DEHAVILLAND DH-82A TIGER MOTH II Model Guide
DEHAVILLAND DH-82A TIGER MOTH II · Model Guide
Overview
The DEHAVILLAND DH-82A TIGER MOTH II is a single-engine piston biplane with wooden or metal tubular fuselage construction, covered by the DH82 series airworthiness rules. The supplied documents contain no specification or performance figures. They are service and airworthiness papers, so this guide is a condition-and-compliance checklist for buyers.
- Both lateral fuselage tie rods are life-limited to 2000 flying hours or 18 years, whichever is sooner. Check the records for the last renewal date.
- Front fuselage angle fittings must be inspected at intervals not exceeding 50 hours TIS and after any reported heavy landing (DCA/DH82/120A).
- Replacement wing or aileron spars made by Croydon Aircraft Company Limited before 31 May 2008 carry flight limitations until they are inspected.
- No specifications or performance data were supplied for this model. Confirm figures from the aircraft's own documents.
Summary written by AI from the source document. Check the original before relying on it. See which parts of Sprinkle are written by AI.
Reference only, not for flight. Use the current approved manual for your aircraft. See terms, section 5.
Document
Source
Copy found at sprinkle.com. Sprinkle hosts a reference copy with an added summary, specifications and searchable full text.
Document details
- Type ·
- Model Guide
- Year ·
- 2026
- File size ·
- 47 KB
- Copy found at ·
- sprinkle.com
How often must the tie rods be replaced?
On the DEHAVILLAND DH-82A TIGER MOTH II, both lateral fuselage tie rods are lifed at 2000 flying hours or 18 years, whichever is sooner, counted from the last renewal. Ask for the renewal date in the aircraft records.
What should I check after a heavy landing?
For the DEHAVILLAND DH-82A TIGER MOTH II, the bulletin calls for checks of wheel alignment, undercarriage attachments, bracing wire tension, wing fitting holes, engine mount tubes, the front cockpit fuselage frame and the tie rods. The front fuselage angle fittings are also inspected after any reported heavy landing.
Do the documents give performance or price data?
No. For the DEHAVILLAND DH-82A TIGER MOTH II, the supplied documents give no speeds, weights, range or prices. They cover airworthiness requirements only, so get those figures from the aircraft's own documents.
What is the DEHAVILLAND DH-82A TIGER MOTH II Model Guide?
The DEHAVILLAND DH-82A TIGER MOTH II Model Guide is a model guide for the DEHAVILLAND DH-82A TIGER MOTH II, dated 2026.
What year was the DEHAVILLAND DH-82A TIGER MOTH II Model Guide published?
The DEHAVILLAND DH-82A TIGER MOTH II Model Guide — the DEHAVILLAND DH-82A TIGER MOTH II model guide on file — is dated 2026.
Most owners only have the POH. Here's the essential set for the DEHAVILLAND DH-82A TIGER MOTH II.
- Pilot's Operating Handbook / AFM
- Checklist
- Maintenance Manual
- Parts Catalog (IPC)
- Systems & Wiring
- Service Bulletins on file
- Type Certificate (TCDS)
More DEHAVILLAND DH-82A TIGER MOTH IImanuals & documents
Related documents
- Technical News Sheet CT (MOTH) No 29 Issue 3DEHAVILLAND DH-82A TIGER MOTH II · Service Bulletins
- Aeroplanes - De Havilland DH82 Series (Tiger Moth)DEHAVILLAND DH-82A TIGER MOTH II · Service Bulletins
- DEHAVILLAND DHC-2 Model GuideDEHAVILLAND DHC-2 · Model Guide
- SCOTTISH AVIATION Bulldog MDL 120/121 Model GuideSCOTTISH AVIATION Bulldog MDL 120/121 · Model Guide
- Taylorcraft BC-12D Model GuideTaylorcraft BC-12D · Model Guide
In this document
Tie rods and heavy landings
The mandatory tie rod bulletin followed a sheared aft lateral tie rod caused by fatigue cracking at the thread root. It also applies to the DH 82A. If there is no evidence of the last renewal, the rods were due within six months or 100 flying hours of issue. The bulletin adds a structural check after a heavy landing, after undercarriage trauma and at annual inspection.
Recurring inspections to ask about
The NZ schedule lists checks at intervals not exceeding 12 months: control box cracks, fin post crushing, elevator rock shaft end play and fuel cock slide force (not less than 6 lb). Every periodic inspection covers the tailplane support bracket and the fuel tank balance pipe. The balance pipe is annealed at intervals not exceeding 300 hours TIS. The elevator control bracket is checked every 50 hours until mod. DH.114 is embodied, then every 150 hours.
Spars, harness and records
Ask whether Croydon-made wing or aileron spars are fitted. Fin post crushing over 1/16 inch means the post must be renewed. Wing spar cut-out inside radii under 0.25 inches mean the spar must be removed from service. Sutton harnesses need inspection for broken stitches, cuts, chafing, contamination and sunlight damage. Compliance should be recorded in the technical records.
Summary written by AI from the source document. Check the original before relying on it. See which parts of Sprinkle are written by AI.
Safety notes
- If affected Croydon spars are fitted, aerobatics and other high load-factor flight, including turbulence, are prohibited until the required inspection is done.
- Replace a harness before further flight if you find signs of degradation such as broken stitches, cuts, tears or contamination.
- Do not tension slack bracing wires until the cause of the slackness is found. It may be lug, spar or fitting damage.
Summary written by AI from the source document. Check the original before relying on it. See which parts of Sprinkle are written by AI.
Full document text
DEHAVILLAND DH-82A TIGER MOTH II Model Guide The DEHAVILLAND DH-82A TIGER MOTH II is a single-engine piston biplane with wooden or metal tubular fuselage construction, covered by the DH82 series airworthiness rules. The supplied documents contain no specification or performance figures. They are service and airworthiness papers, so this guide is a condition-and-compliance checklist for buyers. • Both lateral fuselage tie rods are life-limited to 2000 flying hours or 18 years, whichever is sooner. Check the records for the last renewal date. • Front fuselage angle fittings must be inspected at intervals not exceeding 50 hours TIS and after any reported heavy landing (DCA/DH82/120A). • Replacement wing or aileron spars made by Croydon Aircraft Company Limited before 31 May 2008 carry flight limitations until they are inspected. • No specifications or performance data were supplied for this model. Confirm figures from the aircraft's own documents. Tie rods and heavy landings The mandatory tie rod bulletin followed a sheared aft lateral tie rod caused by fatigue cracking at the thread root. It also applies to the DH 82A. If there is no evidence of the last renewal, the rods were due within six months or 100 flying hours of issue. The bulletin adds a structural check after a heavy landing, after undercarriage trauma and at annual inspection. Recurring inspections to ask about The NZ schedule lists checks at intervals not exceeding 12 months: control box cracks, fin post crushing, elevator rock shaft end play and fuel cock slide force (not less than 6 lb). Every periodic inspection covers the tailplane support bracket and the fuel tank balance pipe. The balance pipe is annealed at intervals not exceeding 300 hours TIS. The elevator control bracket is checked every 50 hours until mod. DH.114 is embodied, then every 150 hours. Spars, harness and records Ask whether Croydon-made wing or aileron spars are fitted. Fin post crushing over 1/16 inch means the post must be renewed. Wing spar cut-out inside radii under 0.25 inches mean the spar must be removed from service. Sutton harnesses need inspection for broken stitches, cuts, chafing, contamination and sunlight damage. Compliance should be recorded in the technical records. Safety notes: • If affected Croydon spars are fitted, aerobatics and other high load-factor flight, including turbulence, are prohibited until the required inspection is done. • Replace a harness before further flight if you find signs of degradation such as broken stitches, cuts, tears or contamination. • Do not tension slack bracing wires until the cause of the slackness is found. It may be lug, spar or fitting damage.