t have decision making

authority; or if you do involve them, make sure they have associated

with them a decision maker who has authority

– During flight operations, a data or analysis briefing needs to come with a

recommendation (ties back to authority)

• At earlier stages of the project, analysts tend to show you all the

data, so decisions can be collectively made by the team – this isn’t

useful or productive during operations

– Additional LLs in work

Project Orion: Flight Test Office

Altitude Time History from flight

Project Orion: Flight Test Office

Apogee was 10,386.0 feet (geodetic)

CM downrange was 6907.5 feet (SIGI measured)

Total flight time was 134.4 seconds

PA-1 Flight Test Ground Track

32.425 .... .. .. . . . . ........... .. . . . . . ........... .. . . . . . . .......... . . . . . . . . ........... .. . . . . . ............. . . .. . . .... .

32.42 .... . .................... . ......... .. :-----""""'--_ .... - ....... ....... . . .............. . .... .

Ci ...... ... . , ....... ,., ...... .. , ...... . .. .. ...... . : ......... . .. ....... : ... .. .. ..... ..... .

! 32.415

..

"C

-

- SIGIl Day of Flight

-

-' -- SIGI2 Day of Flight z • eM Lawu:h Stool ..... .... .. .... : ........... .. ... .. . : .. .. .. . .. ....... .

32.41 • eM Landing Location · .

· .

· .

A FEe Landing Location · .

· .

V LAS Landing Location · .

· .

· .

o Reorientation : : · .

o LAS Jettison Project Orion: Flight Test Office 32.405 .......... . ............ . ...... . .... . .. ....... . .......... ... . ....... . ... .

o FEe Jettison o Drogue Deploy o Main Deploy -106.405 -106.4 -106 .395 -106.39 -106.385 -106.38 -106.375 E Longitude (deg)

Post-flight data comparisons to simulation

• ANTARES simulation runs done using post-flight updated simulation

models for

– Abort Motor thrust profile from flight

– Attitude Control Motor thrust profile from flight

– Meterology day-of-flight atmospheric model

– Mass Properties

– Parachutes (higher fidelity models incorporated)

• Still waiting for day-of-flight aerodynamic models to come in

– Possible that drag is not as high as pre-flight aero models predict?

Project Orion: Flight Test Office

Flight Data compared to dispersed simulation runs

FT A Altitude 12000 iCERT Runs 11000 - Nom Run - BET Data 10000 g 8000 Q) "0 ::::J :;::::;

-

~

Project Orion: Flight Test Office

3000L-------~--------~--------~--------L-------~--------~------~ o 20 40 60 80 100 120 140 Time (sec)

Ground Track

Ground Track 32.44 iCERT Runs - Nom Run 32.435 - BET Data 32.43 '§l 32.425 2- Q) "0 j 32.42 32.415

Project Orion: Flight Test Office

32.41 32 . 405L------L------~----~------~----~-------L------L------L----~ -106.415 -106.41 -106.405 -106.4 -106. 395 -106. 39 -106. 385 -106. 38 -106. 375 -106. 37 Longitude (deg)

Winds blowing from West to the East

CM East Wind Velocity iCERT Runs -- Nom Run - BETData ':>(;~\,..f'"'t;io

~~

~ .?:' ·0 Qi > -0 c ~ U; w '" , ~ ""~

Project Orion: Flight Test Office -40

/ I ,,J -60 20 40 60 80 100 120 140 Time (sec)

6 May 2010 – 6:09am local time

Project Orion: Flight Test Office

What is next for Orion & Abort Flight Test

• Orion program management has decided to pursue OFT-1 as the

next flight test

– Test is mainly an entry test, with only a nominal LAS jettison

– OFT-1 is a un-crewed orbital test (no docking with space station)

– FT-2 (Orion-2) is the first crewed flight test on the manifest

• AA-2 is currently being considered as a follow on test in between

OFT-1 and FT-2 (Orion-1 & Orion-2)

– AA-2 is a transonic abort (LAS abort occurs as vehicle passes through

Mach 1, about 40 seconds into the ascent)

– Would test the production LAV controller

– Would be performed with an abort test booster (ATB)

• Currently SR 118 Peacekeeper motor

Project Orion: Flight Test Office

– Currently performing a trade study on the AA-2 launch site location

• Production launch vehicle determination expected by Oct 31

Wrap-Up

• Ops candid commentary during flight

– Includes helicopter chase video

• Questions/Comments?

Project Orion: Flight Test Office

Source & rights

Source: ntrs.nasa.gov. Public-domain U.S. Government work (17 USC §105) — freely reproducible.

Permanent URL — we don’t break links.

Report a problem or request removal

Document details

Doc number
DFRC-E-DAA-TN2272
Publisher
NASA (NTRS)
Year
2010
Pages
31
File size
5.0 MB