Skip to main content

CESSNA TURBO 210L — Checklist

2 checklist references for the CESSNA TURBO 210L.

Overview
Savvy-Cessna-210-prebuy-checklist.pdf · 2018

This document is a prebuy examination checklist specifically for the Cessna 210 aircraft. It is divided into two phases, with Phase 1 focusing on operational checks and engine inspections, while Phase 2 covers landing gear, cabin, and airframe checks. The checklist is designed for mechanics and pilots conducting thorough inspections before purchasing a Cessna 210. It emphasizes the importance of documenting findings and obtaining authorization before proceeding to the second phase of the examination. The estimated labor hours for completing both phases range from 10 to 15 hours, depending on the equipment installed.

  • Estimated labor hours for both phases: 10-15 hours.
  • Perform operational and functional checks as the first step in Phase 1.
  • Inspect cylinder compressions and check for oil leaks in engine components.
  • Check landing gear for tire condition and hydraulic leaks in Phase 2.
  • Ensure all flight controls operate smoothly and check for corrosion.
2 documents

CESSNA TURBO 210L for sale now